Specialist in Marine, Coastal & Environmental Construction
Page 1
APS profile 17.7.15 8/5/19 10:39 AM Page 1
Specialist in Marine, Coastal & Environmental Construction
Page 2 - Capability Statement
CONTENTS
1. Capability Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
1.2 Qualifications and Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
1.3 OH&S / Quality Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
1.4 Typical Projects Undertaken by APS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
1.5 Technical and Physical Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
1.6 Project Delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
2. Wharf / Harbour, Construction & Rehabilitation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
3. Floating Pontoon, Pier & Jetty Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
4. Rock Revetments & Rock Groynes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
5. Boat Ramps & Structural Concrete Works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24
6. Timber Boardwalks & Timber Seawalls & Timber Groynes. . . . . . . . . . . . . . . . . . . . .30
7. Beach Renourishment & Foreshore Protection Works . . . . . . . . . . . . . . . . . . . . . . . . .36
8. Masonary Seawalls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41
9. General Civil Works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
APS profile 17.7.15 8/5/19 10:39 AM Page 2
Specialist in Marine, Coastal & Environmental Construction
Page 3 - Capability Statement
1.1 IntroductionAustralian Project Solutions Pty Ltd (APS) is a specialist firm, established in 1997 to provide specialisedengineering construction / project management services to State, Local Government and CommercialBusinesses in the private sector.
Typical projects include, construction and or rehabilitation of marine, coastal and commercialinfrastructure.
The primary goals of APS are to ensure that all projects undertaken are completed, on budget, to a timeschedule, and to a quality standard which exceeds the clients expectations.
The nature of services provided by APS is both diverse and comprehensive and includes:
■ Project construction via APS’s highly skilled employee’s ensuring a high quality level of construction
■ Project management and project implementation on behalf of clients, supervising all aspects of theproject from design to construction.
1.2 Professional Qualifications and ExperienceShane Hickey and Mark Krstic are both principles of APS and perform all project management activities.The partners have qualifications in engineering and project management and together have over 40 yearsof combined industry experience.
These qualifications together with their commitment to providing clients with a quality service will ensurethat each project is performed to the highest level, ensuring a minimum cost to the client.
1.3 OH&S / Quality ManagementOccupation Health and Safety is paramount with each project that APS undertakes. APS operates aOH&S system based upon one of the industry’s leading systems “Safety Map”
To ensure that quality is well managed throughout the organisation. A.P.S. operate a quality managementsystem based upon the requirements of AS/NZS ISO 9002 -1994, Quality Systems- Model for QualityAssurance in Design, Construction, Development, Production, Installation, and Servicing.
As members of The Civil Contractors Federation (CCF) APS are currently incorporating the above elementsto provide an Integrated Management System for Industry Certification in accordance with the followingcodes:ISO 9001 – 2000 (Quality Assurance)AS/NZ 4801 – 2001 (Occupational Health & Safety)ISO 14001 -204 (Environmental Management)
Capability Statement
APS profile 17.7.15 8/5/19 10:39 AM Page 3
Specialist in Marine, Coastal & Environmental Construction
Page 4 - Capability Statement
1.4 Typical Projects Undertaken by APS
The following works are typical projects undertaken by APS.
■ Pier & Jetty Construction
■ Wharf Construction, Rehabilitation & Maintenance Works
■ Harbour Construction
■ Piling & Dredging Works
■ Sheet Piling Works
■ Structural Retaining Walls
■ Rock Revetments & Rock Groynes
■ Timber Boardwalks & Fishing Platforms
■ Boat Ramps, & Structural Concrete Works
■ Floating Pontoon & Concrete Abutments
■ Beach Renourishment Works
■ General Civil Works
Capability Statement
APS profile 17.7.15 8/5/19 10:39 AM Page 4
Specialist in Marine, Coastal & Environmental Construction
Page 5 - Capability Statement
1.5 Technical and Physical Resources
Technical Resources
APS operates from its business address at 17 Keys St Beaumaris. This office is equipped with a range ofintellectual equipment to facilitate the operation of a professional engineering business.
The benefits to the firm’s clients arising from utilisation of these technical support systems include;
■ Increased reliability of projects management procedures
■ Precise control throughout each stage of the project
■ Optimum usage of all materials and resources deployed on each project.
