Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3...

15
Appendix A: Maps & Figures Pack 1 – Introduction and Project Description Figures: SW-DR-V-00058 WS-DR-V-00012 WM-DR-V-00012 WT-DR-V-00010 SW-DR-V-00054 SW-DR-V-00053 C1-DR-L-00030 C2-DR-L-00021 C3-DR-L-00020

Transcript of Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3...

Page 1: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

Appendix A: Maps & Figures

Pack 1 – Introduction and Project Description

Figures:

SW-DR-V-00058

WS-DR-V-00012

WM-DR-V-00012

WT-DR-V-00010

SW-DR-V-00054

SW-DR-V-00053

C1-DR-L-00030

C2-DR-L-00021

C3-DR-L-00020

Page 2: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

This Page has been intentionally left blank.

Page 3: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

Bell Lock

Old WindsorLock

!.

!.!.

!.

!.!.

!.

!.!.

!. !.

!.

!.

!.

!.

!.

!.

!.

?

?

?

Datchet 2

21

Wraysbury1 (S)

Sunnymeads 3

KingsmeadIsland Lake

Wraysbury2 (N)

Datchet3 (N)

Datchet3 (S)

4

6

5

DouglasLane

CrayfishPool

ChurchLake

Kingsmead1 (S)

Kingsmead1 (N)

Horton4

Horton 2

Horton 1

Wraysbury1 (N)

Wraysbury2 (S)

BlenheimLake

Lower Hythe Gravel Pit 5

Lower Hythe Gravel Pit 3

Lower Hythe Gravel Pit 2

Lower Hythe Gravel Pit 4

WraysburyHilton

The Moor Gravel Pit

QueensmeadLake

ChurchLammas

Lake

Hythe End West

Hythe End Central

Hythe End East

Lake (Noname)

Sunnymeads

Lower Hythe Gravel Pit 1

RUNNYMEDEBOROUGHCOUNCIL

LA1

NR1C1

LA2

FCS2NR2

LA3

FCS3LA4

LA5 FCS4

IS1

C5

FBR1

FBR2

FBR3

FBR4

FCS21

SPELTHORNEBOROUGHCOUNCIL

SLOUGHBOROUGHCOUNCIL

ROYAL BOROUGHOF WINDSOR AND

MAIDENHEAD

FW1C

FW2A

FW3

FW1B

FW2B

FW1A

498000

498000

500000

500000

502000

502000

1720

0017

4000

1760

00122

368-BV

L-Z0-S

W-MX

-V-000

58.P0

1 mi

c76267

17/0

5/2017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres @ A3

122368-BVL-Z0-SW-DR-V-00058 P01

EIA SCOPINGPREFERRED DESIGN

SHEET 1 OF 2

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

2

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

P01 MMG

1:20,000 A3

Print Version: Print Quality (100dpi @ A3)

JME KQ EB 17/05/2017 SUITABLEFOR INFROMATION

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:!. MAJOR STRUCTURE

PREFERRED DESIGN CHANNEL CORRIDORINDICATIVE FLOOD EMBANKMENTSEPARATION / PROTECTION EMBANKMENTTHAMES SIDE BANK RISINGDESBOROUGH CUT - WIDENING WORKSCHANNEL THROUGH NATURAL GROUNDENGINEERED CHANNEL THROUGHNATURAL GROUNDCHANNEL THROUGH LANDFILL/MADE GROUNDENGINEERED CHANNEL THROUGHLANDFILL/MADE GROUNDBUNDREVETTED SPILLWAYPOTENTIAL LANDSCAPE ENHANCEMENT AREA

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

ROYAL BOROUGH OF WINDSOR & MAIDENHEADHILLINGDON LONDON BOROUGHSLOUGH BOROUGH COUNCILELMBRIDGE BOROUGH COUNCILSPELTHORNE BOROUGH COUNCILRUNNYMEDE BOROUGH COUNCILWATER

LA7

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

FW1

Rev Drawn Chkd Rvwd Apprvd Date Description

Page 4: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

SheppertonLock

ChertseyLock

Penton Hook Lock

!.!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

?

?

?

?

