Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of...
Transcript of Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of...
![Page 1: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/1.jpg)
LIFE ÁGUEDAConservation and Management Actions for
Migratory Fish in the Vouga River Basin (LIFE16 ENV/PT/000411)
16th May 2019
Funded by EU’s LIFEProgramme for theEnvironment andClimate action
![Page 2: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/2.jpg)
Project Summary
This communication reflects only the authors’ view. EASME and the EU are not responsible for any use that may be made of the information it contains.
![Page 3: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/3.jpg)
⦿ Duration: 01.Aug.2017 - 31.Jul.2022
⦿ Budget info:
⦿ Project’s location: Águeda
⦿ Total: 3 324 804 €
⦿ % EU Co-funding: 60%
(1 989 992 €)
⦿ EDP Co-funding :
(300 000€)
⦿ Additional financial support (post application, 2018):
⦿ Navigator Pulp Cacia
(≈140 000€)
List of National Sites of Community Importance (SIC)
![Page 4: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/4.jpg)
• Águeda Municipality (CMA)
• Mora Municipality (CMM) / Fluviário de Mora
• Aqualogus – Engenharia do Ambiente, Lda.
• Docapesca – Portos e Lotas, S.A.
⦿ Project’s Implementors:
⦿ Coordinating Beneficiary: • University of Évora / MARE
⦿ Associated Beneficiaries :
⦿ Institutional Support:
![Page 5: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/5.jpg)
Objectives &
Proposed Solutions
![Page 6: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/6.jpg)
Elimination of hydro-morphological pressures towards the reestablishment of conditions for a
Good Ecological Status, as required by the Water-Framework Directive (WFD, 2000/60/EC) and
River Basin Management Plans (RBMP).
![Page 7: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/7.jpg)
Sea lamprey
Allis shad
Twaite shad
Anadromous
European eel
Thin-lipped grey mullet
Catadromous
⦿ Elimination of river discontinuity in the rivers Águeda and Alfusqueiro, effectively ensuring the recovery and
re-naturalization of river habitats towards a Good Ecological State (WFD) for migratory fish populations
Al5
Al1Al2
Al3n Al3
Al4
![Page 8: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/8.jpg)
⦿ Obsolete obstacles removed from the riverbed
⦿ Nature-like fish passes at unsurmountable obstacles that are currently used
![Page 9: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/9.jpg)
⦿ Mitigation of the effects of unsurmountable dams on the nearby River Vouga
⦿ design and operation of a pilot translocation
program directed at European eel juveniles
(European eel Management Plan, EMP)
Grela’s hydropowerdam
![Page 10: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/10.jpg)
⦿ Re-naturalization of marginal riparian habitats, by reducing terrestrial habitats degradation and
controlling invasive alien species (European Biodiversity Strategy, EBS)
![Page 11: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/11.jpg)
Recreational and commercial fisheries management
⦿ Anglers’ engagement for fish monitoring (development of a mobile App “Pesca em
Portugal”)
⦿ Market differentiation and fish valorization (mobile auctions and label of origin)
Stakeholders engagement and compatibility of ecosystem uses
![Page 12: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/12.jpg)
Preparatory Actions
(A)
![Page 13: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/13.jpg)
⦿ Land and obstacle owners
⦿ Professional fisherman
⦿ Professional fishery associations
⦿ Supermarket chains
⦿ Corporations
⦿ Public administration
Stakeholders engagement
![Page 14: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/14.jpg)
Unforeseen outcome:
Contact with paper pulp producer (NAVIGATOR Pulp Cacia)
– Seasonal weir built for several decades (May – October)
– No fish pass: manual control of wooden boards to operate floodgates at every tide
– Monitoring plan proposed and accepted → additional funding
![Page 15: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/15.jpg)
Ag5n
Ag8Ag7
Fish pass
Removal / rearrangement
Management plan
Update of the reference situation• Number of obstacles changed from 2015 to 2017
![Page 16: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/16.jpg)
4 fish pass projects
3 nature-like
1 technical (seasonal)
obstacle removal /rearrangement (#8)
*Eel capture device
*Re-naturalization of riverbed (sediment distribution and relocation)
Projects developed / under development*
![Page 17: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/17.jpg)
Seasonal fishway (River Águeda)
![Page 18: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/18.jpg)
Water abstraction weir (for public supply) / riverside beach (Ag9 - River Águeda)
![Page 19: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/19.jpg)
Water abstraction weir (agricultural) (Ag10 - River Águeda)
PIT antenna
![Page 20: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/20.jpg)
Ancient (inactive) watermill (Al5 - River Alfusqueiro)
PIT antenna
![Page 21: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/21.jpg)
Eel capture device (Grela Hydropower Dam- River Vouga)
(First draft)
![Page 22: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/22.jpg)
Projects on invasive alien species (IAS) control and re-naturalization of riparian areas
Re-naturalization of riparian galleries
Acacia sp. (Mimosa) Arundo donax (Giant cane)
Phytolacca americana(American poke weed)
Ailanthus altissima(Tree-of-Heaven)
Areas of riparian habitat restoration and IAS control
![Page 23: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/23.jpg)
Land and obstacle owners
Informed consent forms signed (river and riparian areas intervention)
Public administration
Projects under appreciation
![Page 24: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/24.jpg)
Implementation Actions
(B)
![Page 25: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/25.jpg)
