![Page 1: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/1.jpg)
APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG DEFECT ASSESSMENT GUIDELINES.
![Page 2: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/2.jpg)
Introduction
![Page 3: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/3.jpg)
Operator experience
![Page 4: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/4.jpg)
System Kwalification
![Page 5: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/5.jpg)
Acceptance criteria
• API 1104 Annex A
• AS 2815-2
• EN 12732 Annex G
![Page 6: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/6.jpg)
EPRG weld defects acceptance criteria tier 2 Limitation Overmatching weld How to perform in 4.5 to 8 mm wall thickness
Advantages Expensive CTOD testing not required Focus on relevant defects
Acceptance criteria
![Page 7: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/7.jpg)
30 planar defects 26 special defects All defects Planar defects
Missed defects
Defects found
%
Misseddefects
Defects found
%
Found defects
%
Tolerance on averagelength(mm)
PA company X
4 87% 6 77% 82% -7,9
PA company Y
3 90% 4 85% 87% -4,8
RT 16 47% 8 70% 57% - 8,7
Acceptance criteria
Detection and length tolerance of PAUT versus RT
![Page 8: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/8.jpg)
Acceptance criteria
![Page 9: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/9.jpg)
EN-ISO 19285
0
0,4
0,8
1,2
0 0,4 0,8 1,2
√DR
LR
2 mm surface flaw l=t2 mm sub surface flaw 0,5 mm under surface l=t2 mm sub surface 1 mm under surface l=t3 mm sub surface 0,5 mm under surface l=0,75t3 mm sub surface 1,5 mm under surface l=t
safe region
unsafe regionL415M
DN450d= 8mm
Min KVC 27Jouleweld
![Page 10: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/10.jpg)
Implementation
PA versus RT • Found defects• Repair %• NDT time
required
![Page 11: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/11.jpg)
Verify the data quality before acceptance and storage
Check the presence of the correct weld overlay
Evaluation of data 2 year use
![Page 12: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/12.jpg)
Revision of defect sizing #12
DIFFRACTION?
![Page 13: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/13.jpg)
Negative Operator must be experienced. Lower limit of 4.5 mm. Material limited to L245/gr B. Re calibration can be time consuming.
Positive Fast method with direct results. Work kan continue no radiation issue
Survey welding contractors
![Page 14: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/14.jpg)
Future developments
• Singel sided PA on fitting to pipe welds
• Full Matrix Capture
![Page 15: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/15.jpg)
CT RT scanUT FMC scan
Current method fit it in a rectangleManually verify to tables of alloweddefects
3D-FEA methodModel the flaw as is in the meshof the girth weldCompute if loads can be transferred through weld with indications
![Page 16: APPLICATION OF THIN-WALLED PHASED ARRAY WITH EPRG … · • API 1104 Annex A • AS 2815-2 • EN 12732 Annex G. EPRG weld defects acceptance criteria tier 2 Limitation Overmatching](https://reader033.fdocuments.us/reader033/viewer/2022041903/5e61edc242a03f1b87207ebc/html5/thumbnails/16.jpg)
Outcome
https://www.twi-global.com/technical-knowledge/published-papers/development-of-girth-weld-flaw-assessment-procedures-for-pipelines-subjected-to-plastic-straining-july-2007/
Workmanship-ECA 3D NDE methods
Automated generation of
indications in FEA mesh
MOBILE 3D-X-RAY TOMOGRAPHY FOR ANALYSIS OF PLANAR DEFECTS IN WELDS BY “TOMOCAR”
AutomatedVerification in FEA for
loads based on pre-set mechanical levels
Possible VariablesFEA MeshFEA Mechanical parameters accuracyNDT technique limitationsRequirements on load capacity