Approved Competent Person 13 Steps for Underground Cable Detection (2018 Edition)

Transcript of Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable...

Page 1: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

Approved Competent Person

13 Steps for Underground

Cable Detection (2018 Edition)

Page 2: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

450

Introduction

The Electricity Supply Lines (Protection) Regulation requires that a competent person shall

undertake cable detection to ascertain the existence, alignment and depth of underground

electricity cables before excavation.

Underground cable detection is a specialised job. The competent person must be approved

by the Director of Electrical and Mechanical Services and shall carry out the cable detection

according to the steps as stipulated in the Code of Practice on Working near Electricity

Supply Lines.

The competent person shall pay attention to the following items:

1. Shall not delegate his duty of cable detection work to another person;

2. May carry out cable detection work with the assistance of other persons, but such

persons shall be directly supervised by that competent person;

3. Shall carry out cable detection work in a manner without causing damage to the

underground electricity cables;

4. If there is any difficulty in detecting the underground cables, assistance from the

electricity supplier must be sought;

5. Shall provide a “Competent Person Written Report” to the responsible person of the

work site and give a site briefing to the site personnel after completion of detection work.

Page 3: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

450

Work in Work in

Progress

Obtain drawings of works site and electricity supplier’s

cable plans.

1

13 Steps for Underground Cable Detection

Page 4: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

Carry out passive cable detection and propose trial hole locations.2

Supervise the excavation of trial holes in order to expose all target underground electric-

ity cables.

3

Proposed Trial Hole Alignment of U/G cable

detected by

passive detection

Competent

Person

Fence off the works site

Competent Person

Proposed Trial Hole Alignment of U/G cable

detected by

passive detection

Fence off the works site

建議

用圍欄圍封工地

建議

用圍欄圍封工地

Page 5: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

The competent person should repeatedly use a cable detection device and frequently

update the working personnel as to the most accurate cable location.

4

Trial hole excavation completed and the target cable is exposed.5

Competent Person

Proposed Trial Hole Alignment of U/G cable

detected by

passive detection

Fence off the works site

Competent Person

Alignment of U/G cable

detected by

passive detection

Fence off the works site

Page 6: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

Place a signal clamp around the cable and carry out toroidal active cable detection in order

to ascertain the alignment and depth of the unexposed underground electricity cables.

6

Mark the alignment and depth of underground electricity cables on the ground.7

Alignment of U/G cable

detected by

passive detection

Fence off the works site

450

Mark alignment

of the U/G cable

detected by

active detection

Competent

Person

Fence off the works site

Page 7: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

The competent person shall repeat the cable detection and/or contact electricity supplier when they find discrepancies between the cable detection results and the electricity supplier’s cable plans.

8

Take photos to record the cable detection process.9

450

Competent Person

Cable Plan

Fence off the works site

Alignment of

U/G cable by

active detection

450

Fence off the works site

Alignment of

U/G cable by

active detection

Page 8: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

Provide a “Competent Person Written Report” to the working party.10

Conduct site briefing to site personnel to explain the contents of the Report and the

safety precautions.

11

Competent PersonWritten Report Working party

Competent Person

Site Briefing

Competent PersonWrittenReport

Competent Person

ForemanWorker

Operator

Page 9: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

Working party shall keep the Competent Person Written Report or Cable Alignment

Record available on the construction site for the Director's inspection. The report/record

should be posted on the barrier or railing on the site.

12

Working party shall ensure the markings (both alignment and depth) identified by the

CP are available at site before the commencement of works.

13

Site Briefing

Competent PersonWrittenReport

Competent Person

ForemanWorker

Operator

450

Fence off the works site

Alignment of

U/G cable by

active detection

450 Working party

WorkerOperator

Fence off the works site

Page 10: Approved Competent Person - 13 Steps for Underground Cable ... · 13 Steps for Underground Cable Detection(2018 Edition) 450 Introduction The Electricity Supply Lines (Protection)

Penalties

A competent person failing to perform cable detection work to the reasonably

expected standard may have his/her approval as a competent person suspended for a

period up to 12 months.

Note: This is NOT a legal document and is prepared for general information only.

Electrical and Mechanical Services Department3 Kai Shing Street, Kowloon, Hong KongTel.: (852) 1823Fax: (852) 2895 4929Website: www.emsd.gov.hkE-mail: [email protected]

Publ

ishe

d by

the

Ele

ctric

al a

nd M

echa

nica

l Ser

vice

s D

epar

tmen

tPr

inte

d by

the

Gov

ernm

ent

Logi

stic

s D

epar

tmen

t