BUSINESS AREAS

• Dams / Power capacity increases

• Fluvial hydraulics

• Railway works • Track infra &

superstructure • Overhead electrification • Infrastructure

maintenance

• Transportation infrastructures • Roads • Bridges and viaducts • Airports

• Industrial construction works • Energy • Environment • Water, sanitation and gas

infrastructures

• Building construction works • Housing • Offices • Leisure, sports, health

and environmental infrastructures

• Airports terminals • Monuments and buildings

renovation and rehabilitation

Page 3: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Hotels expertise

Page 4: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Altis Park Hotel

Characteristics: Finishing work. Remodelling of floors, rooms, suites, auditorium, restaurant and bar, games room. Main quantities: Work area: 28.000 m2 ▌Floors: 19 above ground level and 3 underground parking levels ▌Rooms: 300 ▌Suites: 15

Location: Portugal - Olaias, Lisbon Start / completion date: 1993 / 1995

Page 5: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Casino Estoril

Characteristics: The remodelling and expansion. One noteworthy aspect is that the casino remained operational while construction was under way. The south façade was demolished at the level of floor 0 and covers were created, on the same façade, made of prestressed concrete layers. The Winter Garden was constructed, including 3 mobile stages for shows, and the technical areas were remodelled: electricity, water and drains, emergency generators. External work was carried out, comprising a pond and roads/pathways covered with red tarmac and cobbled paving along the south façade. Complete remodelling of the casino entrance hall. Main quantities: Expansion of the slot machine room: 1,800 m2 ▌Complete remodelling of the Wonder Bar: 600 m2 ▌Complete refurbishment of the mainstream gambling room: 1,500 m2 ▌Construction of Chinese restaurant: 800 m2

Location: Portugal, Estoril - Cascais Start / completion date: 1996 / 1998

Page 6: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Expansion of Hotel Mundial

Characteristics: Remodelling. Building constructed in a reinforced concrete frame using the “up and down” construction process; comprised of 3 underground floors for parking and services, floor 0 and 1 for services, coffee shop and meeting room and floors 2 to 9 with 105 rooms and 3 suites. Main quantities: Gross construction area: 8,750 m2 ▌Earthmoving: 12,000 m3 ▌Shuttering: 17,650 m2 ▌Concrete: 4,860 m3 ▌Stell: 500,000 kg

Location: Portugal – Martim Moniz, Lisbon Start / completion date: 1996 / 1998

Page 7: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Quinta da Marinha Hotel

Characteristics: Construction and remodeling the hotel: Phase 1: Building of a 4 star hotel with 4 floors. Swimming pool facing the hotel golf course. Phase 2: In 2007 remodeling, with a view to the upgrade to 5 stars. Main quantities: Functional area: 15,800 m2 ▌Excavation: 19,875 m3 ▌Shuttering: 49,300 m2 ▌Concrete: 8,430 m3 ▌Steel: 720 ton

Location: Portugal - Cascais Start / completion date: 1998 / 2007

Page 9: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Palácio Sotto Mayor

Characteristics: Restoration of Sotto Mayor Palace with the technical work carried out in partnership with IPPAR, and execution of a buried or mostly semi-buried structure, with 8 underground levels under Avenida Fontes Pereira de Melo, improving all surface areas and converting the original palace structure (use; business centre; 4-star hotel with 83 rooms; shopping centre; health centre; parking). This project was conditioned by the integration of the new building into the surrounding urban area, preservation of its architectural and historical heritage and by its location within one of the most important roads of the city. Main quantities: Site area: 7,600 m² ▌Construction area: 50,600 m² ▌General excavation: 150,000 m³ ▌Moulded walls: 12,364 m² ▌Shuttering: 73,705 m² ▌Concrete: 33,484 m³ ▌Steel: 5,486,000 kg ▌Coatings: 108,746 m²

