1 Daylight & Sunlight Assessments of Proposed Housing Development at Grange End, Dunshaughlin, Co. Meath Applicant: Loughglynn Developments Limited Date: May 2020 Prepared by John Healy MSc Environmental Design of Buildings 1 Rathmines Road Upper, Dublin 6, D06 Y5P5 tel 01 4965340 email [email protected] web digitaldimensions.ie Digital Dimensions Ltd trading as Digital Dimensions.

Transcript of Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74...

Page 1: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

1

Daylight & Sunlight Assessments of Proposed Housing Development at Grange End, Dunshaughlin, Co. Meath

Applicant: Loughglynn Developments LimitedDate: May 2020

Prepared by John HealyMSc Environmental Design of Buildings

1 Rathmines Road Upper, Dublin 6, D06 Y5P5 tel 01 4965340 email [email protected] web digitaldimensions.ie Digital Dimensions Ltd trading as Digital Dimensions.

Page 2: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

2

1. Introduction

This proposed residential development is at Grange End, Dunshaughlin Co. Meath. The application site is located in a greenfield site to the East of the town. The site is bounded by the R125 and a the proposed new distributor road. There is a housing estate, Grange Park to the South West.

The proposed development consists of 2 storey houses, 3 - 4 storey apartment blocks and a creche building. There are a number of amenity spaces throughout the development.

The calculations are based on the drawings prepared by O’Daly Architects.

The results find that there would be no impact on the neighbouring dwellings or amenities and there would be good quality daylight in the apartments analysed. The amenity spaces would meet the BRE criteria for Open Space and Gardens. The proposed development meets the recommendations of the BRE guidelines.

2. Methodology

2.1 Notes on the use of BS 8026-2 2008 and BRE guidance document (2011) “Site layout planning for daylight and sunlight”.

To date, it is understood that no standards or guidance documents (statutory or otherwise) on the subject of sunlight access to buildings or open spaces or daylight access to buildings have been prepared or published in Ireland. Sustainable Urban Housing: Design Standards for New Apartments, Guidelines for Planning Authorities 2018 directs Planning authorities to have regard to quantitative performance approaches to daylight provision outlined in guides like the BRE guide ‘Site Layout Planning for Daylight and Sunlight’ (2nd edition) or British Standard BS 8206-2: 2008 – ‘Lighting for Buildings – Part 2: Code of Practice for Daylighting’. The standards for daylight and sunlight access in buildings (and the methodologies for assessment of same) suggested in both of these documents have been referenced in this Sunlight and Daylight Access Analysis. Neither the British Standard nor the BRE Guide set out rigid standards or limits. The BRE Guide is preceded by the following very clear warning as to how the design advice contained therein should be used: “The advice given here is not mandatory and the guide should not be seen as an instrument of planning policy; its aims is to help rather than constrain the designer. Although it gives numerical guidelines, these should be interpreted flexibly since natural lighting is only one of many factors in site layout design.” That the recommendations of the BRE Guide are not suitable for rigid application to all develop-ments in all contexts is of particular importance in the context of national and local policies for the consolidation and densification of urban areas. Given that the British Standard and the BRE Guide was drafted in the UK in the context of UK strategic planning policy, recommendations or advices provided in either document that have the potential to conflict with Irish statutory planning policy have been disregarded for the purposes of this analysis.

Page 3: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

3

2.3 Sunlight to gardens and open spaces

For calculations of sunlight analysis it is general practice to use March 21 and the recommenda-tions of the BRE guidance document (2011) “Site layout planning for daylight and sunlight”. P.J Littlefair, in relation to Gardens and open spaces section 3.3.17 state:

“It is recommended that for it to appear adequately sunlit throughout the year, at least half of a garden or amenity area should receive at least two hours of sunlight on 21 March. If as a result of new development an existing garden or amenity area does not meet the above, and the area which can receive two hours of sun on 21 March is less than 0.8 times its former value, then the loss of sunlight is likely to be noticeable. If a detailed calculation cannot be carried out, it is recom-mended that the centre of the area should receive at least two hours of sunlight on 21 March.”The BRE Guidance document recommends “To assess loss of sunlight to an existing building, it is suggested that all main living rooms of dwellings, and conservatories, should be checked if they have a window facing within 90º of due south.”