Physical Resources
APS has a number of specialised items of plant and equipment at hand to carry out works on a diverserange of projects
A typical list of the physical resources available include,
Plant and equipment Skilled Tradesmen
• Survey equipment • Concreters
• Excavators • Stonemasons
• Trucks • Heavy plant operators
• Dozers • Landscape contractors
• Scrapers • Building maintenance personnel
• Moxy’s • Riggers
• Backhoes and Bobcats • Fitters/Welders
• Pile Driving Rig • Wharf Carpenters
• Marine barges & vessels • Marine coxwains & divers
• Company vehicles • Electricans, plumbers etc
Capability Statement
APS profile 17.7.15 8/5/19 10:39 AM Page 5
Specialist in Marine, Coastal & Environmental Construction
Page 6 - Capability Statement
1.6 Project Delivery
APS has a commitment to completing projects on time, on budget, and to our client’s expectations. To consistently achieve these high standards, the firm adopts a practical and methodical approach thatincorporates a strong emphasis on project management techniques including,
■ critical path analysis
■ network analysis
■ resource leveling, and
■ work breakdown structures.
APS have in place the necessary insurances required to undertake the full range of activities specified inany tender application which the firm may submit for. Relevant cover currently includes:
■ Public liability insurance - $20 million
■ Professional indemnity insurance
■ Work cover
In the absence of any specific terms of engagement required by the client we propose the terms ofconditions published as interim Australian Standard AS 4122 (Int.) -1993, Gen
Capability Statement
APS profile 17.7.15 8/5/19 10:39 AM Page 6
Wharf / Harbour Construction, Rehabilitation & Maintenance
Page 7
APS profile 17.7.15 8/5/19 10:39 AM Page 7
Specialist in Marine, Coastal & Environmental Construction
Page 8 - Wharf Harbour Construction, Rehabilitation & Maintenance
Wharf Demolition & AssociatedWorks - Yarraville
June 2013 - Jan 2014
Client: CSR Sugar
Works Included
■ Demolition of old wharf
■ Construction of 60m rock revetment
■ Construction of 45m structural concrete retaining wall
■ Installation of diffuser outlet structure
■ Wharf deck rehabilitation
After completion
Before
APS profile 17.7.15 8/5/19 10:39 AM Page 8
Specialist in Marine, Coastal & Environmental Construction
Page 9 - Wharf Harbour Construction, Rehabilitation & Maintenance
Timber Wharf Construction - Footscray
Date: 2004
Client: Parks Victoria
Works Include:
■ Supply and installation of timber marine piles
■ Supply and construction of timber wharf
■ Supply and installation of rock beach around river bank
■ Supply and installation of bollards
■ Construction of concrete paving
APS profile 17.7.15 8/5/19 10:39 AM Page 9
Specialist in Marine, Coastal & Environmental Construction
Page 10 - Wharf Harbour Construction, Rehabilitation & Maintenance
Construction of Safe Boat Harbour - Limeburners Point,Geelong
Date: November 2001 - September 2002
Client: City of Greater Geelong
Works included:
■ Construction of new rock groynes varying in lengths up to 250 linear metres.
■ Piling and dredging works
■ Supply and installation of new floating pontoon jetty systems.
■ Specific placement of 2 - 5 tonne armour rocks.
■ Construction of concrete abutments, and boat launching ramps.
■ Installation and commissioning of navigation lights and signs.
■ General civil works i.e. kerb/channel, pavement, landscaping, signs linemarking.
APS profile 17.7.15 8/5/19 10:39 AM Page 10
Specialist in Marine, Coastal & Environmental Construction
Page 11 - Wharf Harbour Construction, Rehabilitation & Maintenance
Reconstruction of Apollo BayHarbour Breakwater &Construction of Precast ConcreteBoat Ramp
Stage 1: March 2001 - April 2001Stage 2: March 2002 - May 2002Stage 3: April 2004 - July
Client: Colac Otway City Council, COLAC, Victoria
Works included:
■ Procurement and transportation of large armour rocks upto 18 tonne.