Location: Portugal - Lisbon Start / completion date: 1999 / 2003 Current equivalent value: € 42,782,609

Page 11: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Restoration of Freixo Palace

Characteristics: The upgrading of the Freixo cultural area consisted of the following: complete restoration of Freixo Palace (building and surroundings): comprising complete restoration of the palace, including the installation of all technical infrastructures. Demolition, removal and replacement of stonework and woodwork. Restoration work was carried out, particularly on wood, stonework, plastering, decorative 18th and 19th century paintings, frescos, gilding. Landscaping of surrounding area and exterior in order to establish a public garden with an area of approximately 40,000 m2. Main quantities: Clearing of vegetation/stripping soil: 51,900 m2 ▌Excavation: 61,000 m3 ▌Landfill: 23,900 m3 ▌Special foundations: piles: 2,000 m ▌sheet pile curtain: 1,800 m2 ▌Reinforced concrete framework: 9,000 m3 ▌Walls of granite blocks: 1,300 m2 ▌Tarmac: 16,207 m2 ▌Granite cubes: 7,000 m2 ▌External work/landscaping: 40,000 m2

Location: Portugal - Porto Start / completion date: 2000 / 2003 Value: € 13,010,525.71

Page 12: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Expansion of Hotel Odjo d’Água

Characteristics: 3 new blocks with thirty rooms, in a 4-star hotel.

Location: Cape Verde – Sal island Start / completion date: 2001

Page 13: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Montalvo Tourism Project

Characteristics: Construction of 38 houses in the tourism project of Herdade do Montalvo. Main activities: Foundations, structure, water, sewage and gas networks, electrical and telephone installations and external work.

Location: Portugal, Alcácer do Sal Start / completion date: 2001 / 2003

Page 14: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Remodeling the Corinthia Alfa Hotel

Characteristics: Demolition and total removal of all former coatings (including the inner partition finishing's). Was executed in 2 main phases: phase 1 – rooms and corridors; phase 2 – public areas. Finishing: Hotel has a “tunnel type” construction using precast panels for the façade cladding. The external work (level 0) featured 2 decks with concrete and wooden pergolas placed above, 1 waterfall and 3 lakes. For the pavement, cladding granite was used in order to create external esplanades as well as green areas. Main quantities: Intervention areas: building: 31,900 m² ▌external areas (gardens): 4,750 m² ▌rooms: 517 unit (including presidential suite) ▌conference rooms: 14 unit (most with 1,000 m²) ▌Facing: plaster and painting: 46,500 m² ▌false ceilings: 19,000 m² ▌carpets: 20,500 m² ▌wall paper: 7,500 m² ▌ceramic: 12,000 m² ▌stone: 7,500 m² ▌external Painting: 13,500 m² ▌wooden panels: 3,000 m²

Location: Portugal - Lisbon Start / completion date: 2003 / 2004 Value: € 14,500,000

Page 15: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Azores Lisbon Sercotel

Characteristics: Four-star hotel with 16 floors (128 rooms, of which five are suites) a multi-purpose hall with total seating capacity of 160, which can be divided into five smaller rooms.

Location: Portugal - Lisbon Start / completion date: 2004 / 2005

Page 16: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Riu Hotels (Funaná and Garopa)

Characteristics: The Hotel Riu was built in two distinct stages:

Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa was constructed, with 572 guest rooms. The work began with the construction of the first 2 buildings of rooms (buildings H6 & H7), after which the entire second stage was awarded.

