FORM NO. 1 (Prescribed under Rule 3) Application for permission to construct, extend or take into use any building as a factory. 1. Application for – (a) constructing new building. (b) Extending an existing building (c) Taking into use any building as factory (Tick one or more as applicable) 2. Applicant’s name and address : (In block letters) 3. Full name and postal address : of factory. a. Name b. Address (Town or village/Dist./Pin Code No.) 4. Please indicate also following details – a. Nearest Police station – distance. b. Nearest Railway Station – or steamer Ghat – c. Nearest Public Hospital. 5. a. Whether already registered as factory Yes/No. b. If Yes, 1. Registration No. 2. License No. 3. Date of renewal of License

description

Application for Factory Plan Approval

Transcript of Application for Factory Plan Approval

Page 1: Application for Factory Plan Approval

FORM NO. 1

(Prescribed under Rule 3)

Application for permission to construct, extend or take into use any building as a factory.

1. Application for –

(a) constructing new building.

(b) Extending an existing building

(c) Taking into use any building

as factory

(Tick one or more as applicable)

2. Applicant’s name and address :

(In block letters)

3. Full name and postal address :

of factory.

a. Name

b. Address

(Town or village/Dist./Pin Code No.)

4. Please indicate also following details –

a. Nearest Police station – distance.

b. Nearest Railway Station – or steamer Ghat –

c. Nearest Public Hospital.

5. a. Whether already registered as factory Yes/No.

b. If Yes, 1. Registration No.

2. License No.

3. Date of renewal of License

c. Does it fall in hazardous category

under section 2(cb) ? Yes/No.

d. If so, has site been approved u/s 41 A? Yes/No.

e. If so, date of approval

6. Particulars of plant to be installed.

*To be enclosed only if the site has not been

appraised in terms of Section 41 A.

Page 2: Application for Factory Plan Approval

7. Enclosures

a. Flow chart of the manufacturing process Yes/No.

b. Brief description of the process in its various stages Yes/No.

c. Plan, in duplicate drawn to scale showing –

i. the site of the factory and immediate

surroundings including adjacent buildings

and other structures, roads, drains, etc. Yes/No.

ii. the plan, elevation and necessary cross-sections

of the various building indicating all relevant

details relating to natural lighting, ventilation

and means of escape in case of fire. The

plans shall also clearly indicate the position

of the plant and machinery, aisles

and passage – ways Yes/No.

d. Such other particulars as required by the

Chief Inspector at the time of submission of

the application ,

Signature of applicant.

Name of applicant

(In block letters)

Date : Telephone Number

Page 4: Application for Factory Plan Approval

Pollution Control Board

Petroleum & Explosive

Labor Welfare Clearances

Safety and Health (DISH)

Electricity & Water

Fire Services

BIS Services

Boiler Inspection

Food and Drug Services

Excise & Customs

Sales Tax Services

Income Tax Services

Foreign Trade Services

Land Conversion

PWD Services

Directorate of Industrial Safety and Health (DISH)

The main objective of the Directorate, Ind. Safety and Health is to ensure safety, health, welfare and working conditions of workers working in factories and in construction works by effectively enforcing the provisions of the Factories Act the Building & Other Const. Workers Act and other labour legislations. It is also to ensure the protection of rights of workers and to redress their grievances.

The department supervises and advises in eliminating unsafe condition, actions and situations. It also wants to keep constant watch on factories dealing with hazardous chemicals by way of regularly sampling and carrying out medical check-up for workers employed in such processes.

The department has the objective of preventing any major industrial disaster with help of disaster control plans already prepared for areas having more concentration of hazardous industries, also to promote the concept of mutual aid system which would be useful especially to small-scale industries.

It is also the objective of the department to Act as a Friend, Philosopher and Guide to one and all in creating safe working conditions.