2.4 Daylight in the proposed development.

The proposed project is analysed in plan & section, and building use. The rooms judged to have the potential for the lowest levels of daylight are selected as worst case scenarios and assessed for Average Daylight Factor (ADF).

Page 4: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

4

96.5

00

100.

500

102.063

HEDGE

101.987102.085

CL100.901MH

ROAD

95.25

96.82

96.4396.24

96.0

00

96.500

97.000

97.500

98.000

98.000

98.500

99.000

99.5

00

96.948

BOTTOM OF BANK

96.49996.429

94.183

94.63094.610

94.622

BOTTO

M O

F BANK

97.866

97.156

96.796

96.380

95.29095.109

96.4

72

BOTTO

M O

F BANK

96.6

69

HEDGE

94.471IL

101.618

102.008

99.94

99.59

99.17

98.86

98.60

98.42

98.52

98.79

99.02

99.38

99.00

98.70

98.45

98.20

98.02

97.81

97.85

97.99

98.17

98.39

98.03

97.84

97.65

97.53

97.46

97.04

97.16

97.26

97.33

97.58

97.24

96.96

96.82

96.72

96.70

96.50

96.53

96.59

96.77

96.47

96.61

SP

98.03

TOP OF BANK

97.5697.26

TOP O

F BANK

95.74

95.9195.82

95.4395.51

98.13

97.69

97.22

96.87

96.29

95.98

TOP OF BANK

96.69

96.4

296

.31

96.3

5

96.3

696

.60

96.3

4

96.85TO

P OF BAN

K97.25

97.05

94.649LEVEL

TREE

TREE

TREE

TREE

EXISTING DRAIN

EXISTING DRAIN

WATER

101.

120

FENCE

101.3

32

101.099

102.

222

102.

317

102.

512

102.

480

102.

470

102.

819

100.647FH

100.658FH

GATE

HEDGE

99.699IL

101.

933

101.

633

101.

637

101.

457

101.

355

101.2

71

101.073

100.780

MHCL101.627

100.677

100.452100.043

100.011

100.443

100.457

100.587

100.820

101.052

101.412

100.121

100.696100.637

WALL

99.954

WATER

SP

LEVELWATER

PUMP

FENCE

92.5

00

93.000

93.000

93.500

93.50

0

94.00

0

94.00

0

94.000

94.000

94.50

0

94.500

94.500

94.500

94.500

94.5

00

95.0

00

95.000

95.00

0

95.000

95.000

95.0

00

95.500

95.500

96.000

96.0

00

96.500

96.500

96.500

96.500

96.500

96.5

00

96.500

97.000

97.0

00

97.0

00

97.500

97.500

97.5

00

97.5

00

97.500

97.500

98.000

98.000

98.5

00

98.500

99.000

99.000

99.500

99.500

100.000

100.000

100.500

101.

000

101.500

102.000

102.500

102.500

102.500

102.500

102.500

103.000

103.000

102.106BB102.145

BB

93.590BB

93.99994.36194.755

95.014

95.088

101.946BB

102.048

102.077102.273

102.468

102.392

102.474102.113

BB

BUILDING

97.471

98.04EIR

EP

EP

97.6

42

94.86995.108

95.41195.435

96.04

5

FENCE

96.62

2

96.47

496.

653

96.7

79

96.6

17

102.

