APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost...

21
A-1 APPENDIX 1 MEMBER LIST OF THE STUDY TEAM 1. Field Survey Name Position Affiliation (1) Mr. Ryuichi KATO Team Leader Deputy Resident Representative JICA Senegal Office (2) Ms. Maki IKKATAI Coordinator First Project Management Division Grant Aid Management Dept., JICA (3) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd. (4) Ms. Mikiko AZUMA Operation and Maintenance Planner/ Socio-Economist Japan Techno Co., Ltd. (5) Mr. Christopher JAYAKARAN Hydrogeologist Japan Techno Co., Ltd. (6) Mr. Minoru KIMISHIMA Water Supply Planner/ Equipment Planner Japan Techno Co., Ltd. (7) Mr. Shinichi MOROMACHI Water Supply Planner 2 Japan Techno Co., Ltd. (8) Mr. Shoji TAKAMATSU Cost Estimation/ Procurement Planner Japan Techno Co., Ltd. 2. Explanation of Draft Final Report Name Position Affiliation (1) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd. (2) Mr. Minoru KIMISHIMA Water Supply Planner/ Equipment Planner Japan Techno Co., Ltd. (3) Mr. Shoji TAKAMATSU Cost Estimation/ Procurement Planner Japan Techno Co., Ltd.

Transcript of APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost...

Page 1: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A-1

APPENDIX 1 MEMBER LIST OF THE STUDY TEAM

1. Field Survey

Name Position Affiliation

(1) Mr. Ryuichi KATO Team Leader Deputy Resident RepresentativeJICA Senegal Office

(2) Ms. Maki IKKATAI Coordinator First Project Management DivisionGrant Aid Management Dept., JICA

(3) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd.

(4) Ms. Mikiko AZUMAOperation and Maintenance

Planner/ Socio-EconomistJapan Techno Co., Ltd.

(5) Mr. Christopher JAYAKARAN Hydrogeologist Japan Techno Co., Ltd.

(6) Mr. Minoru KIMISHIMAWater Supply Planner/Equipment Planner

Japan Techno Co., Ltd.

(7) Mr. Shinichi MOROMACHI Water Supply Planner 2 Japan Techno Co., Ltd.

(8) Mr. Shoji TAKAMATSUCost Estimation/Procurement Planner

Japan Techno Co., Ltd.

2. Explanation of Draft Final Report

Name Position Affiliation

(1) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd.

(2) Mr. Minoru KIMISHIMAWater Supply Planner/

Equipment PlannerJapan Techno Co., Ltd.

(3) Mr. Shoji TAKAMATSUCost Estimation/

Procurement PlannerJapan Techno Co., Ltd.

Page 2: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

APPENDIX 2 STUDY SCHEDULE(1) Basic Design Field Survey

Mr. Ryuichi KATO Ms. Maki IKKATAI Mr. S. KAGAWA Ms. M. AZUMA Mr. TAKAMATSU Mr. KIMISHIMA Mr. MOROMACHI Mr. JAYAKARAN

1 8/18 Mon Leave Bangalore

2 8/19 Tue

3 8/20 WedCourtesy call and Meeting

with JICA and EOJ

4 8/21 Thu

5 8/22 Fri Arrive Banjul

6 8/23 Sat Site Survey

7 8/24 SunArrive Banjul, Site Survey(EDF,UNDP/UNCDF)

Preparation forField Survey

Leave Tokyo Workshop Survey

8 8/25 Mon ParisMeeting & Data

Collection

9 8/26 Tue Arrive BanjulPreparation for

Survey

10 8/27 WedField Trip to Solar

Sites w/Team LeaderPreparation for

Site Survey

11 8/28 Thu Leave Dakar for ParisContract w/Sub-Contract Study

Site Survey andDiscussion w/

NBD

ProcurementSurvey (Banjul)

Preparation PreparationHydrogeologicalSurvey (WD)

12 8/29 Fri Leave Paris for TokyoProcurement

Survey (Banjul)Preparation Preparation

HydrogeologicalSurvey (NBD)

13 8/30 SatEDF/DWR meeting

for O & M SolarSite Survey

(WD)Procurement

Survey (Banjul)W-01,W-02 W-01,W-02

HydrogeologicalSurvey (NBD)

14 8/31 Sun Leave for Dakar N-09,N-10, N-02 N-09,N-10, N-02Move to Tendaba &

Survey (LRD)

15 9/1 MonSub-Contract (SoilTest/Topographic

Survey)

Site Survey(LRD)

ProcurementSurvey (Dakar)

N-01, N-11 N-01, N-11HydrogeologicalSurvey (LRD)

16 9/2 TueDWR Water Quality

Analysis Lab.

