AOR 41-82

122
Contractor's profit 10% Overhead expenses 3.50%  VAT 4.50% Foreman Tk. 250.00 Each Head mason Tk. 180.00 Each Mason Tk. 150.00 Each Skilled labour /Helper Tk. 120.00 Each Ordinary labour Tk. 100.00 Each Rod binder Tk. 180.00 Each Machine operator Tk. 160.00 Each Diesel operated rig operator Tk. 300.00 Each Helper to diesel operated rig operator Tk. 150.00 Each Plumber Tk. 160.00 Each Carpenter Tk. 160.00 Each Lime Tk. 20.00 kg. Bamboo Tk. 4.00 rft. Bailing-out water Tk. 1,000.00 day  Palisading Tk. 17.08 sft. Bamboo driving Tk. 6.63 rft. G.I. wire Tk. 50.00 kg. Sal ballah Tk. 30.00 rft. Nails and gazals etc Tk. 40.00 kg.  Wooden plank Tk. 360.00 cft. 40 grade rod Tk. 22,660.00 ton Bricks Tk. 3,100.00 % 0 Nos. Fine sand Tk. 625.00 % cft. 1.2 F.M sand Tk. 990.00 % cft. 2.5 Sylhet sand Tk. 1,330.00 % cft. Cement Tk. 250.00 bag  Form work place & remove Tk. 6.00 sft. Breaking brick chips Tk. 550.00 % cft. Bitumenous coating Tk. 150.00 % sft. Crushed stone chips Tk. 6,500.00 % cft. Scaffolding Tk. 3.00 sft. 1/2" plaster on walls (1:4) Tk. 6.95 sft. Marble dust / powder 12.00  Tk. Per kg. Concrete mixer machine 500.00  Tk. Per day Concrete vibrator 385.00  Tk. Per day Fuel & lubricant for mixer machine, Vibrator, um etc. 350.00  Tk. Per day  Water pump for concret ing or similar purpo se 150.00  Tk. Per day Supplying & fixing Rupban or equivalent sheet and hessian tape (where necessary) for making water- ti ht s uff ici ent l  Tk. 1.00 Per sft. Bamboo props in/c top supports 40.00  Tk. Each Salballah props in/c top supports 350.00  Tk. Each 2" dia M.S. pipe 80.00  Tk. rft. 1.5" dia M.S. pipe 60.00  Tk. rft. 2" dia G.I. pipe Tk. 80.00 rft. BASIS AND CONSIDERATION

Transcript of AOR 41-82

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 1/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 2/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 3/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 4/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 5/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 6/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 7/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 8/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 9/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 10/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 11/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 12/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 13/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 14/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 15/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 16/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 17/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 18/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 19/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 20/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 21/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 22/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 23/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 24/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 25/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 26/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 27/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 28/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 29/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 30/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 31/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 32/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 33/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 34/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 35/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 36/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 37/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 38/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 39/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 40/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 41/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 42/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 43/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 44/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 45/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 46/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 47/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 48/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 49/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 50/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 51/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 52/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 53/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 54/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 55/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 56/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 57/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 58/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 59/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 60/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 61/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 62/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 63/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 64/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 65/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 66/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 67/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 68/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 69/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 70/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 71/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 72/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 73/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 74/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 75/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 76/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 77/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 78/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 79/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 80/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 81/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 82/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 83/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 84/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 85/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 86/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 87/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 88/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 89/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 90/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 91/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 92/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 93/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 94/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 95/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 96/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 97/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate51 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder with cement conforming to BDS 232 & ASTM standard, bestquality coarse sand [50% quantity of best local sand (F.M. 1.2) and 50%quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5] and 20 mmdown well graded picked jhama brick chips including breaking chips andscreening, making, placing in position, making shuttering water-tight leak-proof properly, placing of rod in position; mixing the aggregates withmixer machine, casting in forms, compacting by vibrator machine andcuring at least for 28 days, removing centering shuttering etc. allcomplete including cost of water, electricity, testing & other charges asper direction of the engineer-in-charge.In Tie beam and lintel (Rate excluding the cost of reinforcementand its fabrication) .

a Ground floor cum Tk. 6,565.00

b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.7752 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder with cement conforming to BDS 232 & ASTM standard, bestquality coarse sand [50% quantity of best local sand (F.M. 1.2) and 50%quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5] and 20 mmdown well graded picked jhama brick chips including breaking chips andscreening, making, placing in position, making shuttering water-tight leak-proof properly, placing of rod in position; mixing the aggregates withmixer machine, casting in forms, compacting by vibrator machine andcuring at least for 28 days, removing centering shuttering etc. allcomplete including cost of water, electricity, testing & other charges asper direction of the engineer-in-charge.In Tee beam, Ell Beam, Rectangular Beam. (Rate excluding thecost of reinforcement and its fabrication).

