“Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq...

120
19 Deember 2007 Workshop at TRIPP-IIT Delhi 1 “Transport, Health, Environment & Equity in Indian cities” Workshop Organized By McGill University and TRIPP-IIT Delhi On 17 – 19 December 2007 “Is anyone listening out there?” By Sudhir Badami Transport & Urban Analyst and Activist sudhirbadami@gmail.com

Transcript of “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq...

Page 1: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 1

“Transport, Health, Environment &

Equity in Indian cities”

Workshop Organized By

McGill University and TRIPP-IIT Delhi

On17 – 19 December 2007

“Is anyone listening out there?”By

Sudhir BadamiTransport & Urban Analyst and Activist

[email protected]

Page 2: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 2

I would like to put before you the case of

Mumbai’s

1. 146.5 km of Mumbai Metro Master Plan - which is being considered as the solution for Mumbai's inadequate Public Transport capacity.

2. Scuttling of Sky Bus Technology

3. Low priority to BRTS in Mumbai

Page 3: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 3

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Greater Mumbai

and

Urban Agglomerate

Page 4: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 4

Mumbai Metropolitan Region

MMR • Population 2001 Census

• Mira-Bhayandar 5 lac

• Bhiwandi-Nizampur 6 lac

� Thane 13 lac

� Kalyan-Dombivili 13 lac

� Ulhasnagar 5 lac

� Navi Mumbai 7 lac

� Greater Mumbai 119 lac

7 M’Corpns, 13 M’Councils and ~900

villages exist in the MMR

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 5: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 5

~1870 ~1900 1950 1957

Municipal Corporation of Greater Mumbai

Over the years

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 6: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 6

Western Suburbs

Eastern Suburbs

Island City24 Municipal

Wards of MCGM

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 7: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 7

408309234 (31%)205.51771273MMR Urban

426325248 (31%)218.5189 (28%)

4355MMR

230181143 (27%)131119 (20%)

468MCGM

775945 (25%)40.536 (22%)168Eastern Suburbs

1158664 (28%)5750 (28%)226Western Suburbs

383634(3%)33.533(3%)72Island City

2031

Lacs

2021

Lacs

2011

Lacs

2006

Lacs

2001

Lacs

Area

Sq km

Population Projections (10 Lacs = 1 Million)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 8: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 8

3202431841611391273MMR Urban

98755750434355MMR

492387306280254468MCGM

458351268241214168Eastern Suburbs

509381283252221226Western Suburbs

52850047246545872Island City

2031

P/Ha

2021

P/Ha

2011

P/Ha

2006

P/Ha

2001

P/Ha

Area

Sq km

Population Density Projections

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 9: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 9

18 %7.5 Lac42 LacChennai

20 %20 Lac98 LacDelhi

32 %15 Lac46 LacKolkatta

33 %4.2 Lac13 LacThane

36 %7.5 Lac21 LacNagpur

44 %4.7 Lac11 LacMeerat

46 %5 Lac11 LacFaridabad

50 %60 Lac119 LacGreater Mumbai

Slum%

SlumPopulation

PopulationCity

Slum Population Figures

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 10: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 10

18 %6 Lac35 LacHyderabad

8 %3.5 Lac45 LacBangalore

33 %4.2 Lac13 LacThane

36 %7.5 Lac21 LacNagpur

44 %4.7 Lac11 LacMeerat

46 %5 Lac11 LacFaridabad

50 %60 Lac119 LacGreater Mumbai

Slum%

SlumPopulation

PopulationCity

Slum Population Figures (Cont’d)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 11: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 11

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

The Suburban Railway System

Page 12: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 12

The B.E.S.T. Bus Transport

334 Routes

Fleet size 3404

Route No 521

Route No 93

Page 13: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 13

10 %7 %Private Vehicle Users

5 %5 %Intermediate Public Transport (IPT)

Users

85 %88 %Public Transport (PT) Users

20071994

Atkin’s Report

Commuter Proportions

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 14: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 14

Commuter Proportions

Commuter journeys are made using Buses. 75% of these bus journeys are related to

suburban rail journeys45 lac

Commuters use Suburban Railway daily60 – 65 lac

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 15: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 15

What are the ground realities?

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 16: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 16

This is peak hour load of

3,50,000 pph

500 to 550 p/coach

(Design load is Only 200p/coach)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 17: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 17

Peak hour crowd

waiting for the next

train

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 18: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 18

Peak hour crowd trying to board a crowded

train.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 19: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 19

Mumbai Rail Commuters

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 20: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 20

Inadequate ladies

compartments add to their

woes

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 21: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 21

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Any room for the Senior Citizens, Pregnant

Women, Children and the Physically Challenged?