■ Procurement and delivery of specialised plant (including)100 tonne crane, 45 and 50 tonne excavators with rockgrable and 35 tonne 4WD dump truck.
■ Stabilisation of breakwater access track and siteestablishment.
■ Reconstruction of failed breakwater using 8-18 tonnerocks.
■ Reconstruction ofprecast boat ramp andconcrete abutment.
■ Demolition of existingconcrete boat ramp.
■ Construction of 35 lmprecast concrete boatramp
■ Construction of 25 lmconcrete jetty abutment.
Before
After
APS profile 17.7.15 8/5/19 10:39 AM Page 11
Specialist in Marine, Coastal & Environmental Construction
Page 12 - Wharf Harbour Construction, Rehabilitation & Maintenance
Construction of Boat launching Facilities - Werribee South
Date: May 2002 - July 2002
Client: Wyndham City Council Werribee South, Victoria
Works included:
■ Supply and installation of two new floating pontoon jetty systems.
■ Construction of concrete abutments and boat launching ramp.
■ Installation and commissioning of navigation lights and signs.
■ Construction of carpark including:
■ Kerb/channel, pavement, landscaping, signs,linemarking etc.
■ Construction of a boat washdown facility including oil/petrol interceptor and storm water diversionsystem.
■ Construction of Boat Launching Facilities at Werribee South.
APS profile 17.7.15 8/5/19 10:39 AM Page 12
Floating Pontoon, Pier & Jetty Construction
Page 13
APS profile 17.7.15 8/5/19 10:39 AM Page 13
Specialist in Marine, Coastal & Environmental Construction
Page 14
Design and Construction of FloatingJetties at 4 inner city locations alongthe Yarra River, Melbourne
Date: July 2005 - January 2006
Client: Parks Victoria
Works included:
■ Design and liaison with public authorities
■ Construction included the following sites: Melbourne ExhibitionCentre; Crown Casio; Southgate and Swan Street Bridge
■ Supply and installation of 120lm of Bellingham floatingpontoons
■ Steel tube piling via water based barges
■ Supply and installation of stainless steel handrails
■ Supply and installation of public lighting
■ Associated works including asphalt paving and timber jettyrepairs
APS profile 17.7.15 8/5/19 10:39 AM Page 14
Specialist in Marine, Coastal & Environmental Construction
Page 15 - Floating Pontoon, Pier & Pontoon Construction
Apollo Bay Marina
Date: August 2007 to January 2008
Client: Colac Otway Council
Works included:
■ Demolition of existing timber marina
■ Design of new floating marina
■ Site establishment of floating plant and equipment, includingmobilisation of 100T crane onto floating barge
■ Supply and pile driving of large 508 mm dia steel tubes usingfloating piling rig
■ Supply and installation of Bellingham ‘Unifloat’ pre-castconcrete pontoons
■ Supply, fabrication and installation of aluminum gangways
■ Supply and installation of electrical and water services toeach marina berth
■ Signage and final commission of the marina
APS profile 17.7.15 8/5/19 10:39 AM Page 15
Specialist in Marine, Coastal & Environmental Construction
Page 16 - Floating Pontoon, Pier & Pontoon Construction
Floating Pontoon Installation – Lake Connawarra, Victoria
Date: May 2012 to June 2012
Client: Parks Victoria
Works included:
■ Minor Earthworks
■ Construction of concrete abutment
■ Supply and installation of stainless stainless steel anchors
■ Supply and installation of new floating pontoons
■ Supply and installation of Aluminium gangway
■ Construction of associated civil works
APS profile 17.7.15 8/5/19 10:39 AM Page 16
Specialist in Marine, Coastal & Environmental Construction
Page 17 - Floating Pontoon, Pier & Pontoon Construction
Altona Harbour & WarmiesBoating Facility Floating PontoonExtension – Altona &Williamstown, Victoria
Date: May 2010 to August 2010
Client: Hobsons Bay Council
Works included:
■ Extraction of existing marine piles
■ Supply and installation of new marine piles
■ Dismantle & temporary storage of existing floatingpontoons
■ Installation of existing floating pontoon.