FleetLake

AbbeyLake

Abbey 1

Abbey 2

ManorLake

St.Ann'sLake

LittletonNorth

LittletonSouth

LittletonEast

SheepwalkEast

FerryLane

EghamHythe Pond

Lake Southof Norlands

Lane 2Lake Southof Norlands

Lane 1

TwynershLakes Sheepwalk

West 3Sheepwalk

West 2

SheepwalkWest 1

BlackDitchPond

HallifordMere

Lake South of Green Lane

Meadlake

River CroftLake

Old LittletonLane Lake

Manor FarmLake

Ferry LaneWest 1

2

3

IS2HA1

FCS5

FCS7

FCS9HA2

T3/FCS12

HA3M

LA7IS3 LA9

LA11

LA12

HA5M

FCS8

LA6

FCS19/FBR7

FCS10

HA6M

C2

HA7M

FCS18

LA13

FBR5

C6

T4

FBR6

RUNNYMEDEBOROUGHCOUNCIL

SPELTHORNEBOROUGHCOUNCIL

FW5A

FW5A

FW8

FW5B

FW4

FW6

FW9

FW8

504000

504000

506000

506000

508000

508000

1660

0016

8000

1700

00122

368-BV

L-Z0-S

W-MX

-V-000

58.P0

1 mi

c76267

17/0

5/2017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres @ A3

122368-BVL-Z0-SW-DR-V-00058 P01

EIA SCOPINGPREFERRED DESIGN

SHEET 2 OF 2

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

2

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

P01 MMG

1:20,000 A3

Print Version: Print Quality (100dpi @ A3)

JME KQ EB 17/05/2017 SUITABLEFOR INFROMATION

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:!. MAJOR STRUCTURE

PREFERRED DESIGN CHANNEL CORRIDORINDICATIVE FLOOD EMBANKMENTSEPARATION / PROTECTION EMBANKMENTTHAMES SIDE BANK RISINGDESBOROUGH CUT - WIDENING WORKSCHANNEL THROUGH NATURAL GROUNDENGINEERED CHANNEL THROUGHNATURAL GROUNDCHANNEL THROUGH LANDFILL/MADE GROUNDENGINEERED CHANNEL THROUGHLANDFILL/MADE GROUNDBUNDREVETTED SPILLWAYPOTENTIAL LANDSCAPE ENHANCEMENT AREA

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

ROYAL BOROUGH OF WINDSOR & MAIDENHEADHILLINGDON LONDON BOROUGHSLOUGH BOROUGH COUNCILELMBRIDGE BOROUGH COUNCILSPELTHORNE BOROUGH COUNCILRUNNYMEDE BOROUGH COUNCILWATER

LA7

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

FW1

Rev Drawn Chkd Rvwd Apprvd Date Description

Page 5: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

R:\PR

OJEC

TS\12

2368_R

TS\8_

WORK

SPAC

ES\2_

ISSUE

_MAP

S\1223

68-BV

L-Z0-W

S-MX-V

-00012

.P01.M

XD M

IC7626

7 22/

05/201

7

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

Rev Drawn Chkd Rvwd Apprvd Date Description

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 25 50 75 100Metres @ A3

122368-BVL-Z0-WS-DR-V-00012 P011:2,000

Date:MMG MAY 2017

© Copyright Black & Veatch Ltd. 2017

SCALE 1:2,000 A3

LEGEND:WEIR OPTIONSRIVER FLOW

Print Version: Print Quality (300dpi @ A3)

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATIONIN ADDITION TO THE HAZARDS OR RISKS NORMALLY ASSOCIATEDWITH THE TYPES OF WORK DETAILED ON THIS DRAWING, THEFOLLOWING SIGNIFICANT RESIDUAL RISKS SHOULD BE NOTED.FURTHER DETAILS ARE INCLUDED IN THE CDM DESIGN RISKMANAGEMENT REGISTER

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

CONSTRUCTION :

MAINTENANCE, CLEANING AND OPERATION :

DECOMMISSIONING OR DEMOLITION :

SUNBURY WEIRPREFERRED OPTION

Service Layer Credits: Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo,MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

POSSIBLE FISH PASS LOCATION TO BE DETERMINED

P01 MMG KQ EB 22/05/2017 SUITABLE FORINFORMATION

SUNBURYLOCK AIT

WEIR B

WEIR A

YACHTCLUB

FOOT BRIDGE

BOAT YARD PREFERRED OPTION

LOCK C

UT

JME

Page 6: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

R:\PR

OJEC

TS\12

2368_R

TS\8_

WORK

SPAC

ES\2_

ISSUE

_MAP

S\1223

68-BV

L-Z0-W

M-MX-V

-00012

.P01.M

XD M

IC7626

7 22/

05/201

7

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

Rev Drawn Chkd Rvwd Apprvd Date Description

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 25 50 75 100Metres @ A3

122368-BVL-Z0-WM-DR-V-00012 P011:2,000

Date:MMG MAY 2017

© Copyright Black & Veatch Ltd. 2017

SCALE

P01 MMG

1:2,000 A3

Print Version: Print Quality (300dpi @ A3)

