Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
1
Tivoli Decision Support& Capacity Planning
Emfisys - Bank of Montreal
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
2
TDS & Capacity Planning at Emfisys
Introduction
Combined presentationTDS experienceCapacity Planning website
Currently using TDS SPP and BMC Patrol Perform & Predict Data from 100+ servers (40+
applications)Small fraction of BMO total server farm, will
expand to 1,500+Historical data kept for capacity planning,
daily reports to intranet
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
3
TDS Experience at Emfisys
Background
Using BMC Patrol since 1997 Data from 40+ servers, almost 20 services
and growingLooked at alternatives summer 2000
Tivoli onsite & strategicBMC Patrol & Datametrics Viewpoint also onsiteEvaluated TDS, Patrol, Viewpoint
Installed TDS in production January 2001
Database moved February 2002
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
4
TDS Experience at Emfisys
TDS Logical Architecture
Tivoli TMRserver
Tivoli INVserver
Tivoli Decision SupportD iscovery Adm inistratorand Data Server
Tivoli DSDiscovery C lients
TargetServers
INVDatabase
TDSDatabase
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
5
TDS Experience at Emfisys
Configuration
All data from single TMR Soon to collect from three more Many gateways
Single TDS server handles all functions TDS application, Cognos cubes, also
Oracle databases (SPP, maybe others) SPP database on TDS servers
Gives TDS users access to raw data Inventory database helps billing & costing
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
6
TDS Experience at Emfisys
Successes
Collecting performance data from 100+ production servers Producing daily reports for 40+ business
applications on BMO intranetBenefit to application support teams
Using database with other business information to produce capacity updates
Planning to expand to 1,500+ serversMore efficient capital & expense dollars
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
7
TDS Experience at Emfisys
Challenges (1 of 4)
Job timeout applies to response only All Tivoli, not just TDS
e.g. aggregation and database population jobs
Timed-out job task continues to run
Need longer baseline for extrapolating trends 6 months may exclude seasonal peaks
e.g. Christmas, RRSP seasonEnhancement requested Oct/2000, available?
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
8
TDS Experience at Emfisys
Challenges (2 of 4)
Need workload characterizationServers will soon run multiple applications
Need differentiation between actual and forecast data
e.g. on Hourly views, can’t tell which is whichRequirement not yet raised to Tivoli
Need System Purpose matrixReplace single unsorted text-only variable in
Cube 3 with a matrix with sorting, etc.Enhancement requested Oct/2000
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
9
TDS Experience at Emfisys
System Purpose Matrix Example
Server name Bus. Application Location Support Team
CVDB1 Cust. Value Toronto Team A
CVDB2 Cust. Value Montreal Team A
CVApp Cust. Value Toronto Team A
CVWeb1 Cust. Value Vancouver Team C
CVWeb2 Cust. Value Montreal Team C
CVFW1 Cust. Value Toronto Team B
CVFW2 Cust. Value Montreal Team B
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
10
TDS Experience at Emfisys
Challenges (3 of 4)
Database maintenance and product recovery functions should be delivered
Oracle database cleansing, re-org, tuning, etc.Aggregation file backupDM event(s) for RIM failure, data collection
failureControl over data collection retriesPopulation job log file cleansing or rollover
New version difficultiesImplementation of DM 4.0 has yielded 42
layers instead of 18…?
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
11
TDS Experience at Emfisys
Challenges (4 of 4)Graphics flexibility
Changes sometimes not accepted in TDSUsing Cognos as delivered with TDS helps but
design capability still limited• Exploring full-function version of Cognos, but need to
know if “new TDS” will use it
Want to include capacity threshholds on charts
Web outputJPG output files too big, GIF smallerEnhancement requested Oct/2000Automated thumbnails would be nice
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
12
TDS Experience at Emfisys
Opportunities
Expansion planned to over 1,500 servers Capacity planning and performance
reporting handled by three-person team Enabled by top-down ability to focus on
servers trending towards trouble or running off trend
Looking to evaluate TDS Oracle, UDB, Notes and TSM Discovery Guides
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
13
TDS Experience at Emfisys
Conclusions
TDS has potential to allow a small team to handle capacity planning for a very large number of servers
Require Tivoli support Database tuning Product enhancements
Server purpose matrixGraphics flexibilityetc.
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
14
TDS & Capacity Planning at Emfisys
Interlude - CP at BMOData collection
• Collect raw performance data from systems & applications, aggregate to repositories
Performance reporting• Publish to intranet daily or...
Data inspection• Learn trends and usual patterns• Problem notification to support teams as needed
Capacity Planning!Business / systems history plus business
projections => Systems projections
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
15
Emfisys Capacity Planning Website
Background
Website in existence for many yearsMVS and other data updated daily or as neededUNIX data added starting 1997
UNIX website redesigned 1999/2000Reorganize data by type of serviceGroup charts to avoid scrolling pagesShow daily data week by week
Development continuesAdd application data, improve groupings &
accessibility
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
16
Emfisys Capacity Planning Website
Sample Pages (1 of 5)
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
17
Emfisys Capacity Planning Website
Sample Pages (2 of 5)
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
18
Emfisys Capacity Planning Website
Sample Pages (3 of 5)
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
19
Emfisys Capacity Planning Website
Sample Pages (4 of 5)
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
20
Emfisys Capacity Planning Website
Sample Pages (5 of 5)
Apr. 24, 2002 For CMG Canada - J.Gladstone, Bank of Montreal
21
TDS & Capacity Planning at Emfisys
Discussion
Anyone else using TDS SPP for capacity planning or performance reporting? Successes, challenges, opportunities
Anyone using TDS Oracle, UDB, Notes or TSM Discovery Guides?
Anyone else presenting performance data for large numbers of servers?
Questions?