653

96.903

POST&W

IRE FENCE96.616

94.875

95.026

94.491

94.444

94.402

93.953

93.570

93.730

93.758

93.352

92.880

92.111

92.31792.095

92.518

92.88093.103

93.309

93.549

93.737

93.779

GATE

GATE

GATE

GATE

HEDGE

95.003IL

95.880IL

91.673IL

91.090IL

90.584IL

98.464IL

97.011IL

94.101IL

94.072IL

94.382IL

94.814IL

94.753IL

95.062IL

95.019IL

94.960IL

CL101.623MH

CL99.189MH

CL97.359MH

CL97.412MH

PATH

100.707

99.64

99.47

99.32

99.15

98.9

1

98.3

8

97.8

8

97.5

5

97.40

97.28

97.21

ROAD

97.40

97.57

97.83

97.99

98.11

97.98

97.86

97.91

97.90

97.92

97.78

97.72

98.1

1

97.5

8

97.42

97.34

97.45

97.69

97.70

97.70

97.80

97.97

98.02

97.98

97.92

97.79

97.75

97.64

97.66

96.6897.13

96.79

100.42

95.32

95.09

95.03

94.45

94.22

94.92

95.15

94.99

94.14

94.00

93.83

93.70

93.42

93.18

92.9492.64

92.4592.61

92.79

92.5992.15

92.1192.61

92.19

92.42

92.33

92.8593.49

92.85

92.3392.51

92.1692.48

92.22

92.66

92.4892.74

92.97

93.01

93.16

93.34

93.56

93.70

93.67

93.74

93.80

93.93

93.77

93.59

94.12

94.46

94.27

94.43

94.47

94.55

94.46

95.01

95.19

95.1094.91

95.25

95.5795.68

96.20

96.75

97.14

97.08

96.77

95.51

95.24

95.44

94.83

94.81

94.8494.67

94.86

95.00

94.95

94.84

94.65

94.52

94.65

93.98

93.85

93.77

93.39

93.33

93.11

93.46

93.59

93.84

94.04

94.51

94.47

95.01

95.01

95.24

95.34

95.44

95.2295.39

95.67

95.26

95.76

96.47

96.91

97.02

95.65

95.52

95.35

95.59

95.39

95.31

94.94

94.54

94.46

93.93

93.83

93.86

94.02

93.93

94.42

94.77

95.21

95.41

95.51

95.44

95.50

96.15

96.72

97.46

97.69

97.53

97.61

96.88

96.64

96.73

96.46

96.28

95.89

95.91

95.46

94.95

94.71

94.38

94.04

94.59

94.96

94.9394.92

95.08

95.72

95.66

95.83

96.03

96.30

96.26

96.44

96.57

96.61

96.90

97.07

97.11

97.07

97.21

97.30

97.28

97.71

97.24

97.17

97.39

97.09

96.90

96.70

96.42

96.3596.18

96.27

95.94

95.72

95.65

95.94

95.79

95.58

95.40

95.11

95.10

95.27

95.51

95.64

95.83

95.97

95.6495.65

95.82

96.27

96.44

96.66

96.89

97.18

97.16

97.48

97.11

97.28

96.93

96.85

96.83

96.93

96.6796.73

96.9196.81

96.90

96.56

96.48

96.51

96.85

97.05

97.21

97.06

97.42

97.51

97.05 97.36

97.52

97.5697.53

97.2097.00

97.25

97.0697.08

96.8596.41

96.3196.30

96.61

96.38

96.53

96.28

96.3096.08

96.32

96.5996.25

96.3996.18

95.96

96.2895.63

95.80

95.3995.76

95.3195.51

95.43

95.0895.20

95.14 94.85 94.83

94.53

94.73

94.81

94.57

95.11

94.75

95.34

95.50

95.63

95.7995.94

95.6395.66

95.59

96.15

95.61

95.92

95.64

95.64

96.51

96.23

96.39

96.9097.0297.2897.8198.12

98.43

98.80

99.14

99.18

99.01

99.56

100.30

100.46

100.91

101.19

101.27

101.49

101.85

102.41

102.40

102.20101.94

101.64101.31

101.21

100.99

100.69

100.26

99.85

99.20

98.51 97.66

97.05

96.75

97.36

98.04

98.67

99.30

99.78

100.27

100.61

100.96

101.28

101.89102.75

103.07103.05103.59

103.09103.18103.30

103.06103.29

103.22

103.45102.98