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATIONIN ADDITION TO THE HAZARDS OR RISKS NORMALLY ASSOCIATEDWITH THE TYPES OF WORK DETAILED ON THIS DRAWING, THEFOLLOWING SIGNIFICANT RESIDUAL RISKS SHOULD BE NOTED.FURTHER DETAILS ARE INCLUDED IN THE CDM DESIGN RISKMANAGEMENT REGISTER

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

CONSTRUCTION :

MAINTENANCE, CLEANING AND OPERATION :

DECOMMISSIONING OR DEMOLITION :

MOLESEY WEIRPREFERRED OPTION

Service Layer Credits: Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

LEGEND:WEIR OPTIONSRIVER FLOW

JME KQ EB 22/05/2017 SUITABLE FORINFORMATION

WEIR C

WEIR D

WEIR B

WEIR A

ASHISLAND

PREFERRED OPTION

Page 7: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

R:\PR

OJEC

TS\12

2368_R

TS\8_

WORK

SPAC

ES\2_

ISSUE

_MAP

S\1223

68-BV

L-Z0-W

T-MX-V

-00010

.P01.M

XD M

IC7626

7 22/

05/201

7

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

Rev Drawn Chkd Rvwd Apprvd Date Description

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 25 50 75 100Metres

@ A3

122368-BVL-Z0-WT-DR-Z-00010 P01

1:2,000

Date:MMG MAY 2017

© Copyright Black & Veatch Ltd. 2017

SCALE

P01 MMG

1:2,000 A3

Print Version: Print Quality (300dpi @ A3)

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATIONIN ADDITION TO THE HAZARDS OR RISKS NORMALLY ASSOCIATEDWITH THE TYPES OF WORK DETAILED ON THIS DRAWING, THEFOLLOWING SIGNIFICANT RESIDUAL RISKS SHOULD BE NOTED.FURTHER DETAILS ARE INCLUDED IN THE CDM DESIGN RISKMANAGEMENT REGISTER

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

CONSTRUCTION :

MAINTENANCE, CLEANING AND OPERATION :

DECOMMISSIONING OR DEMOLITION :

TEDDINGTON WEIRPREFERRED OPTION

LEGEND:PREFERRED OPTIONRIVER FLOW

KQ EB 18/05/2017 SUITABLEFOR INFORMATION

TEDDINGTON LOCKISLAND

WEIR R

WEIR B/C

Service Layer Credits: Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL,Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User CommunitySource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

LOCK CUT

JMEPREFERRED OPTION

BOATROLLERS

Page 8: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

!.

!.!.

!.

!.!.

!.

!.!.

!. !.

!.

!.

!.

!.

!.

!.

!.

Datchet 2

21

Wraysbury1 (S)

Sunnymeads 3

KingsmeadIsland Lake

Wraysbury2 (N)

Datchet3 (N)

Datchet3 (S)

4

6

5

DouglasLane

CrayfishPool

ChurchLake

Kingsmead1 (S)

Kingsmead1 (N)

Horton4

Horton 2

Horton 1

Wraysbury1 (N)

Wraysbury2 (S)

BlenheimLake

Lower Hythe Gravel Pit 5

Lower Hythe Gravel Pit 3

Lower Hythe Gravel Pit 2

Lower Hythe Gravel Pit 4

WraysburyHilton

The Moor Gravel Pit

QueensmeadLake

ChurchLammas

Lake

Hythe End West

Hythe End Central

Hythe End East

Lake (Noname)

Sunnymeads

Lower Hythe Gravel Pit 1

RUNNYMEDEBOROUGHCOUNCIL

LA1

NR1C1

LA2

FCS2NR2

LA3

FCS3LA4

LA5 FCS4

IS1

C5

FBR1

FBR2

FBR3

FBR4

FCS21

SOUTHLEA FARM

SOUTHLEA FARM

SOUTHLEAFARM - RAIL

BRIDGE WORKS

WELLEY ROAD

STATIONROAD - RAIL

BRIDGE WORKS

FOWLESRECYCLING

DEPOT

SPELTHORNEBOROUGHCOUNCIL

SLOUGHBOROUGHCOUNCIL

ROYAL BOROUGHOF WINDSOR AND

MAIDENHEAD

River

Tham

es

FW1C

FW2A

FW3

FW1B

FW2B

FW1A

498000

498000

500000

500000

502000

502000

1720

0017

4000

1760

00122

368-BV

L-Z0-S

W-MX

-V-000

54.P0

1 mi

c76267

22/0

5/2017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres

@ A3

122368-BVL-Z0-SW-DR-V-00054 P01

EIA SCOPINGCONSTRUCTION WORKING AREAS

CHANNEL SECTION 1

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

23

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

P01 MMG

1:20,000 A3

Print Version: Print Quality (100dpi @ A3)

JME KQ EB 22/05/2017 SUITABLEFOR INFROMATION

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:

