APPENDIX 'A1' - Toronto Catholic District School Board Tube Field Vane ... le mp Sa Drawing No. of...
Transcript of APPENDIX 'A1' - Toronto Catholic District School Board Tube Field Vane ... le mp Sa Drawing No. of...
99.8
99.7
93.9
93.7
93.1
~195 mm Concrete slab over;
~145 mm Void over;~50 mm Sand over;Black nylon membrane over;FILL: ~175 mm brown sand andgravel followed by black stained sandand silt, brick and asphalt fragments,moist
-Silt and clayey silt, occasional gravel,brown and grey, moist
-Becoming wet
CLAYEY SILT TILL: Trace gravel,grey, wet, firmSAND AND GRAVEL: Grey, wet,dense to very dense
END OF BOREHOLE
March 12, 2013
Ram Sounder
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
100.00 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 1
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
2
Sheet No.Geotechnical Investigation
On completion 2.03 5.49
BRM-00603212-B0
Project: 1
0
1
2
3
4
5
6
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~6.9 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
41.3
43.8
4
3
5
2
2
2
2
11
53
99.899.8
97.0
~200 mm Concrete slab over;
~25 mm Void over;~75 mm Sand over;Black nylon membrane over;FILL: ~250 mm brown sand andgravel followed by black stained sandwith trace gravel and red brick pieces,changing to brown clayey silt withtrace gravel and wood fragments,moist
END OF BOREHOLE
March 12, 2013
Ram Sounder
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
100.00 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 2
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
3
Sheet No.Geotechnical Investigation
On completion No free water 2.69
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
5
6
10
8
99.1
95.4
93.7 22.3
~145 mm Concrete slab over;~50 mm sand over;Black nylon membrane over;FILL: Coarse brown gravel, moist
-Brown to grey silt and sand, somegravel, red brick fragments, woodpieces, moist to wet
SANDY SILT: Grey, wet, compact
-Becoming moist, dense to very denseEND OF BOREHOLE
March 12, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 3
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
4
Sheet No.Geotechnical Investigation
On completion 2.01 3.84
BRM-00603212-B0
Project: 1
0
1
2
3
4
5
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~5.5 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
53.6
88.2
2
1
2
1
45
18
12
50/125 mm
99.0
96.2
~75 and 150 mm (2 layers) Concreteslab over;~50 mm sand over;Black nylon membrane over;FILL: Brown, coarse gravel, somesand, moist
-Sand and gravel, occasional concretefragments, clayey silt pockets, brownwith black staining, moist
END OF BOREHOLE
March 13, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 4
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
5
Sheet No.Geotechnical Investigation
On completion No free water 0.61 - Bridged
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
1
7
2
2
99.199.1
96.2
~125 mm Concrete slab over;~25 mm Void over;~75 mm Sand over;Black nylon membrane over;FILL: Brown, coarse gravel changingto brown medium grained sand withsome gravel, moist-Mix of clayey silt with sand andgravel, concrete and red brickfragments, brown with black staining,moist
END OF BOREHOLE
March 13, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 5
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
6
Sheet No.Geotechnical Investigation
On completion No free water 0.91 - Bridged
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
7
16
10
5
99.0
96.2
~185 mm Concrete slab over;
~75 mm Sand over;Black nylon membrane over;FILL: Brown sand and gravelchanging to mix of silt, sand andgravel, inclusions of brick, cinders,ceramic tile fragments, grey with blackstaining, moist
END OF BOREHOLE
March 13, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 6
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
7
Sheet No.Geotechnical Investigation
On completion No free water 0.66 - Bridged
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
24
35
32
6
99.0
95.4
~205 mm Concrete slab over;
~25 mm Sand over;Black nylon membrane over;FILL: Grey coarse gravel changing tobrown sand and gravel with pieces oftimber, moist
END OF BOREHOLE
March 13, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 7
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
8
Sheet No.Geotechnical Investigation
On completion No free water 1.27
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.8 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
44
1
0
0
22
9
99.0
96.2
~170 mm Concrete slab over;
~50 mm Sand over;Black nylon membrane over;FILL: Coarse gravel, sand pockets,asphalt fragments, grey, moist
END OF BOREHOLE
March 14, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 8
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
9
Sheet No.Geotechnical Investigation
On completion No free water 0.38 - Bridged
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
4
8
3
2
99.199.0
97.4
~150 mm Concrete slab over;~50 mm Void over;~25 mm Sand over;Black nylon membrane over;FILL: Coarse gravel changing toclayey silt with trace gravel, woodfragments, brown to grey, moist
END OF BOREHOLETerminated upon refusal to sampling
equipment on piece of wood
March 14, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
99.20 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 9
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
10
Sheet No.Geotechnical Investigation
On completion No free water 0.48 - Bridged
BRM-00603212-B0
Project: 1
0
1
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~1.8 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
4
4
50/100 mm
50/0 mm
99.8
97.0
~165 mm Concrete slab over;~50 mm Sand over;Black nylon membrane over;FILL: Brown sand and gravelchanging to silt with some gravel,cinders, red brick fragments, darkstained changing to brown and greyclayey silt, trace gravel, red brickfragments, moist
END OF BOREHOLE
March 14, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
100.00 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 10
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
11
Sheet No.Geotechnical Investigation
On completion No free water 1.27
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
26
8
17
4
99.8
97.0
~200 mm Concrete slab over;
~40 mm sand over;Black nylon membrane over;FILL: Brown sand and gravelchanging to silt with trace gravel,clayey silt pockets, plastic and rockfragments, brown with black staining,moist
END OF BOREHOLE
March 14, 2013
Manual SPT
Finished floor elevation of gym (100.00 m)
Drill Type:
Datum:
Auger Sample
SPT (N) Value
Dynamic Cone Test
Shelby Tube
Field Vane TestS
Combustible Vapour Reading
Natural Moisture
Plastic and Liquid Limit
Undrained Triaxial at% Strain at Failure
Penetrometer
Location:
Date Drilled:
50 George Street South, Toronto, Ontario
Combustible Vapour Reading (ppm)
ELEV.m
100.00 10 20 30
Soil Description
NaturalUnit
WeightkN/m3
Natural Moisture Content %Atterberg Limits (% Dry Weight)
100
kPaShear Strength20 40 60 80
200
25 50 75SPT (N Value)
Dep
th (
m)
Sam
ple
Gro
undw
ater
Soi
l/Roc
kS
ymbo
l
Drawing No.
of
Log of Borehole 11
New identity of Trow Associates Inc.
WaterLevel(m)
Hole Opento (m)
12
Sheet No.Geotechnical Investigation
On completion No free water 1.27
BRM-00603212-B0
Project: 1
0
1
2
3
1
Project No.
ElapsedTime
Brampton
Notes:
1. Borehole advanced to completion at ~3.1 m depth by conventional soil sampling methods using
a specialist drilling subcontractor. For borehole definitions, see notes prior to logs.
2. This drawing forms part of and must be read in conjunction with the subject report (Ref. No.:
BRM-00603212-B0); borehole data requires interpretation assistance by exp professional staff
before use by others.
LAG
WG
L02E
XP
BH
LO
GS
.GP
J N
EW
.GD
T 3
/28
/13
18
13
11
5