APPENDIX A DTA Drawing 14075-11Aapps.nuneatonandbedworth.gov.uk/BT_NBBC_Planning... · Appendix A....
Transcript of APPENDIX A DTA Drawing 14075-11Aapps.nuneatonandbedworth.gov.uk/BT_NBBC_Planning... · Appendix A....
320072 ITD ITN 027 A
15 August 2013
Road Safety Audit Stage 1/2
Tunnel Road, Nuneaton
Road Safety Audit Stage 1/2
Tunnel Road, Nuneaton
August 2013
David Tucker Associates
Mott MacDonald, 35 Newhall Street, Birmingham, B3 3PU, United Kingdom
T +44 (0)121 234 1500 F +44 (0)121 200 3295 W www.mottmac.com
Forester House, Doctors Lane, Henley-in-Arden, Warwickshire, B95 5AW
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013
Revision Date Originator Checker Approver Description Standard
A 15/08/2013 T J Blaney B A Pledge C S Ridding First Issue
Issue and revision record
This document is issued for the party which commissioned it and for specific purposes connected with the above-captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it..
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013
Chapter Title Page
1 Introduction 1
2 Items Raised at this Stage 1/2 Audit 3
2.1 Problem 001 _______________________________________________________________________ 3 2.2 Problem 002 _______________________________________________________________________ 3 2.3 Problem 003 _______________________________________________________________________ 4 2.4 Problem 004 _______________________________________________________________________ 4
3 Audit Team Statement 5
Appendices 6
Appendix A. List of Documents Reviewed __________________________________________________________ 7 A.1 Drawings _________________________________________________________________________ 7 A.2 Documents ________________________________________________________________________ 7 Appendix B. Location Plan ______________________________________________________________________ 8
Contents
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
1
This report describes a Stage 1/2 Road Safety Audit carried out on the proposed provision of a
new access off Tunnel Road, Nuneaton. The proposals will provide access to a residential
development of up to 130 dwellings.
The audit was carried out at the request of David Tucker Associates.
The audit took place at the Birmingham office of Mott MacDonald and
consisted of a detailed examination of the submitted documentation and
drawings listed in Appendix A. A visit to the site was completed on
Wednesday 15th August 2013 at 12:10 hrs. During the site visit, the
weather conditions were overcast with occasional sunshine and the
road surface was dry.
It is confirmed that this is a Stage 1/2 Road Safety Audit and that the
audit was undertaken upon completion of the detailed design works.
However, it should be noted that the level of design provided to the
Audit Team was more akin to preliminary design and a further Stage 2
Road Safety Audit should be undertaken prior to construction.
It is also confirmed that the audit was carried out in accordance with the
Departmental Standard HD19/03.
The Audit Team consisted of:
T Blaney BSc (Hons), CMILT, MCIHT, MSoRSA (Team Leader)
Mott MacDonald
B A Pledge AMCIHT (Team Member)
Mott MacDonald
The comments and suggestions for road safety improvements made in
this report seek to address matters that might have an adverse effect
on road safety in the context of the chosen design. No attempt has
been made to comment on the justification of the scheme or the
appropriateness of the design. Consequently the auditors accept no
responsibility for the design or construction of the scheme.
1 Introduction
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
2
All of the issues raised in this report are considered to be required for
action. The comments contained in the report are based on safety
related concerns and as such the design engineer will need to consider
carefully how to respond to each of the issues. The Designer’s
response to the audit should be kept on file for future reference.
Accident and traffic data has been provided and reviewed by the Audit
Team. A Key Plan indicating the location of any identified safety related
issues is provided in Appendix B.
A similar proposal was audited in November 2012 (Document Ref:
307121/ITD/ITN/030/A), however as the design has changed, the
previous audit has not been considered further.
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
3
This section describes any safety related issues identified by the Audit Team during this Stage
1/2 Road Safety Audit that are associated with the scheme as presented in Appendix A.
2.1 Problem 001
Location: Throughout scheme.
Summary: No drainage details indicated in design drawings.
Though some drainage gullies are shown on Drawing No. 14075-11,
the level of detail is insufficient for a Stage 1/2 Road Safety Audit. The
proposed provision of a new access, the realignment of the kerbs and
the installation of two raised tables will impact on the existing drainage.
This may result in a higher level of surface water increasing the risk of
loss of control type collisions.
Recommendation
Appropriate drainage should be provided to minimise the amount of
surface water present on the road surface.
2.2 Problem 002
Location: New priority junction.
Summary: No parking restrictions on southern side of Tunnel Road.
The provision of the access road will result in a reduction of available
on-street parking. Whilst the supporting Transport Assessment
specifies that additional parking will be provided as part of the
development, reduced parking adjacent to the existing properties may
result in motorists parking along the southern side of Tunnel Road.
Vehicles parked along the southern kerb line of Tunnel Road may
impede movement into and out of the junction or narrow the available
road width increasing the risk of collisions.
Recommendation
It is recommended that appropriate parking restrictions are provided to
prevent vehicles from being parked on the southern kerb line of Tunnel
Road.
2 Items Raised at this Stage 1/2 Audit
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
4
2.3 Problem 003
Location: New priority junction.
Summary: No pedestrian crossing points.
No kerb details have been provided to the Audit Team; as such it is
unclear what pedestrian points are to be provided in the vicinity of the
proposed access. Failure to provide pedestrian crossing points may
increase the risk of conflicts between vulnerable road users and
vehicles.