!. MAJOR STRUCTUREPREFERRED DESIGN CHANNEL CORRIDORENGINEERED CHANNEL CORRIDORINDICATIVE FLOOD EMBANKMENTSEPARATION / PROTECTION EMBANKMENTDESBOROUGH CUT - WIDENING WORKS

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

WORKING AREAPERMANENT COMPOUNDTEMPORARY COMPOUNDROYAL BOROUGH OF WINDSOR & MAIDENHEADHILLINGDON LONDON BOROUGHHOUNSLOW BOROUGH COUNCIL KINGSTON UPON THAMESBOROUGH COUNCILSLOUGH BOROUGH COUNCILELMBRIDGE BOROUGH COUNCILSPELTHORNE BOROUGH COUNCILRICHMOND UPON THAMESBOROUGH COUNCILRUNNYMEDE BOROUGH COUNCILWATER

LA7

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

FW1

Rev Drawn Chkd Rvwd Apprvd Date Description

Page 9: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

!.!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

FleetLake

AbbeyLake

Abbey 1

Abbey 2

ManorLake

St.Ann'sLake

LittletonNorth

LittletonSouth

LittletonEast

SheepwalkEast

FerryLane

EghamHythe Pond

Lake Southof Norlands

Lane 2Lake Southof Norlands

Lane 1

TwynershLakes Sheepwalk

West 3Sheepwalk

West 2

SheepwalkWest 1

BlackDitchPond

HallifordMere

Lake South of Green Lane

Meadlake

River CroftLake

Old LittletonLane Lake

Manor FarmLake

Ferry LaneWest 1

2

3

IS2

HA1

FCS5

FCS7

FCS9HA2

T3/FCS12

HA3M

LA7IS3 LA9

LA11

LA12

HA5M

FCS8

LA6

FCS19/FBR7

FCS10

HA6M

C2

HA7M

FCS18LA13

FBR5

C6

T4

FBR6

RUNNYMEDEBOROUGHCOUNCIL

ELMBRIDGEBOROUGHCOUNCIL

A320 CHERTSEYLANE -INTAKE

NORLANDS LANE

ADJACENTJ.B. SKI

CAR PARK

A320 CHERTSEYLANE -

DOWNSTREAM

THAMESSIDE ROAD

LITTLETONLANE

SHEEPWALKLANDFILL

SHEEPWALKLANDFILL

SPELTHORNEBOROUGHCOUNCIL

River Thames

FW5A

FW5A

FW8

FW5B

FW4

FW6

FW9

FW8

504000

504000

506000

506000

508000

508000

1660

0016

8000

1700

00122

368-BV

L-Z0-S

W-MX

-V-000

54.P0

1 mi

c76267

22/0

5/2017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres

@ A3

122368-BVL-Z0-SW-DR-V-00054 P01

EIA SCOPINGCONSTRUCTION WORKING AREAS

CHANNEL SECTION 2 AND 3

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

23

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

P01 MMG

1:20,000 A3

Print Version: Print Quality (100dpi @ A3)

JME KQ EB 22/05/2017 SUITABLEFOR INFROMATION

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:

!. MAJOR STRUCTUREPREFERRED DESIGN CHANNEL CORRIDORENGINEERED CHANNEL CORRIDORINDICATIVE FLOOD EMBANKMENTSEPARATION / PROTECTION EMBANKMENTDESBOROUGH CUT - WIDENING WORKS

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

WORKING AREAPERMANENT COMPOUNDTEMPORARY COMPOUNDROYAL BOROUGH OF WINDSOR & MAIDENHEADHILLINGDON LONDON BOROUGHHOUNSLOW BOROUGH COUNCIL KINGSTON UPON THAMESBOROUGH COUNCILSLOUGH BOROUGH COUNCILELMBRIDGE BOROUGH COUNCILSPELTHORNE BOROUGH COUNCILRICHMOND UPON THAMESBOROUGH COUNCILRUNNYMEDE BOROUGH COUNCILWATER

LA7

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

FW1

Rev Drawn Chkd Rvwd Apprvd Date Description

Page 10: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

ELMBRIDGEBOROUGHCOUNCIL

HAM LANDSCOMPOUND

HAM LANDSWORKING AREA

TEDDINGTON WEIRWORKING AREA

MOLESEY WEIRWORKING AREA

SUNBURY WEIRWORKING AREA

SPELTHORNEBOROUGHCOUNCIL

RICHMONDUPON THAMES

HOUNSLOW

KINGSTONUPON

THAMES

River Thames

BROOM ROADRECREATION

GROUND

HURST PARK

510000

510000

512000

512000

514000

514000

516000

516000

518000

518000

1680

0017

0000

1720

0017

4000

122368

-BVL-Z

0-SW-

MX-V-

00054.