B4 – IAS control & Re-naturalization of riparian habitats
First works on Acacia sp. control with bark removal
![Page 26: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/26.jpg)
B6 – Mobile Auction & Label of Origin
Well received by fishermen and sellers
First fish labelled late March 2019
Mobile auction ready to operate in the 2020 shad and lamprey season
Shad and lamprey tagged with label of origin “Peixe do Vouga” (Fish from Vouga”) in Aveiro fish auction
Vehicle adapted to operate as mobile fish auction in the Vouga and Mondego river basins
![Page 27: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/27.jpg)
Monitoring Actions
(C)
![Page 28: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/28.jpg)
⦿ Characterization of ichthyological communities - electrofishing
⦿ Distribution and abundance of European eel, sea lamprey
larvae, trout - electrofishing
⦿ Movement and migratory patterns of anadromous and
potamodromous species – Radio tags
⦿ 20 barbel, 20 lampreys, 1 trout
⦿ Dispersion pattern of migratory fish species - PIT-tags
⦿ 175 barbel (>20 cm), 162 Iberian nase (>10 cm), 6 trout (>10 cm)
⦿ Inquiries to the fishermen communities of Vouga and Mondego
river basins (ca. 55 fishermen involved)
![Page 29: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/29.jpg)
⦿ Characterization of ichthyological communities
➢ Reference situation 2017/2018 (pre-intervention) – 61 km of river stretches in the Vouga River basin
✓ 2412 specimens from 21 different species (10 families)
![Page 30: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/30.jpg)
⦿ Distribution and abundance of European eel and sea lamprey larvae
➢ Reference situation 2017/2018 (pre-intervention) – 71 km of river stretches in the Vouga River basin
✓ 1304 sea lamprey / 381 European eels
![Page 31: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/31.jpg)
![Page 32: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/32.jpg)
Unforeseen complementary monitoring plan
Navigator Pulp Cacia (paper pulp factory)
Temporary weir to prevent saline intrusion
Built for several decades, from May to October/November
Monitoring plan proposed (2018)
• Maintenance of floodgates opening for longer periods
• ARIS Sonar acquisition financed by Navigator (100%)
![Page 33: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/33.jpg)
![Page 34: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/34.jpg)
Monitoring of the Temporary Weir – Weekly/24h cycles
Evaluate fish behavior and accumulation downstream the weir, at distinct discharge and gate operation
conditions;
Evaluate fish passage through the weir gates, and estimate number of successful fish, for distinct discharge and
gate operation conditions. Downstream: gates open
Upstream: gates open
Downstream: gates closed Downstream: platform built for monitoring
![Page 35: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/35.jpg)
Unforeseen complementary monitoring plan Conductivity and temperature probe placed in the Vouga river in November 2018 (real time
communication of data)
Vandalized in February 2019, partially recovered
![Page 36: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/36.jpg)
Communication &
Dissemination Actions
(D)
![Page 37: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/37.jpg)
http://www.life-agueda.uevora.pt
Visit:
![Page 38: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/38.jpg)
⦿ Roll-up display banner and flyers
Multiple banners printed and in use at events (since 03/2018)
Roll up LIFE Águeda at INTER LIFE PT 2018 (Fundão) and Fluviário de MoraFlyer A5 LIFE Águeda
![Page 39: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/39.jpg)
⦿ Networking:
LifeWatch/AtlantOS - European Tracking Network (ETN) developments workshop / Flanders MarineInstitute (10/2017)
LIFE FLUVIAL (03/2018)
![Page 40: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/40.jpg)
⦿ Visits to LIFE Águeda:
NORCONSULT – Sweden – 09/2018
Focal Point LIFE Hungary (Agnés Szarto) – 10/2018
LIFE SilIFFE (LIFE14 NAT/IT/000809) – Project networkinvitation – 11/2018
LIFE4Fish - France
![Page 41: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/41.jpg)
School visits to Fluviário de Mora
4074 visitantes (Dec.2018)
![Page 42: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/42.jpg)
6 days of activities under LIFE Águeda:
• Invasive Alien Species Control
• Re-establishment of river connectivity
• Ecological monitoring
⦿ Holiday occupation programme for the young
![Page 43: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/43.jpg)
Attendance at food festival “Lisbon Fish & Flavours” in 2018 and 2019
Meetings with large chain-stores to pitchlabel of origin’s market-value
Show-cooking at Lisbon Fish & Flavours 2019;lamprey and shad recipes cooked on site
Live sea lampreys at “Lisbon Fish & Flavours”2018
![Page 44: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/44.jpg)
World Fish Migration Day (2018)
⦿ Additional envolvement:
![Page 45: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/45.jpg)
Short-training programme: “Biologist for a day” – Highschool students
⦿ Additional envolvement:
![Page 46: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/46.jpg)
Upcoming:
Permanent exhibition at Agueda
Temporary exhibition at Fluviário de Mora
![Page 47: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/47.jpg)
Upcoming:
Informative panels in pedestrian paths
20 panels in total covering all interventions (e.g. riparian galleries, fish passes)
![Page 48: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/48.jpg)
Workshop Biomark - PIT-tags - 26 participants (23-25 May 2018)
⦿ Training
![Page 49: Apresentação do PowerPoint · 2019-06-02 · Proposed Solutions. Elimination of hydro-morphological pressures towards the reestablishment of conditions for a Good Ecological Status,](https://reader033.fdocuments.us/reader033/viewer/2022060419/5f16614224ec7032704f246f/html5/thumbnails/49.jpg)
Thank you all!