Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27001
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop mechanical equipment and a door, Building 12B, Second Street between Morris
Avenue and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn, submitted by the
Brooklyn Navy Yard Development Corporation, represented by exhibits 6063-PJ, PK & PL of
record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27002
RESOLVED That the Design Commission, having considered designs for the conversion of
Building 20 into a light-industrial building, Morris Avenue, Third Street, Dock Avenue, and
Fourth Street, Brooklyn Navy Yard Industrial Park, Brooklyn, submitted by the Brooklyn Navy
Yard Development Corporation, represented by exhibits 6063-PM, PN, PO & PP of record in
this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27003
RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical newsstand, 4325 Hunter Street, northwest corner of 44th Drive and Jackson
Avenue, Long Island City, Queens, submitted by the Department of Consumer Affairs and the
Department of Transportation, represented by exhibits 7453-A, B & C of record in this matter,
hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27004
RESOLVED That the Design Commission, having considered a proposal for the installation of
Along Woodhaven Boulevard by Priscila de Carvalho, Woodhaven Boulevard at the intersection
of 101st Avenue and Rockaway Boulevard, Queens, submitted by the Department of Cultural
Affairs’ Percent for Art Program and the Department of Transportation, represented by exhibits
7328-I, J & K of record in this matter, hereby gives to the same unanimous preliminary
approval.
Preliminary approval is conditioned upon commencement of work before April 15, 2021, and
submission of this project for final review and approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27005
RESOLVED That the Design Commission, having considered a proposal for the installation of
Woodhaven in Motion by Robert Hickman, Woodhaven Boulevard at the intersection of
Jamaica Avenue and 91st Street, Queens, submitted by the Department of Cultural Affairs’
Percent for Art Program and the Department of Transportation, represented by exhibits 7328-
L, M & N of record in this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon commencement of work before April 15, 2021, and
submission of this project for final review and approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27006
RESOLVED That the Design Commission, having considered designs for the installation of fuel
tank access hatches, DCA Central Testing Station, 245 Meserole Avenue, Brooklyn, submitted
by the Department of Design and Construction, represented by exhibits 3921-E, F, G & H of
record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27007
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop mechanical equipment, Clarendon Branch Library, 2035 Nostrand Avenue, Brooklyn,
submitted by the Department of Design and Construction and the Brooklyn Public Library,
represented by exhibits 4924-Q, R, S & T of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27008
RESOLVED That the Design Commission, having considered designs for the installation of a
fuel tank access hatch and ventilation equipment, Engine Company 214, 495 Hancock Street,
Brooklyn, submitted by the Department of Design and Construction and the Fire Department,
represented by exhibits 2991-K, L, M & N of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27009
RESOLVED That the Design Commission, having considered designs for the installation of a
fuel tank access hatch, Engine Company 24/Ladder Company 5, 227 Sixth Avenue,
Manhattan, submitted by the Department of Design and Construction and the Fire Department,
represented by exhibits 7385-E, F, G & H of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27010
RESOLVED That the Design Commission, having considered designs for the construction of a
dechlorination facility, Oakwood Beach Water Pollution Control Plant, 751 Mill Road, Staten
Island, submitted by the Department of Environmental Protection, represented by exhibits
2977-KW, KX, KY & KZ of record in this matter, hereby gives to the same unanimous
preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27011
RESOLVED That the Design Commission, having considered designs for the construction of a
dechlorination facility, Owl's Head Water Pollution Control Plant, 6700 Shore Road, Brooklyn,
submitted by the Department of Environmental Protection, represented by exhibits 2429-DA,
DB, DC & DD of record in this matter, hereby gives to the same unanimous preliminary and
final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27012
RESOLVED That the Design Commission, having considered designs for the reconstruction of
two Route 28A bridges over Esopus Creek and the former Ulster and Delaware Railroad
corridor, Olive, Ulster County, submitted by the Department of Environmental Protection,
