APS Construction UpdateNovember 2014
2
Adobe Acres Elementary School
Address: 1724 Camino Del Valle SW
Year School First Opened: 1964
Project Scope: One renovated and one new building (with a total of 21,963 sq. ft.), that include:
A. New Building with 7 Kindergarten class rooms, 1 Art/Music multipurpose room/space square feet
B. New Artificial Turf Playground and Fenced Kindergarten Tot-lot
C. Renovated/expanded Kitchen/Cafeteria with bathrooms and Storage
Date of Completion: Feb 2014
Budget: $5 million
Architect: RMKM
Contractor: T.A Cole & Sons
3
Chaparral Elementary School
Address: 6325 Milne RD NWProject Scope: New Classroom wing, Kitchen
Cafeteria, & Site/Field and traffic improvements • 21 Classroom wing addition
• 7 Kindergarten classrooms• 1 kindergarten level D Classroom• 1 Special education classroom• 5 Intensive support Classrooms• 1 Occupational / Physical therapy• 5 regular education classrooms• 1 fine arts classroom.
• Site/traffic improvements • New Play field• New Playground• New Parent & Bus pick up drop off plus roadway
construction• Kitchen Cafeteria Addition/renovation
• existing cafeteria and kitchen was enlarged• additional storage was added
Budget: $15.9 MillionProject Status: Construction 95% complete; Kitchen
Cafeteria, field, and infrastructure currently in useEstimated Date of Completion: December 2014 Architect: Cherry / See/ ReamesGeneral Contractor: Shumate Contractors Inc.
4
New PreK‐8th Grade School in SW of Albuquerque
Address: 4050 118th Street SW 87121Square Footage: 245,437Project Description: New K‐8 school serving
1,350 students.Budget: $48.6 millionProject Status: 60% construction completeEstimated Date of Completion: July 2015Architect: Jon Anderson ArchitectsGeneral Contractor: Bradbury Stamm
5
West Mesa High School
Address: 6701 Fortuna Road NW
Year School First Opened: 1967
Project Scope: Classroom Building “M” Replacement. 2 phases for a total of 28 new classrooms.
• Phase 1 ‐ a three story classroom building with 17 classrooms.
• Phase 2 ‐ a two story classroom building with 11 classrooms, situated just north of the three story building.
Project Status: Construction Documents being developed
Estimated Date of Completion (both phases): January 2017
Total Project Cost: $ 18.8 million
Architects: Mahlman Studio
General Contractor: TBD
6
Rio Grande High School
Address: 2300 Arenal Rd SW
Year School First Opened: 1959
Project: 9th and 10th grade academies new classroom block; new permanent bus lane; new courtyards and patio, addition of site lighting for security; completion of fire lane loop; new tennis courts; addition of artificial turn for football and baseball fields; landscaping and fencing upgrades
Project Status: Design complete
Groundbreaking: Spring 2015
Est. Date of Completion: Summer 2016
Budget: $25 million
Architect: Van H. Gilbert Architects
General Contractor: TBD
7
Ventana Ranch Elementary School
Address: 6801 Ventana Village Rd NW
Year School First Opened: 2004
Project Description: Artificial turf field, landscaping and site work. A great asset to the school and the surrounding community.