(Exposed breadth and width of rib to be measured only).a Ground floor cum Tk. 6,587.00b Add for each additional floor up to 5th floor. cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.77

ahsan/aqa (59)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 98/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate53 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder with cement conforming to BDS 232 & ASTM standard, bestquality coarse sand [50% quantity of best local sand (F.M. 1.2) and 50%quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5] and 20 mmdown well graded picked jhama brick chips including breaking chips andscreening, making, placing in position, making shuttering water-tight leak-proof properly, placing of rod in position; mixing the aggregates withmixer machine, casting in forms, compacting by vibrator machine andcuring at least for 28 days, removing centering shuttering etc. allcomplete including cost of water, electricity, testing & other charges asper direction of the engineer-in-charge.In Roof slab of all type, cantilever slab and drop panel, excludingfloor slab of ground floor at plinth level. (Rate excluding the costof reinforcement and its fabrication).

a Ground floor. cum Tk. 6,623.00b Add for each additional floor up to 5th floor. cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor for 10th floor & avobe cum Tk. 83.7754 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder with cement conforming to BDS 232 & ASTM standard, bestquality coarse sand [50% quantity of best local sand (F.M. 1.2) and 50%quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5] and 20 mmdown well graded picked jhama brick chips including breaking chips andscreening, making, placing in position, making shuttering water-tight leak-proof properly, placing of rod in position; mixing the aggregates with

mixer machine, casting in forms, compacting by vibrator machine andcuring at least for 28 days, removing centering shuttering etc. allcomplete including cost of water, electricity, testing & other charges asper direction of the engineer-in-charge.In sunshades, cornices, railings drop walls, Louvers and fins:average 62 mm to 87 mm thick. (Rate excluding the cost ofreinforcement and its fabrication).

a Ground floor. sqm Tk. 720.00b Add for each additional floor up to 5th floor sqm Tk. 9.88c Add for each additional floor from 6th floor to 9th floor. sqm Tk. 14.83d Add for each additional floor 10th floor & above. sqm Tk. 19.77

ahsan/aqa (60)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 99/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate55 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder with cement conforming to BDS 232 & ASTM standard, bestquality coarse sand [50% quantity of best local sand (F.M. 1.2) and 50%quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5] and 20 mmdown well graded picked jhama brick chips including breaking chips andscreening, making, placing in position, making shuttering water-tight leak-proof properly, placing of rod in position; mixing the aggregates withmixer machine, casting in forms, compacting by vibrator machine andcuring at least for 28 days, removing centering shuttering etc. allcomplete including cost of water, electricity, testing & other charges asper direction of the engineer-in-charge.In Stair case slab and steps. (Rate excluding the cost ofreinforcement and its fabrication).

a Ground floor cum Tk. 6,516.00

b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor 10th floor & above cum Tk. 83.77

56 Reinforced cement concrete works (1:1.5:3) using steel material asshutter, having minmum cylinder crushing strength 25 Mpa at 28 dayson standard cylinder, with cement conforming to BDS 232 & ASTMstandard, best quality coarse sand [ Sylhet sand or coarse sand ofequivalent F.M. 2.5], 20 mm down well graded crushed stone chips in/cbreaking chips and screening through proper sieves, making, placing inposition the centering shuttering, M.S. sheets, steel forms, 40 mm M.S.

pipes/50 x 40 mm adjustable pipes (jug pipes) with 150 x 150 x 6 mmbase plate having pipe wall thickness 2.5 to 4.5 mm, making shuttering

water-tight, placing of rod in position; concrete mixing with mixermachine, casting in forms, compacting by vibrator machine and curing atleast for 28 days, removing centering shuttering, all complete includingcost of water, eletrcity, testing of materials and concrete & other chargesas er direction of the en ineer-in-char e.

a In Individual and combined footing of column. cum Tk. 5,805.00b In raft/mat/floor slab at plinth level. cum Tk. 5,630.00c In Foundation beam cum Tk. 6,350.00d In pedestal, column, capital lift wall and wall:i) Below plinth Level and in Ground floor. cum Tk. 8,454.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77e In Tie Beam and lintel :

i) Below plinth Level and in Ground floor. cum Tk. 7,529.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36

RCC (1:1.5:3) WITH STONE-CHIPS & STEEL SHUTTER

ahsan/aqa (61)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 100/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rateiii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77f In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth

and width of ribs to be measured only).

i) Ground floor. cum Tk. 7,839.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77g In roof slab of all types, cantilever slab and drop panels (excluding

floor slab of ground floor at plinth level).

i) Ground floor. cum Tk. 8,335.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above

cum Tk. 83.77h In sunshade, cornice, railing drop wall, louver and fins (Average 62mm to 87 mm thick).

i) Ground floor. sqm Tk. 695.00ii) Add for each additional floor up to 5th floor sqm Tk. 9.88iii) Add for each additional floor from 6th floor to 9th floor sqm Tk. 14.83iv) Add for each additional floor for 10th floor & above sqm Tk. 19.77i In stair case slab and step.

i) Ground floor. cum Tk. 7,845.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor

cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77j In Waffle or Ribbed floor/roof slab.i) Ground floor. cum Tk. 10,777.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77

ahsan/aqa (62)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 101/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate56M32 Reinforced cement concrete works (1:1.25:2.5) with approved high

range admixture using steel material as shutter, having minmumcylinder crushing strength 32 Mpa at 28 days on standard cylinder,

with cement conforming to BDS 232 & ASTM standard, best qualitycoarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.5], 20 mmdown well graded crushed stone chips in/c breaking chips and screeningthrough proper sieves, making, placing in position the centeringshuttering, M.S. sheets, steel forms, 40 mm M.S. pipes/50 x 40 mmadjustable pipes (jug pipes) with 150 x 150 x 6 mm base plate having pipe

wall thickness 2.5 to 4.5 mm, making shuttering water-tight, placing ofrod in position; concrete mixing with mixer machine, casting in forms,compacting by vibrator machine and curing at least for 28 days,