represented by exhibits 7217-I, J, K, L & M of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27013
RESOLVED That the Design Commission, having considered designs for the construction of an
ADA ramp, M.S. 72, 133-25 Guy R Brewer Boulevard, Jamaica, Queens, submitted by the
Department of Education, represented by exhibits 3742-Q, R, S & T of record in this matter,
hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27014
RESOLVED That the Design Commission, having considered designs for the construction of an
addition, Bronx High School of Science, 75 West 205th Street, Bronx, submitted by the
Department of Education, represented by exhibits 3142-Q & R of record in this matter, hereby
gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27015
RESOLVED That the Design Commission, having considered designs for the installation of
signage, Midwood High School, 2839 Bedford Avenue, Brooklyn, submitted by the Department
of Education, represented by exhibits 2235-X & Y of record in this matter, hereby gives to the
same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27016
RESOLVED That the Design Commission, having considered designs for the installation of
signage, P.S. 177, 346 Avenue P, Brooklyn, submitted by the Department of Education,
represented by exhibits 1171-K, L & M of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27017
RESOLVED That the Design Commission, having considered designs for the construction of
Vanderbilt Plaza and installation of security bollards, One Vanderbilt, Vanderbilt Avenue, 42nd
Street, Madison Avenue, and 43rd Street, Manhattan, submitted by the Department of
Transportation, represented by exhibits 5308-BR, BS & BT of record in this matter, hereby
gives to the same unanimous preliminary approval with the understanding that (1) before
returning for final review, a revised design will be submitted that includes (a) the final bollard
proposal, based on the results of the security-rated removable bollard tests and (b) a widened
flat seating area on the planter ledge, using the public plaza guidelines by the Department of
City Planning as reference; (2) detailed drawings of the paving pattern will be included in the
final submission, per standard procedure; and (3) if the applicant plans to propose an artwork
for the site, a proposal for the artwork acquisition process will first be submitted to the Design
Commission for review before any artwork is commissioned or purchased.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27018
RESOLVED That the Design Commission, having considered designs for the installation of a
shade structure, Beach 59th Street Playground, Rockaway Beach, Shore Front Parkway
between Beach 59th Street and Beach 60th Street, Arverne, Queens, submitted by the
Department of Parks & Recreation, represented by exhibits 3402-L & M of record in this matter,
notes that this project would ideally result in a family of modular structures of various shapes to
accommodate different site layouts and provide greater shade coverage; however, given the
agency’s limited schedule and budget, hereby gives to the same unanimous preliminary
approval with the understanding that the Department of Parks & Recreation will (1) work to
minimize the structural elements as much as possible; (2) consider the use of aluminum and L-
Beams; (3) revise the structure back to a rectangular shape if a family of structures is not
possible; (4) increase the slope of the roof as previously shown or revise it to be flat; (5)
continue to study the use and function of the solar units; (6) revise the shade structure layout
plan, keeping in mind that the structures do not need to follow the curve of a path, but can be
placed in a line over a path; and (6) integrate any security requirements into the site to minimize
the need for bollards, in consultation with NYPD.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27019
RESOLVED That the Design Commission, having considered designs for the installation of a
shade structure, Beach 98th Street Playground, Rockaway Beach, Shore Front Parkway
between Beach 98th Street and Beach 101st Street, Rockaway Park, Queens, submitted by
the Department of Parks & Recreation, represented by exhibits 2530-HS & HT of record in this
matter, notes that this project would ideally result in a family of modular structures of various
shapes to accommodate different site layouts and provide greater shade coverage; however,
given the agency’s limited schedule and budget, hereby gives to the same unanimous
preliminary approval with the understanding that the Department of Parks & Recreation will (1)
work to minimize the structural elements as much as possible; (2) consider the use of
aluminum and L-Beams; (3) revise the structure back to a rectangular shape if a family of
structures is not possible; (4) increase the slope of the roof as previously shown or revise it to
be flat; (5) continue to study the use and function of the solar units; (6) revise the shade
structure layout plan, keeping in mind that the structures do not need to follow the curve of a
