    Appendix A – ASIC Company Extract

  • Australian Company

    THE CAMPERDOWN COMPOST COMPANY PTY LTDACN 108 839 363

    19/06/2020 AEST 06:19:48 1

    Extracted from ASIC's database at AEST 06:19:48 on 19/06/2020

    Company Summary

    Name: THE CAMPERDOWN COMPOST COMPANY PTY LTD

    ACN: 108 839 363

    ABN: 59 108 839 363

    Registration Date: 26/04/2004

    Next Review Date: 26/04/2021

    Status: Registered

    Type: Australian Proprietary Company, Limited By Shares

    Locality of Registered Office: CAMPERDOWN VIC 3260

    Regulator: Australian Securities & Investments Commission

    Further information relating to this organisation may be purchased from ASIC.

  • Camperdown Compost Works Approval Application July 2020

    87 | P a g e

    Appendix B – Offence Declaration

  • Camperdown Compost Works Approval Application July 2020

    88 | P a g e

    Appendix C – Camperdown Compost Site Layout and Design Plans

  • Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- CS-01

    --------

    COVER SHEET

    03.07.2020

    DRAWING INDEX

    AutoCAD SHX TextSheet Number

    AutoCAD SHX TextDrawing Name

    AutoCAD SHX TextCS-01

    AutoCAD SHX TextCOVER SHEET

    AutoCAD SHX TextECP-01

    AutoCAD SHX TextEXISTING CONDITIONS PLAN

    AutoCAD SHX TextGP-01

    AutoCAD SHX TextGENERAL PLAN PROPOSED

    AutoCAD SHX TextARCH-01

    AutoCAD SHX TextARCHITECTURAL VIEW (West)

    AutoCAD SHX TextARCH-02

    AutoCAD SHX TextARCHITECTURAL VIEWS (East)

    AutoCAD SHX TextSEQ-01

    AutoCAD SHX TextCONSTRUCTION SEQUENCE PLAN

    AutoCAD SHX TextEWS-01

    AutoCAD SHX TextEARTHWORKS SCHEDULE

    AutoCAD SHX TextTYP-01

    AutoCAD SHX TextTYPICAL SECTIONS-1

    AutoCAD SHX TextTYP-02

    AutoCAD SHX TextTYPICAL SECTIONS-2

    AutoCAD SHX TextDET-01

    AutoCAD SHX TextPERIMITER DETAILS

    AutoCAD SHX TextDET-02

    AutoCAD SHX TextBUND DETAILS

    AutoCAD SHX TextDET-03

    AutoCAD SHX TextGATE DETAILS

    AutoCAD SHX TextDET-04

    AutoCAD SHX TextGATE DETAILS (PAVING)

    AutoCAD SHX TextEL-01

    AutoCAD SHX TextMACHINERY SHED

    AutoCAD SHX TextEL-02

    AutoCAD SHX TextPUMP SHED

    AutoCAD SHX TextEL-03

    AutoCAD SHX TextBLOWER SHED

    AutoCAD SHX TextPLAN-01

    AutoCAD SHX TextDETAIL PLAN (Pasteurization Area)

    AutoCAD SHX TextPLAN-02

    AutoCAD SHX TextDETAIL PLAN (Maturation Area)

    AutoCAD SHX TextPLAN-03

    AutoCAD SHX TextDETAIL PLAN (Drop Off)

    AutoCAD SHX TextPLAN-04

    AutoCAD SHX TextTRUCK ACCESS LAYOUT

    AutoCAD SHX TextMEP-01

    AutoCAD SHX TextDRAINAGE & POWER PLAN

    AutoCAD SHX TextMEP-02

    AutoCAD SHX TextPLUMBING PLAN

    AutoCAD SHX TextFP-01

    AutoCAD SHX TextFIRE CONTROL PLAN

  • 1 2 3 4 5 6 7 8 9 10 11 12

    B L I N D C R E E K R O A D

    /

    / / / / / / / / / / / / / / / / / / / / / / / / / /

    //

    //

    D

    D

    // /

    //

    //

    //

    //

    //

    //

    ///////////////////

    /

    D

    D

    D D

    D

    BLIND CREEK ROAD (UNSEALED)

    EXISTING COMPOS

    T PRODUCTION FA

    CILITY

    LIQUID DAM

    SOLID DAM

    COMPOST STOCKPILES AND OPERATIONS PREVENTED FURTHER SURVEY

    COMPOST STOCKPILES AND OPERATIONS PREVENTED FURTHER SURVEY

    COMPOST STOCKPILES AND OPERATIONS PREVENTED FURTHER SURVEY

    CO

    MPO

    ST S

    TOC

    KPI

    LES

    AN

    D O

    PER

    ATI

    ON

    S PR

    EVEN

    TED

    FU

    RTH

    ER S

    UR

    VEY

    NO ELECTRICITY POLES VISIBLENO ELECTRICITY POLES VISIBLE

    / / / /

    Existing Conditions - Proposed Overlayscale 1:1000 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- ECP-01