,adixture and mix design. Payment of these components to bemade on separate items: ref. to item No. 68, 58(c) and 413 (Cement

a In Individual and combined footing of column. cum Tk. 6,055.00b In raft/mat/floor slab at plinth level.

cum Tk. 5,880.00c In Foundation beam cum Tk. 6,600.00d In pedestal, column, capital lift wall and wall:i) Below plinth Level and in Ground floor. cum Tk. 8,705.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77e In Tie Beam and lintel :i) Below plinth Level and in Ground floor. cum Tk. 7,779.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77f In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth

and width of ribs to be measured only).

i) Ground floor. cum Tk. 8,090.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77g In roof slab of all types, cantilever slab and drop panels (excluding

floor slab of ground floor at plinth level).

i) Ground floor. cum Tk. 8,586.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36

iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77h In stair case slab and step.i) Ground floor. cum Tk. 8,095.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77i In Waffle or Ribbed floor/roof slab.

ahsan/aqa (63)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 102/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Ratei) Ground floor. cum Tk. 11,028.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77

ahsan/aqa (64)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 103/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 104/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 105/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 106/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate58(d) Water-proofing work in masonry or concrete surface with sand-

cement mortar mixed with specified admixure (supplied from authorizedlocal agent or from manufacturer comply with ASTM/BS/IS requirements,confirming current compliance of the admixture to specification requirements like

physical properties, uniformity and equivalence in composition, performancerequirements, delivered in sealed containers having and confirming plainly marked the

proprietory name of the admixture type under this specification, net weight & orvolume, manufacturing and expiry date, shelve life, non aggressiveness to environmentand metals in concrete etc.) under the strict accordance with manufacturerrecommendations/instructions and providing safety provisions in allres ect etc. on sound firm surfaces all com lete includin cleanin the sqm Tk. 272.00

59 Boring/drilling for cast in situ pile up to the required depth and dia with minimum 6 m long temporary steel casing, true to vertical,providing bentonite slurry and maintaining water level in the hole,

washing the hole for at least 30 minutes, clean the bore-hole and makethe bore- hole ready for placing steel cage and concreting including hirecharge of rig set with winch machine, tripoid stand, trimie pipe, cost offuel, lubricant, mobilisation, demobilisation, maintainance, spares,

a 400 mm dia A Up to 20 m rm Tk. 339.00B Add extra cost for each additional meter be ond 20 meter u to 30 m rm k. 14.00b 450 mm dia

A u to 20 m rm . .B Add extra cost for each additional meter be ond 20 meter u to 29m rm . .c 500 mm dia

A u to 20 m rm k. 438.00B Add extra cost for each additional meter be ond 20 meter u to 29m rm . .d 550 mm dia

A up to 20m rm Tk. 490.00B Add extra cost for each additional meter beyond 20 meter up to 29m rm Tk. 25.00e 600 mm dia

A up to 20m rm Tk. 508.00B Add extra cost for each additional meter beyond 20 meter up to 29m rm Tk. 27.0060 Reinforced cement concrete works (1:1:5.3) in bore-hole for

making cast-in-situ pile having having minimum compressive strength21 Mpa at 28 days on standard cylinder with cement conforming to BDS232 & ASTM standard mixed with best quality coarse sand [Sylhet sandor coarse sand of equivalent F.M.2.5], 20 mm down well graded crushedstone chips including breaking chips, screening through proper sieves,making, placing re-bar cage in position, placing & removing tri-pod as

per requirement, pouring the concrete in bore-hole with the help of atremie pipemaintaining the tremie pipe immersed in concrete by at least1 meter throughout the period of concreting, maintaing required slump

cum Tk. 6,512.00

9. PILE WORK

ahsan/aqa (68)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 107/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate61 Providing and making point welding at contact point of the spiral

binders at reasonable intervals with the main reinforcements by electricarc welding for construction of cast in situ bored pile carefully withhighly oxidised electrodes making the points prominent as per directionof the engineer-in-charge. The rate is inclusive of cost of all materials,labour tools lants and e ui ments cost of ower mobilisation &

per

point Tk. 1.7862 Providing and making welded splice by welding of minimum 300

mm length at the lap of main reinforcement in re-bar cage to be placedin bore-hole where necessary by electric arc welding with highly oxidisedelectrodes making the joint prominent as per direction of the engineer-in-charge. (The rate is inclusive of all materials labour, tools plants and allequipments. Cost of power, mobilisation & demobilisation of the sameetc. complete in all respects.) per

inch Tk. 2.3763 Labour for breaking head of hardened cast in situ bored

pile/precast pile up to a required length by any means but withoutdamaging the rest and removing the dismantled materials such asconcrete to a safe distance including scraps and cleaning concrete fromsteel/M.S. rods, straightening & bending of pile bars, preparation andmaking platform where necessary, carrying, all sorts of handling, stackingthe same properly after clearing, levelling and dressing the situ andclearing the bed etc. Complete as per direction of the engineer-in-charge.(Measurement will be given for the actual pile head volume to bebroken).

