Ap Project Interior Engineering

15
AP PROJECTS INTERIOR ENGINEERING w ww.approjects.org www.indiamart.com/ap-projects Mail :[email protected]

description

No More ArchitectsNo more Interior DesignersThis is simple Interior Engineering

Transcript of Ap Project Interior Engineering

Page 1: Ap Project Interior Engineering

AP PROJECTSINTERIOR ENGINEERING

w ww.approjects.orgwww.indiamart.com/ap-projects

Mail :[email protected]

Page 2: Ap Project Interior Engineering

SERVICES

PROJECT MANAGEMENT CONSULTANCY

INTERIOR ENGINEERING

CONSTRUCTION ENGINEERING

Mail :[email protected]

Page 3: Ap Project Interior Engineering

MR. ARVIND PUROHIT

BACK BONE

(BE, Mumbai Univ. 1975)

1. HOME TOWN (PANTALOON RETAIL (INDIA) LTD)2. EXPO PROJECTS3. HYDROCARBON INDUSTRIES4. WATER INDUSTRYAS A PROJECT MANAGER,PROJECT HEAD,GM PROJECTS ETC.

40 YEARS EXPERIENCE IN PROJECT MANAGEMENT IN BOTH CONSTRUCTION AND INTERIORS IN VARIOUS COUNTRIES

Mail :[email protected]

Page 4: Ap Project Interior Engineering

VISION

TO STABLISH NEW CONCEPT IN THE MARKET AS INTERIOR ENGINEERING

BEING PIONEER IN PROJECT MANAGEMENT SOLUTION

A WIDE PLATFORM FOR ENGINEERING SOLUTIONS

TO STABLISH TRIPLE POINT OF COST ,QUALITY AND TIME

Mail :[email protected]

Page 5: Ap Project Interior Engineering

INTERIOR ENGINEERING

PROJECT INTRODUCTION

DESIGN

IMPLEMENTATION

Mail :[email protected]

MARKET STUDY COMPETITORS

CONCEPTION

ENGG.DESIGN PRICE

PROJECT DYNAMICS

QUALITY TIME

IMPLEMENTATION

Page 6: Ap Project Interior Engineering

PROJECT INTRODUCTION

ROXTON’S PRODUCT

MARKET STUDY TO DESIGN SHOW ROOM FOR ROXTON

VALUE ENGINEEERING FOR ROXTON

COMPETITORS ROXTON HAS VERY TOUGH COMPETIOTRS IN THE MARKET

ROXTON REQUIRES MORE FOOTFALL OF CUSTOMERS

CUSTOMER AGE GROUP IS 18 YEARS OLD TO 40 YEARS OLD

THE SHOWROOM REQUIRES A ROUGH AND ATTRACTIVE LOOK

THE COST CUTTING HAS TO BE LESS BY 30% WITH EXISTING ONE & MANY MORE….

ROXTON SPENDS ABOUT 20 LACS ON PER STORE

SHOWROOM HAS ONLY STATIC AND FORMAL LOOK

BREAK UP OF B.O.Q. WITH DETAIL COST ANALYSIS

POINTING TOWARDS HIDDEN COST DUE TO POOR DESIGN

Mail :[email protected]

Page 7: Ap Project Interior Engineering

DESIGN

3D-MODELINGSOFTWARES

CATIA

COST ANALYSIS

COST CUTTING OF ALMOST 50%

STATIC + DYNAMIC 3D-MODELING AND DESIGN

PROPOSED AN AUTO-FOCUSED MODIFIED BIKE ON CEILING

A ROUND S.S. GANDOLA AT THE CENTRE

A SEMI ROUND CASH COUNTER AT THE BACK OF STORE

A ROUGH AND DARK LOOK TO OVER ALL STORE

M/S/ POWERDE COATED FIXTURES

LIGHTING WITH CALCULATED INTENSITY

IRONICALLY POSTIONING OF MIRRORS

SYMMETRICAL PLACING OF DUCTING AND FIREFIGHTING PIPIES

A VERY ATTRACTIVE BLUE ILLUMINATED TRANSPARENT LOGO

Mail :[email protected]

Page 8: Ap Project Interior Engineering

COSTDIFFERENCE

02468

1012141618

PREVIOUS DESIGNAP PROJECTS DESIGNCOST

IN LACS

Mail :[email protected]