    --------

    EXISTING CONDITIONS PLAN

    03.07.2020

    N

    AutoCAD SHX TextTBM SPIKE PLACED

    AutoCAD SHX TextBORE

    AutoCAD SHX TextBORE

    AutoCAD SHX TextPOST AND RINGLOCK

    AutoCAD SHX Text225 DIA PVC CULVERT

    AutoCAD SHX TextSHED

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX TextPOST AND RINGLOCK

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX TextOLD POST AND WIRE

    AutoCAD SHX TextOLD POST AND NETTING

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX TextOLD POST AND WIRE

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX TextSYPHON TANKS

    AutoCAD SHX TextBLOWERS

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

    AutoCAD SHX Text138.87

    AutoCAD SHX TextTBM RIVET IN CONC PLACED

    AutoCAD SHX Text139.19

    AutoCAD SHX TextTBM SPIKE PLACED

    AutoCAD SHX Text138.59

    AutoCAD SHX TextTBM SPIKE PLACED

    AutoCAD SHX Text122

    AutoCAD SHX TextNEW PEG PLACED

    AutoCAD SHX TextNEW PEG PLACED

    AutoCAD SHX TextNEW PEG PLACED

    AutoCAD SHX Text137.83

    AutoCAD SHX Text138.20

    AutoCAD SHX Text234

    AutoCAD SHX Text138.30

    AutoCAD SHX Text138.13

    AutoCAD SHX Text137.56

    AutoCAD SHX Text137.53

    AutoCAD SHX Text137.87

    AutoCAD SHX Text137.66

    AutoCAD SHX Text259

    AutoCAD SHX Text137.89

    AutoCAD SHX Text138.28

    AutoCAD SHX Text262

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.24

    AutoCAD SHX Text137.90

    AutoCAD SHX Text137.99

    AutoCAD SHX Text138.20

    AutoCAD SHX Text275

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.30

    AutoCAD SHX Text137.93

    AutoCAD SHX Text282

    AutoCAD SHX Text137.95

    AutoCAD SHX Text138.27

    AutoCAD SHX Text290

    AutoCAD SHX Text138.38

    AutoCAD SHX Text138.29

    AutoCAD SHX Text137.95

    AutoCAD SHX Text137.99

    AutoCAD SHX Text138.29

    AutoCAD SHX Text303

    AutoCAD SHX Text138.38

    AutoCAD SHX Text138.28

    AutoCAD SHX Text138.07

    AutoCAD SHX Text138.06

    AutoCAD SHX Text137.72

    AutoCAD SHX Text137.68

    AutoCAD SHX Text137.41INV

    AutoCAD SHX Text138.24

    AutoCAD SHX Text138.08

    AutoCAD SHX Text329

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.27

    AutoCAD SHX Text137.77

    AutoCAD SHX Text138.01

    AutoCAD SHX Text336

    AutoCAD SHX Text137.77

    AutoCAD SHX Text137.78

    AutoCAD SHX Text137.78

    AutoCAD SHX Text138.31

    AutoCAD SHX Text344

    AutoCAD SHX Text138.42

    AutoCAD SHX Text138.32

    AutoCAD SHX Text350

    AutoCAD SHX Text138.23

    AutoCAD SHX Text138.17

    AutoCAD SHX Text352

    AutoCAD SHX Text138.37

    AutoCAD SHX Text138.30

    AutoCAD SHX Text138.19

    AutoCAD SHX Text361

    AutoCAD SHX Text138.35

    AutoCAD SHX Text137.95

    AutoCAD SHX Text138.18

    AutoCAD SHX Text137.57INV

    AutoCAD SHX Text138.21

    AutoCAD SHX Text378

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.23

    AutoCAD SHX Text138.38

    AutoCAD SHX Text389

    AutoCAD SHX Text138.49

    AutoCAD SHX Text138.38

    AutoCAD SHX Text137.96INV

    AutoCAD SHX Text138.86

    AutoCAD SHX Text416

    AutoCAD SHX Text138.82

    AutoCAD SHX Text417

    AutoCAD SHX Text138.68

    AutoCAD SHX Text418

    AutoCAD SHX Text138.72

    AutoCAD SHX Text138.86

    AutoCAD SHX Text138.47

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.42

    AutoCAD SHX Text138.40

    AutoCAD SHX Text138.52

    AutoCAD SHX Text138.61

    AutoCAD SHX Text430

    AutoCAD SHX Text138.62

    AutoCAD SHX Text431

    AutoCAD SHX Text138.53

    AutoCAD SHX Text138.22

    AutoCAD SHX Text138.14

    AutoCAD SHX Text138.36

    AutoCAD SHX Text138.02

    AutoCAD SHX Text459

    AutoCAD SHX Text138.31

    AutoCAD SHX Text460

    AutoCAD SHX Text138.33

    AutoCAD SHX Text461

    AutoCAD SHX Text138.02

    AutoCAD SHX Text137.58

    AutoCAD SHX Text137.64

    AutoCAD SHX Text137.41

    AutoCAD SHX Text137.73

    AutoCAD SHX Text137.62

    AutoCAD SHX Text137.48

    AutoCAD SHX Text137.74

    AutoCAD SHX TextBORE

    AutoCAD SHX Text137.68

    AutoCAD SHX Text137.46

    AutoCAD SHX Text137.72

    AutoCAD SHX Text137.72

    AutoCAD SHX Text137.67

    AutoCAD SHX Text137.53

    AutoCAD SHX Text137.52

    AutoCAD SHX TextOLD POST AND NETTING

    AutoCAD SHX Text124

    AutoCAD SHX Text138.46

    AutoCAD SHX TextOLD POST AND NETTING

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX Text138.51

    AutoCAD SHX Text138.37

    AutoCAD SHX Text138.37

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.44

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.28

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.38

    AutoCAD SHX Text138.24

    AutoCAD SHX Text138.37

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.20

    AutoCAD SHX Text138.42

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.39

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX Text138.43

    AutoCAD SHX Text138.61

    AutoCAD SHX Text530

    AutoCAD SHX Text138.69

    AutoCAD SHX Text138.58

    AutoCAD SHX Text138.29

    AutoCAD SHX Text138.58

    AutoCAD SHX Text542

    AutoCAD SHX Text138.65

    AutoCAD SHX Text138.49

    AutoCAD SHX Text138.24

    AutoCAD SHX Text550

    AutoCAD SHX Text138.17

    AutoCAD SHX Text555

    AutoCAD SHX Text138.36

    AutoCAD SHX Text570

    AutoCAD SHX Text138.68

    AutoCAD SHX Text138.46

    AutoCAD SHX Text138.24

    AutoCAD SHX Text577

    AutoCAD SHX Text578

    AutoCAD SHX Text138.21

    AutoCAD SHX Text138.57

    AutoCAD SHX Text585

    AutoCAD SHX Text138.71

    AutoCAD SHX Text138.60

    AutoCAD SHX Text138.55

    AutoCAD SHX Text138.56

    AutoCAD SHX Text138.51

    AutoCAD SHX Text138.10INV

    AutoCAD SHX Text607

    AutoCAD SHX Text138.64

    AutoCAD SHX Text608

    AutoCAD SHX Text138.70

    AutoCAD SHX Text609

    AutoCAD SHX Text610

    AutoCAD SHX Text138.66

    AutoCAD SHX Text138.79

    AutoCAD SHX Text138.76

    AutoCAD SHX Text138.52

    AutoCAD SHX Text138.40

    AutoCAD SHX Text138.00INV

    AutoCAD SHX Text138.39

    AutoCAD SHX Text138.28

    AutoCAD SHX Text639

    AutoCAD SHX Text138.52

    AutoCAD SHX Text640

    AutoCAD SHX Text138.63

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.12

    AutoCAD SHX Text138.30

    AutoCAD SHX Text647

    AutoCAD SHX Text138.57

    AutoCAD SHX Text648

    AutoCAD SHX Text138.46

    AutoCAD SHX Text138.27

    AutoCAD SHX Text138.28

    AutoCAD SHX Text659

    AutoCAD SHX Text138.40

    AutoCAD SHX Text660

    AutoCAD SHX Text138.55

    AutoCAD SHX Text138.34

    AutoCAD SHX Text137.99INV

    AutoCAD SHX Text138.33

    AutoCAD SHX Text138.26

    AutoCAD SHX Text138.28

    AutoCAD SHX Text671

    AutoCAD SHX Text138.53

    AutoCAD SHX Text672

    AutoCAD SHX Text138.54

    AutoCAD SHX Text138.40

    AutoCAD SHX Text138.75

    AutoCAD SHX Text675

    AutoCAD SHX Text138.59

    AutoCAD SHX Text676

    AutoCAD SHX Text138.53

    AutoCAD SHX Text677

    AutoCAD SHX Text138.52

    AutoCAD SHX Text138.27

    AutoCAD SHX Text138.34

    AutoCAD SHX Text138.18

    AutoCAD SHX Text138.40

    AutoCAD SHX Text138.34

    AutoCAD SHX Text138.31

    AutoCAD SHX Text138.22

    AutoCAD SHX Text138.43

    AutoCAD SHX Text697

    AutoCAD SHX Text138.27

    AutoCAD SHX Text138.22

    AutoCAD SHX Text138.34

    AutoCAD SHX Text138.47

    AutoCAD SHX Text138.40

    AutoCAD SHX Text703

    AutoCAD SHX Text704

    AutoCAD SHX TextNEW PEG PLACED

    AutoCAD SHX Text138.54

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.31

    AutoCAD SHX Text138.51

    AutoCAD SHX Text138.48

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.29

    AutoCAD SHX Text138.46

    AutoCAD SHX Text138.43

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.28

    AutoCAD SHX Text138.34

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.19

    AutoCAD SHX Text138.49

    AutoCAD SHX Text138.41

    AutoCAD SHX Text138.27

    AutoCAD SHX Text138.53

    AutoCAD SHX Text138.41

    AutoCAD SHX Text138.58

    AutoCAD SHX Text138.44

    AutoCAD SHX Text138.57

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.38

    AutoCAD SHX Text138.48

    AutoCAD SHX Text138.63

    AutoCAD SHX Text138.56

    AutoCAD SHX Text138.54

    AutoCAD SHX Text138.53

    AutoCAD SHX Text138.51

    AutoCAD SHX Text761

    AutoCAD SHX Text138.52

    AutoCAD SHX Text138.46

    AutoCAD SHX Text765

    AutoCAD SHX Text766

    AutoCAD SHX Text767

    AutoCAD SHX Text768

    AutoCAD SHX Text769

    AutoCAD SHX Text138.58

    AutoCAD SHX Text138.54

    AutoCAD SHX Text138.59

    AutoCAD SHX Text138.57

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.47

    AutoCAD SHX Text138.49

    AutoCAD SHX Text138.54

    AutoCAD SHX Text138.41

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.43

    AutoCAD SHX Text138.30

    AutoCAD SHX Text138.32

    AutoCAD SHX Text138.27

    AutoCAD SHX Text138.85

    AutoCAD SHX Text138.86

    AutoCAD SHX Text138.87

    AutoCAD SHX Text138.85

    AutoCAD SHX Text138.84

    AutoCAD SHX Text138.85

    AutoCAD SHX Text138.82

    AutoCAD SHX Text138.89

    AutoCAD SHX Text137.93INV

    AutoCAD SHX Text137.88INV

    AutoCAD SHX Text138.48

    AutoCAD SHX Text138.52

    AutoCAD SHX Text1099

    AutoCAD SHX Text1100

    AutoCAD SHX Text1101

    AutoCAD SHX Text138.50

    AutoCAD SHX Text1109

    AutoCAD SHX Text138.25

    AutoCAD SHX Text138.32

    AutoCAD SHX Text138.29

    AutoCAD SHX Text138.18

    AutoCAD SHX Text138.28

    AutoCAD SHX Text138.24

    AutoCAD SHX Text138.29

    AutoCAD SHX Text138.51

    AutoCAD SHX Text138.48

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.55

    AutoCAD SHX Text138.61

    AutoCAD SHX Text138.38

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.45

    AutoCAD SHX Text138.55

    AutoCAD SHX Text138.38

    AutoCAD SHX Text138.41

    AutoCAD SHX Text138.24

    AutoCAD SHX Text138.25

    AutoCAD SHX Text138.41

    AutoCAD SHX Text138.40

    AutoCAD SHX Text138.57

    AutoCAD SHX Text138.34

    AutoCAD SHX Text138.50

    AutoCAD SHX Text138.48

    AutoCAD SHX Text138.43

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.37

    AutoCAD SHX Text138.31

    AutoCAD SHX Text138.35

    AutoCAD SHX Text138.33

    AutoCAD SHX Text138.32

    AutoCAD SHX Text138.28

    AutoCAD SHX Text138.23

    AutoCAD SHX Text138.20

    AutoCAD SHX Text138.06

    AutoCAD SHX Text138.08

    AutoCAD SHX Text138.17

    AutoCAD SHX Text138.09

    AutoCAD SHX Text137.98

    AutoCAD SHX Text137.91

    AutoCAD SHX Text137.94

    AutoCAD SHX Text138.06

    AutoCAD SHX TextBORE

    AutoCAD SHX Text137.93

    AutoCAD SHX Text137.85

    AutoCAD SHX Text137.72

    AutoCAD SHX Text137.90

    AutoCAD SHX Text137.79

    AutoCAD SHX Text137.90

    AutoCAD SHX Text137.94

    AutoCAD SHX Text137.73

    AutoCAD SHX Text137.70

    AutoCAD SHX Text137.61

    AutoCAD SHX Text137.65

    AutoCAD SHX Text137.67

    AutoCAD SHX Text137.71

    AutoCAD SHX Text137.42

    AutoCAD SHX Text137.48

    AutoCAD SHX Text137.60

    AutoCAD SHX Text137.71

    AutoCAD SHX Text137.49

    AutoCAD SHX Text137.48

    AutoCAD SHX Text137.41

    AutoCAD SHX Text137.48

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX Text225 DIA PVC CULVERT

    AutoCAD SHX Text225 DIA PVC CULVERT

    AutoCAD SHX TextOLD POST AND WIRE

    AutoCAD SHX Text225 DIA PVC CULVERT

    AutoCAD SHX TextSHED

    AutoCAD SHX TextOLD POST AND NETTING

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX TextOLD POST AND WIRE

    AutoCAD SHX TextPOST AND WIRE FENCE REMOVED

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX Text225 DIA PVC CULVERT

    AutoCAD SHX TextPOST AND WIRE

    AutoCAD SHX TextNEW POST AND RINGLOCK

    AutoCAD SHX TextPOST AND WIRE FENCE REMOVED

    AutoCAD SHX TextPOST AND WIRE FENCE REMOVED

    AutoCAD SHX TextPOST AND RINGLOCK REMOVED

    AutoCAD SHX TextTBM NAIL IN POST RL138.32

    AutoCAD SHX TextTBM NAIL IN POST RL138.72

    AutoCAD SHX Text344.10

    AutoCAD SHX Text99%%d41'40"