cum Tk. 1,661.0064 Conducting static load test for the cast in situ/precast pile

providing required scaffolding, bracing, jacks, pressure test gauge,loadingunloading loads, kentledge and other plants and equipment includingstaging, mobilisation, demobilisation, hire charge, cost of gunny bags &sand and filling sacs/gunny bags for loading, recording readings &

preparation of results in standard forms & other incidental charges perstandard practice and procedures in/c submission of load test report,furnishing all graph and chart as per standard practice & direction of theengineer-in-charge.

a For 25 tonne load

test Tk. 22,922.00b For 75 tonne load

test Tk. 46,422.00

c For 125 tonne load

test Tk. 70,158.00d For 175 tonne load

test Tk. 95,009.00

e For 225 tonne load

test Tk. 118,508.00f For 275 tonne load

test Tk. 142,600.00

1 For intermediate loading from 25 tonne to 75 tonne for each additionaltonne per

test Tk. 482.322 For intermediate loading from 75 tonne to 125 tonne for each additional

tonne pertest Tk. 482.00

ahsan/aqa (69)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 108/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate3 For intermediate loading from 125 tonne to 175 tonne for each

additional tonne pertest Tk. 532.00

4 For intermediate loading from 175 tonne to 225 tonne for eachadditional tonne

pertest Tk. 482.00

5 For intermediate loading from 225 tonne to 275 tonne for eachadditional tonne

pertest Tk. 482.00

65 Pre-cast driven pile with reinforced cement concrete (1.1.5:3) havingminimum compressive strength 25 Mpa at 28 days on standard cylinder

with cement conforming to BDS 232 & ASTM standard mixed with bestquality coarse sand (F.M.2.5), 20 mm down well graded stone chips inmixture machine in/c cost of breaking chips, screening through propersieves, cleaning and washing, centring and shuttering with M.S sheet, M.Sangle, F.I bar, nuts & bolts, preparation of bed, laying polythene, placingof reinforcement cage in position, casting, compacting by vibrators andtapered rods, curing for 28 days etc. in/c cost of water, electricity &other charges, providing pile shoe as per design & drawing, driving the

pile up to the design depth as per standard practice or specified methodproviding head cushion, all equipments including mobilisation,demobilisation & hire charge of driving set, labour, shampering, test of

Cost of cement concrete:

(a) Cost of 300 mm x 300 mm size pre-cast pile rm Tk. 589.00(b) Cost of 350 mm x 350 mm size pre-cast pile rm Tk. 774.00(c) Cost of pile shoe as per design & drawing each Tk. 922.00d-I Mobilization and demobilization of pre-cast pile driving rig per set Tk. 2,016.00d-II Cost of driving 300 mm x 300 mm size pre-cast pile

a) From 0 meter to 6 meter rm Tk. 248.00b) From 6 meter to 12 meter rm Tk. 273.00c) Fom 12 meter to 15 meter rm Tk. 300.00

d-III Cost of driving 350 mm x 350 mm size pre-cast pile

a) From 0 meter to 6 meter rm Tk. 315.00b) From 6 meter to 12 meter rm Tk. 347.00c) Fom 12 meter to 15 meter rm Tk. 381.00d) Fom 12 meter to 18 meter rm Tk. 454.00e-I Mobilization and demobilization of automatic diesel hammer

mounted pre-cast pile driving complete rig setset Tk. 135,213.00

e-II Cost for driving 12"x 12" size pre-cast pile with automatic rig fitted withautomatic diesel hammerrm Tk. 329.00

e-III Cost for driving 14" x 14" size pre-cast pile with automatic rig fitted with automatic diesel hammer

rm Tk. 360.00

ahsan/aqa (70)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 109/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate66 Pre-cast 7" x 7" maximum 25'-0 long driven pile with reinforced

cement concrete (1: 1.25: 2.5) having minimum compressive strength30 Mpa at 28 days on standard cylinder with cement conforming to BDS232 & ASTM standard mixed with best quality coarse sand (F.M.2.5) and20 mm down well-graded stone chips in mixture machine, including costof breaking chips, screening through proper sieves, cleaning and washing,centring and shuttering with M.S sheet, M.S angle, F.I bar, nuts & bolts,preparation of bed, laying polythene, placing of reinforcement cage,casting, compacting by vibrators and tapered rods, curing for 28 days etc.in/c cost of water, electricity & other charges, providing pile shoe as perdesign & drawing, driving the pile up to the design depth as per standardpractice or specified method providing head cushion, all equipmentsincluding mobilisation, demobilisation & hire charge of driving set,shampering, test of materials & concrete etc. including carrying all

a Cost of cement concrete Per rm Tk. 226.00b Cost of driving (size: 7" x 7" up to 25 feet.) per rm Tk. 135.0067 Supplying and driving of locally available best wooden ballah pile

having an average dia not less than 150 mm with not less than 175 mmdia at thick end and 125 mm dia at thin end in foundation/retainingpurpose to a depth as per design and drawing by any method in/c allarrangement for staging, hoisting, carrying etc.