Page 9: Ap Project Interior Engineering

FOOT FALL IN SHOWROOM

FOOT FALLIN %

THE ABOVE REPORT IS BASED ON A SURVEY CONDUCTED FOR A MONTH IN JALANDHAR VERIFIED AND APPROVED BY ROXTON

Mail :[email protected]

0

20

40

60

80

100

ROXTON'S PREVIOUS

DESIGN

AP PROJECTS DESIGN

FOOT FALL IN THE MALL

FOOT FALL IN OTHER SHOPS

FOOT FALL IN ROXTON'S STORE

Page 10: Ap Project Interior Engineering

DESIGN

3D - MODELING SOFTWARES

CATIA

COST ANALYSIS & VALUE ENGINEERING

DESIGNING YOUR DREAMS……..

ITEM QTY HARDWARE + FEVICOL 10%

OVER HEAD10%

LABOUR35% TOTAL RATE IN

Rs.AMOUNT

IN Rs.NEW AMOUNT

IN Rs.NEW RATE

IN Rs.18mm

PLY85 SFT 8.5 8.5 29.75 131.75 45 5930 500638

8MM GLASS

12SFT 1.2 1.2 4.2 18.6 165 3069 1860100

LAMINATE

2 NOS 2 1000 2000 1600800

PAINT 1 LTR

1LTR 290 290 200200

TOTAL 11289 8666

ONLY AN EXAMPLEMail :[email protected]

Page 11: Ap Project Interior Engineering

DESIGNING SOP

SITE SURVEY

SCHEDULING THE PROJECT

RESPONSIBILITY MATRIX AND ORGANOGRAM

STANDARD & UNIQUE REPORTING METHOD

DOCUMENTATION

PROJECT CLOSING REPORT

IMPLEMENTATION

Mail :[email protected]

Page 12: Ap Project Interior Engineering

PROJECT PLANNING AND SCHEDUING

CUSTOMER SATISFACTION

QUALITY

TIME MANAGMENT

PLANING

18-4 19/4 20/1 21/4 22/4 23/4 24/4 25/4 26/4 27/4 28/4 29/4

Material N Tool

Manpower

AP.O.P & CIVIL WORK PLAN

PLASTERING

B.O.Q.

CIVIL1,CIVIL2

TILINGB.O.

CIVIL1,CI

1 ACTUAL

Marking as per dwg, PLAN

Line

P.O.P.(PE1,P

2 ACTUAL

Griding PLAN

B.O.Q.

PE1,PH1,PH2

3 ACTUAL

Fixing of Gypsum sheet as per dwgPLAN

Drill m

PE1,PH1,PH2

4 ACTUAL

Punning of Gypsum sheetPLAN

scrature

PE1,PH1,

PH2

5 ACTUAL

T

ADD.-THANE-RAM MARUTI ROAD

Resourc

Delay due to land lord

Delay due to architectDelay due to Roxton

Planned activiteis

On scheduleDelay due to contractor

COLOUR CODES

QUALITY

TIME

COST

Mail :[email protected]

Page 13: Ap Project Interior Engineering

CREATIVITY IN CONCEPTION

EFFICIENCY IN PROJECT DYNAMICS

COMMITMENT IN IMPLEMENTATION

WE PROMISE YOU

Mail :[email protected]

Page 14: Ap Project Interior Engineering

CONCEPTION

WE SIMULATE THE WORKING OF THE STAKEHOLDERS TO CREATE A CONTEXTUALLY SATISFYING ENVIRONMENT.

MR.B.V. RAGHAVARCHITECT EXP- 5 YEARS

TEAM

SURESH TIWARIB.E. MECH EXP- 5 YEARS

PROJECT DYNAMICS

WE ENGINEER THE EFFICIENCY OF TIME AND MONEY TO ACHIEVE AN EQUILIBRIUM BETEEN THE BUILDER AND THE USER.

WE CARVE OUT A WORKING MACHINERY THAT CARVES OUT YOUR INTERIOR SPACES

ALOK CHOUDHARI B.E. MECH EXP-15 YEARS

IMPLEMENTATION

Mail :[email protected]

Page 15: Ap Project Interior Engineering

Looking forward to have a good Business Relation.w ww.approjects.org

www.indiamart.com/ap-projectsMail :[email protected]

NO MORE ARCHITECTSNO MORE INTERIOR DESIGNERS

THIS IS SIMPLE INTERIOR ENGINEERING

THANK YOU