102.96103.04102.96

103.16102.48

102.64

102.35

102.76

102.58

102.66

102.22

102.09

101.78101.48

101.19

100.93

100.64

99.81

99.27

98.67

98.02

97.37

97.25

97.78

98.44

99.03

99.60

100.04

100.51

100.96101.35

101.99

102.05101.62

101.47101.14

100.85

100.46

99.70

98.70

97.42 96.4196.42

96.36

96.81

98.20

99.57

100.55

100.95

101.21101.33

101.50101.80

102.15

101.52

101.09

100.90

100.62

100.60

100.74

100.57

100.14

99.37

98.49

96.92

96.27

96.35

96.26

96.31

96.60

97.28

98.36

98.85

99.38

99.60

99.52

99.37

100.15

100.63

99.26

98.99

98.39

97.75

97.07

96.49

96.40

97.02

101.04

102.66

102.13

101.87101.63

101.37

99.79

98.34

97.93 97.44

96.2499.04

99.59

101.25

101.68

102.22

102.42 102.39 102.37 102.32

102.21

101.89

101.42

100.44

100.80

101.51

101.91

100.84

100.56

99.98

98.70

97.18

100.77

100.98

100.06

98.91

97.06

101.08

96.544

96.080

92.99

99.13 TB

99.0

2

98.4

7TB

96.0

2TB

96.85

TB

96.73

96.7196.63

96.57

96.53

96.30

96.56

96.12

96.02

96.0

096

.58

96.55

TB

95.32TB

95.27

95.2594.86

92.09

TB

92.0392.50

93.04

93.16

93.42

93.61

93.66

96.3296.46 92.61 92.67

92.4792.48

92.5492.33

92.31

102.63TB

103.08

101.43TB

101.09TB

100.73TB

97.5997.69

96.05

96.64

95.92

95.60

95.5896.00

95.66

95.4995.31

95.4495.48

102.51102.85

102.93 102.70

96.15

96.06

96.28

97.06

96.8996.20

96.31

96.1696.21

96.24

95.8496.04

95.99

96.43TB

96.55

97.0

2TB

96.4

4

96.1

4

95.4895.14 94.84

94.3593.83

95.42TB

95.41 95.25 95.0194.54

94.61 93.84

91.286WATERLEVEL

98.887IL

99.623

99.211

101.74SC

99.347

99.74999.581

99.999

98.983LEVEL

WATER

EXISTING DRAIN

EXISTING DRAIN

DRY DRAIN

EXISTING DRAIN

EXISTING DRAIN

102.

500

102.000

102.000

POST&W

IRE FENCE

96.500

96.500

101.000

100.500

97.0

00

98.0

00

98.500

101.000

101.500

102.000

BB

CRUSH

102.

753

93.989IL

93.965IL

100.741

97.53

97.22

100.73

95.30

95.34

97.44

97.14

96.57

95.96

95.78

95.77

95.93

96.18

95.76

95.46

95.75

95.70

95.60

95.29

95.70

95.35

95.80

95.89

95.68

95.93

95.18

95.22

95.8095.48

95.49

95.61

96.63

96.82

97.1196.92

101.75

100.26

96.8896.62

96.95

101.70

96.70

97.09

101.14

101.07

101.48

94.36

95.3595.07

95.23 95.02

96.4996.39

96.75

102.71

95.29TB

TOP OF BANK

94.9

9

93.907LEVEL

WATER

DRY DRAIN

94.000

94.00094.500

94.500

95.00

0

95.500

95.500

96.000

96.000

96.500

96.500

96.500

94.23BB 93.91 93

.7993

.78

BB

94.3694.21 93.96 93.73

96.274

95.953

FENCE

GATE

96.769

96.423

96.16896.005

97.192

96.866

96.533

96.107

94.79

94.83

95.08

94.74

94.44

94.25

94.32

94.59

94.96

95.11

95.14

94.93

94.78

94.59

94.55

94.52

94.60

95.07

95.31

95.56

95.31

95.65

95.77

95.67

95.09

94.95

94.85

94.55

94.44 94.63

94.36

94.52

94.63

94.77

94.73

95.02

94.78

95.57

96.11

96.01

95.84

95.87

95.74

95.67

96.47

96.36

96.13

96.3596.68

96.91

96.75

94.43TB

94.68 94.94 94.67 94.20 93.74

94.55 TB 94.4

5

94.8594.93

97.00097

.000

97.500

97.500

102.