Per rm Tk. 213.00

68 Supplying, fabrication and fixing to details as per designdeformed barreinforcement in concrete in accordance with BSTI standard in/cstraightening and cleaning rust, if any, bending & binding in positionin/c supply of G.I. wires etc. complete in all respects in all floors.

(a) 40 grade deformed bar with minimum fy = 276 Mpa, ultimate strength482 Mpa quintal Tk. 3,129.00

(b) 60 grade deformed bar with minimum fy = 415 Mpa, ultimate strength620 Mpa quintal Tk. 3,302.00

69 Mild steel (Grade - A36) work in roof truss , supplying and fabricationof mild steel sections as per design. Hoisting, fitting and fixing inposition with bolts and nuts or rivets or welded and providing two coatsof anti-corrosive paint over a prime coat of red oxide paint(measurement to be given for solid steel section only).

quintal Tk. 4,759.00

10. M.S. FABRICATION WORK

ahsan/aqa (71)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 110/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate

70 Constructing expansion joints 25 mm /38 mm gap in R.C.C. floor orroof slab or beam provided with “V” folded copper/ aluminium waterstop sheet with loop notch and inserted 75 mm concrete shoulders, the

gap being filled up with mixture of hot applied bitumenous sealingcompound etc. all complete as per direction of the engineer-in-charge(excluding the cost of floor shoulders and floor finishes).

(a) With copper sheet Rm Tk. 546.00(b) With Aluminum sheet Rm Tk. 390.00(c) With Aluminum sheet & 6 mm x 75 mm size MS plate. Rm Tk. 660.0071 Providing bearing joints fixed or free with 250 x 375 x 10 mm

M.S.(Grade - A36) shoe plate fitted in the truss angles with 16 mm diaM.S. rod counter sunk rivets, welded and anchored to 250 x 375 x 10mm .M.S shoe plate by two Nos. 19 mm dia M.S. “U” rod embedded in

the bed of the lintel around the reinforcement, cleaning and greasing thejoints for all floors etc. all complete as per direction of engineer-in-charge.

each Tk. 1,218.0072 Supplying and laying of single layer polythene sheet weighing one

kilogram per 6.5 square meter in floor or any where below cementconcrete complete in all respect as per direction of the engineer-in-charge.

sqm Tk. 18.00

73 Average 100 mm thick finished lime terracing with 20 mm downgraded lst class brick chips (khoa), Surki from lst class bricks and lime(stone lime brought at site, not being powdered in open air and to beslaked in presence of engineer-in-charge and to be measured in volumethree days after slaking for using in the mix) in the proportion 7:2:2(brick chips : suriki : lime) including preparation of the mix on theground by making a suitable platform under proper polythene cover.Cutting the mix twice daily with lime water (1:10) at least for 7 days untilthe mix attain desireable consistency. Laying the mix in proper slope,beating the same with standard `koppa' for minimum 7 days to gainmaximum consolidation, making ghoondy and neat finishing with lime cum Tk. 4,538.00

74 Precast ventilators of minimum 25 mm thick of any design withcement mortar (1:4) fitted and fixed in position, finished with cementplaster (1:6) including necessary scaffolding and curing, in all floors as

per direction of the engineer-in-charge. sqm Tk. 777.0075 75 x 75 mm cornice of brick masonry in cement mortar (1:6) having

minimum 12 mm thick cement plaster (1:6) including scaffolding andcuring at least for 7 days in all floors as per direction of the engineer-in-charge.

rm Tk. 75.00

11. EXPANSION JOINT AND BEARING JOINT

12. LIME TERRACING AND WATER PROOFING

ahsan/aqa (72)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 111/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Rate76 Supplying fan hook of 16 mm dia M.S. rod (one meter straight length)

having rounded hook at the middle of bar in proper size so as to beconcealed within fan cup in/c fabrication and fitting fixing in all floor asper direction of the engineer-in-charge.

each Tk. 40.0077 Supplying, fitting and fixingM.S. flat bar clamp of 175 x 38 x 6 mm

size having bifurcated ends to door and window frames with necessaryscrews and encasing inside the wall with cement concrete (1:2:4) as perdirection of the engineer-in-charge.

each Tk. 34.0078 Supplying, fitting and fixingM.S. flat bar clamp 150 x 38 x 6 mm size

having bifurcated ends to door and window frames with royal plug.Necessary screws etc. with the help of electric drill/hammer drill in/c.cutting groove in chowkat if necessary etc. complete in all respect. as perdirection of engineer-in-charge.

each Tk. 30.00

79 Supplying 100 mm inside dia cast iron rain water down pipe, fitting& fixing in position with head and shoes, bends, trap, tee, offset, clampsand nails etc. complete in all floors as per direction of the engineer-in-char e.

i) MAANCO/NISSAN/NANAKHI/GENERAL Brand rm Tk. 542.00ii) SNC Brand rm #REF!80 Supplying 100 mm inside dia best quality uPVC pipe fitting, fixed in

position with head and shoes, bends, min.20 mm width F.I. Bar clampand nails, and in/c all accessories such as round gratting/domed roofgratting bands, sockets as per direction of the engineer-in-charge.

rm Tk. 271.00

81(a) Supplying, fitting & fixing0.45 mm thick corrugated galvanized ironsheet (Bangladesh made) having min weight 80.28 kg per bundle fittedand fixed on M.S. sections with 'J' hook or wooden purlins with screws,limpet, washers and putty etc. all complete as per direction of theengineer-in-charge.