P01

mic76

267 2

2/05/2

017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres

@ A3

122368-BVL-Z0-SW-DR-V-00054 P01

EIA SCOPINGCONSTRUCTION WORKING AREAS

WEIRS AND HAM LANDS

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

23

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

P01 MMG

1:25,000 A3

Print Version: Print Quality (100dpi @ A3)

JME KQ EB 22/05/2017 SUITABLEFOR INFROMATION

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:

!. MAJOR STRUCTUREPREFERRED DESIGN CHANNEL CORRIDORENGINEERED CHANNEL CORRIDORINDICATIVE FLOOD EMBANKMENTSEPARATION / PROTECTION EMBANKMENTDESBOROUGH CUT - WIDENING WORKS

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

WORKING AREAPERMANENT COMPOUNDTEMPORARY COMPOUNDROYAL BOROUGH OF WINDSOR & MAIDENHEADHILLINGDON LONDON BOROUGHHOUNSLOW BOROUGH COUNCIL KINGSTON UPON THAMESBOROUGH COUNCILSLOUGH BOROUGH COUNCILELMBRIDGE BOROUGH COUNCILSPELTHORNE BOROUGH COUNCILRICHMOND UPON THAMESBOROUGH COUNCILRUNNYMEDE BOROUGH COUNCILWATER

LA7

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

FW1

Rev Drawn Chkd Rvwd Apprvd Date Description

Page 11: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

Bell Lock

Old WindsorLock

?

?

?

Datchet 2

21

Wraysbury1 (S)

Sunnymeads 3

KingsmeadIsland Lake

Wraysbury2 (N)

Datchet3 (N)

Datchet3 (S)

4

6

5

DouglasLane

CrayfishPool

ChurchLake

Kingsmead1 (S)

Kingsmead1 (N)

Horton4

Horton 2

Horton 1

Wraysbury1 (N)

Wraysbury2 (S)

BlenheimLake

Lower Hythe Gravel Pit 5

Lower Hythe Gravel Pit 3

Lower Hythe Gravel Pit 2

Lower Hythe Gravel Pit 4

WraysburyHilton

The Moor Gravel Pit

QueensmeadLake

ChurchLammas

Lake

Hythe End West

Hythe End Central

Hythe End East

Lake (Noname)

Sunnymeads

Lower Hythe Gravel Pit 1

RUNNYMEDEBOROUGHCOUNCIL

HYTHE END

SUNNYMEADS

SPELTHORNEBOROUGHCOUNCIL

SLOUGHBOROUGHCOUNCIL

ROYAL BOROUGHOF WINDSOR AND

MAIDENHEAD

498000

498000

500000

500000

502000

502000

1720

0017

4000

1760

00122

368-BV

L-Z0-S

W-DR

-V-000

53.P0

2 mic

76267

12/06

/2017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres @ A3

122368-BVL-Z0-SW-DR-V-00053 P02

1:20,000

POTENTIAL HABITATCREATION AREAS

SHEET 1 OF 2

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

2

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

SCALE

P02 MMG

1:20,000 A3

Print Version: Print Quality (100dpi @ A3)

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:

PREFERRED DESIGN CHANNEL CORRIDOR

SEPARATION / PROTECTION EMBANKMENT

DESBOROUGH CUT - WIDENING WORKS

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

POTENTIAL HABITATCREATION AREAS

ROYAL BOROUGH OF WINDSOR & MAIDENHEAD

SLOUGH BOROUGH COUNCIL

ELMBRIDGE BOROUGH COUNCIL

SPELTHORNE BOROUGH COUNCIL

RUNNYMEDE BOROUGH COUNCIL

WATER

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

Rev Drawn Chkd Rvwd Apprvd Date Description

JME KQ EB 12/06/2017 SUITABLEFOR INFORMATION

P01 MMG JME KQ EB 23/05/2017 SUITABLEFOR INFORMATION

Page 12: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

SheppertonLock

ChertseyLock

Penton Hook Lock

?

?

?

?

FleetLake

AbbeyLake

Abbey 1

Abbey 2

ManorLake

St.Ann'sLake

LittletonNorth

LittletonSouth

LittletonEast

SheepwalkEast

FerryLane

EghamHythe Pond

Lake Southof Norlands

Lane 2Lake Southof Norlands

Lane 1

TwynershLakes Sheepwalk

West 3Sheepwalk

West 2

SheepwalkWest 1

BlackDitchPond

HallifordMere

Lake South of Green Lane

Meadlake

River CroftLake

Old LittletonLane Lake

Manor FarmLake

Ferry LaneWest 1

2

3

RUNNYMEDEBOROUGHCOUNCIL

SHEEPWALK

ABBEY

ABBEY MEADS

NORLANDSLANE

MANOR FARM

ROYAL HYTHE

DESBOROUGHISLAND

SPELTHORNEBOROUGHCOUNCIL

504000

504000

506000

506000

508000

508000

1660

0016

8000

1700

00122

368-BV

L-Z0-S

W-DR

-V-000

53.P0

2 mic

76267

12/06

/2017

Project:

Drawing title:

Drawing scale:

Drawing no.