Page 22: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 22

Peak hour traffic on

arterial roads do move, but congestion is

increasing rapidly

(Off Peak Hour Peddar Road)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 23: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 23

Traffic congestion affects bus through put, compelling

many commuters to opt for personal vehicles.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

(Peak Hour Peddar Road)

Page 24: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 24

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Between 1951 and 2004 there has been a

127 % increase in the length of city roads.

But population grew by 301 % over that

period while number of vehicles shot up by

3019 %, touching 20 million in 2007.

Page 25: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 25

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 26: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 26

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Whither Pedestrian?

Page 27: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 27

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Whither Pedestrian Safety?

Page 28: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 28

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Too Smooth ?

Too Narrow ?

Page 29: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 29

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Obstacles ?

Page 30: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 30

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Surely there are better footpaths to walk on in Mumbai

But are these where the crowds move?

Page 31: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 31

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 32: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 32

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 33: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 33

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Mantra to be followed:

Make Walking safe and comfortable.

Augment Public Transport Capacity significantly.

Page 34: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 34

Quick Overview of Mumbai’s Proposed Transportation Projects

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 35: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 35

Current Proposals

• Mumbai Urban Transport Project (MUTP) • Expected Completion – 2007 (2009) Cost Rs 4600 Cr (WB Component ~ Rs 2600 Cr)

• Mumbai Urban Infrastructure Project (MUIP) • Expected Completion – 2007 (2009) Cost Rs 2600 Cr

• Bandra Worli Sea Link (BWSL)• Expected Completion – 2008 (2009) Cost 1300 Cr

• Western Freeway Sea Link (WFSL)• Expected Completion – 5 Years Cost 3000 Cr

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 36: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 36

Current Proposals (cont’d)

• Mumbai Trans Harbour Link (MTHL)• Expected Completion – 5 Years Cost 6500 Cr

• Mumbai Metro Master Plan (MMMP) • Expected Completion – 16 Years in phases Cost Realistic Rs 60,000 Cr plus for 146.5 km

• Water Transport Project (WTP)• Expected Completion – 3 Years Cost 600 Cr

• Exclusive Bus Lanes Project (XBLP) • Expected Completion – 2 Years Cost 80 Cr

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 37: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 37

Current Proposals (cont’d)

• Monorail Projects• Expected Completion – 2 Years Cost 6000 Cr for 45 km

• Pedestrian Walkways

• At 21 locations at suburban railway stations

• Fleet Taxi Scheme• Meets the need of comfortable onward journeys for the affluent category

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 38: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 38

Current Proposals (cont’d)

• Bus Rapid Transit System (BRTS) • Pilot route under study

• Sky Bus Metro• Shelved ? Discarded ?

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 39: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 39

Current Proposals (cont’d)

Mumbai Metro Master Plan (MMMP)

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 40: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 40

Current Proposals (cont’d)

MMMP

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

In Delhi

Page 41: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 41

Current Proposals (cont’d)

MMMP

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

In Delhi

Page 42: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 42

Current Proposals

(cont’d)

MMMPPhase I

1. Versova-Andheri-Ghatkopar 15 km

2. Colaba (Backbay)-Mahim-Charkop 36 km

3. Mahim-Mankhurd 12.8 km

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 43: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 43

Current Proposals

(cont’d)

MMMPPhase II

4. Charkop-Dahisar 7.5 km

5. Ghatkopar-Mulund 12.4 km

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 44: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 44

Current Proposals

(cont’d)

MMMPPhase III

6. BKC-Kanjur via Airport 19.5 km

7. Andheri (E) – Dahisar (E) 18 km

8. Hutatma Chowk-Ghatkopar 21.8 km

9. Sewri-Prabhadevi 3.5 km

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 45: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 45

Current Proposals (cont’d)

MMMP

Phase I 12.0 u/g 51.8 Elevated 2005-’11

Phase II 0 u/g 19.9 Elevated 2011-’16

Phase III 20.5 u/g 32.3 Elevated 2016-’21

--------------------------------------------------------

TOTAL 32.5 u/g 114 Elevated 2005-’21

--------------------------------------------------------

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 46: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 46

Overall MMMP Map

Overview of Mumbai’s

Proposed Transportation Projects

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 47: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 47

Current Proposals (cont’d)

MMMP (Revised in May 2006)

Phase I 20.0 u/g 43.8 Elevated 2005-’11

Phase II 0 u/g 19.9 Elevated 2011-’16

Phase III 20.5 u/g 32.3 Elevated 2016-’21

--------------------------------------------------------

TOTAL 40.5 u/g 106 Elevated 2005-’21

--------------------------------------------------------

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 48: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 48