    AutoCAD SHX Text344.10

    AutoCAD SHX Text99%%d41'40"

    AutoCAD SHX Text120

    AutoCAD SHX Text189%%d41'40"

    AutoCAD SHX Text344.10

    AutoCAD SHX Text279%%d41'40"

    AutoCAD SHX Text120

    AutoCAD SHX Text9%%d41'40"

    AutoCAD SHX TextPROPOSED SITE BOUNDARY

    AutoCAD SHX TextPROPOSED SITE BOUNDARY

    AutoCAD SHX TextPROPOSED SITE BOUNDARY

    AutoCAD SHX TextPROPOSED SITE BOUNDARY

    AutoCAD SHX TextPROPOSED SITE BOUNDARY

    AutoCAD SHX TextX-681988.932

    AutoCAD SHX TextY-5772864.473

    AutoCAD SHX TextX-682155.598

    AutoCAD SHX TextY-5772835.952

    AutoCAD SHX TextX-682315.304

    AutoCAD SHX TextY-5772808.715

    AutoCAD SHX TextX-682303.915

    AutoCAD SHX TextY-5772682.559

    AutoCAD SHX TextX-682293.748

    AutoCAD SHX TextY-5772682.543

    AutoCAD SHX TextX-681955.91

    AutoCAD SHX TextY-5772748.376

    AutoCAD SHX TextX-682327.648

    AutoCAD SHX TextY-5772806.606

    AutoCAD SHX TextPOST AND WIRE FENCE REMOVED

  • Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    3690008000

    500038000

    50006000 20000 12000 32000 12000 100000 15000 60000 10000

    600027000

    6000

    7000

    2190

    025

    100

    1650

    026

    500

    5000

    7000

    5000

    80005000

    B L I N D C R E E K R O A D

    WEIGH BRIDGE

    SITEAMENITIES

    SIPHONTANKS

    LIQUIDSEPARATION

    PIT

    PUMPSHED

    LIQUIDSPIT

    MACHINERYSHED

    DAM

    100m X 46mBIOLOGICAL DRYING

    AREA(12 ROWS)

    60m X 68.1mMATURATION

    AREA(12 ROWS)

    CO

    MPO

    STST

    ORA

    GE

    ENTRYEXIT

    CAR PARKING

    SOLIDSEPARATION

    BUNKER

    2 NO. OF PUMPS FORSEPARATION SYSTEM

    2 BAYS OF SHEDENCLOSEDFOR SITE AMENITIES& WORKSHOP

    8 NO. OF STANDARD CAR SPACES+ 1 CAR SPACE AS PER AS1428

    VEHICLE ENTRY

    2.4m HIGHREINFORCED

    CONCRETE WALL

    2.0m WIDE BUND& CHAINWIRE MESH FENCINGAROUND PERIMETER

    CONCRETE PAVING FORTURNER TURNOUT

    ROLLOVER KERB

    275,000LT RWTFOR SUPPLY TO

    PASTEURISATION

    CONCRETESPOON DRAIN

    (EAST) SOLIDSEPARATION

    PIT

    (WEST) SOLIDSEPARATIONPIT

    UNDERGROUND PIPE NETWORKFOR PASTEURISATION SYSTEM

    4 BAYS OF SHEDOPEN FOR HOUSINGMACHINERY & EQUIPMENT

    BAMBOO TREE PLANTATIONTO PROVIDE PRIVACY SCREENAROUND PERIMETER

    3690008000

    500038000

    50006000 20000 12000 32000 12000 100000 15000 60000 10000

    600027000

    6000

    7000

    2190

    025

    100

    1650

    026

    500

    5000

    7000

    5000

    80005000

    WORKSHOP

    275,000LT RWTWITH DEDICATED SUPPLY

    FOR FIRE FIGHTING

    1.5m CONCRETE FOOTPATHLINK BETWEEN CARPARK& SITE AMENITIES / WORKSHOP1.5m CONCRETE FOOTPATH

    LINK BETWEEN CARPARK& SITE AMENITIES / WORKSHOP

    100m X 22mPASTEURISATION

    AREA(12 ROWS)

    Site Layoutscale 1:1000 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- GP-01

    --------

    GENERAL PLAN PROPOSED

    02.07.2020

    N

    AutoCAD SHX Text1

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextR

    AutoCAD SHX TextP

    AutoCAD SHX TextN

    AutoCAD SHX TextM

    AutoCAD SHX TextL

    AutoCAD SHX TextK

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX TextA

    AutoCAD SHX TextQ

    AutoCAD SHX TextO

    AutoCAD SHX Text3

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

    AutoCAD SHX Text1

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextR

    AutoCAD SHX TextP

    AutoCAD SHX TextN

    AutoCAD SHX TextM

    AutoCAD SHX TextL

    AutoCAD SHX TextK

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX TextA

    AutoCAD SHX TextQ

    AutoCAD SHX TextO

    AutoCAD SHX Text3

  • Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- ARCH-01

    --------

    ARCHITECTURAL VIEW (WEST)

    01.06.2020

    ROLLOVERCONCRETE KERB

    CHAINWIREMESH FENCING

    DRIVEABLE LIQUIDS PIT

    PUMP SHED

    BAMBOO TREEPERIMETERSCREENING

    3D Perspective (West end of site)not to scale

    STORAGE DAM

    MACHINERY SHED4 X 8m OPEN BAYS

    VEHICLE EXIT ONTOBLIND CREEK ROAD

    DRIVEABLE SOLIDS PIT

    LIQUIDS PIT

    MACHINERY SHED2 X 8m CLOSED BAYSWITH ROLLER DOORS

    SOLIDS BUNKER

  • 3D Perspective (looking Southwest)not to scale

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- ARCH-02

    --------

    ARCHITECTURAL VIEWS (EAST)

    01.06.2020

    DRIVEABLE LIQUIDS PIT

    PUMP SHED

    BAMBOO TREEPERIMETERSCREENING

    STORAGE DAM

    48 X 20mMACHINERY SHED

    CONCRETE SPOON DRAIN

    DRIVEABLE SOLIDS PIT

    DRIVEABLESOLIDS PIT

    MATURATION AREA

    VEHICLE ENTRYFROM BLIND CREEK ROAD

    COMPOST STORAGE AREA2.0m HIGHCONCRETE WALL

    CHAINWIREMESH FENCING

    3D Perspective (Compost Storage)not to scale

    SOLIDSBUNKER

    LIQUIDS PIT

  • LunchRoom11.20m2

    W1

    W1D1

    SB

    W1

    D1

    ChangeRoom4.76m2

    Office24m2

    W1

    W1D1

    SB

    W1

    Coms

    W1

    W1

    HWS

    Toilet/Shower16.24m2

    SB

    W1

    W1 W1 W1

    Shr

    Bsn

    Wc Wc

    1 2 3 4 5 6 7 8 9 10 11 12

    80005000

    380005000

    6000 20000 12000 32000 12000 100000 15000 60000 100006000

    27000

    6000

    7000

    2190

    025

    100

    1650

    026

    500

    5000

    7000

    5000

    80005000

    B L I N D C R E E K R O A D

    STAGE1

    STAGE2

    STAGE3

    STAGE4

    STAGE5

    STAGE3

    3690006000 20000 12000 32000 12000 100000 15000

    STAGE 1 STAGE 4

    STAGE 5STAGE 2

    STAGE 3

    EXISTING BOUNDARYOF LICENCED AREA

    Site Stagesscale 1:100 @ A1

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - --

    / 1:1000 @ A3

    SEQ-01

    --------

    CONSTRUCTION SEQUENCE PLAN

    01.06.2020

    N

    AutoCAD SHX Text1

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextR

    AutoCAD SHX TextP

    AutoCAD SHX TextN

    AutoCAD SHX TextM

    AutoCAD SHX TextL

    AutoCAD SHX TextK

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX TextA

    AutoCAD SHX TextQ

    AutoCAD SHX TextO

    AutoCAD SHX Text3

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

  • Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    6000

    7000

    2190

    025

    100

    1650

    026

    500

    5000

    7000

    5000

    PUMPS BATHROOM

    AMBULENT

    WC

    WORKSHOP

    OFFICE

    TOILETS

    CHANGEROOMS

    Earthworks Schedulescale 1:100 @ A1

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - --

    / 1:1000 @ A3

    EWS-01

    --------

    EARTHWORKS SCHEDULE

    03.07.2020

    N

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text3

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

    AutoCAD SHX TextUP

    AutoCAD SHX Text7

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text11

    AutoCAD SHX Text12

    AutoCAD SHX Text13

    AutoCAD SHX Text14

    AutoCAD SHX Text15

    AutoCAD SHX Text16

    AutoCAD SHX Text17

    AutoCAD SHX Text6

    AutoCAD SHX Text18

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text3

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX TextType 2: Heavy Duty Concrete Pavement