Sheet size:

Revision

Client Drawing No. Revision

ClientDesigned by:

The limits, including the height and depths of the Works, shown inthis drawing are not to be taken as limiting the obligations of thecontractor under Contract.

Note:

0 250 500 750 1,000Metres @ A3

122368-BVL-Z0-SW-DR-V-00053 P02

1:20,000

POTENTIAL HABITATCREATION AREAS

SHEET 2 OF 2

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON) (RTS)

Date:MMG

1

2

MAY 2017

© Copyright Black & Veatch Ltd. 2017

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database rights 2017. Ordnance Survey Licence number 100026380

SCALE

P02 MMG

1:20,000 A3

Print Version: Print Quality (100dpi @ A3)

Registered office: Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL, UKRegistered in England and Wales: Company no. 08584398

CAPACITY IMPROVEMENTS AND FLOOD CHANNEL (CI&FC)

LEGEND:

PREFERRED DESIGN CHANNEL CORRIDOR

SEPARATION / PROTECTION EMBANKMENT

DESBOROUGH CUT - WIDENING WORKS

? POTENTIAL TEMPORARY MATERIAL PROCESSING SITE

POTENTIAL HABITATCREATION AREAS

ROYAL BOROUGH OF WINDSOR & MAIDENHEAD

SLOUGH BOROUGH COUNCIL

ELMBRIDGE BOROUGH COUNCIL

SPELTHORNE BOROUGH COUNCIL

RUNNYMEDE BOROUGH COUNCIL

WATER

Abbey 1 LAKE NAME

Safety Health and Environment InformationIn addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:Construction.

Maintenance / Clearing / Operation.

Decommissioning / Demolition.

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Archaeology4. Construction through landfill5. Impact on fishing lakes6. Construction under and adjacent to railways7. Pollution risk to local watercourses and SPA lakes8. Working within a Principal Aquifer9. Working in or adjacent to SSSI

1. Flooding2. Manoeuvring heavy plant adjacent to deep and flowing water3. Working on and around Mechanical Plant4. Interaction with the Public

1. Flooding2. Landfill3. Pollution risk to local watercourses and SPA lakes4. Working within a Principal Aquifer5. Working in or adjacent to SSSI

Rev Drawn Chkd Rvwd Apprvd Date Description

HAM LANDS

JME KQ EB 12/06/2017 SUITABLEFOR INFORMATION

P01 MMG JME KQ EB 23/05/2017 SUITABLEFOR INFORMATION

Page 13: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

Lake 2

Datchet

Datchet

Lake 3 (S)

Datchet

Island Lake

Kingsmead

The Queen Mother Reservoir

DATCHET

Datchet Lake 1

Lake 1

Horton

Lake 4

Horton

Lake

Douglas

Lake

Blenheim

WRAYSBURY

Wraysbury

Reservoir

Lake 1 (N)

Wraysbury

Lake 1 (S)

Wraysbury

Lake 2 (N)

Wraysbury

Lane

Central Lake

Hythe End

West Lake

Hythe End

Windsor

Home Park

Datchet

Common

Ankerwycke Farm Estate

National Trust

Runnymede

National Trust

T

h

a

m

e

s

P

a

t

h

C

o

l

n

e

V

a

l

l

e

y

W

a

y

Lake 2 (S)

Wraysbury

Horton

Lake 2

"Magna Carta Way" a new

footpath / cycleway from Datchet,

along Channel 1, to Bell Weir.

Access links to Colne Valley

Way as part of the CEMEX

restoration works

R

i

v

e

r

T

h

a

m

e

s

R

i

v

e

r

T

h

a

m

e

s

R

i

v

e

r

T

h

a

m

e

s

C

o

l

n

e

B

r

o

o

k

C

o

ln

e

B

ro

o

k

Southlea Farm

Wraysbury

Landfill

Runnymede

Pleasure

Ground

Bell Weir

& Lock

M25

Albert

Bridge

Pedestrian and cycle access,

via Colne Valley Way, to

Heathrow Airport Ltd's

landscaping and public access

proposals

Kingsmead

Lake 1 (S)

Church Lake

Kingsmead

Lake 1 (N)

P

P

P

Navigation from Kingsmead

Island Lake to

fixed weir at Horton

Magna Carta

Island

Location of separation

embankments, if required.