Est. Budget: $580,720
Project Status: Completing design
Groundbreaking: December 2014
Estimated Date of Completion: May 2015
General Contractor: TBD
8
Marie Hughes Elementary School
Address: 5701 Mojave NW
Year School First Opened: 1981Project Scope: School replacementPhase I: Demolition Play Areas and New
Construction of 2 story Classroom Block
Phase 2: Demolish existing old classroom blocks, Portable removal, loop road/bus Drop‐Off/Parking construction and New Field/Playground construction
Status: Under design
Ground breaking: Summer 2015
Est. Date of Completion: July 2016
Budget: $21.9 million
Architect: G. Don Dudley
General Contractor: TBD
9
Highland High School Rebuild
Address: 4700 Coal Avenue SE 87108
Year School First Opened: 1949
Project: Highland HS new Classroom Block and PAC construction and Gym upgrade
Project Status: Under Design
Est. Groundbreaking: Phase I Summer 2016Est. Date of Completion: Phase I December 2017
Budget: $14,790,014
Architect: SMPC
General Contractor: TBD
10
Albuquerque High School Commons
Address: 800 Odelia Road NE 87102
Year School First Opened: 1916
Project: Commons/Cafeteria/Classroom Renovation and Addition/ Music Classrooms
Project Status: 95% Construction Documents
Est. Groundbreaking: Summer 2016
Est. Date of Completion: Dec. 2017
Budget: $14,155,777
Architect: Jon Anderson
General Contractor: TBD
11
Sandia HS Science Classroom Block/Library
Address: 7801 Candelaria NE, Albuq, NM 87110
Year School First Opened: 1958
Project: Two new buildings (with a total of 75,350 sq. ft.), that include:A. New Science and Math Academy (57,592
square feet, three stories)B. New Library ‐ 17,758 square feet, two stories‐
the new Library Building includes computer labs, small group study rooms, and a graphic arts production studio.
C. New Softball Field‐provides a new natural sod field with greatly improved dugouts, practice cages, concessions, and storage facilities.
Project Status: Completed May 2014
Budget: $ 21,106,354
Architect: Mahlman Studio
General Contractor: HB Construction
12
La Cueva HS ISP/GYM
Address: 7801 Wilshire NE 87122
Year School First Opened: 1986Project Scope: The project consists of 3 distinct parts:Part I : Addition of an ISP facility to serve special education programsPart II : Addition of a weight roomPart III : Renovation of the existing weight room
Project Status: Design approval
Est. Date of Groundbreaking: Summer 2016
Est. Date of Completion: Fall 2017
Budget: $10,149,891
Architect: RMKM
General Contractor: TBD
13
Dolores Gonzales ES Classroom Block
Address: 900 Atlantic St SW
Year School First Opened: 1975
Project Scope:
New 21 Classroom Block to include and Art/Music and 4 Kindergarten Classrooms
Cafeteria expansion
Restroom remodel
New Playground
Project Status: Under construction
Est. Date of Completion: December 2014
Total Budget: $7.9 million
Architect: Westwork Architects
General Contractor: Shumate Constructors Inc.
14
The Career Enrichment Center (CEC) and Early College Academy (ECA)
Address: 807 Mountain Road NEAlbuquerque, NM 87102Project Square Footage: 20,230Project Scope:
2 Science Labs 2 Prep areas
EMT lab 1 prep area
2 language Classrooms 2 Multi Purpose Classrooms Food Prep Teaching Space Multi Purpose PE/Functions space Electrical Transformer Flatwork/sidewalks/ADA Recycling/Garbage Receptacle area
Project Status: Under constructionEst. Completion Date: Spring 2016Total Budget: $5.5million
Architect: Lee Gamelsky Architects
General Contractor: TBD
15
Food Services Central Kitchen and Storage
Address: 800 Louisiana Blvd. NE
Square Footage: 100,000
Project: Renovation of a 100,000 square foot facility into a food processing facility/commercial kitchen/warehouse for APS Food services
Project Status: Under Construction
Est. Date of Completion: December 2014
Budget: $14.2 million
Architect: Studio SW Architects
Contractor: Gerald A. Martin, LTD
16
eCademy/New Futures Cafeteria/Commons
Address: 5300 Cutler Ave NE
Year School First Opened: 1915 (old AHS Site)
Project Scope:
Cafeteria/Commons eCademy & New‐futures
Site development
Infrastructure
Date of Completion: March 2014
Budget: $3.8 million
Architect: Gregory Hicks
General Contractor: Anchor Built
17
Valley HS Rebuild
Address: 1505 Candelaria NW 87107
Year School First Opened: 1954
Project Scope: The master plan requires building " S " be razed and to construct a new classroom addition consisting of a new Crime, Law, & Protection Classroom building.