    AutoCAD SHX Text200mm Jointed Reinforced Concrete (32MPa, SL92 reinforced Top)

    AutoCAD SHX Text150mm Size 20mm Class 4 crushed Rock, compacted to a minimum density of 98%(modified) AS1289,5.1.1

    AutoCAD SHX Text500mm Select Fill meeting material properties; CBR > 2%, Swell > 1.5%, > 2%, Swell > 1.5%, 2%, Swell > 1.5%, > 1.5%, 1.5%, Permability k > 1 x 10 m/s. > 1 x 10 m/s. 1 x 10 m/s. 9 m/s. Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX TextMaterial as found (Clay) Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX TextType 1: Clay Surface

    AutoCAD SHX TextExisting Clay Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX Text500mm Re-worked Clay. CBR > 7%, Swell > 1.5%, Permability k > 5 x 10 m/s. > 7%, Swell > 1.5%, Permability k > 5 x 10 m/s. 7%, Swell > 1.5%, Permability k > 5 x 10 m/s. > 1.5%, Permability k > 5 x 10 m/s. 1.5%, Permability k > 5 x 10 m/s. > 5 x 10 m/s. 5 x 10 m/s. 9 m/s. Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX TextType 3: Heavy Duty Unsealed Pavement

    AutoCAD SHX Text150mm Size 20mm Class 2 crushed Rock, compacted to a minimum density of 100%(modified) AS1289,5.1.1

    AutoCAD SHX Text270mm Size 20mm Class 3 crushed Rock, compacted in 2 layers to a minimum density of 97%(modified) AS1289,5.1.1

    AutoCAD SHX Text500mm Re-worked Clay. CBR > 7%, Swell > 1.5%, Permability k > > 7%, Swell > 1.5%, Permability k > 7%, Swell > 1.5%, Permability k > > 1.5%, Permability k > 1.5%, Permability k > > 5 x 10 m/s. 9 m/s. Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX TextExisting Clay Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX TextType 5: Heavy Duty Concrete Pavement

    AutoCAD SHX Text200mm Jointed Reinforced Concrete (32MPa, SL92 reinforced Top)

    AutoCAD SHX Text150mm Size 20mm Class 4 crushed Rock, compacted to a minimum density of 98%(modified) AS1289,5.1.1

    AutoCAD SHX Text500mm Select Fill meeting material properties; CBR > 2%, Swell > 1.5%, > 2%, Swell > 1.5%, 2%, Swell > 1.5%, > 1.5%, 1.5%, Permability k > 1 x 10 m/s. > 1 x 10 m/s. 1 x 10 m/s. 9 m/s. Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX Text150mm thick, size 20mm Class 2 crushed Rock, Removed.

    AutoCAD SHX TextMaterial as found (Clay) Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX TextType 4: Light Duty Sealed Pavement

    AutoCAD SHX TextExisting Clay Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX Text500mm Re-worked Clay. CBR > 7%, Swell > 1.5%, Permability k > > 7%, Swell > 1.5%, Permability k > 7%, Swell > 1.5%, Permability k > > 1.5%, Permability k > 1.5%, Permability k > > 5 x 10 m/s. 9 m/s. Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX Text180mm Size 20mm Class 2 crushed Rock, compacted to a minimum density of 100%(modified) AS1289,5.1.1

    AutoCAD SHX Text150mm Size 20mm Class 2 crushed Rock, compacted to a minimum density of 100%(modified) AS1289,5.1.1

    AutoCAD SHX TextSize 7mm Sprayed Seal

    AutoCAD SHX TextSize 14mm Sprayed Seal

    AutoCAD SHX TextPrime or 7mm Primerseal

    AutoCAD SHX Text30mm Type N Asphaltic Concrete

    AutoCAD SHX TextType 6: Heavy Duty Concrete Pavement with Aerated Tubes

    AutoCAD SHX Text200mm Jointed Reinforced Concrete (32MPa, SL92 to Top w/ 50mm cover)

    AutoCAD SHX Text150mm Size 20mm Class 4 crushed Rock, compacted to a minimum density of 98%(modified) AS1289,5.1.1

    AutoCAD SHX Text500mm Select Fill meeting material below tubes. Properties; CBR > 2%, > 2%, 2%, Swell > 1.5%, Permability k > 1 x 10 m/s. > 1.5%, Permability k > 1 x 10 m/s. 1.5%, Permability k > 1 x 10 m/s. > 1 x 10 m/s. 1 x 10 m/s. 9 m/s.

    AutoCAD SHX TextMaterial as found (Clay) Compacted to a minimum density ratio of 98% (Standard) AS1289,5.1.2

    AutoCAD SHX Text170mm Select Fill meeting material below tubes. Properties; CBR > 2%, > 2%, 2%, Swell > 1.5%, Permability k > 1 x 10 m/s. > 1.5%, Permability k > 1 x 10 m/s. 1.5%, Permability k > 1 x 10 m/s. > 1 x 10 m/s. 1 x 10 m/s. 9 m/s.

  • WEIGH BRIDGE

    ENTRY

    SOLIDSEPERATION

    BUNKER

    Machinery Area Pump Room

    Liquids Seperation Pit

    Solids Bunker

    LiquidsSolids

    Pump Shed

    RL:13

    7.70

    RL:13

    7.62

    RL:13

    9.31

    RL:13

    9.07

    RL:13

    8.84

    RL:13

    8.86

    RL:13

    9.14

    RL:13

    9.16

    RL:13

    8.06

    RL:137.95RL:137.68 RL:137.84

    RL:13

    7.70

    RL:13

    7.62

    RL:13

    9.31

    RL:13

    9.07

    RL:13

    8.84

    RL:13

    8.86

    RL:13

    9.14

    RL:13

    9.16

    RL:13

    8.06

    RL:137.95RL:137.68 RL:137.84

    MACHINERYSHED

    LIQUIDSEPERATION

    PIT

    LIQUIDSEPERATION

    PIT

    DAM

    Hard stand type 1Hard stand type 1 Pasteurisation

    Existing Ground LevelExisting Ground Level

    100m X 68.1mPASTEURIZATION

    AREA(12 ROWS)

    PUMPSHED

    SOLIDSPIT

    Sectionscale 1:500 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- TYP-01

    --------

    TYPICAL SECTIONS-1

    01.06.2020

    Sectionscale 1:500 @ A3

    Sectionscale 1:500 @ A3

    A1

    A2

    A3

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text3

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text3

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text3

  • LIQUIDSEPERATION

    PIT

    SOLIDSPIT

    MACHINERYSHED

    DAM

    100m X 68.1mPASTEURIZATION

    AREA(12 ROWS)

    60m X 68.1mMATURATION

    AREA(12 ROWS)

    COMPOSTSTORAGE

    IL:137.30IL:1

    37.25

    RL:138.85RL:139.16RL:139.35

    RL:137.74

    Existing Ground Level

    2400

    Existing Ground Level

    Machinery ShedExisting Ground Level

    2400

    8000

    Spoon Drain

    DAM

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- TYP-02

    --------

    TYPICAL SECTIONS-2

    01.06.2020

    Sectionscale 1:500 @ A3

    B1

    Sectionscale 1:500 @ A3

    B2

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX TextA

    AutoCAD SHX TextR

    AutoCAD SHX TextP

    AutoCAD SHX TextN

    AutoCAD SHX TextM

    AutoCAD SHX TextL

    AutoCAD SHX TextK

    AutoCAD SHX TextQ

    AutoCAD SHX TextO

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX TextA

    AutoCAD SHX TextR

    AutoCAD SHX TextP

    AutoCAD SHX TextN

    AutoCAD SHX TextM

    AutoCAD SHX TextL

    AutoCAD SHX TextK

    AutoCAD SHX TextQ

    AutoCAD SHX TextO

  • DAM

    Grass & Topsoil

    Top Soil @ 6:1

    prop

    erty

    line

    Dam batter @ 3:1

    wide dam bankDam batter @ 2.5:1

    5000Selected Bamboo TreeScreen around Site Perimeter

    600

    2000

    max

    .20

    00 m

    ax.

    min

    .

    WATER FREEBOARD

    Abo

    ve N

    GL

    Bel

    ow N

    GL

    60002000

    NATURAL GROUND LEVEL (NGL)

    BOTTOM OF DAM

    TOP OF BANK

    plantation

    prop

    erty

    line

    2400

    8000

    Fall Existing Ground Level

    ReinforcedConcrete Wall

    150 thick FCRConcreteSpoon Drain

    Concrete Wallreturning

    in background

    ChainwireMesh Fencingin background

    Footing System TBC

    Perimter Detailsscale 1:100 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- DET-01

    --------

    PERIMITER DETAILS

    01.06.2020

    AutoCAD SHX TextPart North & East Fence

    AutoCAD SHX TextPart West Fenceline

  • 2000

    1000 1000

    300

    1700

    6000

    chain meshfence to

    full height

    plantation2400

    400

    1000 Impermeable

    Layer

    Compacted Clay

    prop

    erty

    line

    min.

    · 50NB MG pipe cranked 600mm, stays and bracing as required.· 50mm x 2.5 gal chain mesh full height including crank.· Shade mesh on Blind Creek Road side only, cover including crank.· Clay compacted to shape on impermeable base.· Plantation on all sides.

    FENCE:

    BUND:

    2000

    10001000

    300

    1700

    5000

    chain meshfence tofull height

    plantation 2400

    400

    1000 Impermeable

    Layer

    Compacted Clay

    prop

    erty

    line

    min.