F

F

S

Lakes

M

Lake 3 (N)

Lower

Hythe

Gravel

Pits

S

Sunnymeads

S

S

LEGEND :

Existing Public Rights of Way

Existing Permissive Footpaths

Thames Path National Trail

National Cycle Route 4

Existing Open Space (Parks, Open Access

Land, Recreation Grounds)

Existing Woodland Area

Colne Valley Regional Park

Existing Car Park (public & private)

Existing Car Park for potential use for RTS

Primary Footpath/Cycleway

Route of "Magna Carta Way"

Vehicular/All Purpose Bridge Crossing

Pedestrian/Cycle Bridge Crossing

Car Park

Fishing

Moorings

Slipway

Navigable Section of Channel

Gated Weir

Fixed Weir

Flood Embankment

Separation Embankment

Landscape Enhancement Area

following materials processing and/or soil re-use

Material Processing Site 1

Existing features

Proposed features included in RTS costs

Outline Channel Design

P

1 Several locations are being considered as material management

areas during construction. Not all will be needed, but where created

these will potentially provide opportunities for landscape or habitat

enhancement'.

LEGEND :

Existing features

Proposed features (included in RTS costs)

F

S

M

100m

Scale 1:5000

0m 100m 200m 300m

RvwdDrawnRev Chkd DescriptionDate

Client

RevisionClient Drawing No.

Project

Drawing title

Drawing scale:

Drawing no.

Sheet size: A0Revision

Apprvd

Designed by: Date:

10 Upper Grosvenor Road

Tunbridge Wells

Kent, TN1 2EP

T 01892 545460

F 01892 545461

W www.enplan.net

Checked by:PRV

© Crown Copyright and database rights 2017. OrdnanceSurvey 100026380

122368-ENP-Z0-C1-DR-L-000030

1:5,000

JDSP December 2016

(CI&FC)

JDSP 22/03/17

400m 500m

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON)(RTS)

CAPACITY IMPROVEMENTS & FLOOD CHANNEL

P05.2

Features updates

0

JDSP 29/03/17 Features updatesP03P02

JDSP 19/05/17 Features updatesP04 PRV PRVJDSP 23/05/17 Features updatesP05 PRV PRVJDSP 12/06/17 Features updatesP06 PRV PRV

Page 14: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

River T

ham

es

R

i

v

e

r

T

h

a

m

e

s

R

i

v

e

r

T

h

a

m

e

s

THORPE

Egham Hythe Pond

Manor Lake

St Ann's Lake

Twynersh Lakes

Meadlake

CHERTSEY

Chertsey

Meads

Dumsey

Meadow

Laleham

Park

Thorpe

Park

T

h

a

m

e

s

P

a

t

h

/

N

a

t

io

n

a

l

C

y

c

le

R

o

u

t

e

4

STAINES-UPON-THAMES

W

h

e

a

ts

h

e

a

f L

a

n

e

G

r

e

e

n

L

a

n

e

Norlands Lane

Landfill

Penton Hook

Marina

Laleham

Golf Course

M

3

M

3

St. Ann's

Hill

M

o

n

k

'

s

W

a

l

k

A

b

b

e

y

R

iv

e

r

Chertsey

Bridge

Chertsey Weir

& Lock

Thorpe Hay

Meadow

Littleton

North

P

P

P

Littleton

South

Access along the edge of Thorpe

Fleet Lake

Abbey Lake

Abbey 1

Abbey 2

P

M

F

Visitors facilities would be

provided at one or the other of

these two locations.

B

u

r

w

a

y

D

it

c

h

Existing Car Park for potential use for RTS

LEGEND :

Existing Public Rights of Way

Existing Permissive Footpaths

Existing Public Bridleways

Thames Path National Trail

National Cycle Route 4

Existing Open Space (Parks, Open

Access Land, Recreation Grounds)

Existing Woodland Area

Existing Car Park (public & private)

Existing Car Park for potential use for RTS

Primary Footpath/Cycleway

Vehicular/All Purpose Bridge Crossing

Car Park

Fishing

Moorings

Gated Weir

Fixed Weir

Flood Embankment

Landscape Enhancement Area

following materials processing and/or soil re-use

Habitat Creation Area 2

Material Processing Sites 1

Existing features

Proposed features (included in RTS costs)

Outline Channel Design

P

1 Several locations are being considered as material

management areas during construction. Not all will be

needed, but where created these will potentially provide

opportunities for landscape or habitat enhancement'.

2 Several locations are being considered (including as part

of the Landscape Enhancement Areas), but not all will be

needed or delivered.

