    - GCC

    and ancillary works to be executed. all items and things to be supplied/ done and services / activities to be performed by the Contractor inpursuance of and in accordance with the Contract.

    R E P R E S E N T A T I O N S3.1The Contractor acknowledges that the Client has entered into thisContract in full reliance on the following representations made by theContractor.It is a company incorporated and existing under the (.:c.rripc,inics Act,1956.

    If is a qualified engineering Company competent to execute theWorks cnvered by the scope of this Contract.It has full power, authority and legal right under the laws of India andhas taken all necessary steps to enter into, deliver and perform thisContract.The Contract constitutes legal, valid and binding obligations of theContractor enforceable in accordance with its terms and in law.

    (e) It has the required capacity to perform the duties under this Contractand undertakes the liabilities imposed by this Contract.

    4SCOPE O F W O R K S.1The Contractor shall execute the Works as per the Scope of Works statedin Annexure I hereto.4.2All the Works shall be executed in accordance with the TechnicalSpecifications and drawings forming part of the Contract and / or as perdirections of the Client from time to lime.5.A S S IG N M E N T A N D S U B -L E T T I N G. 1The Contractor shall not subcontract, transfer or assign the entire work to-any other party. The Contractor may, however, engage_ sub-contractorsfor various parts of the Works. The Contractor shalt remain fully responsibleto the Client for such sub-contractors in all aspects related to theContract.6.O B L IG A T IO N S O F T H E C O N T R A C T O RThe Contractor shall, inter alia, fulfill following obligations in relation toperformance of this Contract, without any liability on the Clientwhatsoever :6 .1The Contractor shall comply with all labour /industrial laws / otherapplicable laws, rules, regulations, orders etc. of various authorities.6.2The Contractor shall obtain applicable permits, consent, clearancesapprovals etc. for carrying out its obligations under the Contract.The Contractor stall with due care- and diligence- perform and exPage 4 of 21

  • 8/7/2019 Appendix v- Relevant Part of EPC Contract

    2/3

    enable access to the Site, and permit its use in accordance wift-Contract:

    Page 5 of 21

    ( I )

    the works and arrange all labour, materials. machines. plant andEquipment, zags and fixtures, T&P, consultants / specialists / sub-contractorsetc. as required for planning, executing and managing the entire Work inaccordance with the provisions of this Contract.

    6.4the Con !roc torr)(Trk,E- all necessary arrangements for quarrying,transporting and arranging different materials, including earth.6.5the Contractor shallat all times afford fhe Client and it authorizedrepresentative(s) access to the Site and carry out its instructions /directions with due care, skill and diligence.6.6the Contractor shall ensure safety, soundness, quality and durability of theWorks in accordance with the applicable Specifications and standards.The Contractor shot! also ensure adequacy, stability and safety of all itsoperations innludingsite operations, methods of construction andadequate security at the Site.6.7The Contractor shallmake all arrangements for basic facilities likeelectricity, sanitation, water supply efc.6.8The Contractor shall make cirrangements for adequate standby captivepower to meet requirement of power.6.9The Contractor shall construct and maintain haulage road and the accessroads where necessary for the purpose of movement of materials,equipment etc.6.10The Contractor shall maintain existing village or other roads as may beused by it.6.11In case, any cliversiur Loy closure of, army existing road is necessary, it will bedone by the Con troc: lot after the .2pproval_ of the Client and also !heconcerned authorities. The Contractor shall maintain such existing roadand the diversion roads for all weather conditions and shall restore theexisting road when diversion is no more required.6.12The Contractor, during the construction of the Works, shall keep the Sitereasonably free from all unnecessary obstruction(s) to the satisfaction ofthe Client.6.13The Contractor shall coordinate its activities with the activities of othercontractors or agencies, if appointed by the Client.6.14The Contractor, on the completion of the Works, shall hand over the Worksto the Client in accordance with the provisions of this Contract.7.OBLI GA TI ON S OF THE C LI EN T.1The Client shall make payments to the Contractor for the execution ofWorks in accordance with the terms of the Contract.7.2Inaddition and not in derogation or substitution of any of its otherobligations under this Contract the Client agrees to comply and performthe following:

  • 8/7/2019 Appendix v- Relevant Part of EPC Contract

    3/3

    - 2 9 1 )Ornoticing the defect/ clarn(Dge, the Client sl-H.,11 forthwith inform theContractor the nature of the defect/ damage. The Contractor shallrepair, rectify and replace such defect/ damage to the satisfaction of theClient within re:-. . - p - , o n c r u d e . time , Nit before expin. r.:4 the Defects LiabilityP e r K x . I .30.F IN A L . A C C E P T A N C E CERTIF ICATE30.1The Final Acceptance Certificate will be issued after satisfactorycompletion of Works / removal of defects during the Defe.c I Liability Periodfor which request shall be mode by file Contractor io the Client pursuantto this Clause and such request shall be accompanied with the list ofdocuments already handed over in accordance with the Conditions ofContract and such other doc.:urnc., ntsiinf(:. , rmatic. , n a