Current Proposals (cont’d)

Monorail Projects

Overview of Mumbai’s

Proposed Transportation Projects

Page 49: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 49

Current Proposals (cont’d)

Monorail Projects

Proposed on

• Thane – Kalyan - Bhiwandi

• Lokhandwalla – Kanjur Marg

• Chembur - Mankhurd -Mahul

• Malabar Hill – Wadala - BKC

Overview of Mumbai’s

Proposed Transportation Projects

Page 50: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 50

Current Proposals (cont’d)

Monorail Projects

• Thane – Kalyan - Bhiwandi

• Lokhandwalla – Kanjur Marg

• Chembur - Mankhurd - Mahul

• Malabar Hill – Wadala - BKC

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 51: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 51

Current Proposals (cont’d)

Pedestrian Walkways

Overview of Mumbai’s

Proposed Transportation Projects

Page 52: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 52

Current Proposals (cont’d)

Pedestrian Walkways

Proposed at

• Twenty locations to facilitate easy dispersion of

suburban rail commuters.

Overview of Mumbai’s

Proposed Transportation Projects

Page 53: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 53

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Current Proposals (cont’d)

Pedestrian Walkways

At about 20 Suburban Railway

Stations

Page 54: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 54

Current Proposals (cont’d)

Fleet Taxi Scheme

Overview of Mumbai’s

Proposed Transportation Projects

Page 55: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 55

Current Proposals (cont’d)

Bus Rapid Transit System (BRTS)

Overview of Mumbai’s

Proposed Transportation Projects

Page 56: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 56

Current Proposals (cont’d)

Bus Rapid Transit System (BRTS)

Proposed a pilot route on

• Western Express Highway

Overview of Mumbai’s

Proposed Transportation Projects

Page 57: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 57

Current Proposals (cont’d)

Bus Rapid Transit System

(BRTS)

Western Express Highway

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 58: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 58

Current Proposals (cont’d)

Sky Bus Metro

Overview of Mumbai’s

Proposed Transportation Projects

Page 59: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 59

Current Proposals (cont’d)

Sky Bus Metro

Currently not under consideration.

Hopefully its importance is realised before it is too

late.

Overview of Mumbai’s

Proposed Transportation Projects

Page 60: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 60

Current Proposals (cont’d)

Mumbai Metropolitan Region Projects

Overview of Mumbai’s

Proposed Transportation Projects

Page 61: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 61

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Current Proposals (cont’d)

Mumbai Metropolitan Region Rail Projects

Page 62: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 62

~ Rs 80,000 Cr with

WTP & XBLPTotal

Rs 19,525 Cr

(Rs 60,000 Cr realistic)16 years ( 2024 ?)MMMP

Rs 6500 Cr5 yearsMTHL

Rs 3000 Cr5 years (after clearance)WFSL

Rs 1300 Cr2008 (2009)BWSL

Rs 2600 Cr2007 (2009)MUIP

Rs 4600 Cr2007 (2009)MUTP

Estimated CostExpected CompletionProject

Transportation Projects

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 63: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 63

Rs 5000 Cr5 years (after technology acceptance)

Sky Bus Metro (80 km)

Rs 2000 Cr2 years (after 1st Pilot in

operation)BRTS (200 km)

Operation commenced 2007

Fleet Taxi Scheme

2009Pedestrian Walkways

Rs 6000 Cr2010Monorail

Estimated CostExpected CompletionProject

Transportation Projects

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 64: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 64

Capacity Computations – MUTP/MUIP

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 65: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 65

25%(MUTP Phase I

Estimate)

Expected reduction in congestion in

coaches =

Say: 3,50,00075 x (4500 to 5000)

i.e. 3,37,500 to 3,75,000 pph

Current load (before full

implementation of MUTP) =

4500 to 5000Current load of

persons per 9 coach train =

75Numbar of train

services per hour =

Capacity Computation – MUTP/MUIP

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 66: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 66

200(220aspiration figure of Mckinsie

Report

110 seated and 90 standees

Design capacity of each coach

3894,667/12 = 389

Number of persons per coach after

increasing coaches to 12 per rake =

519 4,667 / 9 = 519 Number of persons

per coach in a 9 coach train =

4,6673,50,000 / 75 = 4,667

Number of persons per train =

Capacity Computation – MUTP/MUIP

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 67: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 67

Capacity Computation – MUTP/MUIP

69% of its capacity

(337-200) / 200 =With MUTP Phase II, each coach will be overloadedby

337(100-35) x 519 / 100 = 337

Number of persons per coach after 35% reduction in coach congestion (MUTP

Phase II) =

95% of its capacity

(389-200) / 200 = With only 12 Coach per train, coach will be overloadedby

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 68: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 68

Capacity Computation – MUTP/MUIP

69% Overloaded337MUTP Phase II Coach Loading

95% Overloaded389MUTP Phase I Coach Loading

150% to 175% Overloaded

500 to 550(Design Load 200)

Present Coach Loading

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 69: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 69

Capacity Computation – MUTP/MUIP

1,80,000 pph75 x 12 x 200 i.e.

