Inspector CourseAppendix II | Page 1 of 5
Sample VSMP Authority Stormwater Management Facility
Generic Maintenance Inspection Checklist
The form on the following page is a generic inspection checklist developed by the Center for
Watershed Protection in collaboration with the Department. This form allows an inspector to
quickly assess the performance of a stormwater management (SWM) facility by using simple
visual indicators. It is recommended that these rapid investigations be conducted during every
other routine SWM management facility inspection by a locality to verify BMP performance.
This basic form can be modified, simplified, or customized to meet the unique BMP terminology
and design criteria employed in the locality.
Inspector CourseAppendix II | Page 2 of 5
FACILITY ID: DATE: / / ASSESSED BY:
NAME:
ADDRESS:
PHOTO IDS:
HANDHELD/
GPS ID:
SECTION 1- BACKGROUND INFORMATION (GIS)BMP TYPE :
Dry Detention Pond
Extended Detention Pond
Wet Pond
Filter (specify: ______________)
Infiltration (specify:_____________)
Check if structure is underground
Dry Swale
Wet Swale
Grass Channel
Dry Well
Permeable Pavement
Bioretention
Wetland
Level Spreader
WQ Inlet
Proprietary Device
Other
YEAR CONSTRUCTED:
OWNERSHIP
Public Private Unknown
SITE CHARACTERIZATION
DRAINAGE AREA: (acres) IMPERVIOUS COVER: (acres) Discerned from: Plan County Data GIS Field
CONTRIBUTING DRAINAGE AREA (% land use): Note – All percentages should sum up to 100%.
Industrial Commercial Urban/Residential Suburban/Res
Forested Institutional Golf course Park
Crop Pasture Other:
WATER QUALITY VOL
(FROM DESIGN PLAN): (ft3)
SECTION 2- FIELD VISIT
Rain in last 48 hrs? Yes No Evidence of high water table (e.g., excessive soil saturation)? Yes No
DESIGN ELEMENTS
FACILITY SIZE:
Length: (ft)
Width: (ft)
Surface Area: (ft2)
Depth of WQ storage (ft)
OBSERVED WQ STORAGE VOL:(ft3)
HYDRAULIC
CONFIGURATION
On-line Facility
Off-line Facility
DESIGN STORM(S):
Water Quality
Flood Control
Channel Protection
Unknown
BMP SIGNAGE: (check all that apply)
None Flood Warning Stormwater Education No Trespassing Wildlife HabitatPublic Property Do Not Mow Other:
OUTLET CHARACTERISTICS
PRIMARY OUTLET
STRUCTURE:N/A – infiltration w/ no outlet Pipe Riser Weir Large Storm Overflow Open channelLarge Storm By-pass Other:
OUTLET FEATURES:N/A Trash Rack Pond Drain Inverted outlet pipe Hooded outlet Anti-vortex device
Perforated pipe Gravel Diaphragm Micropool outlet Multiple outlet levels
Outlet includes restrictor? Yes No
OUTLET STRUCTURE
CONDITIONS:
Erosion at Outlet: None Slight Moderate Severe
Outlet Clogging: None Slight Moderate Severe
Structural Problems: None Slight Moderate Severe
CONDITIONS AT
OUTFALL:Stream Closed storm sewer Surface channel Road ditch Other:
Unknown
Active Erosion:
Trash:
Sedimentation:
None Slight Moderate Severe
None Slight Moderate Severe
None Slight Moderate Severe
Odor: None Slight Moderate Severe
Algae: None Slight Moderate Severe
Other WQ Problems: None Slight Moderate Severe
Emergency Spillway Type: Channel Riser Overflow Weir Other:
Inspector CourseAppendix II | Page 3 of 5
SOIL OR FILTER MEDIATYPE OF FILTER/INFILTRATION MEDIA: (check all that apply)
Soil mix (in) Sand (in) Gravel (in) Large Stone (in)Organic material (in) Other N/A Unknown
Avg. depth of sediment build-up on surface? (in)
SOIL MEDIA SAMPLE: Note – Complete during site investigation, if applicableDominant Soil Type Clay Loam Sand Sand/LoamIs the soil homogenous? Yes No
Comments:
VEGETATION
GENERAL OBSERVATIONS:Landscaped
Aquatic Bench
Invasive Species
Plant Diversity
TYPE OF GROUND COVER (% of Surface Area in Plan View up to low Outlet):Note – All percentages should sum up to 100 %.
Trees Grasses/Perennials Ponded water Other:
Managed Turf Bare Soil Shrubs N/A
Gravel/stone Mulch Emergent wetland
Depth of mulch, if present: Hardwood (in) Pine Straw (in) Other (in)
Rate degree of shading of BMP Surface Area by trees: Well Shaded Some Shading No Shading N/A
INLET CHARACTERISTICS
INLET #1:
Diameter/Width:
(in)
TYPE OF INLET: Open Channel Closed Pipe
Sheet Flow Curb Cut Other:
Elevation difference between bottom of inletand BMP surface:
(in)
INLET SUBMERSION:
Complete
Partial
None
INLET CONDITIONS:
Inlet Erosion
Inlet Clogging
Structural Problems
None Slight Moderate Severe
None Slight Moderate Severe
None Slight Moderate Severe
Comments:
INLET #2:
Diameter/Width:
(in)
TYPE OF INLET: Open Channel Closed Pipe
Sheet Flow Curb Cut Other:
Elevation difference between bottom of inletand BMP surface:
(in)
INLET SUBMERSION:
Complete
Partial
None
INLET CONDITIONS:
Inlet Erosion
Inlet Clogging
Structural Problems
None Slight Moderate Severe
None Slight Moderate Severe
None Slight Moderate Severe
Comments:
PRETREATMENTTYPE OF PRETREATMENT (check all that apply) PRETREATMENT FUNCTION By design Incidental
Is pretreatment functioning? Yes NoIs sediment removal necessary? Yes NoSigns of pretreatment bypass? Yes No
Signs of flow of sediment from pretreatment to BMP? Yes No
Severity: Slight Moderate Severe
None
Sediment Forebay ( ft3)Grass ChannelRiprap Channel or Apron
Grass Filter StripPlunge Pool?Stone DiaphragmOther:
GENERAL DESIGN
BMP FEATURES (check all that apply)
Maintenance AccessFenceMulti-cellMicropoolImpermeable Liner
UnderdrainClean OutObservation WellIs water present in observation well?
Yes No Depth: ft
Pond DrainOther:
CONVEYANCE THROUGH BMP
No Defined Channel
Low Flow Channel
Concrete Eroded Earthen Other ____________
Length of Shortest Flow Path: (ft)
Is BMP designed with a Permanent Pool? Yes No
Inspector CourseAppendix II | Page 4 of 5
PERFORMANCE
GENERAL PROBLEMS: (check all that apply)
Maintenance Needed
Water Bypass of Inlet
Water Bypass of Outlet
Incorrect Flow Paths
Short-circuiting of treatment mechanism
No or ineffective treatment
Ineffective pretreatment
Others ________________________ __
Erosion at Embankments
Erosion within Facility
Deposition within Facility
Inappropriate Ponding of Water
Clogged Pond Drain/Underdrain
Clogged Media
Inappropriate media material
Inappropriate underlying soil (infiltration)
Permanent Pools not stable
Inadequate vegetation
Dead or Diseased Vegetation
Too many invasive plants
Trees on Embankment
Failing structural components
Safety issue (Note:________________)
WATER QUALITY IN FACILITY: N/A EVIDENCE OF:
Geese
Animal Burrows
Mosquitoes
BMP Alteration
Algae
Odor
Turbidity
Color
None Slight Moderate Severe
None Slight Moderate Severe
None Slight Moderate Severe
Normal Abnormal:
PROBLEM 1=NONE 2 - FEW 3 – SEVERAL 4-SEVERE
TRASH No evidence of trashA few pieces of trash
throughout BMPTrash accumulation near
inlet/outletLots of trash in BMP orBMP used for storage
BMP BANK EROSION No noticeable erosionSlight erosion
< 5% of bank affected
Moderate erosion
~15% of bank affectedBanks severely eroded,>25% of bank affected
SEDIMENT DEPOSITIONNo sedimentdeposition
Areas of minor sedimentdeposition
Areas of somedeposition, may be
severe near inlet/outlets
Lots of depositionresulting in pond bottom
clogging
SURFACE
SLOPE
0-1% BMP surfaceslope
1-3% BMP surface slopeor steeper slopes with
check dams,
3-5% BMP surface slopewith no check dams,
>5% surface slope;
SIDE SLOPESBMP side slopes 3:1
or flatterBMP side slopes 2:1 Steep BMP side slopes Risk of side slope failure
STRUCTURALNo evidence of
structural damage
Minor problems (e.g.,bank slump, eroded
channels)
Moderate structuralproblems –failure
pending
Structural failures (e.g.,bank failure, blowout)
VISIBILITYHigh visibility, near
high-traffic areasSome visibility, near
traffic areasLimited visibility, near
low traffic areasNo visibility, behindbuildings or fences
ACCESSIBILITYMaintained accessarea for vehicles
Access area designated,but not maintained
Access for vehicles notdesignated
Access for vehicles notpossible
VEG
COVER
No mowingin/around BMP
Mowing along BMPedges but areas of nomow in BMP bottom
Mowed turf vegetationBMP bottom has large
areas of bare soil
Dense plant cover(>75%)
Plant cover,50-75%
Some plant cover,25-50%
Sparse vegetative cover(<25%),
VEG
HEALTH
TREESHealthy andestablished
Slightly stressed Stressed Dead
GROUND
COVER
Healthy andestablished
Slightly stressed Stressed Dead
SHRUBSHealthy andestablished
Slightly stressed Stressed Dead
EMERGENT
WETLAND
Healthy andestablished
Slightly stressed Stressed Dead
OVERALL PERFORMANCE SCORE (circle one number)
Excellent design andfunction, no general
problems with performance
BMP is well designed, but isundersized or has a fewperformance problems
BMP is adequately designed,several problems withperformance are noted
Poor BMP design, severeperformance problems or
failure
10 9 8 7 6 5 4 3 2 1
Inspector CourseAppendix II | Page 5 of 5
FIELD NOTES
GOOD OR INTERESTING DESIGN FEATURES:
PHOTO #’S:
POOR OR PROBLEMATIC DESIGN FEATURES:
PHOTO #’S:
SECTION 3 – DESIGN PLAN VERIFICATIONPLAN AVAILABLE: As-built Other:
Do field observations match design plans/as-builts? Describe any differences.