■ Construction of concrete abutments
■ Supply and installation of concrete flex mat
■ Supply and installation of new floating pontoons
■ Supply and installation of Aluminium gangway
■ Construction of associated civil works
■ Dredging Works
APS profile 17.7.15 8/5/19 10:39 AM Page 17
Rock Revetments & Rock Groynes
Page 18
APS profile 17.7.15 8/5/19 10:39 AM Page 18
Specialist in Marine, Coastal & Environmental Construction
Page 19 - Rock Revetments & Rock Groynes
Point Richards Rock Revetment
Date: March 2015
Client:D.E.P.I. South West
Works included:
■ Traffic Management of Harbour car park for rockdeliveries
■ Demolish failed section of existing rock groyne
■ Reconstruct 17 m of rock groyne
■ Transition of rock groyne to rock revetment
■ Construction of approximately 35m of rockrevetment
APS profile 17.7.15 8/5/19 10:39 AM Page 19
Specialist in Marine, Coastal & Environmental Construction
Page 20 - Rock Revetments & Rock Groynes
Newport Rock Revetment &Pathway
Date: September 2014 – November 2014
Client: Port of Melbourne Corporation
Works included:
■ Traffic Management of access roadway andforeshore area
■ Demolition of old rock revetment
■ Demolition of illegal access to beach & oldconcrete structures
■ Construction of 80m rock revetment
■ Construction of new tiered landscape
■ Associated landscape works
APS profile 17.7.15 8/5/19 10:39 AM Page 20
Specialist in Marine, Coastal & Environmental Construction
Page 21
Clifton Springs Rock Groyne
Date: November 2013 – January 2014
Client: Geelong City Council
Works included:
■ Traffic Management of beach car park /foreshore for rock deliveries
■ Demolition of old rock groyne
■ Construction of rock swale adjacentconcrete spillway
■ Construction of 120m rock groyne
■ Construction of rock access throughgroynes each side of beach
APS profile 17.7.15 8/5/19 10:39 AM Page 21
Specialist in Marine, Coastal & Environmental Construction
Page 22 - Rock Revetments & Rock Groynes
Merrick Creek Revetment Somers
Date: July 2012 – September 2012
Client: D.E.P.I.
Works included:
■ Traffic Management of Beach Traffic (RaceHorses & Public)
■ Diversion of creek during construction works
■ Demolition of old timber seawall
■ Construction of 110m rock revetment
■ Transition of rock revetment to rock groyne
■ Construction of rock groyne head
■ Realignment of somers creek
■ Sand fill to rear of revetment
■ Repairs to adjacent timber sea wall
APS profile 17.7.15 8/5/19 10:39 AM Page 22
Specialist in Marine, Coastal & Environmental Construction
Page 23 - Rock Revetments & Rock Groynes
Yarra River Hawthorn
Date: September 2011 – December 2011
Client: Private
Works included:
■ Establishment of 200 tonne barge andwork boat on Yarra River
■ Transport of rock on material barges upriver from Prahan to Hawthorn
■ Construction of rock support toe in riverbed
■ Construction of 60 lineal metre rockrevetment
■ Construction of 3.0m pathway accessabove revetment
■ Drive steel piles for jetty and structuralconcrete works
■ Construction of steel framed Jetty withtimber deck
■ Construction of structural stairs andlandings
APS profile 17.7.15 8/5/19 10:39 AM Page 23
Boat Ramps & Structural Concrete Works
Page 24
APS profile 17.7.15 8/5/19 10:39 AM Page 24
Specialist in Marine, Coastal & Environmental Construction
Page 25 - Boat Ramps & Structural Concrete Works
Construction of 4 lane Boat Ramp - Portland
Date: February 2014 - June 2014
Works included:
■ Construction of structural piling pad
■ Driving of piles to support boat ramp
■ Installation of concrete crossheads and precast panels
■ Construction of concrete abutments
■ Construction of rock revetment along ramp edges
■ Insitu concrete beam construction
Ramp Preparation and Piling
Completed Ramps
APS profile 17.7.15 8/5/19 10:39 AM Page 25
Specialist in Marine, Coastal & Environmental Construction
Page 26 - Boat Ramps & Structural Concrete Works
Elwood Beach Rock Groyne,Revetment & Boat Ramp
Date: June 2011 – September 2011
Client: D.E.P.I.