    NOTES:

    Bund Detailsscale 1:50 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- DET-02

    --------

    BUND DETAILS

    01.06.2020

    AutoCAD SHX TextNorth Fence only

    AutoCAD SHX TextSouth & Part East Fence

  • 120006000 6000

    12000

    6000

    3000

    3000

    prop

    erty

    line

    300

    1900

    2000

    6000

    200

    200

    200mm Concrete

    150mm Deep Class 3 Crushed Rock.

    Sliding Gate

    500

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- DET-03

    --------

    GATE DETAILS

    01.06.2020

    Plan Viewscale 1:100 @ A3

    Front Viewscale 1:100 @ A3

    Side Viewscale 1:100 @ A3

    AutoCAD SHX TextSliding Gate

    AutoCAD SHX TextSliding Gate

    AutoCAD SHX TextEntry Ramp

    AutoCAD SHX TextEntry Ramp

    AutoCAD SHX TextSliding Gate

    AutoCAD SHX TextSliding Gate

    AutoCAD SHX TextIN

    AutoCAD SHX TextOUT

    AutoCAD SHX TextIN

    AutoCAD SHX TextOUT

  • 150

    270

    500

    Geofab Textile Membrane(Geotextile A34)

    270mm Deep Class 3 Crushed rock.

    150mm Deep Class 2 Crushed Rock.

    500mm Deep Compacted Clay Fill

    150mm Deep Class 3 Crushed Rock.

    200mm Concrete

    200

    plantation

    prop

    erty

    line

    150

    270

    500

    2000

    Geofab Textile Membrane(Geotextile A34)

    270mm Deep Class 3 Crushed rock.

    150mm Deep Class 2 Crushed Rock.

    500mm Deep Compacted Clay Fill

    Detail:scale 1:50 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - --

    1.

    DET-04

    --------

    GATE DETAILS (PAVING)

    01.06.2020

    Detail:scale 1:50 @ A3

    1.

  • 48000

    2000

    0

    8000

    5000 10

    °

    5000

    2000048000Skylight

    Skylight

    Skylight

    Skylight

    Skylight

    Skylight

    PA DoorSliding Doors x 2

    Machinery Shed

    East Elevation North Elevation

    80008000800080008000

    Sliding Doors

    C/B Cottage Green Roof& Walls

    C/B Cottage Green Roof& Walls

    Cross Section

    STAFFHALLOFFICE

    PUMPS

    MEZZANINE

    WORKSHOP

    OFFICE

    STAFF

    HALL

    PUMPSWORKSHOP

    AM

    ENIT

    IES

    Machinery Shedscale 1:250 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- EL-01

    --------

    MACHINERY SHED

    02.07.2020

    AutoCAD SHX TextUP

  • 5000

    15000

    3000

    5000

    10°

    3472

    3000

    South Elevation

    Floor Plan

    East Elevation

    SeparatorMachine

    C/B CottageGreen

    Free Standing Roof for Separator Machines

    Pump Shedscale 1:100 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- EL-02

    --------

    PUMP SHED

    01.06.2020

  • 8000

    12000

    2260

    3000

    300037

    36

    10°

    South Elevation

    Floor Plan

    East Elevation

    Syphon Pots

    Blowers

    C/B CottageGreen

    Free Standing Roof for Blowers & Syphon Pots

    Mounting Wall

    8000

    Mounting WallFor Blowers

    1 2 3 4 5 6 7 8 9 10 11 12

    waterlevel

    OUTLET Ø 160

    attachment piece5 - 28cm

    19

    SIPH

    ON

    Ø 1

    60

    SIPH

    ON

    Ø 1

    60

    SIPH

    ON

    Ø 1

    60

    siphon pot ES 1100XL

    waterlevel

    OUTLET Ø 160

    attachment piece5 - 28cm

    SIPH

    ON

    Ø 1

    60

    SIPH

    ON

    Ø 1

    60

    SIPH

    ON

    Ø 1

    60

    siphon pot ES 1100XL

    100

    Mounting WallFor BlowersBlower

    typ.

    Syphon Pottyp.

    Blower Shedscale 1:100 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- EL-03

    --------

    BLOWER SHED

    03.07.2020

  • Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    WEIGH BRIDGESYPHONTANKS

    100m X 46mBIOLOGICAL DRYING AREA

    (8 ROWS)

    60m X 68.1mMATURATION

    AREA(12 ROWS)

    CAR PARKING

    CONCRETE PAVING FORTRACTOR TURNOUT

    ROLLOVER KERB

    SEPERATION PIT

    UNDERGROUND PIPE NETWORKFOR PASTEURIZATION SYSTEM

    OPEN FOR HOUSINGMACHINERY & EQUIPMENT

    100m X 22mPASTEURIZATION

    AREA(4 ROWS)

    Part Plan (A): Pasteurisation & Maturationscale 1:500 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- PLAN-01

    --------

    DETAIL PLAN (PASTEURIZATION AREA)

    17.06.2020

    N

    AutoCAD SHX TextRWT

    AutoCAD SHX TextF1

    AutoCAD SHX TextI

    AutoCAD SHX TextP1

    AutoCAD SHX TextP2

    AutoCAD SHX TextP3

    AutoCAD SHX TextP4

    AutoCAD SHX TextF2

    AutoCAD SHX TextJ

    AutoCAD SHX TextK

    AutoCAD SHX TextL

    AutoCAD SHX TextH

    AutoCAD SHX TextP5

    AutoCAD SHX TextP6

    AutoCAD SHX TextP7

    AutoCAD SHX TextP8

    AutoCAD SHX TextP9

    AutoCAD SHX TextP10

    AutoCAD SHX TextP11

    AutoCAD SHX TextP12

    AutoCAD SHX TextF3

  • Office24m2

    W1

    D1

    Coms

    W1

    W1

    SBWEIGH BRIDGE

    100m X 46mBIOLOGICAL DRYING AREA

    (8 ROWS)

    60m X 68.1mMATURATION

    AREA(12 ROWS)

    CO

    MPO

    STST

    ORA

    GE

    2.4m HIGHREINFORCED

    CONCRETE WALL

    CONCRETE PAVING FORTRACTOR TURNOUT

    CONCRETESPOON DRAIN

    (EAST) SOLIDSEPERATION PIT

    UNDERGROUND PIPE NETWORKFOR PASTEURIZATION SYSTEM

    100m X 22mPASTEURIZATION

    AREA(4 ROWS)

    Part Plan (B): Pasteurisation & Maturationscale 1:500 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- PLAN-02

    --------

    DETAIL PLAN (MATURATION AREA)

    17.06.2020

    N

    AutoCAD SHX TextJ

    AutoCAD SHX TextK

    AutoCAD SHX TextL

    AutoCAD SHX TextM

  • 21000

    8000 1000 6000

    LunchRoom11.20m2

    W1

    W1

    D1

    SB

    W1

    D1

    ChangeRoom4.76m2

    1000

    Office24m2

    W1

    W1

    D1

    SB

    W1

    Coms

    W1

    W1

    W1

    Shr

    1 2 3 4 5 6 7 8 9 10 11 12

    B L I N D C R E E K R O A D

    Part Plan: Drop Off Areascale 1:500 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- PLAN-03

    --------

    DETAIL PLAN (DROP OFF)

    01.06.2020

    N

    AutoCAD SHX TextF

    AutoCAD SHX Text1

    AutoCAD SHX TextG

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX TextSYPHON TANKS

    AutoCAD SHX TextBLOWERS

    AutoCAD SHX Text1

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX TextA

    AutoCAD SHX Text3

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

  • Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    3690008000

    500038000

    50006000 20000 12000 32000 12000 100000 15000 60000 10000

    600027000

    6000

    7000

    2190

    025

    100

    1650

    026

    500

    5000

    7000

    5000

    80005000

    B L I N D C R E E K R O A D

    WEIGH BRIDGE

    SITE AMMENITIESSYPHONTANKS

    LIQUIDSEPERATION

    PIT

    PUMPSHED

    LIQUIDSPIT

    MACHINERYSHED

    DAM

    100m X 68.1mPASTEURIZATION

    AREA(12 ROWS)

    60m X 68.1mMATURATION

    AREA(12 ROWS)

    CO

    MPO

    STST

    ORA

    GE

    ENTRY EXIT

    CAR PARKING

    SOLIDSEPERATION

    BUNKER

    PRELIMINARY PLANNOT TO BE USED FOR CONSTRUCTION

    vehicle:B-DOUBLE25.0Mgroup:JOHNspeed:6:kphpathUnits:meterstime:2004-09-17-08-14-39display:1,1,1,1,1,1,1,0,1,0,0,0,0color:0,0,0,0,0,2,3,7,4,7,0,7,7style:0,0,0,0,0,0,0,2,0,0,2,0,0fill:0,0clearance:0.000,3.000,3.000spacing:0,2.500level:20,aircraft:N

    vehicle:B-DOUBLE26.0Mgroup:JOHNspeed:6:kphpathUnits:meterstime:2004-09-17-08-27-26display:1,1,1,1,1,1,1,0,1,0,0,0,0color:0,0,0,0,0,2,3,7,4,7,0,7,7style:0,0,0,0,0,0,0,2,0,0,2,0,0fill:0,0clearance:0.000,3.000,3.000spacing:0,2.500level:20,aircraft:N

    vehicle:SEMI19M2group:JOHNspeed:6:kphpathUnits:meterstime:2004-07-27-14-01-15display:1,1,1,1,1,1,1,0,1,0,0,0,0color:5,5,0,0,0,2,3,7,4,7,0,7,7style:0,0,0,0,0,0,0,2,0,0,2,0,0fill:0,0clearance:0.000,3.000,3.000spacing:0,2.500level:18,aircraft:N