Soil type in facility N/A Yes No If no, describe:
Pretreatment type and size N/A Yes No If no, describe:
Signage N/A Yes No If no, describe:
Low-flow channel N/A Yes No If no, describe:
Dimensions/volume N/A Yes No If no, describe:
Inlet type, #, and sizing N/A Yes No If no, describe:
Outlet type, #, and sizing N/A Yes No If no, describe:
Vegetation composition N/A Yes No If no, describe:
Other features N/A Yes No If no, describe:
Inspector CourseAppendix II-a | Page 1 of 2
Sample Maintenance Inspection Checklist:
Rooftop Diconnect
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Compensatory device type (include if the pervious area flow path is less than the required minimumlength): (NOTE: See the separate plan review checklist for the compensatory device)
Dry Well
French Drain
Rain Garden
Other: ____________________________
Element ofBMP
PotentialProblem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pair
ed
?Y
/N
How to Fix ProblemWho WillAddressProblem
Comments
Piping, Gutters,Drainsand Pre-TreatmentSumps
Fluid from adifferent practice isbeing piped nearpervious areas
Prevent adjacent uses frompiping through or aroundpervious area.
Professional
Sediment anddebrisaccumulation
Correct the source ofsediment and debris andremove it immediately
Owner orprofessional
Mosquitoproliferation
Correct gutter flow to eliminatestanding water; treat formosquitoes, as needed
Owner orprofessional
Runoff is notentering thereceiving perviousarea
Check to see if connectionspout or overflow pipe isclogged. Remove thesediment.
Owner orprofessional
The downspoutsremaindisconnected
Restore disconnectionOwner orprofessional
ManufacturedProducts
Product orcomponent isbroken or notfunctioningcorrectly.
Follow the manufacturer’smaintenancerecommendations, and repairor replace as needed.
Owner orprofessional
DownstreamTreatment
The compensatorytreatment unitshave not beenmaintained
Correct identifiedd problems,according to the maintenanceguidelines for the specificsupplementary BMP.
Owner orprofessional
Stormwaterdischarge isponding at point ofdisconnection
Dry wells or french drains maybe needed, if not alreadypresent. Clean out manually,and reconstruct or replacewhen no longer functioning.
Professional
Inspector CourseAppendix II-a | Page 2 of 2
Element ofBMP
PotentialProblem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
DownstreamTreatment(continued)
Erosion is evidentat the simpledisconnection,bioretention/raingardens, filterpaths, orfoundation planter
Remove the sediment anddebris build-up at the pointswhere runoff enters thepervious area. Then re-stabilize.
Owner orprofessional
Practices to whichthe disconnectiondischarges are notfunctioning
Reference that practice’schecklist for instructions to fixproblems.
Professional
Practices to whichthe disconnectiondischarges aredisturbed or havebeen converted
Correct identified problemsand stabilize as needed
Owner orprofessional
The receivingpervious area(s)retain dimensionsas shown on plansand are in goodcondition
Restore dimensions and makeneeded repairs
Owner orprofessional
There isencroachment onthe receivingpervious area(s) oreasement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundaries ofthe receiving pervious area, asneeded
Owner orprofessional(andperhaps thelocality)
Inspector CourseAppendix II-b | Page 1 of 3
Sample Maintenance Inspection Checklist:
Sheet Flow to Vegetated Filter Areas and Conserved Open Space
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Ideally, these BMP areas should be inspected annually, with the inspection conducted during the non-growing season when it is easier to observe the flow path. Once established, vegetated filter stripshave minimal maintenance needs outside of the Spring clean up: regular mowing, repair of checkdams and other measures to maintain the hydraulic efficiency of the filter strip and a dense, healthygrass cover. Grass filter strips and boundary zones must be mowed at least twice a year to preventwoody growth. A conservation easement may be required to ensure that the vegetated filter strip areaand any newly established or restored forest cover may not be cleared. Also, a responsible partyshould ensure that routine forest improvements are made over time (i.e., thinning, invasive plantremoval, etc.).
Element ofBMP
PotentialProblem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ired
?Y
/N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
There is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidenceof erosino and/orbare or exposedsoil
Stabilize immediately.Owner orprofessional
Inlet
Inlets providestable conveyanceinto facility
Stabilize immediately, asneeded.
Owner orprofessional
Excessive trash /debris / sedimentaccumulation at theinlet
Remove trash and debrisimmediately
Owner
Evidence oferosion at / aroundthe inlet
Correct the source problemand stabilize immediately
Owner orprofessional
Channel
Scour and erosionare present withinthe vegetated filterarea
Sediments are to be cleanedout of Level Spreaderforebays and flow splitters
Owner orprofessional
Debris andsediment build-upis present at thetop of thevegetated filterarea
Check conveyance(s) to thefilter area for trouble spots andcorrect any problemsimmediately. Manually removethe deposited sediment.
Owner orprofessional
GravelDiaphragm
Foot or vehiculartraffic iscompromising thegravel diaphragm.
Block foot and vehiculartraffic. Re-stabilize the areaimmediately.
Professional
Inspector CourseAppendix II-b | Page 2 of 3
Element ofBMP
PotentialProblem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Level Spreader
The level spreaderis performingproperly. Flows arenot concentratingon the down-gradient side of theelement
Search the spreader for chips,cracks, or any otherfundamental compromise ofthe structure. Repairimmediately.
Professional
There is excessivelandscape wasteand yard clippings
Remove immediately.Owner orprofessional
Vegetation
Vegetative densityis less than 90%cover in theboundary zone orgrass filter
Reseed and fertilize (ifnecessary) the exposed soil
Owner orprofessional
The plantcomposition isconsistent with theapproved plans
Make a judgment regardingwhether plants need to bereplaced, and replace ifnecessary
Professional
Invasive species orweeds are present
Correctly destroy and/orremove the invasive species;make a judgment regardingwhether other weeds need tobe removed, and remove ifnecessary
Owner orprofessional
There istroublesome pestinfestation
Use integrated pestmanagement (IPM)techniques to minimize theuse of pesticides andherbicides. Minimize use oforganic (not chemical)fertilizer, as needed.
Owner orprofessional
There is deadvegetation and/orexposed soil
Reseed or replace deadvegetation on exposed soilareas
Owner orprofessional
Overflow Area
Flows through thefilter area short-circuit the overflowcontrol section
Check that the structure is notclogged. If so, manually cleanout debris immediately.
Owner orprofessional
Outlet
The outlet providesstable conveyanceaway from the filterarea
Stabilize immediately, asneeded.
Professional
Overall
There is adequateaccess to the levelspreader and filterarea
Establish adequate accessProfessional
There is evidenceof standing water
Fill in low spots and stabilize;correct flow problems causingponding
Owner orprofessional
There is excessivetrash and debris
. Remove immediatelyOwner orprofessional
Inspector CourseAppendix II-b | Page 3 of 3
Element ofBMP
PotentialProblem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overall(continued)
Mosquitoproliferation
Eliminate stagnant pools andestablish vegetation; treat formosquitoes as needed. Ifsprays are considered, thena mosquito larvicide, such asBacillus thurendensis orAltoside formulations can beapplied only if absolutelynecessary.
Owner orprofessional
Complaints fromlocal residents
Correct real problemsOwner orprofessional
Encroachment onthe filter area oreasement bybuildings/structures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Inspector CourseAppendix II-c | Page 1 of 4
Sample Maintenance Inspection Checklist:
Grass Channels
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Type of pretreatment facility:
Sediment Forebay
Check Dam
Grass Filter Strip
Stone Diaphragm
Other: __________________________ None
Ideally, these BMP areas should be inspected annually, with the inspection conducted spring whenthe health of the grass channel lining should be evident. Once established, Grass Channels haveminimal maintenance needs outside of the spring clean up: regular mowing, repair of check dams andother measures to maintain the hydraulic efficiency of the channel and a dense, healthy grass cover.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inve
sti
ga
te?
Y/
N
Re
pair
ed
?Y
/N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainageArea
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidence oferosion and / or bareor exposed soil
Stabilize immediatelyOwner orprofessional
Pre-treatment
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash / debris /sediment in the facility
Remove immediatelyOwner orprofessional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
There is evidence ofdiaphragm or otherclogging
Identify and eliminate thesource of the problem; . Ifnecessary, remove and cleanor replace the stone.
Professional
There is deadvegetation andevidence of erosionand / or exposed soil
Repair erosion damage, andreseed or otherwise restabilizewith vegetation
Owner orprofessional
Inspector CourseAppendix II-c | Page 2 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Inlets
The inlet is notmaintaining a calmflow of water enteringthe channel or theconveyance capacityis blocked
Remove trash and sedimentaccumulated at the inflow.Sources of sediment anddebris must be identified andcorrected. Stone splash padsmust be replenished toprevent erosion.
Owner orprofessional
There is evidence oferosion at / aroundinlet
Repair erosion damage, andreseed or otherwise restabilizewith vegetation.
Owner orprofessional
Vegetation
Native soil is exposedor erosion channelsare forming
If sediment deposits are thickenough to damage or killvegetation, remove thesediment by hand, whileprotecting the vegetation.
Owner orProfessional
Grass height does notreach standards
Grass channels must bemowed to keep grass at aheight of 4” to 9”. Removegrass clippings after mowing.
Owner orProfessional
Vegetation requiresfertilizer or pestcontrol
Fertilize according tospecifications. Use organicrather than chemical fertilizer.If feasible, use compost. Useintegrated pest management(IPM) techniques to minimizethe use of pesticides andherbicides.
Owner orProfessional
The plant compositionis consistent with theapproved plans
Make a judgment regardingwhether plants need to bereplaced, and replace ifnecessary
Professional
Invasive species orweeds are present
Correctly destroy and/orremove the invasive species;make a judgment regardingwhether other weeds need tobe removed, and remove ifnecessary
Owner orprofessional
There is deadvegetation and/orexposed soil
Reseed or replace deadvegetation and exposed soilareas
Owner orprofessional
Side Slopes
Evidence of erosionon side slopes,introducing sedimentinto the swale.
Repair erosion damageimmediately. Stabilize slopesusing appropriate erosioncontrol measures and plantappropriate vegetation.
Owner orProfessional
Check Dams
Dam is not functioningproperly.
Check upstream anddownstream sides of checkdams for evidence ofundercutting, side cutting orerosion and repairimmediately.
Professional
There is a largeaccumulation ofsediment ortrash/debris behindthe check dam.
Remove sediment when theaccumulation exceeds 25% ofthe original Tv. Removetrash/debris and clearblockages of weep holes.
Professional
Inspector CourseAppendix II-c | Page 3 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ChannelBottom
Undesirable plantspecies,accumulations offallen leaves, andother debris fromdeciduous plantfoliage are present.
Remove woody vegetationfrom the channel. Pruneadjacent trees and shrubs tokeep the channel clear.Remove/replace invasive veg.or weeds if they cover < 25%of the channel area. Removeaccumulated organic matterand debris immediately.
Owner orProfessional
Base soils arecompacted. Thepractice does notdraw down within 48hours after a storm.
De-thatch and aerate thechannel. Remove sedimentwhen the accumulationexceeds 25% of channelvolume. Restore the originalcross section and revegetatethe channel.