Move to Soma,Site Survey

(LRD)Move to Tendaba Move to Tendaba

Move to Soma &Survey (LRD)

17 9/3 WedDiscussion

w/Division Officer(LRD)

Discussionw/Division(LRD)

L-08,L-03,L-01 L-08,L-03,L-01HydrogeologicalSurvey (CRD)

18 9/4 ThuWater Supply

Survey L-10 & 11Site Survey

(CRD)L-10,L-11, L-10,L-11,

HydrogeologicalSurvey (CRD)

19 9/5 FriDiscussion w/VWC,

W-1 & 2

Move toJanjanbureh andSurvey (CRD)

Data Analysis Data AnalysisMove to Janjanbureh

& Survey (CRD)

20 9/6 SatM-13 Sambang

ComplexSite Survey

(CRD)L-09,M-13 L-09,M-13

HydrogeologicalSurvey (CRD)

21 9/7 SunWater Supply

Survey M-6 & 2Site Survey

(CRD)M-06, M-02 M-06, M-02

HydrogeologicalSurvey (CRD)

22 9/8 MonWater Supply

Survey M-5 & 11

Discussionw/Division Office

(CRD)M-05, M-11 M-05, M-11

HydrogeologicalSurvey (CRD)

23 9/9 TueMeeting w/Division

(CRD & LRD)Site Survey

(CRD、LRD)M-12, M-09 M-12, M-09 Move to Banjul

24 9/10 WedSite Survey (WD)

Move to Banjul

Site Survey(WD) Move to

BanjulM-08, M-10 M-08, M-10 Data Analysis

25 9/11 ThuDWR Meeting(Groundwater)

DWR Meeting &Sub-Contractor

M-03, M-04,M-01 M-03, M-04,M-01DWR Meeting(Groundwater)

26 9/12 FriDWR Meeting

(Water Analysis)Meeting w/DWR

(O & M)DWR Meeting,Data Analysis

DWR Meeting,Data Analysis

DWR Meeting, DataAnalysis

27 9/13 Sat

28 9/14 Sun Leave Banjul

29 9/15 Monvia Burussel and

London

30 9/16 Tue Arrive Bangalore

NBD: North Bank Division LRD: Lower River Division

WD: Western Division CRD: Central River Division

Team Leader (JICA) Coordinator (JICA) Hydrogeologist

Leave for Tokyovia Paris

Site and Workshop Survey with Team Leader Site and Workshop Survey

with Team Leader

Field Trip of EDF, UNDP/UNCDF and JICAProject Sites, Leave for Dakar

Preparation for Site SurveyProcurement and Local Cost Survey

Minutes of Discussion

Water SupplyPlanner 2

O&MPlanner/Socio-

Economist

Leave Tokyo for Paris

Field Trip of EDF Solar Pumping Systems and JICA Grant Project Sites

Chief ConsultantCost &

ProcurementPlanner

Meeting with UNDP, EDF and DWR

Water Supply/Equipment Planner

Minutes of Discussion, Negotiation of Sub-Contract Study, and Data Collection

Signing of Minutes Signing of Minutes, Negotiation of Sub-Contract Study, and Data Collection

Leave Paris and Arrive Tokyo onSeptember 17

Leave Banjul for Dakar

Report to JICA in Banjul and Leave forTokyo via Paris

Leave Paris and Arrive Tokyo onSeptember 17

Meeting within the Team, Data Analysis Meeting within Team and Data Analysis

No. Date

Leave Banjul for Dakar

Report to JICA in Banjul, Leave forTokyo via Paris

Meeting with UNDP, EDF and DWR, DataCollection

Leave Paris for Dakar

Courtesy call and Meeting with JICA and Embassy of Japan (EOJ)), Leave Dakar and Arrive Banjul

Discussion w/Division (NBD), SiteSurvey N-03,N-01

Site Survey and Discussion w/Division& Village Water Committee (WD)

Courtesy call and I/R Explanation Meeting with the Gambia Government (DSFA, DSFNRE, and DWR)

A-2

Page 3: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

Chief ConsultantWater Supply/

Equipment PlannerCost & Procurement

PlannerMr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU

1 1/12 Mon

2 1/13 Tue

3 1/14 Wed

4 1/15 Thu

5 1/16 Fri

6 1/17 Sat

7 1/18 Sun

8 1/19 Mon

9 1/20 Tue

10 1/21 Wed

11 1/22 Thu

12 1/23 Fri

(2) Explanation of Draft Final Report

No. Date Day

Leave Tokyo for Paris

Leave Paris for Dakar

Courtesy call and meeting with JICA and Japanese Embassy, Leave Dakarfor BanjulCurtesy call to Department of State for Fisheries, Natural Resources and theEnvironment and Department of State for Foreign Affairs, Explanation ofdraft final report to DWR