Main quantities: Occupy area: 204,000 m2 ▌Earthmoving: excavations: 36,600 m3 ▌landfills: 58,700 m3 ▌Reinforced concrete structure: concrete: 42,000 m3 ▌in foundation slabs: 24,000 m3 ▌in floor slabs: 66,000 m2 (13,000 m3 ▌other features: 5,000 m3 ▌Steel: 1,700 ton ▌Masonry: 146,000 m2 ▌Roughcast: 218,000 m2 ▌Screed: 66,000 m2 ▌Floor tiles: 58,000 m2 ▌Wall tiles: 35,000 m2 ▌Roofs: 42,000 m2 ▌False ceilings: 27,000 m2 ▌Accesses and pavements: 35,000 m2

Location: Cape Verde - Santa Maria, Sal Island Start / completion date: 2004 / 2006

Page 17: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Riu Karamboa Hotel

Characteristics: Main building, the central area of which has two floors and includes technical areas, a commercial area, one main restaurant, two theme restaurants, a lounge bar, a disco, bars etc. North end with three floors, composed of 36 guest rooms, 16 staff rooms, staff refectory, staff showers, laundry and linen room. South end with two floors, which includes the water tanks, machine room, store rooms, offices and reception hall. Guest room buildings with three floors, one in the north wing and the other in the south wing, symmetrical in relation to the central body of the main building. Building of rooms for managers and deputy managers, swimming pools and pool restaurant (Chiringuito), Hobby-Club building (mini-club), children’s pool, wellness/health club and two tennis courts. Main quantities: Ground area: 175,000 m2 ▌Construction area: 60,000 m2 ▌Guest rooms: 848

Location: Cape Verde – Boa Vista, Salina Beach Start / completion date: 2007 / 2008

Page 18: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Riu Touareg Hotel

Characteristics: Hotel with 750 rooms, including swimming pool, restaurants, bars, discos, landscaping, sports areas, parking. Main quantities: Construction area: 56,200 m2

Location: Cape Verde - Boa Vista Start / completion date: 2008 / 2011

Page 19: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Hotel Pestana Trópico remodelling

Characteristics: Hotel with 41 new rooms/suites, 32 rooms and renovation of the pool and surrounding area

Location: Cape Verde - Praia Start / completion date: 2011 / 2012

Page 20: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Pestana CR7 Hotel – Funchal

Characteristics: Located on Funchal Port, Hotel Pestana CR7 boasts a contemporary Art Deco and Lifestyle design. It comprises 48 CR/CR Superior rooms and 1 CR7 suite; a rooftop swimming pool, a relaxation deck, and its Marina. The Pestana CR7 Funchal has an open-air gym and a sauna.

Location: Portugal – Madeira, Funchal Start / completion date: 2015 / 2016 Value: € 2.300.000

Page 21: Apresentação do PowerPoint - Sacyr · The Hotel Riu was built in two distinct stages: Phase 1: the Hotel Riu Funaná was built, with 500 guest rooms; Phase 2: the Hotel Riu Garopa

▌Leisure infrastructures

Renovation of the Hotel Baía Azul

Characteristics: Demolition and stripping of all old coatings (including adjustments to interior partitioning), replacement of all exterior frames, sanitary ware, taps and accessories. Demolition of the outdoor pool and building of a new outdoor and indoor pool. Construction of an indoor SPA. Finishings: Estremoz marble flooring for the reception area, plasterboard false ceilings, painting of all interior and exterior walls, paving of balconies with ceramic tile, Ipê wood decking in the pool's solarium and on the sixth-floor terrace. Basalt coping. Portuguese-style pavement. Glass railing in the common areas. Main quantities: Total number of floors: 11 ▌ Total number of rooms: 215 ▌ Conference rooms: 2 ▌ Kitchens: 3 ▌ Restaurants: 3 ▌ Pools: 2 ▌ Turkish baths: 1 ▌ Saunas: 1 ▌ Massage rooms: 3 ▌ Yoga rooms: 1 ▌ Gyms: 1 ▌ Colour therapy rooms: 1 ▌ Interior painting: 43,700 m² ▌ Exterior painting: 7,070 m² ▌ False ceilings: 8,210 m² ▌ Ceramic tiles: 10,136 m²

Location: Portugal – Madeira, Funchal Start / completion date: 2015 / 2016 Value: € 4.280.000