I. Galvanised sqm Tk. 232.00II. Coloured sqm Tk. 318.00

81(b) Supplying, fitting & fixing1.5 mm thick fibre glass sheet roofing fitted andfixed on M.S. sections with 'J' hook or wooden purlins with screws. limpet,

washers and puty etc. all complete as per direction of the engineer-in -charge. Tk. 567.0082. 0.27 mm thick Galvanized iron plain sheet ridging with 300 mm lap on

either side fitted and fixed with galvanized bolts and nuts etc. all complete asper direction of the engineer-in-charge.

a Galvanised rm Tk. 110.00b Coloured: rm Tk. 131.00

13. RAIN WATER PIPE

14. C.I. SHEET ROOFING

ahsan/aqa (73)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 112/122

P.W.D. Schedule of Rates, 16th October, 2002 (10th Edition)

Item No. Description of items Unit Unit Ratec 1.5 mm thick plain fibre glass sheet ridging with 300 mm lap on either side

fitted and fixed with galvanized bolts and nuts etc. all complete as per directionof the engineer-in-charge.

rm Tk. 310.00

ahsan/aqa (74)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 113/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Ratei) Ground floor sqm Tk. 1,263.00

ii) Add for each additional floor upto 5th floor sqm Tk. 3.19iii) Add for each additional floor from 6th floor to 9th floor sqm Tk. 6.38

iv) Add for each additional floor for 10th floor and above sqm Tk. 9.58

41 Reinforced cement concrete works (1:2:4) with brick-chips havingminmum cylinder crushing strength 19 Mpa at 28 days on standardcylinder.In footing, raft/mat, foundation beam: (Rate excluding the cost ofreinforcement and its fabrication).

a In Individual and combined footing of column. cum Tk. 4,432.00b In raft/mat/floor slab at plinth level. cum Tk. 4,140.00c In Foundation beam cum Tk. 5,103.00

42 Reinforced cement concrete works (1:2:4) with brick-chips havingminmum cylinder crushing strength 19 Mpa at 28 days on standardcylinder.

a Below plinth Level and in Ground floor cum Tk. 7,150.00b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.7743 Reinforced cement concrete works (1:2:4) with brick-chips having

minmum cylinder crushing strength 19 Mpa at 28 days on standardcylinder.In tie beams and lintels.

a Below plinth level and in ground floor cum Tk. 6,256.00b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.7744 Reinforced cement concrete works (1:2:4) with brick-chips having

minmum cylinder crushing strength 19 Mpa at 28 days on standardcylinder.

a Below plinth Level and in Ground floor. cum Tk. 6,278.00b Add for each additional floor up to 5th floor cum Tk. 52.36

c Add for each additional floor from 6th floor 9th floor cum Tk. 73.30d Add each additional floor for 10th floor & above cum Tk. 83.7745 Reinforced cement concrete works (1:2:4) with brick chips having

minmum cylinder crushing strength 19 Mpa at 28 days on standardcylinder.In Roof slab of all types, cantilever slab and drop panel, excluding

a Ground floor cum Tk. 6,314.00b Add for each additional floor up to 5th floor cum Tk. 52.36

RCC (1:2:4) WITH BRICK-CHIPS & WOODEN SHUTTER

8. REINFORCED CEMENT CONCRETE WORK

ahsan/aqa (182)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 114/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Ratec Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.7746 Reinforced cement concrete works (1:2:4) with brick-chips having

minmum cylinder crushing strength 19 Mpa at 28 days on standardc linder.

a Ground floor cum Tk. 9,287.00b Add for each additional floor up to 5th floor. cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30d Add for each additional floor for 10th floor & above. cum Tk. 83.7747 Reinforced cement concrete works (1:2:4) with brick-chips having

minmum cylinder crushing strength 19 Mpa at 28 days on standardcylinder.

a Ground floor sqm Tk. 697.00b Add for each additional floor up to 5th floor. sqm Tk. 9.88

c Add for each additional floor from 6th floor to 9th floor sqm Tk. 14.83d Add for each additional floor for 10th floor & above sqm Tk. 19.7748 Reinforced cement concrete works (1:2:4) with brick-chips having

minmum cylinder crushing strength 19 Mpa at 28 days on standardc linder.

a Ground floor cum Tk. 6,207.00b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.77

49 Reinforced cement concrete works (1:1.5:3) with brick-chips havingminmum cylinder crushing strength 21 Mpa at 28 days on standardc linder.

a In Individual and combined footing of column. cum Tk. 4,741.00b In raft/mat/floor slab at plinth level. cum Tk. 4,449.00c. In Foundation beam cum Tk. 5,412.0050 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standarda Below Plinth Level and in Ground floor cum Tk. 7,460.00b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30d Add for each additional floor for 10th floor & above . cum Tk. 83.7751 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardc linder.

a Ground floor cum Tk. 6,565.00b Add for each additional floor up to 5th floor cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30d Add for each additional floor for 10th floor & above cum Tk. 83.7752 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standard cylinder