    PRELIMINARY PLAN

    NOT TO BE USED FOR CONSTRUCTION

    vehicle:B-DOUBLE26.0Mgroup:JOHNspeed:6:kphpathUnits:meterstime:2004-09-17-08-27-26display:1,1,1,1,1,1,1,0,1,0,0,0,0color:0,0,0,0,0,2,3,7,4,7,0,7,7style:0,0,0,0,0,0,0,2,0,0,2,0,0fill:0,0clearance:0.000,3.000,3.000spacing:0,2.500level:20,aircraft:N

    vehicle:B-DOUBLE26.0Mgroup:JOHNspeed:6:kphpathUnits:meterstime:2004-09-17-08-27-26display:1,1,1,1,1,1,1,0,1,0,0,0,0color:0,0,0,0,0,2,3,7,4,7,0,7,7style:0,0,0,0,0,0,0,2,0,0,2,0,0fill:0,0clearance:0.000,3.000,3.000spacing:0,2.500level:20,aircraft:N

    TEMPLATE USED FROM'Austroads Design Vehicles andTurning Path Templates Guide'

    Truck Access / Egressscale 1:1000 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CCB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARDD

    - -- PLAN-04

    --------

    TRUCK ACCESS

    02.07.2020

    N

    AutoCAD SHX Text1

    AutoCAD SHX TextB

    AutoCAD SHX TextC

    AutoCAD SHX TextR

    AutoCAD SHX TextP

    AutoCAD SHX TextN

    AutoCAD SHX TextM

    AutoCAD SHX TextL

    AutoCAD SHX TextK

    AutoCAD SHX TextJ

    AutoCAD SHX TextI

    AutoCAD SHX TextH

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextF

    AutoCAD SHX TextG

    AutoCAD SHX Text2

    AutoCAD SHX Text7

    AutoCAD SHX Text6

    AutoCAD SHX Text5

    AutoCAD SHX Text4

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX TextA

    AutoCAD SHX TextQ

    AutoCAD SHX TextO

    AutoCAD SHX Text3

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

    AutoCAD SHX Text12.5 m radius

    AutoCAD SHX TextInnermost path

    AutoCAD SHX Textof vehicle

  • InstrumentPt1InstrumentPt2

    InstrumentPt3

    InstrumentPt4

    401

    402

    138.425301

    FENCE1

    138.418302

    FENCE2

    138.445303

    FENCE3

    139.584304

    FENCE4 139.173305

    FENCE5138.587306

    FENCE6

    RL 139.500RL 139.500

    RL 139.301RL 136.740

    138.0

    138.0

    138.0

    137.6

    137.7

    137.7

    137.7

    137.8

    137.8

    137.9

    137.9

    137.9137.9

    138.1

    138.1

    138.1

    138.1

    138.1

    138.2

    138.2

    138.2

    138.2138.2

    138.2

    138.3

    138.3

    138.4

    RL 135.500

    -1:2.50-1:3.00

    Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    B L I N D C R E E K R O A D

    High Point

    1% Fall

    1% Fall

    1% Fall

    1% Fall

    Fall

    All l

    iqui

    ds/

    Rain

    wat

    erRe

    tain

    ed O

    nsite

    Overflow

    Overflow

    New Power Pole

    Power Cabinet

    1% Fall1% Fall

    High Point

    Perimeter Bundingand fencing as detailed

    RampedVehicle Egress

    RampedVehicle Access

    ConcreteWall

    East Pit,Pumped backto Liquids Dam

    ConcreteSpoon Drain

    LiquidsCollection Pit

    West Pit

    Trafficableconcretebund

    275KLRWT

    Site Drainage & Mains Power Supplyscale 1:1000 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARRDD

    MEP-01

    --------

    DRAINAGE & POWER

    02.07.2020

    N

    East Catchment Area

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

  • InstrumentPt1InstrumentPt2

    InstrumentPt3

    InstrumentPt4

    401

    402

    138.425301

    FENCE1

    138.418302

    FENCE2

    138.445303

    FENCE3

    139.584304

    FENCE4305 306

    RL 139.500RL 139.500

    RL 139.301RL 136.740

    138.0

    138.0

    138.0

    137.6

    137.7

    137.7

    137.7

    137.8

    137.8

    137.9

    137.9

    137.9137.9

    138.1

    138.1

    138.1

    138.1

    138.1

    138.2

    138.2

    138.2

    138.2138.2

    138.2

    138.3

    138.3

    138.4

    RL 135.500

    -1:2.50-1:3.00

    Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    B L I N D C R E E K R O A D

    100mmCamlock100mm HDPE

    HDPE RollP8

    WD

    P10P11

    WD

    WD

    P5 P6

    overflow

    P1

    WDP7

    P13

    WD

    WDP3 P4

    WD

    P9

    P2 P12

    137.9

    P8

    WD

    P5P6

    over

    flow

    P1P7 P1

    3

    WD

    P3P4

    LEGEND

    DAM WATER PIPELINE

    FW

    RW

    P-

    DW

    WD

    RECYCLED WATER PIPELINEFRESH WATER PIPELINE

    FLOOD WASH SUPPLY

    PUMP

    WASH DOWN

    POWER SUPPLY

    TANK OVERFLOW

    TW UV TREATED DAM WATER

    PLumbing Layoutscale 1:1000 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARRDD

    MEP-02

    --------

    PLUMBING

    03.07.2020

    N

    Pump Roomscale 1:500 @ A3

    N

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

  • InstrumentPt1InstrumentPt2

    InstrumentPt3

    InstrumentPt4

    401

    402

    138.425301

    FENCE1

    138.418302

    FENCE2

    138.445303

    FENCE3

    139.584304

    FENCE4 139.173305

    FENCE5138.587306

    FENCE6

    RL 139.500RL 139.500

    RL 139.301RL 136.740

    138.0

    138.0

    138.0

    137.6

    137.7

    137.7

    137.7

    137.8

    137.8

    137.9

    137.9

    137.9137.9

    138.1

    138.1

    138.1

    138.1

    138.1

    138.2

    138.2

    138.2

    138.2138.2

    138.2

    138.3

    138.3

    138.4

    RL 135.500

    -1:2.50-1:3.00

    Office24m2

    W1

    D1

    Coms

    W1

    W1

    SB

    1 2 3 4 5 6 7 8 9 10 11 12

    B L I N D C R E E K R O A D

    NOTE:Production water outlet tobe set to maintain 144,000Lavailable to the Hydrant.

    FE

    FE

    FEFE

    FHR

    SO

    FHR

    MC

    FE

    Suction Point Outlet144,000L available.

    10000

    -Fire Hose Reel (50m)

    -Mill Cock

    -Fire Extinguisher

    SO -Suction Point Outlet with65-125 Storz Fittings

    MCMC

    MC

    100Ø fire Service100Ø fire Service

    SO

    Storz Adaptor Fitting

    65

    65

    100mm Hydrant Riser

    Fire System Layoutscale 1:1000 @ A3

    Drawing no.

    Drawn: Date:Checked: Revision:

    Drawing name:

    Ammendments: Date:RevB. ENG. CB-U-57908Registered Building Practitioner

    Ph: (03) 5595 1078 Fax: (03) 5595 1644 Web: www.greencon.com.au Australia Pty. Ltd.GreenCon

    CCOMPOST FACILITY UPGRADEfor Camperdown Compost Company

    located at 445 Blind Creek Rd, BOOKARRDD

    FP-01

    --------

    FIRE CONTROL PLAN

    03.07.2020

    NStorz Adaptor Fitting

    Legend

    100mm Hydrant Riser

    AutoCAD SHX TextRWT

    AutoCAD SHX TextRWT

  • Camperdown Compost Works Approval Application July 2020

    89 | P a g e

    Appendix D – Air Quality Assessment (GHD, 2020)

  • The Camperdown Compost Company Pty Ltd Camperdown Compost Air Quality Assessment

    February 2020

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | i

    Table of contents 1. Introduction ............................................................................................................................... 1

    1.1 Overview ......................................................................................................................... 1

    1.2 Purpose of this report ...................................................................................................... 1

    1.3 Scope and limitations ...................................................................................................... 1

    1.4 Scope of works ................................................................................................................ 2

    1.5 Assumptions.................................................................................................................... 2

    2. Project description ..................................................................................................................... 4

    2.1 Site location and land use ................................................................................................ 4

    2.2 Sensitive receptors .......................................................................................................... 4

    2.3 Site operations ................................................................................................................ 6

    2.4 Potential sources of odour ............................................................................................. 10

    2.5 Complaint history........................................................................................................... 14

    3. Relevant policies and guidelines .............................................................................................. 15

    3.1 Victorian State Environmental Protection Policy (Air Quality Management) (SEPP (AQM)) ............................................................................................................... 15

    3.2 EPA Publication 1518, Recommended Separation Distances for Industrial Residual Air Emissions .................................................................................................. 15

    3.3 EPA Publication 1588.1, Designing, constructing and operating composting facilities ......................................................................................................................... 15

    4. Default buffer assessment ....................................................................................................... 16

    4.1 EPA Publication 1518, Recommended Separation Distances for Industrial Residual Air Emissions .................................................................................................. 16

    4.2 EPA Publication 1588.1, Designing, constructing and operating composting facilities ......................................................................................................................... 16

    4.3 Application to the site .................................................................................................... 16

    5. Baseline odour surveys ........................................................................................................... 18