Project Status: 95% construction documents complete
Est. Groundbreaking: Phase I Summer 2016Est. Date of Completion: Phase I Fall 2017
Budget: $7,194,644
Architect: Huitt Zollars
General Contractor: TBD
18
Manzano HS Rebuild
Address: 12200 Lomas Blvd. NE 87112
Year School First Opened: 1961
Project Scope: Preliminary Scope is Physical Education wing Additions and Renovations.
Project Status: 50% Construction Documents
Est. Groundbreaking: Phase I Summer 2015Est. Date of Completion: Phase I Fall 2016
Budget: $14,844,920
Architect: Studio SW
General Contractor: TBD
19
Mountain View ES Rebuild
Address: 5317 Second St. SW 87105
Year School First Opened: 1952
Project Scope: Demolition and replacement of all buildings on the campus except for mini‐gym and Kindergarten classroom building. New facilities will include 25 classrooms, library, health office, parent center, cafeteria/kitchen, administration area, and related support spaces.
Project Status: 50% Construction Documents
Est. Groundbreaking: Summer 2015Est. Date of Completion: Dec. 2016
Budget: $21,173,547
Architect: Gregory Hicks
General Contractor: TBD
20
RFK Charter Multipurpose/PE/Gym
Address: 4300 Blake Rd SW
Year School First Opened: 2001
Project Scope: Multi Purpose Facility
Multi media center
Physical educational Gymnasium/Community space combo
Full Auto Body Shop
Project Status: Under construction
Est. Date of Completion: Jan 2015
Budget: $5.4 million
Architect: DWL Architects
General Contractor: Anchor Built
21
Montezuma TurfAddress: 3100 Indian School NE 87106
Year School First Opened: 1953
Project Scope: Montezuma Elementary School Community Turf Field consists of approximately 24,000 square feet of an artificial turf field bordered by a concrete walking path, low water use landscaping and trees. The following components were installed: Artificial turf field; Concrete walking path; Low water use landscaping and trees; Pre‐engineered steel shade structure; Concrete plaza Infrastructure including electrical, parking and landscape; Picnic table; Seating; Trash receptacles and Fencing
Project Status: Complete
Date of Completion: August 2014
Budget: $ 360,000
General Contractor: Westwind Landscape
22
MacArthur Elementary School
Address: 1100 MacArthur Rd NW
Year School First Opened: 1948
Project Scope: 12,373 Square foot addition/renovation
• Kindergarten Classrooms & Play Lot
• Cafeteria Addition / Kitchen Upgrades
• Improve Site Lighting for Security
• Install Security Fencing
• Site Improvements
Budget: $4,309,277
Project Status: Under construction
Est. Date of Completion: Spring 2015
Architect: Wright & Hammer
General Contractor: Anchorbilt
23
McKinley Middle School
Address: 4500 Comanche NE
Year School First Opened: 1956
Project Scope:Classroom block AdditionDrainage/Infrastructure
Project Status: Under construction
Est. Date of Completion: Aug 2015
Budget: $ 6,196,182
Architect: NCA
Contractor: Shumate Constructors
24
Eldorado High SchoolAddress: 11300 Montgomery Blvd NE
Year School First Opened: 1970‐71
Project Scope:Renovation of:
MathHumanitiesFine Arts
Project Status: Under Construction
Est. Date of Completion: July 2015
Total Budget: $4.4 million
Architect: Van H. Gilbert Architects
General Contractor: ESA Construction Inc.