path, but can be placed in a line over a path; and (7) integrate any security requirements into
the site to minimize the need for bollards, in consultation with NYPD.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27020
RESOLVED That the Design Commission, having considered designs for the installation of a
shade structure, Rockaway Beach, Shore Front Parkway between Beach 101st Street and
Beach 102nd Street, Arverne and Rockaway Park, Queens, submitted by the Department of
Parks & Recreation, represented by exhibits 2530-HU & HV of record in this matter, notes that
this project would ideally result in a family of modular structures of various shapes to
accommodate different site layouts and provide greater shade coverage; however, given the
agency’s limited schedule and budget, hereby gives to the same unanimous preliminary
approval with the understanding that the Department of Parks & Recreation will (1) work to
minimize the structural elements as much as possible; (2) consider the use of aluminum and L-
Beams; (3) revise the structure back to a rectangular shape if a family of structures is not
possible; (4) increase the slope of the roof as previously shown or revise it to be flat; (5)
continue to study the use and function of the solar units; (6) revise the shade structure layout
plan, keeping in mind that the structures do not need to follow the curve of a path, but can be
placed in a line over a path; and (7) integrate any security requirements into the site to minimize
the need for bollards, in consultation with NYPD.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27021
RESOLVED That the Design Commission, having considered designs for the installation of a
shade structure, Rockaway Beach, Shore Front Parkway between Beach 77th Street and
Beach 81st Street, Arverne, Queens, submitted by the Department of Parks & Recreation,
represented by exhibits 2530-HW & HX of record in this matter notes that this project would
ideally result in a family of modular structures of various shapes to accommodate different site
layouts and provide greater shade coverage; however, given the agency’s limited schedule and
budget, hereby gives to the same unanimous preliminary approval with the understanding that
the Department of Parks & Recreation will (1) work to minimize the structural elements as much
as possible; (2) consider the use of aluminum and L-Beams; (3) revise the structure back to a
rectangular shape if a family of structures is not possible; (4) increase the slope of the roof as
previously shown or revise it to be flat; (5) continue to study the use and function of the solar
units; (6) revise the shade structure layout plan, keeping in mind that the structures do not
need to follow the curve of a path, but can be placed in a line over a path; and (7) integrate any
security requirements into the site to minimize the need for bollards, in consultation with NYPD.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27022
RESOLVED That the Design Commission, having considered designs for the installation of a
shade structure and adult fitness equipment, Harmony Playground, Prospect Park West
between 9th Street and 11th Street, Prospect Park, Brooklyn, submitted by the Department of
Parks & Recreation and the Prospect Park Alliance, represented by exhibits 5954-M, N & O of
record in this matter, hereby gives to the same unanimous preliminary approval with the
conditions that the team will submit a revised proposal for committee review with (1) the shade
structure design simplified and structural elements minimized as much as possible; (2) the red
and green colors revised to black; and (3) a plan that combines the proposed shade structure
and footing locations with the utilities.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27023
RESOLVED That the Design Commission, having considered a proposal for the installation of
Dr. Sun Yat-sen (2011) by Lu Chun-Hsiung, Columbus Park, Worth Street, Baxter Street,
Mulberry Street, and Bayard Street, Manhattan, submitted by the Department of Parks &
Recreation, represented by exhibits 7437-C & D of record in this matter, hereby gives to the
same unanimous preliminary approval with the understanding that a maintenance endowment
will be established before the artwork is reinstalled.
Preliminary approval is conditioned upon commencement of work before April 15, 2021, and
submission of this project for final review and approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27024
RESOLVED That the Design Commission, having considered a proposal for the reconstruction
of a pedestal, William Henry Seward (1876) by Randolph Rogers, Madison Square Park, Fifth
Avenue and East 23rd Street, Manhattan, submitted by the Department of Parks & Recreation,
represented by exhibits 5387-G & H of record in this matter, hereby gives to the same
unanimous preliminary approval with the condition that a site visit will be arranged to review
granite stone samples against the marble pedestal.