Works included:
■ Management of truck movements through carpark and beach front
■ Traffic Management of pedestrian & cyclist sharedpathway
■ Construction of concrete access ramps for Councilplant & equipment
■ Construction of concrete staging platform
■ Construction of 65 metre rock groyne
■ Construction of associated rock revetment
■ Construction of precast concrete boat ramp
APS profile 17.7.15 8/5/19 10:39 AM Page 26
Specialist in Marine, Coastal & Environmental Construction
Page 27 - Boat Ramps & Structural Concrete Works
Patterson River Boat RampConstruction and AssociatedWorks
Date: February 2008 to June 2008
Client: Park’s Victoria
Works included:
■ Demolition of 2 existing concrete boat ramps and 160lmof concrete/timber retaining wall
■ Site establishment of plant and equipment includingpiling equipment
■ Supply and pile driving of 24 No, 508 mm dia, 12lmlong steel piles for both boat ramps.
■ Supply and installation of boat ramp precast concreteheadstock’s and bearer’s
■ Supply and installation of boat ramp precast concretepanels including fluted surface profile and edge kerbing
■ Supply and construction of insitu concrete works
■ Supply and driving of 36 No 12 lm long epoxy coated250 UC piles for retaining wall
■ Supply and installation of precastconcrete retaining wall panels
■ Supply and installation of 80lm ofsheet pile retaining wall
■ Supply and construction of 160lm ofinsitu concrete capping works
■ Associated civil works includingdrainage and hard landscape works
■ Supply and installation of 160lm offenders along river side of retainingwall.
APS profile 17.7.15 8/5/19 10:40 AM Page 27
Specialist in Marine, Coastal & Environmental Construction
Page 28 - Boat Ramps & Structural Concrete Works
Altona Harbour Boat RampConstruction
Date: February 2008 to June 2008
Client: Hobson’s Bay City Council
Works included:
■ Demolition of existing concrete boat ramp
■ Design of new pre cast concrete boat ramp
■ Supply and installation of 12 tonne pre-cast concrete toebeam, using divers to locate and place 3m down fromwater surface.
■ Supply and construction of boat ramp rock subgrade
■ Supply and installation of precast ramp panels includingfluted surface profile
■ Supply and construction of insitu concrete works
■ Dredging of harbour immediately around ramp
APS profile 17.7.15 8/5/19 10:40 AM Page 28
Specialist in Marine, Coastal & Environmental Construction
Page 29 - Boat Ramps & Structural Concrete Works
Construction of Precast Concrete Boat Ramp - Apollo Bay Harbour
Date: October 2003 to January 2004
Client: Colac Otway Shire, COLAC, Victoria
Works included:
■ Procurement and transportation of large armour rocks up to 18 tonne.
■ Procurement and delivery of specialised plant (including) 100 tonne crane, 45 and 50 tonne excavators with rock grable and 35 tonne 4WD dump truck.
■ Stabilisation of breakwater access track and site establishment.
■ Reconstruction of failed breakwater using 8-18 tonne rocks.
■ Reconstruction of precast boat ramp and concrete abutment.
■ Reconstruction of Apollo Bay Harbour Breakwater.
APS profile 17.7.15 8/5/19 10:40 AM Page 29
Timber Boardwalks, Timber Sea Walls & Timber Groynes
Page 30
APS profile 17.7.15 8/5/19 10:40 AM Page 30
Specialist in Marine, Coastal & Environmental Construction
Page 31 - Timber Boardwalks, Timber Sea Walls & Timber Groynes
Re-construction of 60 metres of Timber Sea Wall -Wye River
Date: March 2015
Works included:
■ Demolition of old sea wall timber walers
■ Driving of new timber piles where required
■ Supply and construct new timber walers
■ Redirect stormwater outlet
■ Regrade of beach and picnic area
Before
After
APS profile 17.7.15 8/5/19 10:40 AM Page 31
Specialist in Marine, Coastal & Environmental Construction
Page 32 - Timber Boardwalks, Timber Sea Walls & Timber Groynes
Re-construction of 20 metre Timber Groyne - St Leonards
Date: 2014
Works included:
■ Demolition of old timber groyne
■ Driving timber piles for new groyne
■ Supply and construct new timber walers
■ Sand renourishment between new and existing timber groynes
Before
After
APS profile 17.7.15 8/5/19 10:40 AM Page 32
Specialist in Marine, Coastal & Environmental Construction
Page 33 - Timber Boardwalks, Timber Sea Walls & Timber Groynes
Construction of 3 Timber Groynes - Rosebud
Date: 2015
Works included
■ Driving timber piles for new timber groynes
■ Supply and construct new timber walers
■ Sand renourishment between new and existing timber groyne
Before
After
APS profile 17.7.15 8/5/19 10:40 AM Page 33
Specialist in Marine, Coastal & Environmental Construction
Page 34 - Timber Boardwalks, Timber Sea Walls & Timber Groynes
Studley Park Boat House Timber JettyReconstruction, Yarra River - Kew,Victoria
Date: 2006.
