1. a pipe has a thickness designation of"40S". what does the "S" mean?
stainless steel
2. A pneumatic pressure test is to beconducted on a Normal Service pipingsystem. During pipe erection, how manyof the joint assemblies should beexamined?
100 %
3. A PQR test coupon with a shell thicknessof "T" can generally be used to qualify awall thickness on the WPS up to.
2T
4. A pressure test is always required: whenever theauthorizedinspectorbelieves oneis necessary
5. A propane piping system should beclassified as?
Class 1
6. A welder becomes unqualified when hehas not welded using the:
Process for 6months
7. According to ASME/ANSI B16.5 flangesfrom plate materials can only be usedfor:
Blind flanges
8. According to B31.3, a welder'squalification records from a previousemployer can:
Be accepted ifthe inspectorapproves
9. An inservice process pipe should beclassified as Class 1 when the % of H2Sexceeds:
3%
10. ASME/ANSI B16.5 requires flanges to be: marked withthe classrating.
11. Carbon steel materials are most likely tobe incorrectly substituted in.
a chromesteel pipingsystem.
12. Describe the 3G welding test position. Verticalgroove
13. During a direct visual exam of a pipeweld, the minimum light intensity shouldbe:
100footcandles
14. During a hydrotest, all joints should be: leftuninsulated
15. During a pipe repair, preheat issubstituted for the required PWHT.What is the minimum preheattemperature.
300 F
16. During an API 570 pipe repairs, whichwelding discontinuity is alwaysunacceptable?
Cracks andInadequatefusion
17. During pipe fabrication who hasoverall responsibility forcompliance with the code?
owner/user
18. During welding, non-esentialvariables:
Must be recorded onlyon the WPS and mustbe followed by thewelder.
19. Excessive repairs to pumpbearings may be a result of:
excessive forcescoming from thermalgrowth in the attachedpiping system
20. Flange bolts are unacceptable ifthe bolt threads do not extend.
inside the nut within 1thread of the nut face
21. Flange leaks in certain fluids cancause:
bolts to crack andcorrode
22. for welded pipe, the normalthickness of under-tolerance is?
.010 or 10 mils
23. Generally socket-welded pipe isnot used for nominal pipe sizesabove:
2 inches
24. Generally, raised face flangesshould have a surface finish of:
125-250 micro- inches
25. Graphitization of carbon steelsbegins to occur when metaltemperatures exceed:
800 F
26. Heat Tracing could causecracking in carbon steel pipingwhich is in:
Caustic service
27. In severe refinery services whichtype of pipe is normally used?
seamless
28. Liquid thermal relief valvesshould be set at a pressure nothigher than:
120 %
29. Loose or broken anchor bolts atpipe supports are most easilydetected by:
hammer testing
30. Per B31.3 how much of thefabrication should be visuallyexamined for a pipe in severecyclic service:
100 %
31. Per B31.3, how much RT isconducted on circumferentialwelds of a pipe in normalservice.
10%
32. Preheat should never besubstituted for PWHT if:
The PWHT wasdesigned to preventenvironmentalcracking
API 570 practice testStudy online at quizlet.com/_e5u77
33. Pressure applied inside a pipecreates stress in the pipe wall.These stresses are highest onwhich weld orientation?
longitudinal weld
34. Seal welding pipe threads: may be used toprevent leaks
35. The corrosiveness of soils can bedetermined by measuring thesoils:
Resistivity
36. The material verification programspecified by API 578 covers:
only pressurecontainingcomponents.
37. The RT procedure used for a piperepair must conform to therequirements of:
Sec 5
38. Thickness measurements aresuggested at pipefittings since:
directional changesgenerally createincreased turbulence.
39. What do you call a groove in theparent metal at the toe of a weld?
undercut
40. what is the interval for thicknessmeasurements on a class 1 pipingsystem?
lesser of 5 years orhalf life of the pipe
41. What is the minimum holdingtime for all pressure tests onpiping?
10 mins
42. When a relief device or valve isremoved for repair, the inspectorshould:
inspect the inside ofthe inlet and outletpiping where thevalve was removed.
43. When calibrating a UTinstrument, that has a delay linewith single element unit, use:
At least 2 test blockswith thicknessesnear the max andmin. to be examined.
44. When can radiography not beused to qualify a welder?
when using theGMAW process withthe short circuit mode
45. When fabricating pipe, unknownmaterials:
Should never be used(except for doorstops)
46. When performing preheat priorto welding, the preheat zone mustextend how far beyond the edge ofthe weld
1 inch
47. When performing soil-to airinspections on uncoated lines, itis recommended to excavate thesoil:
6-12"
48. when qualifying a weld procedurethe esential variables must:
be recorded on boththe WPS & PQR
49. When welding together piping componentsof different thicknesses, the thicker partshould be trimmed with a:
30 degreetaper.
50. Who has the responsibility to determinethe extent of PMI performed?
owner/user