Recommendation
It is recommended that uncontrolled pedestrian crossing points and, if
necessary, appropriate tactile paving are provided across the bell
mouth of the proposed development access.
It was noted on site that a bus stop is located on the southern side of
Tunnel Road to the east of the proposed access; it may be beneficial to
provide pedestrian crossing points across Tunnel Road in this area.
2.4 Problem 004
Location: Approaches to raised tables.
Summary: No signs warning of the presence of the raised tables.
It is proposed that two raised tables are provided as part of the scheme.
It is normal to warn motorists of the presence of such features; failure to
do so may result in motorists failing to slow sufficiently on the approach
to the raised tables increasing the risk of loss of control accidents.
Recommendation
It is recommended that signs to TSRGD Diagram No. 557 and 557.2
are provided to warn motorists of the raised tables.
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
5
I certify that this audit has been carried out in accordance with the Highways Agency
Departmental Standard HD 19/03.
Audit Team Leader
T J Blaney BSc (Hons), CMILT, MCIHT, MSoRSA
Signed:
Date: 15th August 2013
Senior Road Safety Engineer
Mott MacDonald
35 Newhall Street
Birmingham
B3 3PU
Audit Team Member
B A Pledge AMCIHT
Road Safety Engineer
Mott MacDonald
Stoneham Place
Stoneham Lane
SO50 9NW
3 Audit Team Statement
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
6
Appendices
Appendix A. List of Documents Reviewed___________________________________________________________ 7 Appendix B. Location Plan ______________________________________________________________________ 8
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
320072/ITD/ITN/027/A 15 August 2013 320072/ITD/ITN/027/A 15 August 2013
7
A.1 Drawings
Drawings Reviewed by Audit Team
Drawings Rev Title
14075-11 A Proposed site access based on rear access parking and speed management
Source: DTA
A.2 Documents
Documents Reviewed by Audit Team
Documents Rev Title
14075-01 TA Land at Tunnel Road, Nuneaton Transport Assessment
14075-02 RSA Brief Tunnel Road RSA Brief
307121/ITD/ITN/030 A Tunnel Road, Stage 1/2 Road Safety Audit (November 2012)
Source: DTA
Appendix A. List of Documents Reviewed
Road Safety Audit Stage 1/2 Tunnel Road, Nuneaton
8 320072/ITD/ITN/027/A 15 August 2013
Appendix B. Location Plan
Not to scale
002, 003, 004
Throughout Scheme
001
004
Road Safety Audit Designers Response Tunnel Road, Nuneaton
RJM\14075-05 RSA Response 1 19th August 2013
Problem 001
Location: Throughout scheme.
Summary: No drainage details indicated in design drawings.
Though some drainage gullies are shown on Drawing No. 14075-11, the level of detail is
insufficient for a Stage 1/2 Road Safety Audit. The proposed provision of a new access, the
realignment of the kerbs and the installation of two raised tables will impact on the existing
drainage. This may result in a higher level of surface water increasing the risk of loss of
control type collisions.
Recommendation :
Appropriate drainage should be provided to minimise the amount of surface water present
on the road surface.
Designers response:
Agree.
An adequate number of road gullies will be provided at the raised table at the junction of
Tunnel Road and the proposed access, and connect to the surface water drainage system
serving the proposed development.
An adequate number of road gullies will be provided at the raised table at the junction of
Tunnel Road and Orford Rise and connect to the public sewer at that location.
Problem 002
Location: New priority junction.
Summary: No parking restrictions on southern side of Tunnel Road.
The provision of the access road will result in a reduction of available on-street parking.
Whilst the supporting Transport Assessment specifies that additional parking will be
provided as part of the development, reduced parking adjacent to the existing properties
may result in motorists parking along the southern side of Tunnel Road. Vehicles parked
along the southern kerb line of Tunnel Road may impede movement into and out of the
junction or narrow the available road width increasing the risk of collisions.
Recommendation
It is recommended that appropriate parking restrictions are provided to prevent vehicles
from being parked on the southern kerb line of Tunnel Road.
Designers response:
Agree.
Road Safety Audit Designers Response Tunnel Road, Nuneaton
RJM\14075-05 RSA Response 2 19th August 2013
Problem 003
Location: New priority junction.
Summary: No pedestrian crossing points.
No kerb details have been provided to the Audit Team; as such it is unclear what pedestrian
points are to be provided in the vicinity of the proposed access. Failure to provide pedestrian
crossing points may increase the risk of conflicts between vulnerable road users and
vehicles.
Recommendation:
It is recommended that uncontrolled pedestrian crossing points and, if necessary,
appropriate tactile paving are provided across the bell mouth of the proposed development
access.
It was noted on site that a bus stop is located on the southern side of Tunnel Road to the
east of the proposed access; it may be beneficial to provide pedestrian crossing points
across Tunnel Road in this area.
Designers response:
Agree. Crossings will be provided across the access road and across Tunnel Road. The
precise location of crossings will be agreed with WCC at the detailed design stage.
Problem 004
Location: Approaches to raised tables.
Summary: No signs warning of the presence of the raised tables.
It is proposed that two raised tables are provided as part of the scheme. It is normal to
warn motorists of the presence of such features; failure to do so may result in motorists
failing to slow sufficiently on the approach to the raised tables increasing the risk of loss of
control accidents.
Recommendation:
It is recommended that signs to TSRGD Diagram No. 557 and 557.2 are provided to warn
motorists of the raised tables.
Designers response:
Agree. Additional signage will be agreed with WCC at the detailed design stage.