AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people...
-
Upload
marjory-blankenship -
Category
Documents
-
view
213 -
download
0
Transcript of AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people...
![Page 1: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/1.jpg)
AP2 Line & Debuncher Studies Status
Keith GollwitzerAntiproton SourceJanuary 9, 2006
Many people involved with providing the hardware and software that was commissioned as well as performing
the beam studies
AP2
Debuncher
![Page 2: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/2.jpg)
Gollwitzer -- Jan 9, 2006
Story Starts Seven Weeks Ago…
• McGinnis at the All Experimenters’ Meeting was describing a two week block of pbar studies
• TeVatron breaks• Scramble to find people for Thanksgiving
weekend studies• Finished preparatory studies• Started on the designed study plan• Owl shifts: started studies for the Debuncher to
Accumulator (D/A) transfers
![Page 3: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/3.jpg)
Gollwitzer -- Jan 9, 2006
One of the several preparatory items that was done before Thanksgiving
Attempt to remove RF cavities effect on reverse proton injection
![Page 4: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/4.jpg)
Gollwitzer -- Jan 9, 2006
Statistics
• Length of Time: Tue Nov 22 to Thu Dec 15• Number of Elog shift pages: 72• Number of Recorded Debuncher Orbits: 857• Number of Recorded AP2 Orbits: 775• Number of Commissioned items: 11• Number of Major Accomplishments: 6+½ +½• Number of Confusions (at the time): • Number of Other Things Done: 6+1• Number of “Next Times” Known Items: 9
![Page 5: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/5.jpg)
Gollwitzer -- Jan 9, 2006
AP2
Debuncher
Commissioned Items
• Debuncher Reverse Proton Turn-By-Turn system
• Debuncher Reverse Proton partial turn extraction up AP2
• Debuncher Component Centering• Debuncher Orbit-Quad offset• AP2 Orbit-Quad offset• AP2 Beam Line Correction• One-Shot Time-line for acquiring
Debuncher beam• Admittance measurement from data-logger• “Deb Heat Rev p’s to AP2” aggregate• AP2-Debuncher Injection region setup • Auto-tune 120 GeV orbit of P1-P2-AP1
![Page 6: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/6.jpg)
Gollwitzer -- Jan 9, 2006
AP2
Debuncher
Scheduled Studies Accomplishments
• Lattice measurements for Debuncher and AP2
• Determine Debuncher Orbit/BPM-Quad offsets
• Corrected Debuncher Vertical Orbit to Quad Centers
• Centered Debuncher Components about orbit
• Determine AP2 Orbit/BPM-Quad offsets• Set Orbit, Stands and Settings for AP2-
Debuncher Injection Region• Corrected AP2 Orbit to near Quad Centers• Installed AP2 lattice that matches to
current Debuncher Lattice
Items ½ completed
![Page 7: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/7.jpg)
Gollwitzer -- Jan 9, 2006
Change in Debuncher Vertical Orbit
• Determined Orbit-Quad center offsets• Steered to center of quads• Center components about orbit using motorized
stands
![Page 8: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/8.jpg)
Gollwitzer -- Jan 9, 2006
Change in AP2 Stacking Orbit
![Page 9: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/9.jpg)
Bottom – December BPM Positions – Orbit Auto-Correction active
Top - November BPM Positions – NO orbit correction & drifting
AP1 Horiz. AP2 Vert
H
H
V
V
5mm
10m
m
10m
m
3hr
![Page 10: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/10.jpg)
Gollwitzer -- Jan 9, 2006
Stacking Rate is Better
Compiled by P.Derwent
Best stacking hour for each day
Average stacking rate per stacking cycle (includeseffects of complex downtime)
Stacking record
17.46mA/hr (Dec 29, 2005)
![Page 11: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/11.jpg)
Gollwitzer -- Jan 9, 2006
Weekly Statistics
From E. Harms200
1
200
6
Studies Period Increased Increased by ~15%by ~15%
![Page 12: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/12.jpg)
Gollwitzer -- Jan 9, 2006
Other Items Done
• Replaced failed Li Lens• Installed Collimator in Target Station• Survey of AP2-Debuncher Injection
Region• Commissioned Ramped Devices in AP1• D/A Beam Based Alignment• Accumulator aperture: Injection channel &
orbit
• Stacking tune-up
![Page 13: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/13.jpg)
Gollwitzer -- Jan 9, 2006
Next Steps
• Investigate AP2 lattice• Correct Debuncher Horizontal
Orbit• Center Debuncher Components• Install new Debuncher Lattice• Install matched AP2 Lattice• Remove Lens Steering• Steer AP2 on apertures• D/A Orbit• Accumulator Orbit and Aperture
AP2
Debuncher
![Page 14: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/14.jpg)
Gollwitzer -- Jan 9, 2006
New Shutdown Items
AP2
Debuncher
• Identified Debuncher limiting aperture to be the Transverse Schottky’s– New larger aperture pickups to be
installed
• Identified the need for four dipole trims in the AP2 beam line– Two vertical trims to set position and
angle going into the AP2 bend– One trim in each plane to set position
and angle prior to AP2 downward bend to Debuncher
![Page 15: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/15.jpg)
Gollwitzer -- Jan 9, 2006
Summary-1• AP2
– Defined a better orbit based on quad centers– Installed matched lattice to Debuncher– Identified vertical scraping in main AP2 bend region– Set Injection Region orbit and motorized stand positions– Need to work on
• Center orbit vertically in main AP2 bend region • Upstream orbit• Lattice
• Debuncher– Defined the vertical orbit based on quad centers– Centered components on motorized stands about orbit– Identified next limiting aperture to be transverse Schottkys– Need to work on
• Center orbit horizontally on quad centers• Center components on motorized stands about orbit• Lattice work to help beam size in tight apertures
• Antiproton Accumulation has increased by 15%
![Page 16: AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.](https://reader036.fdocuments.us/reader036/viewer/2022062805/5697bfec1a28abf838cb860c/html5/thumbnails/16.jpg)
Gollwitzer -- Jan 9, 2006
Summary-2
• D/A and Accumulator Injection Orbit– Next stacking limitation
• D/A orbit needs to be centered in quads• Measured Accumulator admittances are <75% of what were
measured at the beginning of Run II
• Lessons Learned from 3 Weeks of Studies– Configuration control– Focus– Feedback of the effect of any one change on
performance• Applying the Lessons Learned
– Break into 1 to 2 day study periods• Will request 3 or 4 such periods before the long shutdown