Client: Studley Park Boat House
Works included:
■ Demolition of existing timber jetty
■ Establish floating piling rig via adjacent park lands
■ Supply and install CCA treated HW timber piles
■ Supply and construction of 150lm of timber jetty
■ Supply and installation pile caps.
■ Demobilisation of floating plant.
APS profile 17.7.15 8/5/19 10:40 AM Page 34
Specialist in Marine, Coastal & Environmental Construction
Page 35 - Timber Boardwalks, Timber Sea Walls & Timber Groynes
Fairfield Park Boat House Timber Jetty Reconstruction, YarraRiver – Kew, Victoria
Date: 2003.
Client: Fairfield Park Boat House
Works included:
■ Demolition of existing timber jetty
■ Establish floating piling rig via adjacent park lands
■ Supply and install CCA treated HW timber piles
■ Supply and construction of 100lm of timber jetty
■ Supply and installation pile caps.
■ Demobilisation of floating plant.
APS profile 17.7.15 8/5/19 10:40 AM Page 35
Beach Renourishment & Foreshore ProtectionWorks
Page 36
APS profile 17.7.15 8/5/19 10:40 AM Page 36
Specialist in Marine, Coastal & Environmental Construction
Page 37 - Beach Renourishment & Foreshore Protection Works
Re-construction of 3 Timber Groynes - Blairgowrie
Date: September - October 2013
Works included:
■ Driving timber piles for new timber groynes
■ Supply and construct new timber walers
■ Sand renourishment between new and existing timber groynes
APS profile 17.7.15 8/5/19 10:40 AM Page 37
Specialist in Marine, Coastal & Environmental Construction
Page 38 - Beach Renourishment & Foreshore Protection Works
Elco Rock Sand Bag Revetment – Portsea Front Beach,Victoria
Date: August 2010 to December 2010
Client: DSE
Works included:
■ Earth works and profile establishment
■ Temporary protection works of construction zone
■ Procurement and filling of Elco rock sand bags
■ Construction of 150lm Elco rock sand bag revetment
■ Construction of armour rock protection
■ Stormwater drainage works
■ Reconstruction of beach
APS profile 17.7.15 8/5/19 10:40 AM Page 38
Specialist in Marine, Coastal & Environmental Construction
Page 39 - Beach Renourishment & Foreshore Protection Works
Elco Rock Sand Bag Revetment – Rosebud Beach, Victoria
Date: April 2009 to June 2009
Client: DSE
Works included:
■ Earth works and profile establishment
■ Procurement and filling of Elco rock sand bags
■ Construction of timber retaining walls
■ Stormwater drainage works
■ Landscape construction and planting
APS profile 17.7.15 8/5/19 10:40 AM Page 39
Specialist in Marine, Coastal & Environmental Construction
Page 40 - Beach Renourishment & Foreshore Protection Works
Foreshore/BeachRehabilitation, St KildaBeach, Victoria
Stage 1: November 2000 - January 2001
Stage2: December 2005
Client: Department of Natural resources & Conservation
Works included:
■ Procurement of specialised plant.
■ Excavation and bulk sand relocation(60,000 m3) to establish a new beach.
■ Reshaping and levelling of beach.
■ Completion of project to strict short termprogram.