Permissions and Licences

Page 5: Application for Factory Plan Approval

Note: If the factory is under construction then the Factory Plans are to be approved by DISH before commencement of the construction. The changes if any are to be incorporated by submitting and obtaining approval of the revised plan. Before commencement of the production the application is to be made to DISH for Factory License. The Factory License is given for the specific period and need to be renewed from time to time.

FACTORY PLAN APPROVAL (Form - 1)

FACTORY REGISTRATION and LICENSE (Form - 2)

FACTORY LICENSE RENEWAL (Form - 3)

ASCC Service Offering:ASCC will liaise with State Directorate of Industrial Safety and Health to help you with Factory Plan Approval, Factory Registration and License and Renewal of Factory License as listed above required at various stages while setting up your industry or change of activity by your industry or any expansion of industry.

Supporting Documents

Note: Supporting document(s) like Building Stability Certificate are required when submitting application for Factory License.

Building Stability Certificate

ASCC Service Offering:ASCC works with Approved Civil Engineers to carry out structural audit of your factory and issues you a Building Stability Certificate.

Safety Audit Service

Note: Safety Audit needs to be carried out yearly or half-yearly depending as per guideline from DISH. Detailed report of Safety Audit needs to be submitted to DISH.

ASCC works with Approved Safety Audit firms to carry out detailed audit of your factory -

Page 6: Application for Factory Plan Approval

machinery, cranes etc. There are FOUR STAGES to an inspection (Safety Audit) Carried out by External Inspector (Chartered Engineer).

The first stage includes information gathering, the assembly of inspection tools and other preparations. This process ensures that the members conducting the inspection are well informed about the area to be visited and better able to identify hazards. Inspection tools include floor plans of the area, flow charts of the work process, checklists and other records.

The second stage involves the physical inspection of the workplace or work area. It should involve talks with workers and supervisors, the use of the inspecting member's senses, knowledge and training to help detect hazards and the use of common sense to identify hazardous situations that could develop under certain conditions. Where hazards are discovered during the inspection that immediately endanger the health or safety of a worker, the member should take the steps required by law, and by the employer's health and safety program, to have the danger removed immediately. This includes immediately reporting the situation to the employer. One purpose of the inspection is to verify that controls installed as a result of a previous inspection are in place and are working properly. Immediately following the inspection, the member should carry out third stage.

The third stage, which is review and writing of the report. The written report should state the place, date and time of the inspection and name the person who conducted it. The findings of the report should describe the potential hazards identified, classify them by priority categories and provide any other relevant information. Classification identifies those potential hazards that need immediate attention. The report may draw conclusions about the potential hazards that have been identified, and recommend controls to reduce or eliminate worker exposure to the potential hazard.

The fourth and the final stage, as per the government standards, the Safety Audit Engineer/Inspector will issue the Safety Audit Certificate.

ASCC Service Offering:ASCC works with Approved Safety Audit Firms to carry out detailed audit of your factory as per the DISH guidelines.

Disclaimer of Warranties/Accuracy and Use of Information

Although the data found using the ASCC Pvt. Ltd. website have been produced and processed from sources believed to be reliable, no warranty expressed or implied is made regarding accuracy, adequacy, completeness, legality, reliability or usefulness of any information. This disclaimer applies to both isolated and aggregate uses of the information. ASCC Pvt. Ltd. website provide this information on an "AS IS" basis. All warranties of any kind, express or implied ARE DISCLAIMED. Changes may be periodically added to the information herein. If the user has obtained information from ASCC Pvt. Ltd. website, the user must be aware that electronic data can be altered subsequent to original distribution. Data can also quickly become out-of-date. It is recommended that the user pay careful attention to the contents of any metadata associated with a file, and that the originator of the data or information be contacted with any questions regarding appropriate use. If the user finds any errors or omissions, we encourage the user to report them by writing an email to [email protected]. We appreciate you helping us to keep the information updated at all times and thus helping the community.

While using the ASCC Pvt. Ltd. website (www.ascconline.com), user accepts the "ASCC - Terms and Conditions" and the "ASCC - Privacy Policy".