Meeting with DWR on the draft final report

Meeting with DWR on the draft final report

Discussion on minutes with DWR

Signing of Minutes with DSFNRE and DWR

Leave Banjul for Dakar

Report to JICA and Japanese Embassy, Leave Dakar for Paris

Leave Paris for Tokyo

Arrive in Tokyo

A-3

Page 4: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A-4

APPENDIX 3 LIST OF PARTIES CONCERNEDIN THE RECIPIENT COUNTRY

Department of State for Foreign AffairsHon. Mr. Babucarr BlaiseIsmaila Jagne

Secretary of State for Foreign Affairs

Mr. Ansumana E. Ceesay Permanent SecretaryMr. Momodou Jang Jallow Ag. Principal Assistant Secretary

Department of State for Fisheries, Natural Resources and the EnvironmentHon. Ms. Susan Waffa-OgooO.R.G.

Secretary of State for Fisheries, NaturalResources and the Environment

Mr. Momodou A. Cham Ag. Permanent SecretaryMr. Dodu Gaye Deputy Permanent SecretaryMr. Momodou O. Njie Principal Assistant SecretaryMr. Funahashi Nobufumi JICA Expert

Department of Water Resources (DWR)Mr. Bubu Pateh Jallow DirectorMr. Loues Bass Ceesay Assistant DirectorMr. Momodou Njie Principal HydrologistMr. Giran Corr Principal HydrogeologistMr. Paousman Jarju  Senior Scientific OfficerMr. Alhagi Jabi Works SuperintendentMr. John Peacock International Public Relation OfficerMr. Sheriff Bojang Motivator/ Western DivisionMr. Sheriff Mboge Motivator/ North Bank DivisionMr. Lamin Saidyleigh Senior Motivator/ Lower River DivisionMs. Isatou Bah Motivator/ Central River Division

Department of Community DevelopmentMr. Saikou Suwareh Community Development OfficerMr. Omar Ngum Community Development Officer

Commissioner ’s Office- North Bank Division (North Bank Division )

Mr. Momodou Soma Jobe Commissioner

Commissioner ’s Office – Central River Division (Western Division )

Major Mr. Momodou Bojang Commissioner

European Development Fund (EDF)Mr. Joseph A. de Bats Technical Advisor, EC/EDF Water Supply

ProgrammeMr. Moro Ceesay Co-ordinator

United Nations Capital Development Fund (UNCDF)Ms. Isatou Nasir Cham Program AnalystDr. Mopoi Nuwanyakpa ConsultantMr. Abdoulie B. Dibba Social Development Specialist/ RWSSP

Page 5: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A-5

Local Solar Maintenance CompanyMr.Reynold CarrolMr.Pap Malick Sey

Deputy General Manager, VM SolarGeneral Manager, Dabaakh Malick EnergyCentre

Mr. Omar M.M.Touray Managing Director, Gam-Solar Energy &Engineering Co., Ltd.

Mr. Lamin Bogang Financial Controller, Gam-Solar Energy &Engineering Co., Ltd.

NGO/Local ConsultantsMr.Edi A.Njie Managing Director, The Gambia

Engineering Consultancy Services Ltd.(GAMECS)

Mr.M.S.Gaye Chartered Surveyor, Cityscape AssociatesMr.Malamin O Sonko Sociologist, Afri ConsultMr.Foma A.M.Ceesay Sociologist, Afri Consult

Embassy of JapanMr. Tetsuro Kawaguchi CouncilorMr. Shinya Iwata First SecretaryMr. Shunya Sorimachi Second SecretaryMs. Yasuyo Tanii Special Assistant

JICA Senegal OfficeMr. Kiyofumi Konishi Resident RepresentativeMr. Ryuichi Kato Deputy Resident RepresentativeMr. Junji Yokokura Senior Technical AdviserMs. Kazumi Seino Assistant Resident RepresentativeMs. Ritsuko Yamagata Assistant Resident Representative

Page 6: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A- 7

APPENDIX 4 MINUTES OF DISCUSSIONS

(1) Minutes of Discussions on the Basic Design Study

(2) Minutes of Discussions on Explanation of the Draft Final Report

Page 7: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 9

Page 8: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 10

Page 9: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 11

Page 10: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 12

Page 11: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 13

Page 12: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 14

Page 13: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 15

Page 14: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 16

Page 15: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 17

Page 16: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 18

Page 17: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 19

Page 18: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 20

Page 19: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 21

Page 20: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 22

Page 21: APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon

A - 23