    5.1 Methodology ................................................................................................................. 18

    5.2 Results .......................................................................................................................... 19

    6. Risk assessment ..................................................................................................................... 22

    6.1 Site specific variation to the default buffer ...................................................................... 22

    6.2 Methodology ................................................................................................................. 22

    6.3 Emission scenarios ....................................................................................................... 23

    6.4 Risk scenarios ............................................................................................................... 24

    6.5 Site specific meteorology ............................................................................................... 24

    6.6 Risk based directional buffers ........................................................................................ 29

    7. Qualitative dust assessment .................................................................................................... 32

    8. Qualitative bio-aerosol assessment ......................................................................................... 34

    9. Conclusions ............................................................................................................................ 35

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | ii

    Table index Table 2-1 Types of raw material received ........................................................................................ 6

    Table 2-2 Feedstock and associated odour risk ............................................................................. 10

    Table 2-3 Odour sources (upgraded facility) .................................................................................. 12

    Table 5-1 Odour intensity determination ........................................................................................ 18

    Table 5-2 Odour duration descriptors ............................................................................................ 19

    Table 5-3 Summary of baseline odour survey results..................................................................... 19

    Table 6-1 Risk matrix .................................................................................................................... 24

    Table 6-2 Modelled risk scenarios ................................................................................................. 24

    Table 7-1 Potential dust emission sources..................................................................................... 33

    Figure index Figure 2-1 Site location and receptors .............................................................................................. 5

    Figure 2-2 Process flow diagram ...................................................................................................... 9

    Figure 4-1 Default buffers ............................................................................................................... 17

    Figure 6-1 Annual wind rose at Mortlake (2015-2019) ..................................................................... 26

    Figure 6-2 Risk scenario wind roses ............................................................................................... 28

    Figure 6-3 Risk based directional buffers ........................................................................................ 31

    Appendices Appendix A – Baseline odour survey routes

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 1

    1. Introduction 1.1 Overview

    GHD has been engaged by The Camperdown Compost Company Pty Ltd (Camperdown Compost) to undertake an Air Quality Assessment (AQA) for the proposed expansion and upgrade of their existing composting facility located at Gnotuk, Victoria (herein after ‘the subject site’).

    The assessment was undertaken following discussions with EPA1 regarding requirements for the works approval application (WAA) to include an AQA to assess the potential impacts from the proposed upgrade. Air quality (primarily odour) associated with the facility has the potential to be an environmental issue. The potential for off-site odour impacts needs to be well understood as this may have a bearing on the proposed upgrade approval. The air emissions which have the potential for concern in order of importance are:

    1. Odour

    2. Dust

    3. Bio aerosols

    Generally odour poses the critical constraint with respect to the available separation distance to nearby residences.

    Baseline field odour surveys were undertaken to establish the current odour impact from the site, followed by a risk based approach to assess the potential for odour to be emitted offsite, based on the type of operations occurring at the site, and the meteorology at the time of those operations. Dust and bio aerosols were addressed qualitatively.

    1.2 Purpose of this report

    The purpose of this report is assess of potential air emission impacts from the proposed upgrade to the subject site and determine baseline odour conditions at the subject site.

    The findings, conclusions and recommendations of this assessment should be read in conjunction with the limitations presented in section 1.3.

    1.3 Scope and limitations

    This report has been prepared by GHD for The Camperdown Compost Company Pty Ltd and may only be used and relied on by The Camperdown Compost Company Pty Ltd for the purpose agreed between GHD and The Camperdown Compost Company Pty Ltd as set out in section 1.2 of this report.

    GHD otherwise disclaims responsibility to any person other than The Camperdown Compost Company Pty Ltd arising in connection with this report. GHD also excludes implied warranties and conditions, to the extent legally permissible.

    The services undertaken by GHD in connection with preparing this report were limited to those specifically detailed in the report and are subject to the scope limitations set out in the report.

    1 Phone meeting with Ben Carr, EPA Victoria, 21 November 2019

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 2

    The opinions, conclusions and any recommendations in this report are based on conditions encountered and information reviewed at the date of preparation of the report. GHD has no responsibility or obligation to update this report to account for events or changes occurring subsequent to the date that the report was prepared.

    The opinions, conclusions and any recommendations in this report are based on assumptions made by GHD described in this report (refer section(s) 1.5 of this report). GHD disclaims liability arising from any of the assumptions being incorrect.

    GHD has prepared this report on the basis of information provided by The Camperdown Compost Company Pty Ltd and others who provided information to GHD (including Government authorities), which GHD has not independently verified or checked beyond the agreed scope of work. GHD does not accept liability in connection with such unverified information, including errors and omissions in the report which were caused by errors or omissions in that information.

    The opinions, conclusions and any recommendations in this report are based on information obtained from, and testing undertaken at or in connection with, specific sample points. Site conditions at other parts of the site may be different from the site conditions found at the specific sample points.

    Site conditions (including the presence of hazardous substances and/or site contamination) may change after the date of this Report. GHD does not accept responsibility arising from, or in connection with, any change to the site conditions. GHD is also not responsible for updating this report if the site conditions change.

    1.4 Scope of works

    The scope of work for this report included the following:

    Inception meeting and site visit to discuss the proposed upgrade and gain an understanding of current operations

    Four baseline field odour surveys to establish the current odour impact from the site

    Assess EPA default buffers in accordance with Publication 1588.1 (June 2017)

    Risk based assessment for odour including the following:

    – Identify potential odour sources – Default buffer assessment – Assess potential emission scenarios – Directional buffers using site-representative meteorology

    Qualitative dust assessment

    Qualitative bio aerosol assessment

    Presentation of the findings in the form of an Air Quality Assessment report

    1.5 Assumptions

    The following assumptions were used in this report:

    Data obtained from the Mortlake Racecourse and Warrnambool Airport Bureau of Meteorology Automatic Weather Stations (AWS) are deemed to be representative of the meteorology at the subject site.

    For the emission scenarios, it is assumed that greater movement/disturbance of composting material will increase the potential for odour and dust to be generated.

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 3

    Emission scenarios were created using operational periods supplied by the client, which GHD assumes are correct.

    The site activity boundary used for dispersion modelling is based on site process areas provided by the client, which GHD assume are correct.

    All information provided in the Works Approval Application is correct and representative of proposed future operations at the subject site.

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 4

    2. Project description 2.1 Site location and land use

    The subject site is located approximately 9 km northwest from the town centre of Camperdown Township at 445 Sandys Lane, Gnotuk, Victoria.

    The subject site is located on Blind Creek Road with the planning zone at and surrounding the subject site classified as Farming Zone 1 (FZ1).

    2.2 Sensitive receptors

    The definition of a sensitive receptor or sensitive land use is defined by the EPA2 as:

    ‘any land uses which require a particular focus on protecting the beneficial uses of the air environment relating to human health and well-being, local amenity and aesthetic enjoyment, for example residential premises, child care centres, pre-schools, primary schools, education centres or informal outdoor recreation sites’.

    Nine sensitive receptors have been identified within a 5 km radius of the subject site, as shown in Figure 2-1. The closest sensitive receptor (R1) is located approximately 1.2 km south-southwest from the subject site and is the property owner (landholder) of the subject site. Receptors R1A and R1B are cottages located on the same landholder's (R1) property. One house has a farm worker living in it, and the other is rarely occupied. The next closest sensitive receptor (R3) is located approximately 2.1 km south-southeast of the subject site and is occupied by the daughter of an owner of Camperdown Compost.

    2 EPAV 2013 “Recommended separation distances for industrial residual air emissions” Publication. 1518, March 2013

  • N:\AU\Melbourne\Projects\31\12521951\GIS\Maps\Working\Site location2020. While GHD has taken care to ensure the accuracy of this product, GHD and DATA CUSTODIAN(S), make no representations or warranties about its accuracy, completeness or suitability for any particular purpose. GHD and DATACUSTODIAN(S) cannot accept liability of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred as a result of the product being inaccurate, incomplete or unsuitable in any wayGoogle Earth Imagery 2018. Created by: YL

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 6

    2.3 Site operations

    The following two sections outline the current and proposed future operations of the subject site.

    2.3.1 Current operations

    The subject site uses an open-windrow process to form compost from solid and liquid wastes. The typical operations of the current facility are as follows: Solid and liquid wastes (as outlined in Table 2-1) are received.

    Chipped green waste bund dams are formed to soak up liquid wastes.

    The moist green waste mass is then formed into windrows, whilst the surplus liquid drains to a contact dam. Large windrows are used in order to minimise the surface area to volume ratio of the emitting surfaces, to reduce odorous emissions.

    The windrows are turned by excavators and are managed and monitored for moisture level and temperature. The windrows are turned/aerated by the excavators cracking fissures into the sides of the windrows to allow aeration and to form a pseudo biofilter layer as they convect and evaporate the high moisture content.

    Further process waters are added to windrows through the process, ceasing prior to the completion of a final pasteurisation sequence.

    The compost is then further matured and dried for screening and sale to the farming industry.

    The subject site is currently licensed to compost 24,000 tonnes of waste per year and operates from 7:30 am to 5:00 pm Monday to Friday and 8:00 am to 12:00 pm Saturday. The site has been in operation for over twenty years.

    Recently ten smaller windrows were introduced on the east side of the property which were turned by a self-propelled turner in preparation and for trialling of the facility upgrade. It is noted in the Camperdown Compost Environmental Management Plan (August 2019) that the smaller windrows were proven to be more odorous. Although small windrows are proposed in the WAA, they will be placed on an aerated concrete floor which is expected to overcome the recent difficulties of maintaining aerobic conditions.