Preliminary approval is conditioned upon commencement of work before April 15, 2021, and
submission of this project for final review and approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27025
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a portion of Naples Playground, adjacent to P.S. 9, Naples Street between Targee Street and
Stanwich Street, Staten Island, submitted by the Department of Parks & Recreation,
represented by exhibits 5048-F, G & H of record in this matter, hereby gives to the same
unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27026
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a portion of Bellevue South Park, Mount Carmel Place between East 26th Street and East 28th
Street, Manhattan, submitted by the Department of Parks & Recreation, represented by
exhibits 4051-L, M & N of record in this matter, hereby gives to the same unanimous
preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27027
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Lion's Pride Playground, Riverdale Avenue between Snediker Avenue and Van Sinderen
Avenue, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits
1908-H & I of record in this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27028
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station and adjacent site work, Cadman Plaza Park, Tillary Street and Cadman Plaza
East, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits
6589-BK, BL & BM of record in this matter, hereby gives to the same unanimous preliminary
approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27029
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, Havemeyer Playground, Watson Avenue, Havemeyer Avenue, and East 177th
Street, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits
7454-A & B of record in this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27030
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, Marlboro Playground, West 11th Street and Avenue W, Brooklyn, submitted by
the Department of Parks & Recreation, represented by exhibits 7455-A, B & C of record in this
matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before April 15, 2021.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27031
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, Quisqueya Playground, Highbridge Park, Amsterdam Avenue and West 180th
Street, Manhattan, submitted by the Department of Parks & Recreation, represented by
exhibits 1712-GE, GF, GG & GH of record in this matter, hereby gives to the same unanimous
preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27032
RESOLVED That the Design Commission, having considered designs for the installation of a
shade pavilion with rooftop photovoltaic panels, La Plaza Cultural de Armando Perez
Community Garden, 143 Avenue C, Manhattan, submitted by the Department of Parks &
Recreation, represented by exhibits 7456-A, B & C of record in this matter, hereby gives to the
same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27033
RESOLVED That the Design Commission, having considered designs for the installation of a
soccer sealcoat field, Equity Playground, adjacent to P.S. 60, 88th Avenue, 90th Street, and
89th Avenue, Woodhaven, Queens, submitted by the Department of Parks & Recreation,
represented by exhibits 3614-C, D, E & F of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27034
RESOLVED That the Design Commission, having considered designs for the installation of a
soccer sealcoat field, Moore Playground, adjacent to P.S. 133, East 130th Street, Madison
Avenue, and East 131st Street, Manhattan, submitted by the Department of Parks &
Recreation, represented by exhibits 2538-V, W & X of record in this matter, hereby gives to the
same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27035
RESOLVED That the Design Commission, having considered designs for the installation of
signage, Citi Field, 41 Seaver Way (120-01 Roosevelt Avenue,) Corona, Queens, submitted by
the Department of Parks & Recreation, represented by exhibits 2103-AFQ & AFR of record in
this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27036
RESOLVED That the Design Commission, having considered designs for the construction of a
comfort station, M. Fidler Wyckoff House Park, 5914 Clarendon Road, Brooklyn, submitted by
the Department of Parks & Recreation, represented by exhibits 4119-L, M, N & O of record in
this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27037
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the playground, Nathan Weidenbaum (Little Bush) Playground, south of Laurel Hill Boulevard
between 63rd Street and 64th Street, Woodside, Queens, submitted by the Department of
Parks & Recreation, represented by exhibits 6173-G, H, I & J of record in this matter, hereby
gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27038
RESOLVED That the Design Commission, having considered a final report for the temporary
storage of Abstraction (1942) by Joseph Rugolo, Naglee Fine Arts, 1525 Grand Central Avenue,
Elmira, Chemung County, submitted by the Economic Development Corporation, represented
by exhibits 2043-AH & AI of record in this matter, hereby gives to the same unanimous
preliminary and final approval with the understanding that (1) before the mural is removed, a
brief proposal from the art transportation company will be submitted for review; (2) after the
mural is relocated, the conservator will check the mural every six months while it is in storage;
(3) a report from the conservator confirming the status of the mural will be submitted every six
months, following their review of the mural; (4) a proposal for the relocation of the mural will be
submitted within two years; and (5) a submission for the final review of the relocation of
Abstraction (1942) by Ilya Bolotowsky and Abstraction (1942) by Albert Swinden will be
submitted within six months.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
April 15, 2019
CERTIFICATE 27039
RESOLVED That the Design Commission, having considered designs for the installation of
interim flood protection measures, East River Waterfront from Wall Street to Catherine Slip,
Manhattan, submitted by Emergency Management and the Department of Transportation,
represented by exhibits 5467-HO, HP & HQ of record in this matter, hereby gives to the same
unanimous preliminary and final approval with the understanding that the team will provide
details on who is organizing, designing, and painting the mural before the mural project moves
forward.
Final approval is conditioned upon commencement of work before April 15, 2021, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on April 15, 2019.
Keri Butler
Deputy Executive Director