RCC (1:1.5:3) WITH BRICK-CHIPS & WOODEN SHUTTER

ahsan/aqa (183)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 115/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Ratea Ground floor cum Tk. 6,587.00b Add for each additional floor up to 5th floor. cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30

d Add for each additional floor for 10th floor & above cum Tk. 83.7753 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder.In Roof slab of all type, cantilever slab and drop panel, excluding

a Ground floor. cum Tk. 6,623.00b Add for each additional floor up to 5th floor. cum Tk. 52.36c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor for 10th floor & avobe cum Tk. 83.7754 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standardcylinder.

a Ground floor. sqm Tk. 720.00b Add for each additional floor up to 5th floor sqm Tk. 9.88c Add for each additional floor from 6th floor to 9th floor. sqm Tk. 14.83d Add for each additional floor 10th floor & above. sqm Tk. 19.7755 Reinforced cement concrete works (1:1.5:3) with brick-chips having

minmum cylinder crushing strength 21 Mpa at 28 days on standard cylinderIn Stair case slab and steps.

a Ground floor cum Tk. 6,516.00

b Add for each additional floor up to 5th floorcum Tk. 52.36

c Add for each additional floor from 6th floor to 9th floor. cum Tk. 73.30d Add for each additional floor 10th floor & above cum Tk. 83.77

56 Reinforced cement concrete works (1:1.5:3) with stone chips usingsteel material as shutter, having minmum cylinder crushing strength 25

a In Individual and combined footing of column. cum Tk. 5,805.00b In raft/mat/floor slab at plinth level. cum Tk. 5,630.00c In Foundation beam cum Tk. 6,350.00d In pedestal, column, capital lift wall and wall:i) Below plinth Level and in Ground floor. cum Tk. 8,454.00

ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77e In Tie Beam and lintel:i) Below plinth Level and in Ground floor. cum Tk. 7,529.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77

RCC (1:1.5:3) WITH STONE-CHIPS & STEEL SHUTTER

ahsan/aqa (184)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 116/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 117/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Rateiv) Add for each additional floor for 10th floor & above cum Tk. 83.77f In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth

and width of ribs to be measured only).

i) Ground floor. cum Tk. 8,090.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77g In roof slab of all types, cantilever slab and drop panels (excluding

floor slab of ground floor at plinth level).

i) Ground floor. cum Tk. 8,586.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77h In stair case slab and step.i) Ground floor. cum Tk. 8,095.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77i In Waffle or Ribbed floor/roof slab.i) Ground floor. cum Tk. 11,028.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77

RCC (1:2:4) WITH STONE CHIPS & STEEL SHUTTER 57 Reinforced cement concrete works (1:2:4) with stone-chips using

steel material as shutter, having minmum cylinder crushing strength 22Mpa at 28 days on standard cylinder.

a In Individual and combined footing of column. cum Tk. 5,596.00b In raft/mat/floor slab at plinth level. cum Tk. 5,421.00c In Foundation beam cum Tk. 6,141.00d In pedestal, column, capital lift wall and wall:i) Below plinth Level and in Ground floor. cum Tk. 8,246.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30

iv) Add for each additional floor for 10th floor & above cum Tk. 83.77e In Tie Beam and linteli) Below plinth Level and in Ground floor. cum Tk. 7,320.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77

ahsan/aqa (186)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 118/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Ratef In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth

and width of ribs to be measured only).

i) Ground floor. cum Tk. 7,631.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77g In roof slab of all types, cantilever slab and drop panels (excluding

floor slab of ground floor at plinth level).

i) Ground floor. cum Tk. 8,127.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77h In sunshade, cornice, railing, drop wall, louver and fins (Average 62

mm to 87 mm thick)

i) Ground floor. sqm Tk. 679.00ii) Add for each additional floor up to 5th floor sm Tk. 9.88iii) Add for each additional floor from 6th floor to 9th floor sqm Tk. 14.83iv) Add for each additional floor for 10th floor & above sqm Tk. 19.77i In stair case slab and step.i) Ground floor. cum Tk. 7,636.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77j. In Waffle or Ribbed floor/roof slab.i) Ground floor. cum Tk. 10,569.00ii) Add for each additional floor up to 5th floor cum Tk. 52.36iii) Add for each additional floor from 6th floor to 9th floor cum Tk. 73.30iv) Add for each additional floor for 10th floor & above cum Tk. 83.77

58(a) Extra rate of RCC work at free height beyond 4 m to 11 m incorresponding item

i) In colomn, coloumn capitals, & walls where the free height exceeds 4meter (rate to be considered for the free height of each additional 4 (four)meter and part beyond 4 meter)

cum Tk. 222.00

ii) In Tee beams, Ell Beams and Rectangular beams placed beyond 4meter height; for each additional meter of free height.cum Tk. 307.00

iii) In floor/roof slab, Cantilever slab, Waffle slab and drop panels placedbeyond 4 meter height, for each meter of free height.

cum Tk. 338.0058(b) Supplying and mixing ASTM designated specified type chemical admixture

from an authorized local agent or manufacturer, comply with the ASTM C-

ahsan/aqa (187)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 119/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Ratei) Supply and use of water reducing chemical admixture Type - A in liter Tk. 170.00ii) Supply and use of retarding chemical admixture Type - B in concrete liter Tk. 146.00iii) Supply and use of accelerating chemical admixture Type - C in concrete liter Tk. 181.00iv) Supply and use of water-reducing and retarding chemical admixture Type -