    Table 2-1 Types of raw material received

    Waste description

    Solid waste

    Hard green waste

    Municipal green waste

    Liquid waste

    Animal effluent and residues including abattoir waste and other waste from animal processing

    Grease interceptor trap effluent

    Food and beverage processing waste

    Car and truck washwater

    Industrial washwater from cleaning, rinsing or washing operations not otherwise specified

    Fly ash (Not received for over ten years)

    Filter cake (Not received for over ten years)

    Inert sludges or slurries

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 7

    2.3.2 Future operations

    Camperdown Compost is proposing to upgrade the technology and processes of the subject site and increase its processing capacity. The subject site has been operating at capacity for several years and recent closure of nearby organic processing facilities has placed the company under market pressure to receive more feedstock material. Markets for finished compost product in surrounding farming districts remain strong.

    A current challenge for the subject site is to keep oxygen in the windrows at all times. A lack of oxygen (anaerobic) can lead to odour production, and increase the time taken to produce compost.

    The proposal seeks to both upgrade the technology and processes of the processing facility, improve its environmental performance and increase its processing capacity to enable future growth.

    Site upgrades

    The following upgrades to the subject site are proposed:

    Installation of a concrete, force aerated floor, for turned windrow composting. This is proposed to reduce the risk of odorous anaerobic pockets forming inside the windrows and maintain a more even temperature spread throughout the windrows.

    Installation of a self-propelled windrow turner that will irrigate as it turns.

    Monitoring of windrows though the use of compost system probes which continuously measure temperature at three different depths. The timing of aeration/turning will be scheduled based on monitoring parameters using compost system probes.

    Installation of a de-watering system.

    Increase the licenced tonnage from 24,000 to 50,000 tonnes of input feedstock, including up to 30,000 tonnes of prescribed industrial waste.

    Raw material to remain similar, as outlined in Table 2-1, with the following amendments:

    – The addition of:– Municipal green wastes (including mixed kerbside food and garden organics)– Commercial Food Waste

    – The removal of:– Fly ash– Filter cake

    Proposed operations

    A description of the proposed processes are described below and in Figure 2-2. The proposed site layout can be found as part of the Works Approval Application.

    Receival:

    – Liquid wastes will be received in a dedicated liquid acceptance pit where multipletrucks can simultaneously discharge. The liquid acceptance pit will be pumped througha de-watering screen and the solids separated onto a storage pad for blending withbulking agents.

    – The solid residue remaining after pumping to the de-watering system will be collectedin the liquid acceptance pit to be periodically dug out by loader and mixed with gardenand food based solid organic bulking agents for formation into windrows.

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 8

    – The solids from the de-watering process captured on the solids pad will be dug out and mixed with municipal garden, or food and garden, organics ready for windrow formation.

    – Solid waste will be received and blended on the receipts pad with solids from the de-watering process and residue from the liquid receipts pit (as described above).

    Force aerated floor (eight weeks):

    – Windrows will be formed on the biological drying pad/aerated floor (100 x 65 m) and hold 12 windrows.

    – Aeration of windrows will occur on the force aerated floor whilst the separated processed liquid will be pumped onto the biological drying pad daily for application via the self-propelled windrow turner that can irrigate as it turns.

    – Turning will be undertaken using a Komptech X55 self-propelled turner and scheduled based on monitoring parameters using compost system probes which continuously measure temperature at three different depths.

    – Windrows will be turned on a minimum weekly cycle and may be turned daily if required in the early stages of the forced aeration process to minimise odour potential.

    – A maximum of eight windrows will be used for adding liquids, with the remaining four rows used for pasteurisation.

    – A pasteurisation sequence will be undertaken on the aerated floor prior to moving to the maturation area.

    Hardstand (eight weeks):

    – Transfer of material to a maturation pad (60 x 65 m) forming 12 shorter windrows and turned

    Compost screening area:

    – The compost is then screened for sale and loaded for dispatch

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 9

    Figure 2-2 Process flow diagram

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 10

    2.4 Potential sources of odour

    2.4.1 Current odour sources

    The sources associated with waste receival and the turning of windrows are considered to be the largest odour sources, as the material in these sources is freshest. This includes offloading solid and liquid waste from trucks and turning of stockpiles. The current windrow composting process is also considered to be a large odour source when the material is freshest. As the feedstock is pasteurised and matured (and dries out in the process) it is expected to generate less odour (in quiescent phases).

    GHD conducted a site visit of the subject site on 10 December 2019. During the site visit, the following observations with regards to odour were made:

    The odour characteristics in different areas of the site varied significantly, as follows:

    – During a liquid waste delivery: sour, foul odour – During a solid waste delivery: grassy odour – Windrows: compost odour – Turning of windrows: compost odour – Contact dam: wastewater odour – Finished product: sweet/earthy compost odour

    Of the odours detected during the site visit, the odour associated with the liquid waste delivery was considered the most unpleasant

    The Environmental Management Plan (EMP)3 for the subject site details the types of feedstock received and their associated odour risk. This has been reproduced in Table 2-2 below.

    Table 2-2 Feedstock and associated odour risk4

    Feedstock type Overall Risk Level Factors Affecting Odour Risk

    GO & FOGO Medium Seasonal moisture levels

    Summer FOGO rot risk

    Commercial food waste Medium Delivery time

    Temperature

    Source and nature of feedstock

    Grease trap waste Medium Temperature

    Solids fraction

    Animal effluent and residues including abattoir waste and other waste from animal processing

    High Temperature

    Source & nature of feedstock

    Food and beverage processing waste

    High/medium Temperature

    Source and nature of feedstock

    Drilling muds Low Blending rate

    3 Camperdown Compost Company Environmental Management Plan August 2019, Bookaar Compost Facility EPA License

    13415 4 4Adapted from Camperdown Compost Company Environmental Management Plan August 2019, Bookaar Compost Facility

    EPA License 13415

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 11

    2.4.2 Future odour sources

    The EMP for the subject site details an inventory of the on-site odour sources for the proposed operations and control measures to be implemented in order to reduce odour. The individual sources, process, control measures and subsequent odour implications are described in Table 2-3.

    Based on proposed upgrade measures and proposed controls, GHD expects that odour from the upgraded facility will decrease in comparison with the existing operations.

    The EMP also provides various odour control measures for upset conditions (emergencies, maintenance, breakdowns, extreme weather events, etc.) to reduce the odour emissions of which GHD consider to be sufficient to minimise the risk of odour.

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 12

    Table 2-3 Odour sources (upgraded facility)5

    Source Location Process Control measures Overall Odour implications

    Waste delivery

    Site access Waste reception on receipt pad

    Waste enclosed in delivery vehicles

    Prompt delivery of material and no extended “waiting time” for trucks

    Odour emissions for liquid waste receival is expected to be lower than current operations due to the implementation of a new liquid receival system and de-watering process. The new liquid receival system will have containment controls where liquids can be efficiently discharged and controlled. Receipts flow to a solids trap which takes water out of the middle depth, trapping heavy solids by gravity and floating solids which remain above the drainage level. A de-watering process will separate solids from liquids allowing the processed water to be directly irrigated to windrows for biological drying.

    Odour implications for solid waste expected to remain similar noting that holding time is limited to five days to minimise odours.

    Receipts pad Spreading, decontamination, and shredding of waste

    Priority processing and windrowing of odorous deliveries

    Rejection of deliveries deemed to be too odorous

    Liquid acceptance pit Liquid delivery

    Immediate de-watering processing

    Prompt blending of solids and residues with chipped solid wastes

    Wash down procedures

    Water System Contact water dam Water storage Aeration of contact water dam

    The new liquids receipts facility is expected to reduce the amount of solids from liquid receipts currently entering the contact water dam.

    This should reduce the biological oxygen demand of the contact water dam and reduce the odorous emission potential of this source.

    Further, odour for the contact dam is expected to be lower than current operations due to the introduction of aerators.

    5Adapted from Camperdown Compost Company Environmental Management Plan August 2019, Bookaar Compost Facility EPA License 13415

  • GHD | Report for The Camperdown Compost Company Pty Ltd - Camperdown Compost, 12521951 | 13

    Source Location Process Control measures Overall Odour implications

    Force Aerated Windrow Processing

    Force aeration pad

    Transfer to windrow pads

    Avoid process in the morning due to mornings generally being the calmest time of day

    Odour emissions are expected to be lower for active compost phase due to introduction of the forced aeration pad to maintain aerobic conditions.

    Data6 provided from Camperdown Compost demonstrate significant measured odour reductions at every week for an aeration system compared to turned windrows without aeration. For a bio-waste blend windrow a reduction of 11% at day six and an average of 75% for days 13 to 28 was seen while for a sewage blend windrow a reduction of 11% at day six and average of 47% for days 13 to 28 was seen.

    Further odour is also expected to reduce due to the implementation of a self-propelled windrow turner (providing greater mixing and homogenisation of the material).

    Reactive management (delay or avoid) for turning and windrow formation based on wind direction (i.e. placing receptors downwind) and high risk wind conditions (i.e. light winds in winter time) is expected to further reduce the likelihood of odour emissions.

    Formation of windrows

    Wind Direction monitoring and activity scheduling for windrow formation

    Appropriate blend ratios for odour minimisation

    Windrow turning/force aeration

    Active compost

    Wind direction monitoring and activity scheduling for windrow formation

    Continuous and regular parameter monitoring for optimal force aeration

    Turning frequency increase if required

    Addition of zeolite or finished compost as odour ameliorants if needed

    Maturation Active compost

    Dry process reducing moisture through maturity

    Appro