000

100.22EAVES

GATE

CL101.614MH

102.526RIDGE

97.53

97.24

97.17

97.1297.1197.08

97.02

97.18

97.16

97.31

97.17

97.22

97.44

97.56

97.8497.55

97.41

97.36 97.29 97.01

96.78

96.78

97.0897.2697.53

97.3596.984

97.087

97.216

97.158

97.03

96.86

97.1697.31

BUILDING

97.45

GATE

GRANGE PARK

GRANGE PARK

GRANGE PARK

CNOC TIARNACH

AB

C

D

EF

1

2

7

8

9

10

11

12

13

14

19

20

37

36

35

34

33

32

31

30

25

24

23

22

39

48

49

50

51

52

53

54

55

56

57

63

62

65

64

67

66

69

68

70

47

21

77

94

95

96

97

99

98

101

100

BLOCK A

198 - 212

BLOCK B

183 - 197

15

16

17

18

29

28

27

26

92

91

90

105

93

102

104

103

BLOCK C

168 - 182

BLOCK D

150 - 167

58

59

61

60

BLOCK E

132 - 149

88

87

86

109

89

106

108

1077879

8081

7273

7475

76

85

84

83

82

113

112

111

110

Creche

3

4

5

6

38

46

45

44

43

42

41

40

71

BLOCK F

114 -131 Bikes & Bins

Bikes & Bins

Bikes & Bins

Bikes & Bins

Bikes & Bins

NEW

SECTION

OF DISTRIBU

TOR RO

AD

NEW SECTIO

N OF DISTRIBUTO

R ROAD

Figure 1. Aerial view of site.

3. Proposed Project Description

SITE

Figure 2. Proposed site plan

N

N

Page 5: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

5

Figure 3. View towards the proposed site, from The R125

Figure 4. View East towards the site, with Grange Park to the South

SITE

The site is bounded by two roads, the R125 to the North and a the proposed new distributor road to the East. The housing estate, Grange Park is to the South West.

Due to it’s location, this development has would not impact on the Daylight or Sunlight amenity of any neighbouring property. Within the development, the buildings are predominately low rise, of the scale and distances typical of the adjacent housing estate.

SITE

Page 6: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

6

4. Assessment of Daylight in the Proposed Development.

The BRE guidelines recommend that the Average Daylight Factor be assessed in new developments. BS 8206-2 gives minimum values of ADF of 2% for kitchens and living rooms which include a kitchen, 1.5% for living rooms and 1% for bedrooms. An average daylight factor of 5% is a well daylit space.

The overall development was examined for daylight. Factors influencing daylight include room depth, area in relation to area of window, single aspect and closeness to an adjacent obstruction mass. Only living rooms, kitchens and bedrooms are required to be assessed.

The low rise nature of the housing estate means that the house are likely to have a good quality of both daylight, internally and sunlight, externally. Equally the apartment blocks are well laid out, many have dual aspect living spaces. The ground floor windows have a higher lintel, at 2250m, affording a deeper penetration of daylight into the rooms.

Blocks A, B & CThese blocks have good orientation, all living-spaces are dual aspect with at least one window unobstructed by a balcony above.

Figure 5. Ground floor plan of Blocks A, B & C

Page 7: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

7

Figure 7. Ground floor plan of Block F, showing unit tested for ADF. Blocks D and E have the same layout.

Figure 6. Site plan showing location of unit assessed for Average Daylight Factor94

.000

94.000

94.000

94.50

0

94.500

94.500

94.500

94.5

00

95.000

95.00

0

95.000

95.000

95.0

00

95.500

96.00096

.000

96.500

96.500

96.500

96.500

96.500

96.5

00

96.500

97.0

00

97.0

00

97.500

97.50

0

97.5

00

97.500

97.500

98.000

98.000 93.590BB

93.99994.36194.755

95.014

95.088

BUILDING

97.471

98.04EIR

EP

97.6

42

96.04

5

FENCE

96.62

2

96.47

496.