D in concrete liter Tk. 158.00 v) Supply and use of water-reducing and accelerating chemical admixture

Type - E in concrete liter Tk. 170.00 vi) Supply and use of water-reducing high range chemical admixture Type - F

in concrete liter Tk. 176.00 vii) Supply and use of water-reducing high range and retarding chemical

admixture (Type - G) in concreteliter Tk. 164.00

58(c) Supplying, best quality pliable, cold applied pre-formed self adhesiverubberised/ bituminous water proofing membrane having minimum

i) Water-proofing membrane on external surface of inclined or vertical wall (excluding cost of back fill/brick wall on back/plaster when sqm Tk. 742.00

ii) Water-proofing membrane on made up surface below the floor or belowthe horizontal surfaces with rotective cover sqm Tk. 675.00

iii) Water-proofing membrane on the floor or on the horizontal surfaces with rotective cover & wearin coarse sqm Tk. 705.00

58(d) Water-proofing work in masonry or concrete surface with sand-cementmortar mixed with s ecified admixure sqm Tk. 272.00

59 Boring/drilling for cast in situ pile up to the required depth and dia.

a 400 mm dia A Up to 20 m rm Tk. 339.00B Add extra cost for each additional meter beyond 20 meter up to 30 m rm Tk. 14.00b 450 mm dia

A up to 20 m rm Tk. 396.00B Add extra cost for each additional meter beyond 20 meter up to 29m rm Tk. 17.00c 500 mm dia

A up to 20 m rm Tk. 438.00B Add extra cost for each additional meter beyond 20 meter up to 29m rm Tk. 17.00d 550 mm dia

A up to 20m rm Tk. 490.00B Add extra cost for each additional meter beyond 20 meter up to 29m rm Tk. 25.00e 600 mm dia

A up to 20m rm Tk. 508.00B Add extra cost for each additional meter beyond 20 meter up to 29m rm Tk. 27.0060 Reinforced cement concrete works (1:1:5.3) in bore-hole for making

cast-in-situ pile having having minimum compressive strength 19 Mpa at28 days on standard cylinder. cum Tk. 6,512.00

61 Providing and making point welding at contact point of the spiralbinders. per

point Tk. 1.78

9. PILE WORK

ahsan/aqa (188)

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 120/122

8/13/2019 AOR 41-82

http://slidepdf.com/reader/full/aor-41-82 121/122

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

ANNEXURE - A

Item No. Description of items Unit Unit Ratee-I Mobilization and demobilization of automatic diesel hammer mounted

pre-cast pile driving complete rig setset Tk. 135,213.00

e-II Cost for driving 12"x 12" size pre-cast pile with automatic rig fitted withautomatic diesel hammer

rm Tk. 329.00e-III Cost for driving 14" x 14" size pre-cast pile with automatic rig fitted with

automatic diesel hammerrm Tk. 360.00

66 Pre-cast driven 7" x 7" x 25' - 0” pile with reinforced cementconcrete (1:1.25:2.5) having minimum compressive strength 25 Mpa at 28da s on standard c linder.

a Cost of cement concrete (size: 175 mm x 175 mm) Per rm Tk. 226.00b Cost of driving (size: 175 mm x 175 mm) up to 8 meters each rm Tk. 135.0067 Supplying and driving of locally available best wooden ballah pile. Per rm Tk. 213.00

68 Supplying, fabrication and fixing to details as per designdeformed barreinforcement in concrete.

(a) 40 grade deformed bar with minimum fy = 276 Mpa, ultimate strength482 Mpa quintal Tk. 3,129.00

(b) 60 grade deformed bar with minimum fy = 415 Mpa, ultimate strength620 Mpa quintal Tk. 3,302.00

69 Mild steel (Grade - A36) work in roof truss , supplying and fabrication ofmild steel sections as per design. quintal Tk. 4,759.00

70 Constructing expansion joints 25 mm /38 mm gap in R.C.C. floor orroof slab or beam provided with “V” folded copper/aluminium water stopsheet.

(a) With copper sheet Rm Tk. 546.00(b) With Aluminum sheet Rm Tk. 390.00(c) With Aluminum sheet & 6 mm x 75 mm size MS plate. Rm Tk. 660.0071 Providing bearing joints fixed or free with 250 x 375 x 10 mm

M.S.(Grade - A36) shoe plate. each Tk. 1,218.0072 Supplying and laying of single layer polythene sheet weighing one

kilogram per 6.5 square meter. sqm Tk. 18.00

73 Average 100 mm thick finished lime terracing (7:2:2) with 20 mmdown raded lst class brick chi s khoa surki from lst class bricks and cum Tk. 4,538.0074 Precast ventilators of minimum 25 mm thick of any design. sqm Tk. 777.0075 75 x 75 mm cornice of brick masonry in cement mortar (1:6) having

minimum 12 mm thick cement plaster (1:6). rm Tk. 75.0076 Supplying fan hook of 16 mm dia M.S. rod (one meter straight length).

each Tk. 40.00

10. M.S. FABRICATION WORK

11. EXPANSION JOINT AND BEARING JOINT

12. LIME TERRACING AND WATER PROOFING

ahsan/aqa (190)