Owner orProfessional
There is unhealthy ordead grass cover orevidence of erosion,braiding, or excessiveponding in thechannel bottom
Fill in low spots, repairerosion, and addreinforcement planting tomaintain 90% turf cover.Reseed any salt killedvegetation and stabilizeimmediately. Keep the grassin a healthy, vigorouscondition at all times, since itis the primary erosionprotection for the channel.
Owner orProfessional
ChannelOutlet
The outlet does notmaintain sheet flow ofwater exiting thechannel (unless acollection drain isused).
The source of erosion damagemust be identified andcontrolled when native soil isexposed or erosion channelsare forming. Check thechannel outlet and all roadcrossings for bank stabilityand evidence of piping orscour holes.
Owner orprofessional
The outlet providesstable conveyanceout of the channel
Stabilize immediately, asneeded.
Professional
There is excessivetrash, debris orsedimentaccumulation at outlet
Check inflow points forcogging and remove any trashand sediment deposits
Owner orprofessional
There is deadvegetation and/orexposed soil
Reseed or replace deadvegetation and exposed soilareas
Owner orprofessional
Pest Control
There is evidence ofstanding water andmosquito habitat orrodent damage
Pest control measures mustbe taken when mosquitoesand/or rodents are found to bepresent. If sprays areconsidered, then a mosquitolarvicide, such as Bacillusthurendensis or Altosideformulations can be appliedonly if absolutely necessary.Holes in the ground located inand around the swale must befilled and stabilized withvegetation.
Professional
Inspector CourseAppendix II-c | Page 4 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overall
Access to the GrassChannel is adequate
Establish adequate accessProfessionaland, perhaps,the locality
Complaints from localresidents
Correct real problemsOwner orprofessional
Encroachment bybuildings or otherstructures
Clearly mark BMP and informthose involved of the BMPs.
Owner, pro(and perhapsthe locality)
Inspector CourseAppendix II-d| Page 1
Sample Maintenance Inspection Checklist:
Soil Compost Amendments
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Ideally, the amended soil area should be watered once every 3 days for the first month, and thenweekly during the first growing season (April-October), depending upon rainfall. The area should beinspected at least after each storm event that exceeds 1/2-inch of rainfall during the first six monthsfollowing the incorporation of soil amendments. Depending on the results of a soil test for theamended area, a one-time spot fertilization may be needed in the fall after the first growing season toincrease plant vigor. The area should be de-thatched every few years to increase permeability.
Element ofBMP
PotentialProblem
Pro
ble
m?
Y/
N
Inv
esti
ga
te?
Y/
N
Re
pair
ed
?Y
/N
How to Fix ProblemWho WillAddressProblem
Comments
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidenceof erosion and / orbare or exposedsoil
Stabilize immediatelywith grass cover
Owner orprofessional
Evidence ofexcessive use offertilizer or lawnchemicals
Develop and implementa nutrient and pestcontrol managementplan
Owner orprofessional
Runoff is ponding,creating rills,and/or causingerosion
Dethatch or aerate thesoil. Introduce morecompost amendmentsand/or lime. Restabilizeeroded areas byreplanting vegetation.
Owner orprofessional
Access to theamended soil areafor maintenance isadequate.
Establish adequateaccess
Professional
Absence of signsdesignating thearea as aConservation Area
Obtain or create andpost appropriatesignage
Owner (andperhaps thelocality)
There is evidenceof erosion and / orbare or exposedsoil
Stabilize immediatelyOwner orprofessional
Encroachment onthe amended areaor easement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark theboundaries of thereceiving pervious area,as needed
Owner orprofessional(andperhaps thelocality)
NOTE: Soil compost amendments do not need to be addressed in a maintenance agreement if they are incorporated toreduce lawn runoff volume or improve a residential rooftop disconnection. They probably should be addressed in a simplemaintenance agreement if the soil restoration/improvement is associated with more than 10,000 square feet of reforestation.Soil compost amendments within a vegetated filter strip or grass channel should be located in a public right of way or within adedicated stormwater or drainage easement.
Inspector CourseAppendix II-e | Page 1 of 3
Sample Maintenance Inspection Checklist:
Vegetated Roofs
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Ideally, following construction, this practice should be inspected monthly during the vegetationestablishment period, and then every six months thereafter to assess the state of vegetativecover and to look for leaks, drainage problems and other functional or structural concerns.Maintenance may include watering, hand-weeding to remove invasive or volunteer plants, andto add plant materials to repair bare areas. The use of herbicides, insecticides, fungicides, andfertilizers should be avoided, since their presence could hasten degradation of the waterproofmembrane. Also, power-washing and other exterior maintenance operations should be avoidedso that cleaning agents and other chemicals do not harm the vegetated roof plant communities.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
esti
ga
te?
Y/
N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Vegetation
Plant cover is less90% plant cover
During establishmentperiod, replace dead plantsas needed. During thelong-term period, deadplants must generally bereplaced once per year inthe fall.
Owner orprofessional
Plants are wilting
Water more frequently topromote growth andsurvival. Annual applicationof slow-release fertilizer isrecommended in the fallduring the first five yearsfollowing installation. Afterthat, fertilizer is generallynot necessary and shouldnot be applied.
Owner orprofessional
Plants are choking onexcess vegetation
Fallen leaves and debrisfrom deciduous plantfoliage must be removedand should be recycled orcomposted.
Owner orprofessional
Invasive and nuisanceplant species arepresent
Completely removeinvasive plant species.Weeding must be done byhand, without the use ofherbicides or pesticides.Remov weeds regularlyand do not allow them toaccumulate.
Owner orprofessional
Inspector CourseAppendix II-e | Page 2 of 3
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Vegetation(continued)
Drought conditionsare present
Mulch or shade cloth maybe applied to preventexcess solar damage andwater loss
Professional
There is troublesomepest infestation
Use integrated pestmanagement (IPM)techniques to minimize theuse of pesticides andherbicides. Minimize use oforganic (not chemical)fertilizer, as needed.
Owner orprofessional
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
Grass has becomeunruly
Grass should be mowed asneeded. Clippings must beremoved and should berecycled or composted.
Owner orprofessional
VegetationIrrigation
During theestablishment period(initial 1-3 years)
Water sufficiently to assureplant establishment, but donot exceed 1/4-inch ofwater once every 3 days
Owner orprofessional
During the long-termperiod (3+ years)
Water sufficiently tomaintain plant cover, butdo not exceed 1/4-inch ofwater once every 14 days.For automatic sprinklers,use manufacturers’instructions for operationand maintenance.
Owner orprofessional
StructuralComponents
Waterproofmembrane is leakingor cracked
Make necessary repairsimmediately
Professional
Root barrier isperforated
Replace swatch Professional
DrainageLayer/InletPipes
Soil substrate,vegetation, debris,litter or othermaterials clog the roofdrain inlet, scuppersor gutters
Sources of organic matter,debris, litter, and othersediment must beidentified and materialsremoved to preventclogging drainagestructures
Professional
Drain inlet pipe is inpoor condition
Repair as needed Professional
Soil Substrate/GrowingMedium
Evidence of erosionfrom wind or water
If erosion channels areevident, they must bestabilized with additionalsoil substrate/growthmedium and covered withadditional plants
Professional
Growth media hasbecome clogged withsediment
Manually remove sedimentso as not to damage plantmaterials.
Professional
Inspector CourseAppendix II-e | Page 3 of 3
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overall
Access to thevegetated roof isadequate.
Egress and ingress routesmust be restored to designstandards. Walkways mustbe clear of obstructionsand maintained to designstandards.
Professional
There is evidence ofdamage or vandalism
Maintain the vegetatedroof’s aesthetics as anasset to the property ownerand community.
Owner orprofessional
Mosquitoes or otherinsects are breeding/abundant at thepractice
Standing water creating anenvironment fordevelopment of insectlarvae must be eliminatedmanually. Chemical spraysmust not be used.
Owner orprofessional
Threat of a spill isimminent
Spill prevention measuresmust be exercised formechanical systemslocated on roofs whensubstances that cancontaminate stormwaterare used. Releases ofpollutants must becorrected as soon as theyare identified.
Owner orprofessional
Inspector CourseAppendix II-f | Page 1 of 2
Sample Maintenance Inspection Checklist:
Rainwater Harvesting
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Ideally, this practice should be inspected each spring and fall by the owner, with an extensiveinspection every three years by a qualified third party inspector.
Element ofBMP
PotentialProblems
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
Overall(Every thirdyear)
A component of thesystem is leaking ordamaged
Make necessary repairs orreplace damagedcomponents
Professional
Water is flowing out ofthe overflow pipeduring the designrainfall or smallerstorm (1-1.5 inch)
Check for clogging ordamage and ensure thepump is operating correctly.Ensure water is being usedat the volume for which thesystem was designed.
Owner orprofessional
Electric system isflawed
Make any necessaryrepairs/adjustments
Professional
Sedimentaccumulation incistern exceeds 5% ofthe design volume
Remove sediment Professional
Excessiveoverhangingvegetation/treespresent
Trim branches back to meetstandards
Professional
Captured roofarea(Twice a year)
Excessdebris/sediment onthe rooftop
Remove debris immediatelyOwner orprofessional
Gutter system(Twice a year)
Gutters are cloggedand water is backedup
Unclog/remove leaves anddebris. May need to installgutter screens.
Owner orprofessional
Rooftop runoff is notreaching the guttersystem
Correct the positioning orinstallation of gutters. Mayneed to replace the system
Owner orprofessional
Algae growth
Do not allow sunlight topenetrate cistern. Treat thewater to remove/preventalgae
Owner orprofessional
Mosquitoes arepresent in the cistern
Check screens for damageand repair/ replace. Treatwith mosquito dunks ifnecessary
Owner orprofessional
Lids are damaged. Besure to check ventsand screens on inflowand outflow spigotsand mosquito screens
Repair immediately. Ensurethat lid damage has not ledto any of the aforementionedproblems with the cistern
Owner orprofessional
Inspector CourseAppendix II-f | Page 2 of 2
Element ofBMP
PotentialProblems
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
Screens andfilters(Twice a year)
Debris/sedimentaccumulation.Screens are clogged
Find the source of debrisand sediment and remedy.Clear the screen/filter.Replace if necessary
Professional
Pump(Twice a year)
Not operating properlyCheck for clogging. Flush ifneeded. May need to bereplaced
Professional
Pre-screeningdevices andfirst flushdevices(Every 3 months)
Dirty/clogged
Have a professional ensurescreens have not causedbacterial growth within thegutters or downspouts. Theowner may remove the cleanout plug from the first flushdevice and manually wipe itclean.
Owner orProfessional
Backflowpreventer(Every thirdyear)
Pressure is unevenand is causingbackpressure or back-siphonage
Immediately stop use of theindoor water supplied by thetank and call a professional.