653

96.7

79

96.6

17

POST&W

IRE FENCE96.616

94.875

95.026

94.491

94.444

94.402

93.953

93.570

93.730

93.758

GATE

GATE

GATE

GATE

HEDGE

95.003IL

95.880IL

97.011IL

94.814IL

94.753IL

95.062IL

95.019IL

94.960IL

CL97.359MH

97.28

97.21

ROAD

97.40

97.57

97.83

97.99

98.11

97.98

97.86

97.34

97.45

97.69

97.70

97.70

97.80

97.97

98.02

97.98

96.6897.13

96.79

93.67

93.80

93.93

93.77

93.59

94.12

94.46

94.27

94.43

94.47

94.55

94.46

95.01

95.19

95.1094.91

95.25

95.5795.68

96.20

96.7597.08

96.77

95.51

95.24

95.44

94.83

94.81

94.8494.67

94.86

95.00

94.95

94.84

94.65

94.52

94.65

93.98

94.51

94.47

95.01

95.01

95.24

95.34

95.44

95.2295.39

95.67

95.26

95.76

96.47

96.91

97.02

95.65

95.52

95.35

95.59

95.39

95.31

94.94

95.41

95.51

95.44

95.50

96.15

96.72

97.46

97.69

97.53

97.61

96.88

96.64

96.73

96.46

96.28

95.89

95.91

95.72

95.66

95.83

96.03

96.30

96.26

96.44

96.57

96.61

96.90

97.07

97.11

97.07

97.21

97.30

97.28

97.71

97.24

97.17

97.39

97.09

96.90

96.70

96.42

96.3596.18

96.27

95.94

95.72

95.65

95.9495.97

95.6495.65

95.82

96.27

96.44

96.66

96.89

97.18

97.16

97.48

97.11

97.28

96.93

96.85

96.83

96.93

96.6796.73

96.9196.81

96.90

96.56

96.48

96.51

96.85

97.05

97.21

97.06

97.42

97.51

97.05 97.36

97.52

97.5697.53

97.2097.00

97.25

97.0697.08

96.8596.41

96.3196.30

96.61

96.38

96.53

96.28

96.3096.08

96.32

96.5996.25

96.3996.18

95.96

96.2895.63

95.80

95.3995.76

95.3195.51

95.43

95.0895.20

95.14 94.85 94.83

94.53

94.73

94.81

94.57

95.11

94.75

95.34

95.50

95.63

95.7995.94

95.6395.66

95.59

96.15

95.61

95.92

95.64

95.64

96.51

96.23

96.39

96.9097.0297.2897.8198.12

96.26

96.31

96.60

97.28

98.36

98.39

97.75

97.07

96.49

98.70

97.18

96.544

96.080

96.85

TB

96.73

96.7196.63

96.57

96.53

96.30

96.56

96.12

96.02

96.0

096

.58

96.5

5

97.5997.69

96.05

96.64

95.92

95.60

95.5896.00

96.15

96.06

96.28

97.06

96.8996.20

96.31

96.1

4

95.4895.14 94.84

94.3593.83

95.42TB

95.41 95.25 95.0194.54

94.61 93.84

EXISTING DRAIN

EXISTING DRAIN

POST&W

IRE FENCE

96.500

96.500

98.500

BB

CRUSH97.53

97.22

97.44

97.14

96.57

95.96

95.78

95.77

95.93

96.18

95.76

95.46

95.75

95.70

95.60

95.80

95.89

95.68

95.93

95.18

95.22

95.8095.48

95.49

95.61

95.29TB

95.00

0

95.500

96.000

96.500

94.23

94.3694.21

94.44

94.25

94.32

94.59

94.96

95.11

95.14

94.93

94.78

94.59

94.55

94.52

95.56

95.31

95.65

95.77

95.67

95.09

94.95

94.85

94.55

94.44 94.63

94.36

94.52

94.63

94.77

94.73

95.02

94.78

95.57

96.11

96.01

95.84

96.75

94.43TB

94.68 94.94

94.55

97.000

97.0

00

97.500

100.22EAVES

GATE

102.526RIDGE

97.17

97.1297.1197.08

97.02

97.18

97.16

97.31

97.17

97.22

97.44

97.5597.41

97.36 97.29 97.01

96.78

96.78

97.0897.2697.53

97.3596.984

97.087

97.216

97.158

97.03

96.86

97.1697.31

BUILDING

97.45

Block F Block E

Block DTest Apt

69

70

47

77

94

95 99

98

101

100

92

91

90

105

93

102

104

103

BLOCK D

150 - 167

BLOCK E

132 - 149

88

87

86

109

89

106

108

10778

8081

7273

7576

85

84

83

82

113

112

111

110

Creche

46

45

44

43

42

71

BLOCK F

114 -131 Bikes & Bins

Bikes & Bins

Bikes & Bins

NEW

SECTION

OF DISTRIBU

TOR RO

AD

NEW SECTIO

N OF DISTRIBUTO

R ROAD

79

74

Block D

N

Blocks D, E & F

These blocks are well laid out, with all living-spaces and terraces facing South or West. The corner apartments have dual aspect rooms. A single unit was selected for testing, as a worst case scenario. The results are set out in Table 1 below. Location plans are shown in Figures 6 & 7, Generated analysis is shown in Figure 8.

