APHYD226

download APHYD226

of 8

Transcript of APHYD226

  • 8/12/2019 APHYD226

    1/8

    Site Name: BOGGULAKUNTA

    Site ID : APHYD226 2/27/2014

    BSC : Redhills

    Sl.No Description OK/NO/NA Remarks

    1 Entry to Site OK

    2 Security availability NO

    3 Access to lifts (if any) NO

    4 Verify site registers & log books and update OK

    5 Site Premises cleanliness OK

    6 Any other issues

    Sl.No Descr pt on OK/NO/NA Remarks

    1 Aviation lamps working OK

    2 LA Pole verticality OK

    3 LA & supply cabling (physical look) OK

    4 Door, Lock & Stopper Operation OK

    5 Room Temperature & Humidity OK

    6 AC functioning OK

    7 Fire fighting Eqpt. OK

    8 Bulk head lamp OK

    9 All lights inside the shelter OK

    10 Functinality of all external alarms from the site OK

    11 Rain protection NO

    12 Cleanliness of equipment room OK

    13 Any other issues

    Sl.No Description OK/NO/NA Remarks

    1 Cooling effect OK

    2 Auto / Manual mode Controller OK

    3 Room Temperature OK

    4 Visual inspection of AC cabling OK

    5 PMU functioning OK

    6 Auto / Manual mode functioning of PMU OK

    7 Visual inspection of AC cabling OK

    8 Earth pits properly maintained OK

    9 Earth to Neutral Voltage (Measured value) OK

    10 EB Power and DG Power (Measured Value) OK

    11 DG Functioning and Condition OK

    12 Electricity meter functinality OK

    13 Power plant internal alarms OK

    14 Current reading OK

    15 Voltage reading OK

    16 Battery bank capacity OK

    17 Cell voltage (after discharging the battery 1/2 hour) OK

    18 Visual inspection of Battery bank & Power plant OK

    19 Check each rectifier Functioning OK

    20 LVD setting done(LVD1/LVD2) OK

    21 Any other issues

    Sl.No Description OK/NO/NA Remarks

    1 BTS Configuration OK

    2 Check for input voltage OK

    3Check for Alarms

    OK4 Check for LED status OK

    5 Cabinet door locking OK

    Air conditioner & PowersUtilities

    PM Report

    Basic Details

    Infra Utilities

    BTS

  • 8/12/2019 APHYD226

    2/8

    11 RF Cabling physical look OK12 Any other issues

    Sl.No Description OK/NO/NA Remarks /

    1 TX Protection(1+0/1+1/ring) OK

    2 Hop on NMS OK3 Check for input voltage OK

    4 Check for Alarms OK

    5 Performance Moniter OK

    6 Check the logs OK

    7 Check for alarm extension if applicable OK

    8 Check for node visibility on NMS OK

    9 Check for patch code connection OK

    10 Cleanliness of DDF OK

    11 Whether DDF data updated ? OK

    12 Check for dust accumulation, if required clean the filter OK

    13 MW Antenna & its pole Physical check OK

    14 Labelling done(pole/cable) OK15 MW Cabling physical look OK

    16 Receive level issue OK17 Any other issues

    Far End ID Des gne - Tx Power Rx eve Achieved Rx Level Current-Tx Pow

    Punch Points

    NON DG site

    BSS Engineer Name : Signature

    P.RAVIKUMAR

    Microwave Radios

  • 8/12/2019 APHYD226

    3/8

    Voltage Float 0 hours 0.5 hour 1 hour 1.5 hour 2 hour 2.5 hours 3 hours Voltage Float 0 hours 0.5 hour 1 hour 1.5 hour 2 hour

    1 1

    2 2

    3 3

    4 45 5

    6 6

    7 7

    8 8

    9 9

    10 10

    11 11

    12 12

    13 13

    14 14

    15 15

    16 16

    17 17

    18 1819 19

    20 20

    21 21

    22 22

    23 23

    24 24

    Total Total

    Panel Volt Panel Volt

    Amps Amps

    Engineer Name :

    Battery Bank 2

    DISCHARGE TEST

    Battery Bank 1

    Site Name:

    Site ID:

    BSC:

    Battery Capacity :

    Rectifier Capacity:

  • 8/12/2019 APHYD226

    4/8

    Signature :

  • 8/12/2019 APHYD226

    5/8

    2.5 hours 3 hours

  • 8/12/2019 APHYD226

    6/8

  • 8/12/2019 APHYD226

    7/8

  • 8/12/2019 APHYD226

    8/8

    Seq No. Alarm Status Loop Simulation

    1 LLOP/HCT/Alternator Fault YES / NO

    2 Mains Failure YES / NO

    3 DG ON YES / NO

    4 Low Fuel YES / NO

    5 DG Fails to start YES / NO

    6 DG Fails to stop YES / NO

    7 Rectifier Fail alarm YES / NO

    8 Mains Failure/Site on Battery YES / NO YES

    9 Low Battery Voltage YES / NO10 Battery Fuse Failure YES / NO

    11 AC-1 Faulty YES / NO NO

    12 AC-2 Faulty YES / NO NO

    13 Both AC-1 & AC-2 faulty YES / NO NO

    14 Fire & Smoke YES / NO

    15 Door Open YES / NO

    16 High Temperature YES / NO

    SITE ENGINEER :P.RAVIKUMAR

    External Alarm Verification

    SITE NAME:

    SITE ID:

    OMC ENGINEER :