Professional
Secondarywater supply(Every thirdyear)
Not operating properly Consult an expert only Professional
Overflow pipe(Annually)
Erosion is evident atoverflow dischargepoint, along the filterpath/secondary runoffreduction practices
Stabilize immediately. It maybe necessary to refer toinspection checklists forother BMPs.
Professional
Overflow pipe in poorcondition
Repair or replace pipe Professional
Inspector CourseAppendix II-g | Page 1 of 2
Sample Maintenance Inspection Checklist:
Permeable Pavement
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Ideally, each permeable pavement installation should be inspected in the Spring of each year,especially at large-scale installations.
Element ofBMP
PotentialProblems
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ired
?Y
/N
How to fix problemWho WillAddressProblem
Comments
ContributingDrainage Area
There is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidence oferosino and/or bare orexposed soil
Stabilize immediately.Owner orprofessional
There is excessivelandscape waste andyard clippings
Remove immediately.Owner orprofessional
AdjacentVegetation
Trees and shrubs arewithin 5 feet of thepavement surface
Check that tree roots havenot penetrated the pavementand leaf residue has notclogged the pavement.Vegetation that limits accessor interferes with thepermeable pavementoperation must be pruned orremoved.
Owner orProfessional
Inlets, Pre-Treatment Cellsand FlowDiversionStructures
There is excessivetrash, debris orsedimentaccumulation
Remove immediatelyOwner orProfessional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
Evidence of cloggingClean out sediment ordebris. Remove and wash orreplace stone, as needed
Professional
Inspector CourseAppendix II-g | Page 2 of 2
Element ofBMP
PotentialProblems
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pair
ed
?Y
/N
How to fix problemWho WillAddressProblem
Comments
PavementSurface
Mosquito proliferation
Eliminate standing water andestablish vegetation; treat formosquitoes as needed. Ifsprays are considered, thenuse a licensed pestcontroller to apply anapproved mosquito larvicide(only if absolutelynecessary).
Owner orprofessional
There is evidence oferosion and / or bareor exposed soil in gridpaver areas
Stabilize immediately. Mow,irrigate and apply organic(not chemical) fertilizer, asneeded to keep grasshealthy and dense enough toprovide filtering whileprotecting the underlyingsoil. Remove any grassclippings.
Owner orprofessional
There is loosematerial (e.g., bark,sand, etc.) stored onthe pavement surface
Remove immediately andvacuum sweep the area toprevent clogging thepavement pores.
Professional
Pavement is stainedand/or clogged orwater is ponding,indicating thepavement is notdraining properly.Measure thedrawdown rate in theobservation well forthree (3) daysfollowing a stormevent that exceeds1/2-inch of rain. Ifstanding water is stillobserved in the wellafter three days, thisis a clear sign that thepavement is clogged.There are significantamounts of sedimenthave accumulatedbetween the pavers.
The surface must be keptclean and free of leaves,debris, and sediment byvacuum sweeping (withoutbrooms or water spray)immediately and, otherwise,at a frequency consistentwith the use and loadingsencountered (at a minimum,annual dry-weathersweeping in the Spring).Where paving blocks areinstalled, the sweeper mustbe calibrated so it does notpick up the stones betweenthe paver blocks. Followingthe vacuum sweeping, testpavement sections bypouring water from 5 gallonbuckets, to ensure properdrainage.
Professional
StructuralIntegrity
There is evidence ofsurface deteriortation,such as slumping,cracking, spalling orbroken pavers.
Repair or replace affectedareas, as necessary.
Professional
ObservationWells
Is each observationwell still capped?
Repair, as necessary. Professional
Outlet
Outlets are obstructedor erosion and soilexposure is evidentbelow the outlet.
Remove obstructions andstabilize eroded or exposedareas.
Owner orProfessional
Inspector CourseAppendix II-h | Page 1 of 4
Sample VSMP Maintenance Inspection Checklist:
Infiltration
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Facility Location:G SurfaceG Underground
Filtration Media: No filtration (e.g., dry well,
permeable pavement,infiltration facility, etc.
Sand Bioretention Soil Peat Other: ________________
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Sedimentation chamber Plunge pool Stone diaphragm Grass filter strip Grass channel Other: ___________________
Ideally, infiltration facilities should be inspected annually. Spill Prevention measures should beused around infiltration facilities when handling substances that contaminate stormwater.Releases of pollutants should be corrected as soon as identified.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
esti
ga
te?
Y/
N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
Vegetative cover isadequate
Supplement as neededOwner orprofessional
There are excessivelandscape waste oryard clippings
Remove immediately andrecycle or compost
Owner orprofessional
Pre-TreatmentFacility
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion and/orexposed soil
Stabilize immediatelyOwner orprofessional
Inspector CourseAppendix II-h | Page 2 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/N
How to Fix ProblemWho WillAddressProblem
Comments
Pre-TreatmentFacility(continued)
There is evidence ofclogging (standingwater, noticeableodors, water stains,algae or floatingaquatic vegetation)
Identify and eliminate thesource of the problem. Ifnecessary, remove andclean or replace the cloggedmaterial.
Professional
There is deadvegetation or exposedsoil in the grass filter
Restabilize and revegetateas necessary
Owner orprofessional
Inlets
Inlets provide a stableconveyance intofacility
Stabilize immediately, asneeded.
Owner orprofessional
There is excessivetrash/debris/sediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion at or aroundthe inlet
Repair erosion damage andreseed or otherwiserestabilize with vegetation
Owner orprofessional
Embankment,Flow DiversionStructures(e.g., Dikes,Berms, etc.)and SideSlopes
There is evidence oferosion or bare soil
Identify the source of erosiondamage and prevent it fromrecurring. Repair erosiondamage and reseed orotherwise restabilize withvegetation
Owner orprofessional
There is excesssedimentaccumulation
Remove immediatelyOwner orprofessional
Water is not detainedin the infiltration basin
Check for a breach in thecontainment structure andrepair immediately.
Professional
Side slopes supportnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed frm area.
Professional
MaintainingFacilityCapacity andProperDrainage
Look for weedygrowth on the stonesurface indicatingsedimentaccumulation andpotential clogging
Identify and control sourcesof sediment anddebris.Remove sedimentand debris in excess of 4” indepth every 2-5 years (orsooner if performance isaffected).
Professional
Measure the draw-down rate of theobservation well forthree days following astorm event in excessof 1/2 inches in depth.If standing water isstill observed afterthree days, this is aclear sign thatclogging is a problem.
Immediately clear debrisfrom the underdrain.Replace the underdrain ifnecessary. If needed,regrade and till to restoreinfiltration capacity (the needfor this can be prevented bypreventing upstream erosionand subsequent sedimenttransport to the facility).
Professional
There is excessivetrash/debris Remove immediately
Owner orprofessional
VegetationGrass within thepractice is overgrown
Grass must be mowed to aheight of 4”-9” and grassclippings removed (ideallyrecycled or composted).
Owner orprofessional
Inspector CourseAppendix II-h | Page 3 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/N
How to Fix ProblemWho WillAddressProblem
Comments
Vegetation(continued)
Pioneer trees aresprouting in the baseof the facility
Remove trees to preventroots from puncturing thefilter fabric, allowingsediment to enter
Vegetation forms anoverhead canopy thatmay drop leaf litter,fruit and othervegetative materialsthat may causeclogging.
Prune or remove vegetationas necessary
Owner orprofessional
ObservationWell
Is each observationwell still capped?
Repair, as necessary. Professional
Outlet
Outlets are obstructedor erosion and soilexposure is evidentbelow the outlet.
Remove obstructions andstabilize eroded or exposedareas.
Owner orProfessional
Evidence of flowbypassing facility
Repair immediately Professional
There is excessivetrash, debris, orsediment at the outlet
Remove immediatelyOwner orprofessional
Overflow orEmergencySpillway
The pipe or spillway isnot effectivelyconveying excesswater to an adequatereceiving system
Clear sediment and debriswhenever 25% or more ofthe conveyance capacity isblocked. When damagedpipe is discovered, it must berepaired or replacedimmediately. Identify andcontrol sources of erosiondamage. Replace orreinforce stone armamentwhenever only one layer ofstone remains.
Professional
StructuralComponents
Evidence of structuraldeterioration
Repair as necessary Professional
Evidence of spallingor cracking ofstructural components
Repair or replace, asnecessary
Professional
Grates are in goodcondition
Repair or replace, asnecessary
Owner orprofessional
Overall
Access to theInfiltration facility or itscomponents isadequate
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thatmanholes, valves and/orlocks can be opened andoperated.
Professionaland, perhaps,the locality
There is evidence ofstanding water
Fill in low spots and stabilize;correct flow problemscausing ponding
Owner orprofessional
Inspector CourseAppendix II-h | Page 4 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/N
How to Fix ProblemWho WillAddressProblem
Comments
Overall(continued)
Mosquito proliferation
Eliminate standing water andestablish vegetation; treat formosquitoes as needed. Ifsprays are considered, thena mosquito larvicide, such asBacillus thurendensis orAltoside formulations can beapplied only if absolutelynecessary.
Owner orprofessional
Complaints from localresidents
Correct real problemsOwner orprofessional
Encroachment on theinfiltration area oreasement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Inspector CourseAppendix II-i | Page 1 of 5
Sample Maintenance Inspection Checklist:
Bioretention Practices
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Facility Location:G SurfaceG Underground
Filtration Media: No filtration (e.g., dry well,
permeable pavement,infiltration facility, etc.
Sand Bioretention Soil Peat Other: ________________
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Sedimentation chamber Plunge pool Stone diaphragm Grass filter strip Grass channel Other: __________________
Ideally, Bioretention facilities should be inspected and cleaned up annually, preferably during the spring. During thefirst 6 months following construction of a bioretention facility, the site should be inspected at least twice after stormevents that exceed 1/2-inch of rainfall. Watering is needed once a week during the first 2 months followinginstallation, and then as needed during the first growing season (April-October), depending upon rainfall. Ifvegetation needs to be replaced, one-time spot fertilization may be needed, preferably using an organic rather thana chemical fertilizer. Each facility should have a customized routine maintenance schedule addressing issues suchas the following: grass mowing, weeding, trash removal, .mulch raking and maintenance, erosion repair,reinforcement plantings, tree and shrub pruning, and sediment removal.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inve
sti
ga
te?
Y/
N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
ContributingDrainage Area
Adequate vegetation Supplement as necessaryOwner orprofessional
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidence oferosion and / or bareor exposed soil
Stabilize immediatelyOwner orprofessional
There are excessivelandscape waste oryard clippings
Remove immediately and recycleor compost
Owner orprofessional
Oil, grease or otherunauthorizedsubstances areentering the facility
Identify and control the source ofthis pollution. It may be necessaryto erect fences, signs, etc
Owner orprofessional
Pre-TreatmentThere is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
Inspector CourseAppendix II-i | Page 2 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
Pre-Treatment(continued)
Excessive trash,debris, or sediment.