F01

F02F03

Page 8: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

8

Average Daylight Factor (ADF)Location Use Daylight Factor

ADF Minimum ADF

Block F Ground Floor

F01 Livingroom & Kitchen 5.52 2F02 Bedroom 1 5.69 1F03 Bedroom 2 7.67 1

Table 2: Average Daylight Factor for the identified worst case units.

Within the development the design was optimised with regard to the BRE guidelines. Bedrooms and living rooms in a unit, in the most challenged position, was assessed; these well exceed the minimum ADF. All rooms should receive good daylight.

Conclusion All habitable rooms in the unit assessed exceed the minimum levels set out and meet the recommendations of the BRE Guidelines and BS8208 Part 2:2008 Lighting for Buildings, Code of Practice for Daylighting.

Figure 8. Generated analysis for Average Daylight Factor (ADF) of the selected ground floor unit in Block F. The scale represents the percentage of daylight received from 0 - 10 hours.

Livingroom/ Kitchen

Bedroom 1Bedroom 2

F01

F03 F02

N

Page 9: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

9

5. Sunlight to gardens and open spaces

Figure 9. Site plan indicating public open space / amenity areas.

This is a predominantly low rise development with a number of areas of amenity, the extent of which can be seen in Figure 8 above. The majority of the public open space will receive in excess of 2 hours sunlight during the course of the day on the 21st March as it is to the south of the development and a detailed assessment is not required. This can be seen in a visual inspection of the shadow diagrams in Appendix A.

ConclusionThere will be no reduction in the available sunlight on the ground to any adjacent residences. The amenity space to the proposed development meets the recommendations of the BRE guidelines and will receive in excess of 2 hours sunlight over 50% of the open space.

N

Page 10: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

10

Figure 10. Shadow diagrams 21 March 8:00 GMT

Appendix A

Shadow Casting diagrams March Equinox

The BRE guidelines recommend using the 21st March for plotting shadow diagrams. June 21st and December 21st are provided for information but it should be noted that the summer solstice is the best case scenario with shadows at their shortest. In Winter even low buildings will cast long shadows and it is common for large areas of the ground to be in shadow.

Figures 9- 14 show the existing and proposed Shadow diagrams for the Equinox on the 21st March at 2 hourly intervals during the day.

N

Page 11: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

11

Figure 11. Shadow diagrams 21 March 10:00 GMT

Appendix AShadow Casting diagrams March Equinox

N

Page 12: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

12

Figure 12. Shadow diagrams 21 March 12:00 GMT

Shadow Casting diagrams March Equinox

N

Page 13: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

13

Figure 13. Shadow diagrams 21 March 14:00 GMT

Shadow Casting diagrams March Equinox

N

Page 14: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

14

Figure 14. Shadow diagrams 21 March 16:00 GMT

Shadow Casting diagrams March Equinox

N

Page 15: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

15

Figure 15. Shadow diagrams 21 March 17:00 GMT

Shadow Casting diagrams March Equinox

N

Page 16: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

16

Figure 16. Shadow diagrams 21 June 09:00 GMT

Shadow Casting diagrams June Solstice

N

Page 17: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

17

Figure 17. Shadow diagrams 21 June 12:00 GMT

Shadow Casting diagrams June Solstice

N

Page 18: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

18

Figure 18. Shadow diagrams 21 June 15:00 GMT

Shadow Casting diagrams June Solstice

N

Page 19: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

19

Figure 19. Shadow diagrams 21 June 18:00 GMT

Shadow Casting diagrams June Solstice

N

Page 20: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

20

Figure 20. Shadow diagrams 21 December 10:00 GMT

Shadow Casting diagrams December Solstice

N

Page 21: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

21

Figure 21. Shadow diagrams 21 December 12:00 GMT

Shadow Casting diagrams December Solstice

N

Page 22: Applicant: Loughglynn Developments Limited · sp 98.03 top of bank 97.56 97.26 top of bank 95.74 95.91 95.82 95.43 95.51 98.13 97.69 97.22 96.87 96.29 95.98 top of bank 96.69 96.42

DRAFT

22

Figure 22. Shadow diagrams 21 December 14:00 GMT

Shadow Casting diagrams December Solstice

N