25
Del Norte High School
Address: 5323 Montgomery Blvd NE
Year school First Opened: 1964‐65
Project Scope:a) Phase 4 Industrial Fine Arts Building ‐completeb) Phase 5 Cafeteria demolition and roof
Project Status: Cafeteria under Construction
Est. Date of Completion: (phase 5) Fall 2015
Budget: $11.5 million
Architect: Dekker/ Perich/Sabatini
General Contractor: T.A Cole & Sons
26
Reginald Chavez ES
Address: 2700 Mountain Road NW 87104
Year School First Opened: 1955
Project Scope: 25,454 square foot addition
New 10 classroom block and library, including new kindergarten classrooms
Project Status: Under Bid for Construction
Est. Date of Completion: Spring 2016
Budget: $7.4 million
Architect: Cherry/See/Reames
General Contractor: TBD
27
Collet Park Elementary School
Address: 2100 Morris NE
Year School First Opened: 1961
Project Scope: 19,249 square foot addition/renovation
Kindergarten Classroom block
Administration expansion
Project Status: Under Construction
Est. Date of Completion: Feb 2016
Budget: $6.2 million
Architect: Vigil & Associates
General Contractor: T.A Cole & Sons
28
Comanche Elementary School
Address: 3505 Pennsylvania NE 87110
Project Square Footage: 13,976 square feet
Project Scope:Kindergarten Addition
5 Kindergarten Classrooms
Administration Renovation
Fine Arts Addition
1 Music/Fine Arts classroom
Relocation & Upgrade of existing utilities
New Fire suppression sprinkler system
Increased site work
Total Project Budget: $6.9 Million
Est. Date of Completion: Summer 2015
Architect: PA Architects
General Contractor: T.A. Cole
Wherry Elementary School
29
Address: 25000 E Kirtland AFBYear School First Opened: 1952Project Scope: New school construction and renovation Project Status: RFP DesignEst. Date of Completion: Dec 2016Budget: $16.25 million
Architect: Fanning Bard TatumGeneral Contractor: TBD
Wilson Middle School
30
Address: 1138 Cardenas Dr SEYear School First Opened: 1953Project Scope: Entire Renovations to the 1953 2‐story building including the cafeteria, administration, classrooms, kitchen, library, and other incidental spaces
Project Status: Under constructionEst. Date of Completion: March 2015
Budget: $10.6 million
Architect: Huitt‐ZollarsGeneral Contractor: HB Construction
31
Projects in Design now for Construction 2015
1. Aztec Complex‐Special Education and Autism Center Preliminary Scope: Major Interior Renovation and Site WorkTotal Project Budget – $ 7,600,000.00
2. Ernie Pyle MSPreliminary Scope: Classroom Addition; Renovation of the 300 wing into an Art Complex; Misc HVAC work throughout the schoolTotal Project Budget: $9,260,004.00
3. Marie Hughes ESPreliminary Scope: Cafeteria/Kitchen/Classroom Addition and some site work. Total Project Budget: $8,475,010.00
4. Mountain View ESPreliminary Scope: Replace Older BuildingsTotal Project Budget: $21,173,547
32
Projects in Design now for Construction 2015
11. Jefferson MSPreliminary Scope: Music Classroom Addition and RenovationTotal Project Budget: $2,218,695.00
12. Madison MSPreliminary Scope: Gymnasium/locker room RenovationTotal Project Budget: $1,521,445.00
13. Manzano High SchoolPreliminary Scope: Physical Education wing Additions and Renovations.Total Project Budget: $9,699,645.00
14. Jackson Middle SchoolSpecialized Lab Addition & Old Wing Replacement and RenovationTotal Project Budget: $12,335,939
33
Projects in Design now for Construction 20155. Reginald Chavez ES
Preliminary Scope: Kinder Addition and Replacement of Classroom BuildingsTotal Project Budget – $7,415,261.00
6. Rio Grande High SchoolPreliminary Scope: Restructuring of the campus and the construction of 9th and 10th grade academies.Total Project Budget: $25,255,234.00
7. Valley High SchoolPreliminary Scope: Raze Building “S” and Construct new classroom in its place.Total Project Budget: $6,620,487.00
8. West Mesa High School Preliminary Scope: Replace Classroom Wing “M”Total Project Budget: $ 18,782,829.00
9. Atrisco ESPreliminary Scope: Re‐roofing and Classroom Replacement
Total Project Budget: $9,854,543.00
34
Projects in Design now for Construction 2016
10. Early Childhood Facility PrototypePreliminary Scope: To design and construct an early childhood facility that will combine pre‐k education and day care services. To be replicated on up to ten sites over the next 4 years. This is the first one.Total Project Budget – $4,563,750
11. Montgomery Complex Training and Meeting Facility: Preliminary Scope: District training facility for teachers, staff with appropriate IT labs and meeting spaces for up to 500.Total Project Budget – $ 10,088,572