Remove immediatelyOwner orprofessional
Pre-Treatment(continued)
There is evidence ofclogging (standingwater, noticeableodors, water stains,algae or floatingaquatic vegetation, oroil/grease)
Identify and eliminate the sourceof the problem. If necessary,remove and clean or replace theclogged material.
Professional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
There is deadvegetation or exposedsoil in the grass filter
Restabilize and revegetate asnecessary
Owner orprofessional
Inlets
Check for sedimentbuild-up at curb cuts,gravel diaphragms orpavement edges thatprevent flow fromgetting into the bed,and check forbypassing.
Remove sediment and correctany other problems that blockinflow.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion at or aroundthe inlet
Repair erosion damage andreseed or otherwise restabilizewith vegetation
Owner orprofessional
Inflow is hindered bytrees and/or shrubs.
Remove woody vegetation frompoints of inflow and directly aboveunderdrains. (Trees and shrubsmay be located closer to theperimeter.)
Owner orprofessional
Side Slopes(Annually, aftermajor storms)
There is evidence ofrill or gully erosion orbare soil
Identify the source of erosiondamage and prevent it fromrecurring. Repair erosion damageand reseed or otherwiserestabilize with vegetation
Owner orprofessional
There is excesssedimentaccumulation
Remove immediatelyOwner orprofessional
Side slopes supportnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed from the area.
Professional
Vegetation(monthly)
Plant composition isconsistent with theapproved plans andany stakes or wiresare in good condition.
Determine if existing plantmaterials are at least consistentwith general Bioretention designcriteria and replace inconsistentspecies.
Professional
There should be 75-90% cover (mulchplus vegetation), andthe mulch covershould be 2-3 inchesdeep.
Supplement vegetation and mulchas needed.
Inspector CourseAppendix II-i | Page 3 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
Vegetation(monthly)(continued)
There is evidence ofhydrocarbons or otherdeleterious materials,resulting inunsatisfactory plantgrowth or mortality,
Replace contaminated mulch. Ifproblem persists, test soils forhydrocarbons and other toxicsubstances. If excess levels arefound, the soils, plants and mulchmay all need to be replaced inaccordance with the approvedconstruction plans.
Professional
Invasive species orweeds make up atleast 10% of thefacility’s vegetation
Remove invasive species andexcessive weeds immediately andreplace vegetation as needed.
Owner orprofessional
The grass is too high
Mow within a week. Grassspecies should be selected thathave dense cover, are relativelyslow growing, and require theleast mowing and chemicalinputs. Grass should be from 6-10inches high.
Owner orprofessional
Vegetation isdiseased, dying ordead
Remove and replace. Increasewatering, but avoid usingchemical fertilizers, unlessabsolutely necessary.
Professional
Winter-killed or salt-killed vegetation ispresent.
Replace with hardier species.Owner orprofessional
Filter Media(Annually)
The filter media is toolow, too compacted,or the composition isinconsistent withdesign specifications
Raise the level, loosen andamend or replace the media, asneeded, to be consistent with thestate design criteria forBioretention (85-88% sand 8-12%soil fines 3-5% organic matter inform of leaf compost). Otherremediation options are describedin the maintenance section of thestate design criteria forBioretention
Professional
The mulch is olderthan 3 years or isotherwise in poorcondition
The mulch must be replacedevery 2-3 years
Professional
There is evidence thatchemicals, fertilizers,and/or oil/grease arepresent
Remove undesirable chemicalsfrom media and facilityimmediately, and replace mulchor media as needed
Professional
There is excessivetrash, debris, orsediment.
Remove trash and debrisimmediately. Check plant healthand, without damaging plants,manually remove the sediment,especially if the depth exceeds20% of the facility’s design depth.
Owner orprofessional
There is evidence ofconcentrated flows,erosion or exposedsoil
Identify the source of erosiondamage and prevent it fromrecurring. Repair the erosiondamage and reseed or otherwiserestabilize with vegetation.
Professional
Inspector CourseAppendix II-i | Page 4 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
Filter Media(Annually)(continued)
The filter bed isclogged and/or filledinappropriately
Redistribute the soil substrate andremove sediment within 2 weeks.
Professional
The topsoil is in poorcondition (e.g., the pHlevel is not 6-7, thecomposition isinappropriate, etc.)
Ensure a 3-inch surface depth oftopsoil consistent with the statedesign criteria for Bioretention(loamy sand or sandy loamtexture, with less than 5% claycontent, and organic mattercontent of at least 2%). If the pHis less than 6.5, spread limestone.
Professional
Underdrain/ProperDrainage
The perforated pipe isnot conveying wateras designed
Determine if the pipe is cloggedwith debris or if woody roots havepierced the pipe. Immediatelyclean out or replace the pipe, asnecessary.
Professional
The underlying soilinterface is clogged(there is evidence onthe surface of soilcrusting, standingwater, the facility doesnot dewater betweenstorms, or waterponds on the surfaceof basin for more than48 hours after anevent).
Measure the draw-down rate ofthe observation well for threedays following a storm event inexcess of 1/2 inches in depth..After three days, if there isstanding water on top but not inthe underdrain, this indicates aclogged soil layer. If standingwater is both on the surface andin the underdrain, then theunderdrain is probably clogged.This should be promptlyinvestigated and remediated torestore proper filtration. Gradingchanges may be needed orunderdrain repairs made. Thefilter media may need to be raked,excavated and cleaned orreplaced to correct the problem.Holes that are not consistent withthe design and allow water to flowdirectly through a planter to theground must be plugged.
Professional
Planters
The planter is unableto receive or detainstormwater prior toinfiltration. Waterdoes not drain fromthe reservoir within 3-4 hours of after astorm event.
Identify and correct sources ofclogging. Topsoil and sand/peatlayer may need to be amendedwith sand or replaced all together.
Owner orprofessional
The planter hasstructural deficiencies,including rot, cracks,and failure, or theplanter is unable tocontain the filtermedia or vegetation
Make needed repairsimmediately.
Owner orprofessional
Outlet/OverflowSpillway
Outlets are obstructedor erosion and soilexposure is evidentbelow the outlet.
Remove obstructions andstabilize eroded or exposedareas.
Owner orProfessional
There is excessivetrash, debris, orsediment at the outlet
Remove immediately, and keepthe contributing area free of trashand debris.
Owner orprofessional
Inspector CourseAppendix II-i | Page 5 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to fix problemWho WillAddressProblem
Comments
Outlet/OverflowSpillway(continued)
Any grates presentare in good condition
Repair or replace as necessaryOwner orprofessional
ObservationWell
Is the observation wellstill capped?
Repair, as necessary. Professional
Overall
Access to theInfiltration facility or itscomponents isadequate
Establish adequate access.Remove woody vegetation anddebris that may block access.Ensure that hardware can beopened and operated.
Professionaland, perhaps,the locality
There is evidence ofstanding water
Fill in low spots and stabilize;correct flow problems causingponding.
Owner orprofessional
Mosquito proliferation
Eliminate stangant pools andestablish vegetation; treat formosquitoes as needed. If spraysare considered, then a mosquitolarvicide, such as Bacillusthurendensis or Altosideformulations can be applied only ifabsolutely necessary.
Owner orprofessional
Complaints from localresidents
Correct real problemsOwner orprofessional
Encroachment on thebioretention area oreasement bybuildings or otherstructures
Inform involved property ownersof BMPs status ; clearly mark theboundaries of the receivingpervious area, as needed
Owner orprofessional(and perhapsthe locality)
Inspector CourseAppendix 4-j | Page 1 of 4
Sample Maintenance Inspection Checklist:
Dry Swales
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Facility Location:G SurfaceG Underground
Filtration Media: No filtration (e.g., dry well,
permeable pavement,infiltration facility, etc.
Sand Bioretention Soil Peat Other: ________________
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Sedimentation chamber Plunge pool Stone diaphragm Grass filter strip Grass channel Other: ___________________
Ideally, Dry Swales should be inspected annually in the Spring, triggering such maintenance activities assediment removal, spot revegetation, inlet stabilization, and repairs to check dams, underdrains andoutlets.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidence oferosion and / or bareor exposed soil
Stabilize immediatelyOwner orprofessional
There are excessivelandscape waste oryard clippings
Remove immediately andrecycle or compost
Owner orprofessional
Pre-Treatmentand FlowSpreaders
There is adequateaccess to the pre-treatment facility.
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
There is evidence ofclogging (standingwater, noticeableodors, water stains,algae or floatingaquatic vegetation)
Identify and eliminate thesource of the problem. Ifnecessary, remove andclean or replace the cloggedmaterial.
Professional
Inspector CourseAppendix 4-j | Page 2 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Pre-Treatmentand FlowSpreaders(continued)
There is deadvegetation or exposedsoil in the grass filter
Restabilize and revegetateas necessary
Owner orprofessional
The pea graveldiaphragm is at thecorrect level
Correct the installation, asneeded
Professional
Inlet and SwaleSides and Base
The inlet provides astable conveyanceinto the swale
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion at or aroundthe inlet
Repair erosion damage andreseed
Owner orprofessional
Check Dams
A check dam is notfunctioning properly.
Check upstream anddownstream sides of checkdams for evidence ofundercutting, side cutting orerosion and repairimmediately.
Professional
There is a largeaccumulation ofsediment ortrash/debris behindthe check dam.
Remove sediment when theaccumulation exceeds 25%of the original Tv. Removetrash/debris and clearblockages of weep holes.
Professional
Vegetation
Invasive species orweeds make up atleast 10% of thefacility’s vegetation
Remove invasive speciesand excessive weedsimmediately and replacevegetation as needed.
Owner orprofessional
Trees form anoverhead canopy thatmay drop leaf litter,fruit and othervegetative materialsthat may causeclogging.
Prune or remove vegetationand organic litter asnecessary.
Owner orprofessional
Grass height is notconsistent withstandards.
Dry Swales must be mowedto keep grass at a height of4” to 9”. Remove grassclippings after mowing.
Owner orprofessional
The grass cover is notdense enough or isdead or dying
Increase watering andreseed, if necessary, tomaintain 95% turf cover, butavoid using chemicalfertilizers unless absolutelynecessary. Replace salt-killed vegetation with salt-tolerant species.
Professional
Filter Media/Soil
There is evidence thatchemicals, fertilizers,and/or oil are present
Remove undesirablechemicals from media andfacility immediately, andreplace mulch or media asneeded
Professional
Inspector CourseAppendix 4-j | Page 3 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Filter Media/Soil (continued)
There is excessivetrash, debris, orsediment.
Remove trash and debrisimmediately. Check planthealth and, withoutdamaging plants, manuallyremove the sediment,especially if the depthexceeds 20% of the facility’sdesign depth.