1,80,000 pph

Design Capacity after full

implementation of MUTP Phase I) =

3,50,000 pphCurrent load (before full

implementation of MUTP) =

75Numbar of train

services per hour =

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Page 70: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 70

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

The magic figure to remember which will enable this to happen is:

3,50,000 – 1,80,000 =

1,70,000 pph

additional capacity of Public Transport

Page 71: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 71

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

What Next ?

Page 72: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 72

“Transport, Heath, Environment &

Equity in Indian cities”(5 min for this slide and then 15 min for Section 1)

Workshop Organized By

McGill University and TRIPP-IIT Delhi

On17 – 19 December 2007

XXXXXXXXXBy

Sudhir BadamiTransport & Urban Analyst ad Activist

[email protected]

Page 73: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 73

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

On to Animations

Page 74: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 74

What is Skybus?

Let us understand

from

Animation Clippings

Page 75: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 75

Page 76: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 76

Page 77: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 77

Page 78: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 78

Page 79: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 79

Page 80: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 80

Page 81: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 81

Page 82: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 82

Page 83: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 83

Transmillenio, Bogota

Page 84: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 84

Page 85: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 85

Page 86: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 86

Page 87: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 87

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

The BRTS-Skybus Combine

Manual from here

Page 88: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 88

Capacity Computations

of

BRTS-Skybus Combine

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 89: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 89

45,000 pph180 x 250 = 45,000 pph

Hourly capacity of single route

18060 x 60 / 20 = 180Hourly services

20 secs3 every minuteFrequency of

buses

250BRTS Bus Capacity

Capacity Computations – BRTS

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 90: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 90

10,000 pphSurplus capacity

achieved by BRTS

1,70,000 pphRequired additional capacity

1,80,000 pph4 x 45,000 = 1,80,000 pph

Capacity of Four North South

Routes

Capacity Computations – BRTS

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 91: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 91

6060 / 1 = 60Hourly service at

operational headway

1 minOperational Headway

27 secs / 32 secsFor a pair / for 3 pairs of coaches

Design Headway

300Pair of coachesSkybus Coach

Capacity

Capacity Computations – Skybus

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 92: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 92

1,08,000 pph2 x 54,000Capacity of Two

North South Routes

54,000 pph900 x 60 = 54,000

pph

6 Coach Capacity at hourly

operational service

9003 x 300 = 9006 Coach Capacity

Capacity Computations – Skybus

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 93: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 93

Total capacity of BRTS-Skybus

Combine

Capacity of four North South

Routes of BRTS

Capacity of Two North South

Routes of Skybus

1,18,000 pphSurplus achieved by BRTS-Skybus

Combine

1,70,000 pphRequired additional capacity

2,88,000 pph1,80,000 pph1,08,000 pph

Capacity Computations – BRTS-Skybus Combine

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 94: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 94

33.71 %Surplus as % of load

3,50,000 pphOverall load

1,18,000 pphSurplus achieved by BRTS-Skybus

Combine

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Capacity Computations – BRTS-Skybus Combine

Page 95: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 95

This would mean that whether it is Suburban Railways or BRTS or Skybus, the peak load will be about 34% less than the design capacity – a very comfortable state for commuters.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 96: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 96

Cost Computations of BRTS-Skybus-

Combine

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 97: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 97

Rs 4,800 Cr@ Rs 60 Cr/km

80 km2 North-South

Routes of Skybus

Rs 2,000 Cr@ Rs10 Cr/km

200 km4 North-South and 3 East-West Routes

of BRTS

TOTAL COST ~ Rs 7,000 Cr

For a surplus capacity of 1,18,000 pph

Cost Computations of BRTS-Skybus Combine

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 98: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 98

The Metro Magic

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 99: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 99

© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m

Although Mumbai Metro Master Plan is an attempt to augment the capacity of Public Transport, it

1. Will take 16 to 20 years

2. Cost about TEN times of what the BRTS-Skybus will cost

And

3. Provide 28% less capacity than what is needed.

Page 100: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 100

Cost Computations of MMMP

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 101: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 101

