Applichem Tita

download Applichem Tita

of 4

Transcript of Applichem Tita

  • 7/31/2019 Applichem Tita

    1/4

    From / To Mexico Canada Venezuela Europe US Japan

    Production

    Cost

    Mexico City 0 11.4 7 11 11 14 95.01

    Ontario 11 0 9 11.5 6 13 97.35

    Cansas 7 10 0 13 10.4 14.3 116.34

    Frankfurt 10 11 12.5 0 11.2 13.3 76.69

    Gary 10 6 11 10 0 12.5 102.93Osaka 14 13 12.5 14.2 13 0 153.8

    Total Demand 3 2.6 16 30 26.4 11.9

    Import Duty 0% 0% 50% 9.50% 4.50% 6%

    From / To Mexico Canada Venezuela Europe US Japan

    Mexico City 95.01 106.41 153.015 116.081 110.7805 115.5506

    Ontario 108.35 97.35 159.525 119.1908 108.0008 116.971

    Cansas 123.34 126.34 174.51 141.6273 132.4433 138.4784

    Frankfurt 86.69 87.69 133.785 83.97555 91.84505 95.3894

    Gary 112.93 108.93 170.895 123.6584 107.5619 122.3558

    Osaka 167.8 166.8 249.45 183.96 174.306 163.028

    Total cost

  • 7/31/2019 Applichem Tita

    2/4

    Plant capacity (x

    100000 lbs) From / To Mexico Canada Venezuela Europe US

    22 Mexico City 3 0 11.5 0 6.8

    3.7 Ontario 0 2.6 0 0 1.1

    4.5 Cansas 0 0 4.5 0 0

    47 Frankfurt 0 0 0 30 0

    18.5 Gary 0 0 0 0 18.55 Osaka 0 0 0 0 0

    Demand 3 2.6 16 30 26.4

    Total demand 3 2.6 16 30 26.4

    Total Cost 161.9

  • 7/31/2019 Applichem Tita

    3/4

    Japan Supply Total Supply

    0 21.3 22

    0 3.7 3.7

    0 4.5 4.5

    0 30 47

    0 18.5 18.511.9 11.9 5

    11.9

    11.9

  • 7/31/2019 Applichem Tita

    4/4

    From / To Colombus St. Louis Denver LA

    Indianapolis 25 35 36 60

    Phoenix 55 30 25 25

    YN 40 50 80 90

    Atlanta 30 40 66 75

    From / To Colombus St. Louis Denver LA Supply Total SupplyIndianapolis 0 0 15 0 15 15

    Phoenix 0 0 0 6 6 6

    YN 10 4 0 0 14 14

    Atlanta 0 8 0 3 11 11

    Demand 10 12 15 9

    Total Demand 10 12 15 9

    total cost 1835