F

M

© Crown Copyright and database rights 2017. OrdnanceSurvey 100026380

RvwdDrawnRev Chkd DescriptionDate

Client

RevisionClient Drawing No.

Project

Drawing title

Drawing scale:

Drawing no.

Sheet size: A0Revision

Apprvd

Designed by: Date:

10 Upper Grosvenor Road

Tunbridge Wells

Kent, TN1 2EP

T 01892 545460

F 01892 545461

W www.enplan.net

Checked by:PRV

1:5,000

JDSP December 2016

122368-ENP-Z0-C2-DR-L-000021 P05.2

JDSP

(CI&FC)

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON)(RTS)

CAPACITY IMPROVEMENTS & FLOOD CHANNEL

100m

Scale 1:5000

0m 100m 200m 300m 400m 500m

JDSP Features Updates29/03/2017P03Features Updates22/03/2017P02

JDSP Features Updates19/05/2017P04 PRV PRVJDSP Features Updates23/05/2017P05 PRV PRVJDSP Features Updates12/06/2017P06 PRV PRV

Page 15: Appendix A: Maps & Figures Pack 1 – Introduction and ......02 57 1, M etr s @ A3 122368-BVL-Z0-SW-DR-V-00058 P01 E IA SCOP NG PREFERRED DESIGN SH ET 1 OF 2 RIVER THAMES SCHEME (DATCHET

R

i

v

e

r

T

h

a

m

e

s

R

i

v

e

r

T

h

a

m

e

s

SHEPPERTON

WEYBRIDGE

CHERTSEY

SHEPPERTON

GREEN

R

i

v

e

r

T

h

a

m

e

s

D

e

s

b

o

ro

u

g

h

C

u

t

R

iv

e

r

T

h

a

m

e

s

Queen Mary Reservoir

Chertsey

Meads

Dumsey

Meadow

Laleham

Park

Manor

Park

T

h

a

m

e

s

P

a

th

/ N

a

tio

n

a

l C

y

c

le

R

o

u

te

4

Laleham

Golf Course

M

3

A

b

b

e

y

R

iv

e

r

M3

Ferry

Chertsey

Bridge

Chertsey Weir

& Lock

Littleton

East Lake

Sheepwalk

Lakes

Ferry Lane

Lake

Littleton

North

OLD

SHEPPERTON

Halliford

Mere

P

P

P

P

P

Funky

Footprints

Nature

Reserve

Littleton

South

Abbey Lake

Abbey 1

Abbey 2

P

M

F

B

u

r

w

a

y

D

it

c

h

Desborough

Island

R

i

v

e

r

T

h

a

m

e

s

LEGEND :

Existing Public Rights of Way

Existing Permissive Footpaths

Thames Path National Trail

National Cycle Route 4

Existing Open Space (Parks, Open

Access Land, Recreation Grounds)

Existing Woodland Area

Existing Car Park (public & private)

Existing Car Park for potential use for RTS

Primary Footpath/Cycleway

Vehicular/All Purpose Bridge Crossing

Pedestrian/Cycle Bridge Crossing

Car Park

Fishing

Gated Weir

Fixed Weir

Flood Embankment

Thames Side Bank Rising

Spillway

Bank Widening

Lowered Bed Under Bridge

Landscape Enhancement Area

following materials processing and/or soil re-use

Habitat Creation Area 1

Material Processing Sites 2

Existing features

Proposed features (included in RTS costs)

Outline Channel Design

P

1 Several locations are being considered (including as part of the

Landscape Enhancement Areas), but not all will be needed or

delivered.

2 Several locations are being considered as material management

areas during construction. Not all will be needed, but where created

these will potentially provide opportunities for landscape or habitat

enhancement'.

F

RvwdDrawnRev Chkd DescriptionDate

Client

RevisionClient Drawing No.

Project

Drawing title

Drawing scale:

Drawing no.

Sheet size: A0Revision

Apprvd

Designed by: Date:

10 Upper Grosvenor Road

Tunbridge Wells

Kent, TN1 2EP

T 01892 545460

F 01892 545461

W www.enplan.net

Checked by:PRV

© Crown Copyright and database rights 2017. OrdnanceSurvey 100026380

1:5,000

JDSP December 2016

122368-ENP-Z0-C3-DR-L-000020 P05.2

JDSP

(CI&FC)

RIVER THAMES SCHEME (DATCHET TO TEDDINGTON)(RTS)

CAPACITY IMPROVEMENTS & FLOOD CHANNEL

100m

Scale 1:5000

0m 100m 200m 300m 400m 500m

JDSP Features Updates29/03/2017P03Features Updates22/03/2017P02

JDSP Features Updates19/05/2017P04 PRV PRVJDSP Features Updates12/06/2017P05 PRV PRV