Owner orprofessional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
There is evidence thatchemicals, fertilizers,and/or oil are present
Remove undesirablechemicals from mediaimmediately, and replacemulch or media as needed
Professional
Underdrain
The perforated pipe isnot conveying wateras designed
Determine if the pipe isclogged with debris or ifwoody roots have piercedthe pipe. Immediately cleanout or replace the pipe, asnecessary.
Professional
The underlying soilinterface is clogged(there is evidence onthe surface of soilcrusting, standingwater, the facility doesnot dewater betweenstorms, or waterponds on the surfaceof basin for more than48 hours after anevent).
Measure the draw-down rateof the observation well forthree days following a stormevent in excess of 1/2 inchesin depth. .After three days, ifthere is standing water ontop but not in the underdrain,this indicates a clogged soillayer. If standing water isboth on the surface and inthe underdrain, then theunderdrain is probablyclogged. This should bepromptly investigated andremediated to restore properfiltration. Grading changesmay be needed orunderdrain repairs made.
Professional
Outlet
Outlets are obstructedor erosion and soilexposure is evidentbelow the outlet.
Remove obstructions andstabilize eroded or exposedareas.
Owner orProfessional
There is excessivetrash, debris, orsediment at the outlet
Remove immediately, andkeep the contributing areafree of trash and debris.
Owner orprofessional
Overall
Access to theInfiltration facility or itscomponents isadequate
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thathardware can be openedand operated.
Professionaland, perhaps,the locality
Inspector CourseAppendix 4-j | Page 4 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overall(continued)
Mosquito proliferation
Eliminate stagnant pools andestablish vegetation; treat formosquitoes as needed. Ifsprays are considered, thena mosquito larvicide, such asBacillus thurendensis orAltoside formulations can beapplied only if absolutelynecessary.
Owner orprofessional
Complaints from localresidents
Correct real problems.Owner orprofessional
Encroachment on theswale or easement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Inspector CourseAppendix II-k | Page 1 of 2
Sample Maintenance Inspection Checklist:
Wet Swales
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Facility Location:G SurfaceG Underground
Filtration Media: No filtration (e.g., dry well,
permeable pavement,infiltration facility, etc.
Sand Bioretention Soil Peat Other:_________________
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Sedimentation chamber Plunge pool Stone diaphragm Grass filter strip Grass channel Other: ___________________
Wet Swales have maintenance needs similar to Dry Swales, although woody wetlandvegetation may need to be removed periodically.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
There is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidence oferosion and / or bareor exposed soil
Stabilize immediatelyOwner orprofessional
There are excessivelandscape waste oryard clippings
Remove immediately andrecycle or compost
Owner orprofessional
Pre-Treatment
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
There is evidence ofclogging (standingwater, noticeableodors, water stains,algae or floatingaquatic vegetation)
Identify and eliminate thesource of the problem. Ifnecessary, remove andclean or replace the cloggedmaterial.
Professional
There is deadvegetation.
Replace dead vegetation asnecessary
Professional
Inspector CourseAppendix II-k | Page 2 of 2
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Inlets
The inlet provides astable conveyanceinto the swale
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion at or aroundthe inlet
Repair erosion damage andreseed
Owner orprofessional
Check Dams
A check dam is notfunctioning properly.
Check upstream anddownstream sides of checkdams for evidence ofundercutting, side cutting orerosion and repairimmediately.
Professional
There is a largeaccumulation ofsediment ortrash/debris behindthe check dam.
Remove sediment when theaccumulation exceeds 25%of the original Tv. Removetrash/debris and clearblockages of weep holes.
Professional
Vegetation(monthly)
Plant composition isconsistent with theapproved plans
Replace inconsistent species Professional
Invasive species (e.g.,phragmites) arepresent.
Remove invasive speciesimmediately and replacevegetation as needed.
Professional
Vegetation is dead ordying
Replace dead vegetation asneeded.
Professional
Outlet
Outlets are obstructedor erosion and soilexposure is evidentbelow the outlet.
Remove obstructions andstabilize eroded or exposedareas.
Owner orProfessional
There is excessivetrash, debris, orsediment at the outlet
Remove immediately, andkeep the contributing areafree of trash and debris.
Owner orprofessional
Overall
Access to theInfiltration facility or itscomponents isadequate.
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thathardware can be openedand operated.
Professionaland, perhaps,the locality
Mosquito proliferation
Eliminate stagnant pools iffeasible, and treat formosquitoes as needed. Ifsprays are considered, thena mosquito larvicide, such asBacillus thurendensis orAltoside formulations can beapplied only if absolutelynecessary.
Owner orprofessional
Complaints from localresidents
Correct real problems.Owner orprofessional
Encroachment on theswale or easement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Inspector CourseAppendix II-l | Page 1 of 3
Sample Maintenance Inspection Checklist:
Filtering Practices
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Facility Location:G SurfaceG Underground
Filtration Media: No filtration (e.g., dry well,
permeable pavement,infiltration facility, etc.
Sand Bioretention Soil Peat Other:_________________
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Sedimentation chamber Plunge pool Stone diaphragm Grass filter strip Grass channel Other: ___________________
An inspection and clean-up should be scheduled annually to remove trash and floatables thataccumulate in the pre-treatment cells and filter bed. Frequent sediment cleanouts in the dry and wetsedimentation chambers are recommended every 2-3 years to maintain the function and performanceof the filter. If the filter treats runoff from a hotspot, crews may need to test the filter bed media beforedisposing of the media and trapped pollutants. If the filter does not treat runoff from a hotspot, themedia can be safely disposed by either land application or land filling, without prior testing.Warning: If the filtering facility has a watertight cover; be careful regarding the possibility offlammable gases within the facility. Care should be taken lighting a match or smoking while inspectingfacilities that are not vented. If the filtering facility is in a completely enclosed vault, the OSHAConfined Space Entry procedures must be followed.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Areaand SideSlopes
Adequate vegetation Supplement as necessary OwnerThere is excessivetrash and debris
Remove immediatelyOwner orprofessional
There is evidence oferosion and / or bareor exposed soil
Stabilize immediatelyOwner orprofessional
There are excessivelandscape waste oryard clippings
Remove immediately andrecycle or compost
Owner orprofessional
Pre-Treatment
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
Excessive trash, Remove immediately Owner or
Inspector CourseAppendix II-l | Page 2 of 3
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
debris, or sediment. professional
Pre-Treatment(continued)
There is evidence oferosion and / orexposed soil
Stabilize immediatelyOwner orprofessional
There is deadvegetation.
Replace dead vegetation asnecessary
Professional
Perimeter turf (or agrass filter strip) is toohigh.
Mow at least 4 times a yearto keep the grass at a heightof 4” to 9”. Remove grassclippings after mowing.
Owner orprofessional
There is evidence ofoil, grease, clogging(standing water,noticeable odors,water stains, algae)
Identify and eliminate thesource of the problem. Ifnecessary, remove andclean or replace the cloggedmaterial.
Professional
Inlets
The inlet provides astable conveyanceinto the swale
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion at or aroundthe inlet
Repair erosion damage andreseed
Owner orprofessional
SedimentationChambers
Sediment or debrisaccumulations areexcessive
Clean out the wet and drysedimentation chambers
Professional
Filter Media
If facility takes longerthan 48 hours to drainor filter media isdiscolored, the mediais probably clogged
Replace the top sand layerof an enclosed filter (typicallydone every 5 years). Till oraerate the surface toimprove infiltration and grasscover of an open filter (alsotypically done every 5 years.
Oil and GreaseEvidence of filtersurface clogging
Clean or replace filter media,as necessary.
Professional
UnderdrainThe underdrain is notconveying water asdesigned
To determine if the pipe isclogged, measure the draw-down rate of the observationwell for three days followinga storm event in excess of1/2 inches in depth. .Afterthree days, if there isstanding water on top but notin the underdrain, thisindicates a clogged sandlayer that must be replaced.If standing water is both onthe surface and in theunderdrain, then theunderdrain is probablyclogged. Immediately cleanout the pipe manually or, ifneeded, use a high-pressurehose. Replace theunderdrain if it is structurallydamaged.
Professional
ObservationWell(every 2 years)
Is the observation wellstill capped?
Repair, as necessary. Professional
Inspector CourseAppendix II-l | Page 3 of 3
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Outlet
The outlet providesstable conveyance
Remove blockages andstabilize, as needed.
Professional
Evidence of flowbypassing facility
Repair immediately Professional
Outlets are obstructedor erosion and soilexposure is evidentbelow the outlet.
Remove obstructions andstabilize eroded or exposedareas.
Owner orProfessional
StructuralComponents
Evidence of structuraldeterioration
Repair as necessary Professional
Evidence of spallingor cracking ofstructural components
Repair or replace, asnecessary
Professional
Grates are in goodcondition
Repair or replace, asnecessary
Owner orprofessional
Pump (whereapplicable)
Catalog cuts andwiring diagram forpump available
If missing, obtainreplacements
Owner
Waterproff conduitsfor wiring appear tobe intact
Repair as necessary Professional
Panel box is wellmarked
If not, mark it correctly Professional
No evidence of pumpfailure (excess waterin pump well, etc.)
Repair as necessary Professional
Overall
Access to the facilityor its components isadequate.
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thathardware can be openedand operated.
Professionaland, perhaps,the locality
Condition of hydrauliccontrol components
Repair, as necessary. Professional
Complaints from localresidents
Correct real problems.Owner orprofessional
Noticeable odorsoutside facility
Determine source andeliminate it.
Professional
Mosquito proliferation
Eliminate stagnant pools iffeasible, and treat formosquitoes as needed. Ifsprays are considered, thena mosquito larvicide, such asBacillus thurendensis orAltoside formulations can beapplied only if absolutelynecessary.
Owner orprofessional
Encroachment on thefilter or easement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Inspector CourseAppendix II-m | Page 1 of 4
Sample Maintenance Inspection Checklist:
Constructed Wetlands
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Hydraulic Configuration: On-line facility Off-line facility
Type of wetland Emergent Forested
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Vegetated buffer area Grass filter strip Grass channel
Other: __________________
During the first 6 months following construction, the wetland should be inspected twice after storm events thatexceed 1/2 inch of rainfall. Bare or eroding areas in the CDA or around the wetland buffer should be stabilizedimmediately with grass cover. Trees planted in the buffer and on wetland islands and peninsulas need to bewatered every 3 days for the first month, and then weekly during the remainder of the first growing season (April-October), depending on rainfall. Due to typical vegetation survival problems, it is typical to plan and budget for around of reinforcement planting after one or two growing seasons. Constructed wetlands should be inspectedand cleaned up annually. A wetland professional should inspect the facility every 5 years, especially to determineif there is any significant negative change in the wetland species composition from the design or an otherwisehealthy wetland.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
Adequate vegetation Supplement as needed OwnerThere is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidence oferosion and/or bare orexposed soil
Stabilize immediately.Owner orprofessional
There are excessivelandscape waste andyard clippings
Remove immediately andrecycle or compost
Owner orprofessional
Pre-Treatment
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidence oferosion and/orexposed soil.