APS profile 17.7.15 8/5/19 10:40 AM Page 40
Masonry Sea Walls
Page 41
APS profile 17.7.15 8/5/19 10:40 AM Page 41
Specialist in Marine, Coastal & Environmental Construction
Page 42 - Masonry Sea Walls
Seawall Construction, Port Albert, Victoria
Date: 2006.
Client: Wellington Shire Council
Works included:
■ Demolition of existing seawall capping
■ Supply and construction of 150lm of reinforced concrete seawall
■ Supply and installation of iron bollards capping.
■ Supply and construction of concrete foot path.
APS profile 17.7.15 8/5/19 10:40 AM Page 42
Specialist in Marine, Coastal & Environmental Construction
Page 43 - Masonry Sea Walls
Port Phillip Bay, various location
Date: Various
Client: DSE
Works included:
■ Demolition of damaged sections of seawall
■ Insitu reinforced concrete reconstruction of structural components ofseawall structure
■ Installation of bluestone facing
■ Installation and construction of wave deflectors and capping.
■ Mortar pointing of all stone work
APS profile 17.7.15 8/5/19 10:40 AM Page 43
Specialist in Marine, Coastal & Environmental Construction
Page 44 - Masonry Sea Walls
Emergency Seawall Repair,Craigie Beach Mount Martha,Victoria
Date: 2009.
Client: DSE
Works included:
■ Demolition of storm damaged seawall
■ Concrete underpinning works of underminedseawall toe
■ Reconstruction of reinforced concrete seawallcore
■ Reconstruction of bluestone face cappingincluding mortar pointing.
APS profile 17.7.15 8/5/19 10:40 AM Page 44
General Civil Works
Page 45
APS profile 17.7.15 8/5/19 10:40 AM Page 45
Specialist in Marine, Coastal & Environmental Construction
Page 46 - General Civil Works
Construction of Boat LaunchingFacilities at Werribee South
Date: May 2002 - July 2002
Client: Wyndham City Council Werribee South, Victoria
Works included:
■ Supply and installation of two new floating pontoonjetty systems.
■ Construction of concrete abutments and boatlaunching ramp.
■ Installation and commissioning of navigation lightsand signs.
■ Construction of carpark including kerb/channel,pavement, landscaping, signs, linemarking etc.
■ Construction of a boat washdown facility includingoil/petrol interceptor and storm water diversionsystem.
APS profile 17.7.15 8/5/19 10:40 AM Page 46
Specialist in Marine, Coastal & Environmental Construction
Page 47 - General Civil Works
Port of Sale Stage 1
Date: November 2003 - June 2004
Client: Wellington Shire Council, Sale, Victoria
Works included:
■ Timber and steel tube piling works.
■ Construction of 140 lineal metres of timber boardwalk and 2No Jetty structures.
■ Sewerage and drainage reticulation works.
■ Construction of exposed aggregate concrete footpaths (700lineal metres) associated kerb and channel works, concreteapproaches and 150 lineal metres of structural retaining wall.
■ Construction of Convenience Centre including toilets, plantroom, BBQ and furniture.
■ General marine works including dredging, installation of screwpiles for structural retaining wall, upgrade of boat pump outfacility and rock stabilisation works.
■ Installation of aluminium gangway and floating pontoonsystem.
■ Electrical and street lighting works.
■ Bulk earthworks.
■ General landscaping works.
APS profile 17.7.15 8/5/19 10:40 AM Page 47
Specialist in Marine, Coastal & Environmental Construction
Page 48 - General Civil Works
Construction of Safe BoatHarbour - Limeburners,Geelong
Limeburners, Geelong
Date: November 2001 - September 2002
Client: City of Greater Geelong
Works included:
■ Construction of new rock groynes varying inlengths up to 250 linear metres.
■ Piling and dredging works
■ Supply and installation of new floatingpontoon jetty systems.
■ Specific placement of 2 - 5 tonne armourrocks.
■ Construction of concrete abutments, and boatlaunching ramps.
■ Installation and commissioning of navigationlights and signs.
■ General civil works i.e. kerb/channel,pavement, landscaping, signs linemarking.
APS profile 17.7.15 8/5/19 10:40 AM Page 48