10,5742105,4844,480Cost

Rs Cr

15520120400Rate

Rs Cr/km

68.410.545.712.2Length

km

TotalOn gradeElevatedUnderground

Table A - Delhi Metro Phase I

(at actual – alt I rates)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 102: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 102

10,5752104,5705,795Cost

Rs Cr

15520100475Rate

Rs Cr/km

68.410.545.712.2Length

km

TotalOn gradeElevatedUnderground

Table B - Delhi Metro Phase I

(at actual – alt II rates)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 103: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 103

19,525011,4008,125Cost

Rs Cr

133.30100250Rate

Rs Cr/km

146.5011432.5Length

km

TotalOn gradeElevatedUnderground

Table C - Mumbai Metro

(with rates placed at Public Consultation by MMRDA/DMRC in Feb 2004)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 104: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 104

26,828011,40015,438Cost

Rs Cr

18220100475Rate

Rs Cr/km

146.5011432.5Length

km

TotalOn gradeElevatedUnderground

Table D - Mumbai Metro

(with same rates as for Delhi Metro – from Table B)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 105: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 105

61,177021,73039,447Cost

Rs Cr

417.520205974

extrapolatedRate

Rs Cr/km

146.5010640.5Length

km

TotalOn gradeElevatedUnderground

Table E - Mumbai Metro

(with bid rates for Versova-Ghatkopar Stretch as accepted by MMRDA-Govt of Maharashtra in May 2006)

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 106: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 106

How Metro is projected as a “Save all” Project

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 107: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 107

A simple oft repeated statement that Metro has the capacity that other modes do not have seems to be the selling point.

Numbers tell us a different story.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 108: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 108

Metro As a savior !

2060 / 3 = 20Hourly service at

operationalheadway

3 minsOperational Headway

300Metro Coach

Capacity

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 109: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 109

Metro As a savior !

1,44,000 pph2 x 72,000Capacity of Two

North South Routes

72,000 pph3600 x 20 =

72,000

12 Coach Capacity at hourly

operational service

360012 x 300 = 360012 Coach Capacity

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 110: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 110

Metro As a savior !

1,70,000 pphThe magic figureRequired additional capacity

26,000 pph1,70,000 –1,44,000 = 26,000

The deficit comes to:

1,44,000 pph2 x 72,000

For 12 coach train

Capacity of Two North South

Routes

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 111: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 111

Capacity Computations – of Proposed Mumbai

Metro

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 112: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 112

2060 / 3 = 20Hourly service at

operational

3 minsOperational Headway

300Metro Coach

Capacity

Capacity Computations – Mumbai Metro

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 113: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 113

72,000 pph2 x 36,000Capacity of Two

North South Routes

36,000 pph1800 x 20 = 36,000 pph

6 Coach Capacity at hourly

operational service

18006 x 300 = 18006 Coach Capacity

Capacity Computations – Mumbai Metro

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 114: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 114

Capacity Computations – Mumbai Metro

1,70,000 pphThe magic figureRequired additional capacity

98,000 pph1,70,000 – 72,000 = 98,000

The deficit comes to:

72,000 pph2 x 36,000

For 6 coach train

Capacity of Two North South

Routes

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 115: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 115

Other projects mentioned have little impact on transportation scenario with Mumbai. However, the MTHL, will throw the Mumbai Metropolitan Region open for rapid development.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 116: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 116

At Rs 60 Cr/km, Sky Bus may become unviable to most cities in India, but may not be so for the metro cities.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 117: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 117

As usual, Metro Rail is being touted as “the” solution to Urban Transport and we know the reality.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 118: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 118

BRTS is being considered only to get funding from JNNURM, but I see hope with some seriousness being shown lately by Government.

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m

Page 119: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 119

“Material being shown here are from sources listed below.

Sincere thanks to them for making them available for these

presentations:

• Mumbai Metropolitan Development Authority• Municipal Corporation of Greater Mumbai• Census• Western and Central Railways• B.E.S.T.• Konkan Railway• Rishi Aggarwal• Delhi Metro Rail Corporation• News papers: Indian Express, Times of India, Hindustan Times, DNA• Mumbai Traffic Police• Maharashtra State Road Development Corporation• Economic & Political Weekly

Page 120: “Is anyone listening out there?” · 2031 Lacs 2021 Lacs 2011 Lacs 2006 Lacs 2001 Lacs Area Sq km ... Faridabad 11 Lac 5 Lac 46 % Greater 119 Lac 60 Lac 50 % Mumbai Slum % Slum

19 Deember 2007 Workshop at TRIPP-IIT Delhi 120

Thank You

© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m