Immediately identify andcorrect the cause of theerosion and stabilize theeroded or bare area.
Owner orprofessional
Sediment depositsare 50% or more offorebay capacity.
Dredge the sediment torestore the design capacity;sediment should be dredgedfrom forebays at least every
Professional
Inspector CourseAppendix 4-M | Page 2 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
5 years.
Pre-Treatment(continued)
The sediment markeris not vertical.
Adjust the sediment depthmarker to a verticalalignment
Professional
There is deadvegetation
Revegetate, as neededOwner orprofessional
Inlets
The inlet provides astable conveyance.
Stabilize immediately, asneeded; clear blockages.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion/undercuttingat or around the inlet
Repair erosion damage andreseed
Owner orprofessional
There is cracking,bulging, erosion orsloughing of theforebay dam.
Repair and restabilizeimmediately.
Professional
There is woodygrowth on the forebaydam.
Remove within 2 weeks ofdiscovery.
Professional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed fromarea
Professional
Vegetation(trees, shrubs,aquatic plants)
Plant composition isconsistent with theapproved plans
Determine if existing plantmaterials are at leastconsistent with the generalConstructed Wetland designcriteria, and replaceinconsistent species.
Professional
Invasive species arepresent.
Remove invasive speciesimmediately and replacevegetation as needed. As ageneral rule, control ofundesirable invasive species(e.g., cattail and Phragmites)should commence whentheir coverage exceeds morethan 15% of a wetland cellarea. Although theapplication of herbicides isnot recommended, sometypes, such as Glyphosate,have been used to controlcattails with some success.Extended periods ofdewatering may also work,since early manual removalprovides only short-termrelief from invasive species.
Professional
Vegetation is dead orreinforcement plantingis needed.
Remove and replace dead ordying vegetation.
Professional
Trees planted in thebuffer and on wetlandislands andpeninsulas needwatering during thefirst growing season
Consider watering every 3days for first month, andthen weekly during first year(April – October), dependingon rainfall.
Owner orprofessional
Inspector CourseAppendix 4-M | Page 3 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Vegetation(trees, shrubs,aquatic plants)(continued)
Practice has becomeovergrown and is notdeveloping into amature wetland.
Harvest vegetationperiodically if the wetlandbecomes overgrown or toguide maturing of forestedwetlands (typically 5 and 10years after constr.).
Owner orprofessional
Wetland Cellsand Pools
Sedimentaccumulation is 50%or more of capacity.
Dredge the sediment torestore the design capacity
Professional
There is evidence offloating debris, sparsevegetative cover,erosion or slumping ofside slopes.
Remove debris. Repair andstabilize.
Owner orprofessional
Open water isbecoming overgrown.
Harvest the unwantedvegetation.
Professional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed from thearea.
Riser/PrincipleSpillway andLow-FlowOrifice(s)
There is adequateaccess to riser formaintenance.
Establish adequate accessProfessionaland, perhaps,the locality
Pieces of the riser aredeteriorating,misaligned, broken ormissing.
Repair immediately. Professional
Adjustable controlvalves are accessibleand operational.
Repair, as needed. Professional
Reverse-slope pipesand flashboard risersare in good condition.
Repair, as needed. Professional
There is excessivetrash, debris, or otherobstructions in thetrash rack.
Remove immediately.Owner orprofessional
Seepage into conduit Seal the conduit Professional
Berm/Dam/Embankmentand Abutments
There is sparse veg.cover, settlement,cracking, bulging,misalignment, erosionrills deeper than 2inches, or sloughingof the dam.
Repair and restabilizeimmediately.
Professional
There are soft spots,boggy areas, seepageor sinkholes present.
Reinforce, fill and stabilizeimmediately.
Professional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed fromarea.
Professional
There is woodyvegetation on theembankment.
Removal of woody speciesnear or on the embankmentand maintenance accessareas should be done whendiscovered, but at leastevery 2 years.
Emergency There is woody Removal of woody species Owner or
Inspector CourseAppendix 4-M | Page 4 of 4
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Spillway growth on thespillway.
near or on the emergencyspillway should be donewhen discovered, but atleast every 2 years.
professional
There is excessivetrash, debris, or otherobstructions.
Remove immediately.Owner orprofessional
There is evidence oferosion/back-cutting
Repair erosion damage andreseed
Owner orprofessional
There are soft spots,seepage or sinkholes.
Reinforce, fill and stabilizeimmediately.
Owner orprofessional
Outlet
The outlet providesstable conveyancefrom the wetland.
Stabilize as needed. Professional
There are excessivesediment deposits.
Remove sediment. Professional
Released water iscausing undercutting,erosion or displacedrip-rap at or aroundthe outlet
Repair, reinforce or replacerip rap as needed, andrestabilize.
Professional
Woody growth within5 feet of the outletpipe barrel.
Prune vegetation back toleave a clear discharge area.
Owner orProfessional
There is excessivetrash, debris, or otherobstructions.
Remove immediately.Owner orprofessional
Overall
Access to the facilityor its components isadequate.
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thathardware can be openedand operated.
Professionaland, perhaps,the locality
Water levels in one ormore cells areabnormally high orlow.
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved designspecifications.
Professional
Complaints from localresidents
Correct real problems.Owner orprofessional
Mosquito proliferation
Eliminate stagnant pools iffeasible, and treat formosquitoes as needed. Ifsprays are considered, thena mosquito larvicide, such asBacillus thurendensis orAltoside formulations can beapplied only if absolutelynecessary. Can also stockthe basin with mosquito fishto provide natural mosquito& midge control.
Owner orprofessional
Encroachment on thewetland or easementby buildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Overall(continued)
Safety signage is notadequate.
Provide sufficient, legiblesafety signage.
Owner orprofessional
Inspector CourseAppendix II-n| Page 1 of 5
Sample aintenance Inspection Checklist:
Wet Ponds
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Pond characteristics and functions(check all that apply)
Water quality treatment Extended detention included Channel protection Ties into groundwater Single cell pond Multiple-cell pond system Pond with one or more wetland cells
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Vegetated buffer area Grass filter strip Grass channel Other: ___________________
During the first 6 months following construction, the pond should be inspected twice after storm events thatexceed 1/2 inch of rainfall. The aquatic benches shuld be planted with emergent wetland species, consistent withthe Wet Pond design specifications. Bare or eroding areas in the CDA or around the pond buffer should bestabilized immediately with grass cover. Trees planted in the buffer need to be watered every 3 days for the firstmonth, and then weekly during the remainder of the first growing season (April-October), depending on rainfall.Due to typical vegetation survival problems, it is typical to plan and budget for a round of reinforcement plantingduring the second growing season after construction. Wet Ponds should be inspected and cleaned up annually.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
Adequate vegetation Supplement as needed OwnerThere is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidence oferosion and/or bare orexposed soil
Stabilize immediately.Owner orprofessional
There are excessivelandscape waste andyard clippings
Remove immediately andrecycle or compost
Owner orprofessional
Pre-Treatment
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash and debris
Remove immediately.Owner orprofessional
Inspector CourseAppendix 4-N | Page 2 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Pre-Treatment(continued)
There is evidence oferosion and/orexposed soil.
Immediately identify andcorrect the cause of theerosion and stabilize theeroded or bare area.
Owner orprofessional
Sediment depositsare 50% or more offorebay capacity.
Dredge the sediment torestore the design capacity;sediment should be dredgedfrom forebays at least every5-7 years, and earlier ifperformance is beingaffected.
Professional
The sediment markeris not vertical.
Adjust the sediment depthmarker to a verticalalignment
Professional
There is evidence ofclogging
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved designspecifications
Professional
Inlet
The inlet provides astable conveyanceinto the pond
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion/undercuttingat or around the inlet
Repair erosion damage andrestabilize
Owner orprofessional
There is cracking,bulging, erosion orsloughing of theforebay dam.
Repair and restabilizeimmediately.
Professional
There is woodygrowth on the forebaydam.
Remove within 2 weeks ofdiscovery.
Professional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed from thearea.
Professional
There is more than 1inch of settlement.
Add fill material and compactthe soil to the design grade
Owner orProfessional
The inlet alignment isincorrect.
Correct immediately.Owner orProfessional
Vegetation
Plant composition isconsistent with theapproved plans
Determine if existing plantmaterials are consistent withthe general Wet Pond designcriteria, and replaceinconsistent species.
Professional
Invasive species arepresent.
Remove invasive speciesimmediately and replacevegetation as needed.
Professional
Trees planted in thebuffer and on wetlandislands andpeninsulas needwatering during thefirst growing season
Consider watering every 3days for first month, andthen weekly during first year(April – October), dependingon rainfall.
Owner orprofessional
Grass around thefacility is overgrown
Mow (at least twice a year)to a height of 4”-9” high andremove grass clippings
Owner orprofessional
Inspector CourseAppendix 4-N | Page 3 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Vegetation(continued)
Vegetation is dead orreinforcement plantingis needed.
Remove and replace dead ordying vegetation.
Professional
Permanent Pooland SideSlopes
There is excessivetrash and/or debris.
Remove immediatelyOwner orprofessional
There is evidence ofsparse vegetativecover, erosion orslumping side slopes.
Repair and stabilize physicaldamage, and reseed or plantadditional vegetation.
Owner orprofessional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Remove burrowing animalshumanely from the area.
There is significantsedimentaccumulation.
Conduct a bathymetric studyto determine the impact todesign volumes, and dredgeif necessary.
Professional
Riser/PrincipleSpillway andLow-FlowOrifice(s)
There is adequateaccess to the riser formaintenance.
Establish adequate accessProfessionaland, perhaps,the locality
Pieces of the riser aredeteriorating,misaligned, broken ormissing.
Repair immediately. Professional
Adjustable controlvalves are accessibleand operational.
Repair, as needed. Professional
Reverse-slope pipesand flashboard risersare in good condition.
Repair, as needed. Professional
There is evidence ofclogging
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved design specs.
Professional
Seepage into conduit Seal the conduit ProfessionalThere is excessivetrash, debris, or otherobstructions in thetrash rack.
Remove immediately.Owner orprofessional
Dam/Embankmentand Abutments
There is sparse veg.cover, settlement,cracking, bulging,misalignment, erosionrills deeper than 2inches, or sloughingof the dam.
Repair and restabilizeimmediately, especially aftermajor storms.
Professional
There are soft spots,seepage, boggy areasor sinkholes present.
Reinforce, fill and stabilizeimmediately.
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed frm area.
There is woodyvegetation on theembankment.
Removal of woody speciesnear or on the embankmentand maintenance accessareas should be done whendiscovered, but at leastevery 2 years.
Inspector CourseAppendix 4-N | Page 4 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overflow/EmergencySpillway
There is woodygrowth on thespillway.
Removal of woody speciesnear or on the emergencyspillway should be donewhen discovered, but atleast every 2 years.
Owner orprofessional
There is excessivetrash, debris, or otherobstructions.
Remove immediately.Owner orprofessional
There is evidence oferosion/back cutting
Repair erosion damage andreseed
Owner orprofessional
There are soft spots,seepage or sinkholes.
Reinforce, fill and stabilizeimmediately.
Owner orprofessional
Only one layer ofstone armoring existsabove the native soil.
Reinforce rip-rap or otherarmoring materials.
Professional
Outlet
The outlet provides astable conveyancefrom the pond.
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is woodygrowth within 5 feet ofthe outlet pipe barrel.
Prune vegetation back toleave a clear discharge area.
Owner orProfessional
There is excessivetrash, debris, or otherobstructions.
Remove immediately.Owner orprofessional
There are excessivesediment deposits atthe outlet.
Remove sediment. Professional
Discharge is causingundercutting, erosionor displaced rip-rap ator around the outlet.
Repair, reinforce or replacerip rap as needed, andrestabilize.
Professional
Overall
Access to the facilityor its components isadequate.
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thathardware can be openedand operated.
Professionaland, perhaps,the locality
Fences areinadequate
Collapsed fences must berestored to an uprightposition. Jagged edges anddamaged fences must berepaired or replaced.
Professional
Water levels in one ormore cells areabnormally high orlow.
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved designspecifications.
Professional
Complaints from localresidents
Correct real problems.Owner orprofessional
Mosquito proliferation
Eliminate stagnant pools andstock the basin withmosquito fish to providenatural mosquito & midgecontrol. Treat for mosquitoesas needed. If spraying, thenuse mosquito larvicide, (e.g.,Bacillus thurendensis orAltoside formulations) only ifabsolutely necessary.
Owner orprofessional
Inspector CourseAppendix 4-N | Page 5 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overall(continued)
Encroachment on thepond or easement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Safety signage is notadequate.
Provide sufficient, legiblesafety signage.
Owner orprofessional
Inspector CourseAppendix II-o | Page 1 of 5
Sample Maintenance Inspection Checklist:
Extended Detention Ponds
Inspection DateProject Site Plan/Permit NumberLocation Date BMP Placed in ServiceDate of Last Inspection InspectorOwner/Owner’s RepresentativeAs-Built Plans available: Y / N
Facility Type: Level 1 ____________________________ Level 2
Pond characteristics and functions(check all that apply)
Water quality treatment Extended detention included Channel protection Ties into groundwater Single cell pond Multiple-cell pond system Pond with one or more wetland cells
Hydraulic Configuration: On-line facility Off-line facility
Type of Pre-Treatment Facility: Sediment forebay (above
ground) Vegetated buffer area Grass filter strip Grass channel Other: ___________________
Ideally, Extended Detention Ponds should be inspected annually. ED Ponds are prone to a highclogging risk at the ED low-flow orifice. Ideally, the orifice should be inspected at least twice a yearafter initial construction. The constantly changing water levels in ED Ponds make it difficult to mow ormanage vegetative growth. The bottom of ED Ponds often become soggy, and water-loving tees suchas willows may invade and will need to be managed. Periodic mowing of the stormwater buffer is onlyrequired along maintenance rights-of-way and the embankment. The remaining buffer may bemanaged as a meadow (mowing every other year) or forest. Frequent removal of sediment from theforebay (every 5-7 years, or when 50% of the forebay capacity is filled) is essential to maintain thefunction and performance of the ED Pond. Sediments excavated from ED Ponds are usually notconsidered toxic or hazardous, so they can be safely disposed of either by land application of landfilling.
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
ContributingDrainage Area
Adequate vegetation Supplement as needed. OwnerThere is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidence oferosino and/or bare orexposed soil
Stabilize immediately.Owner orprofessional
There is excessivelandscape waste andyard clippings
Remove immediately.Owner orprofessional
Inspector CourseAppendix 4-O | Page 2 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Pre-Treatment
There is adequateaccess to the pre-treatment facility
Establish adequate accessProfessionaland, perhaps,the locality
There is excessivetrash and debris
Remove immediately.Owner orprofessional
There is evidence oferosion and/orexposed soil.
Immediately identify andcorrect the cause of theerosion and stabilize theeroded or bare area.
Owner orprofessional
Sediment depositsare 50% or more offorebay capacity.
Dredge the sediment torestore the design capacity;sediment should be dredgedfrom forebays at least every5-7 years, and earlier, asneeded.
Professional
The sediment markeris not vertical.
Adjust the sediment depthmarker to a verticalalignment
Professional
There is evidence ofclogging
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved designspecifications
Professional
There is deadvegetation
Revegetate, as neededOwner orprofessional
Inlet
The inlet provides astable conveyanceinto the pond
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is excessivetrash, debris, orsediment.
Remove immediatelyOwner orprofessional
There is evidence oferosion/undercuttingat or around the inlet
Repair erosion damage andrestabilize
Owner orprofessional
There is cracking,bulging, erosion orsloughing of theforebay dam.
Repair and restabilizeimmediately.
Professional
There is woodygrowth on the forebaydam.
Remove within 2 weeks ofdiscovery.
Professional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed from thearea.
Professional
There is more than 1inch of settlement.
Add fill material and compactthe soil to the design grade
Owner orProfessional
The inlet alignment isincorrect.
Correct immediately.Owner orProfessional
Vegetation
Plant composition isconsistent with theapproved plans
Determine if existing plantmaterials are consistent withthe general Wet Pond designcriteria, and replaceinconsistent species.
Professional
Invasive species arepresent.
Remove invasive speciesimmediately and replacevegetation as needed.
Professional
Inspector CourseAppendix 4-O | Page 3 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Vegetation(continued)
Trees planted in thebuffer and on wetlandislands andpeninsulas needwatering during thefirst growing season
Consider watering every 3days for first month, andthen weekly during first year(April – October), dependingon rainfall.
Owner orprofessional
Grass around thefacility is overgrown
Mow (at least twice a year)to a height of 4”-9” high andremove grass clippings.
Owner orprofessional
Vegetation is dead orreinforcement plantingis needed.
Remove and replace dead ordying vegetation.
Professional
Permanent Pooland SideSlopes
There is excessivetrash and/or debris.
Remove immediatelyOwner orprofessional
There is evidence ofsparse vegetativecover, erosion orslumping side slopes.
Repair and stabilize physicaldamage, and reseed or plantadditional vegetation.
Owner orprofessional
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed frm area.
Owner orprofessional
There is significantsedimentaccumulation.
Conduct a bathymetric studyto determine the impact todesign volumes, and dredgeif necessary.
Professional
Riser/PrincipleSpillway andLow-FlowOrifice(s)
There is adequateaccess to the riser formaintenance.
Establish adequate accessProfessionaland, perhaps,the locality
Pieces of the riser aredeteriorating,misaligned, broken ormissing.
Repair immediately. Professional
Adjustable controlvalves are accessibleand operational.
Repair, as needed. Professional
Reverse-slope pipesand flashboard risersare in good condition.
Repair, as needed. Professional
Seepage into conduit Seal conduit Professional
There is evidence ofclogging
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved design specs.
Professional
There is excessivetrash, debris, or otherobstructions in thetrash rack.
Remove immediately.Owner orprofessional
Dam/Embankmentand Abutments
There is sparse veg.cover, settlement,cracking, bulging,misalignment, erosionrills deeper than 2inches, or sloughing.
Repair and restabilizeimmediately, especially aftermajor storms.
Professional
There are soft spots,seepage, boggy areasor sinkholes.
Reinforce, fill and stabilizeimmediately.
Inspector CourseAppendix 4-O | Page 4 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Dam/Embankmentand Abutments(continued)
There is evidence ofnuisance animals.
Animal burrows must bebackfilled and compacted.Burrowing animals should behumanely removed from thearea.
There is woodyvegetation on theembankment.
Removal of woody speciesnear or on the embankmentand maintenance accessareas should be done whendiscovered, but at leastevery 2 years.
Overflow/Emergency Spillway
There is woodygrowth on thespillway.
Removal of woody speciesnear or on the emergencyspillway should be donewhen discovered, but atleast every 2 years.
Owner orprofessional
There is excessivetrash, debris, or otherobstructions.
Remove immediately.Owner orprofessional
There is evidence oferosion/back cutting
Repair erosion damage andreseed
Owner orprofessional
There are soft spots,seepage or sinkholes.
Reinforce, fill and stabilizeimmediately.
Owner orprofessional
Only one layer ofstone armoring existsabove the native soil.
Reinforce rip-rap or otherarmoring materials.
Professional
Outlet
The outlet provides astable conveyancefrom the pond.
Stabilize immediately, asneeded, and clearblockages.
Owner orprofessional
There is woodygrowth within 5 feet ofthe outlet pipe barrel.
Prune vegetation back toleave a clear discharge area.
Owner orProfessional
There is excessivetrash, debris, or otherobstructions.
Remove immediately.Owner orprofessional
There are excessivesediment deposits atthe outlet.
Remove sediment. Professional
Discharge is causingundercutting, erosionor displaced rip-rap ator around the outlet.
Repair, reinforce or replacerip rap as needed, andrestabilize.
Professional
Overall
Access to the facilityor its components isadequate.
Establish adequate access.Remove woody vegetationand debris that may blockaccess. Ensure thathardware can be openedand operated.
Professionaland, perhaps,the locality
Fences areinadequate
Collapsed fences must berestored to an uprightposition. Jagged edges anddamaged fences must berepaired or replaced.
Professional
Water levels in one ormore cells areabnormally high orlow.
Clear blockages of the riseror orifice(s) and make otheradjustments needed to meetthe approved designspecifications.
Professional
Complaints from localresidents
Correct real problems.Owner orprofessional
Inspector CourseAppendix 4-O | Page 5 of 5
Element ofBMP
Potential Problem
Pro
ble
m?
Y/
N
Inv
es
tig
ate
?Y
/N
Re
pa
ire
d?
Y/
N
How to Fix ProblemWho WillAddressProblem
Comments
Overall(continued)
Mosquito proliferation
Eliminate stagnant pools andstock the basin withmosquito fish to providenatural mosquito & midgecontrol. Treat for mosquitoesas needed. If spraying, thenuse mosquito larvicide, (e.g.,Bacillus thurendensis orAltoside formulations) only ifabsolutely necessary.
Owner orprofessional
Encroachment on thepond or easement bybuildings or otherstructures
Inform involved propertyowners of BMPs status ;clearly mark the boundariesof the receiving perviousarea, as needed
Owner orprofessional(and perhapsthe locality)
Safety signage is notadequate.
Provide sufficient, legiblesafety signage.
Owner orprofessional