“15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ......
Transcript of “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ......
![Page 1: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/1.jpg)
Mitsui Rail Capital Europe - 2019
“15 years of Mitsui Rail Capital Europe”
A Company History against the background of the ETCS
deployment in EuropeERTMS Conference 2019 - Valenciennes
![Page 2: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/2.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 2Page 2
Mitsui Rail Capital Europe 2019 22
MRCE’s Company History: facts & figures
▪MRCE B.V. was founded in 2004 in Amsterdam
▪Shareholder: Mitsui & Co. Ltd, Tokyo
▪ In 2006, MRCE acquired Siemens Dispolok. From that time on, MRCE has been providing «Full
Service Leasing» of Locomotives to the Railway Market in Europe
▪ In 2014, first successful audit as being «ECM – Entity in Charge of Maintenance», fulfilling all
aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798)
▪2016: introduction of MRCE’s «Milano Office», in order to manage the Italian Service Market upfront
▪ In 2019, MRCE’s first Workshop «LWR – Locomotive Workshop Rotterdam» went in operation
(Joint Venture with Siemens)
![Page 3: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/3.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 3Page 3
Mitsui Rail Capital Europe 2019 33
Locomotive type Manufacturer Models Total fleet
Electric
ES64U2 52
X4E “Vectron” 127 + 9 ordered
ES64F4 124
TRAXX AC / MS 29
Total 341
(332 + 9 ordered)
(October, 2019)
MRCE’s Company History: facts & figuresMRCE’s fleet structure
![Page 4: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/4.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 4Page 4
Mitsui Rail Capital Europe 2019 4
F4 VM: DE/AT/PL/CZ/HU/RO/SI/HR
F4 VO: DE/AT/PL/NL
F4 VJ/VK: DE/NL/AT
F4 VD: DE/AT/IT/SI/HR
F4 VE/VL: NL/BE/DE/AT/IT/CH/SI/HR
F4 VI: IT
F4 VH: DE/AT/PL
TRAXX 484: CH/IT
U2 BosporusSprinter: DE/AT/HU/RO/BG/TR
TRAXX DACHI: DE/AT/CH/IT
TRAXX DF: DE/FR
Vectron DAI: DE/AT/IT
… to be continued…
FR
NL
BE DE
CH
IT
PL
CZ
AT
SK
HUSI
HRRO
BG
TR
MRCE’s Portfolio and the complexity of homologation / authorization
![Page 5: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/5.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 5Page 5
Mitsui Rail Capital Europe 2019 5
MRCE’s History against the background of ETCS Upgrades
Pre-
assembly
ETCS-
integration
Step 1
U2 w/o ETCS
1st
installation
ETCS
„Full
integration“
ETCS (2.3.0d)
ETCS 2.3.0d
„Phase 2“
F4 w/o ETCS
ETCS-
integration
Step 2
X4E „Vectron“ incl. ETCS (2.3.0d)
2004 2009 2014 2019
BL3
![Page 6: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/6.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 6Page 6
Mitsui Rail Capital Europe 2019 6
ETCS Upgrades ES64U2
Pre-assembly:
▪ Replacing „MFA“ and JRU
▪ SW-Release „S“
ETCS-integration Step 1:
▪ Activities for Operation in „Classic Mode“
▪ Re-Authorization in AT, DE, HU for Step 1
ETCS-integration Step 2:
▪ Preparation for Operation in „ETCS switched on“ mode
▪ Re-Authorization in AT, DE, HU for Step 2
![Page 7: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/7.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 7Page 7
Mitsui Rail Capital Europe 2019 7
ETCS Upgrades ES64F4
1st implementation ETCS:
▪ 3-Display solution (only temporarily authorized)
▪ Integration of ATB & SCMT as STM
▪ Homologation in all relevant countries
ETCS „full integration“ (2.3.0d):
▪ Upgrade to 2.3.0d after achieved homologation
of 2-Display-solution in all relevant countries
ETCS Upgrade „2.3.0d Phase 2“:
▪ Integration of LZB/PZB as STM
▪ Integration of „Euroloop“ (for Austria)
▪ Fulfillment of 2 CR for Switzerland (usually specified for BL3)
▪ Re-authorization in all relevant countries of each
homologation package
![Page 8: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/8.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 8Page 8
Mitsui Rail Capital Europe 2019 8
ETCS Vectron and first outlook into the future
Delivery Status:
▪ ETCS 2.3.0d
Within every order procedure of new Variants, the same question occurs:
▪ Which will be the best definition of an Option of „Baseline 3“?
How the future Upgrades after first integration of
Baseline 3 will look like?:
▪ Homologation procedures?
▪ Necessary future investments?
▪ Necessary downtimes for installation of Upgrades?
▪ … to be continued …
![Page 9: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/9.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 9Page 9
Mitsui Rail Capital Europe 2019 9
▪ So far, for continuous Upgrades of ETCS on the Multi-System fleet of MRCE,
an investment in the range of a significant high double digit amount of mln
Euros had to be made
▪ To make it clear: we are talking about just 124 Locomotives in total…
▪ If you take all ETCS-related costs / opportunity losses together, this reflects
15% of the total Asset Value
▪ During that period, these Locomotives have achieved only the lifetime of in
average 13 years (in other words: we are talking about Locomotives which are
still at least within the first half of their Life Cycle)
The impact of ETCS-Upgrades – some facts & figures (1)
![Page 10: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/10.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 10Page 10
Mitsui Rail Capital Europe 2019 10
▪ During almost 30% of the lifetime of these Locomotives, MRCE has been
within a phase of ETCS Upgrade-Projects so far
▪ Approx. 1.5% of their lifetime, these Locomotives have been out of Operation
for Upgrade activities
The impact of ETCS-Upgrades – some facts & figures (2)
![Page 11: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/11.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 11Page 11
Mitsui Rail Capital Europe 2019 11
▪ None of the Upgrades have been „off-the-shelf-products“ (due to the vice
versa impact between the ETCS specification as such and the impacted STM‘s)
▪ That means: due to the extended period of ETCS deployment, we needed to
understand the Matrix of development paths of ETCS and the various STM‘s
▪ Without the knowledge of these complex dependencies, as keeper / owner we
might have been driven into „wrong“ investments at the „wrong“ time
Some project characteristics of the ETCS-Upgrades of MRCE’s fleet (1)
![Page 12: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/12.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 12Page 12
Mitsui Rail Capital Europe 2019 12
▪ That means: as keeper / owner of ETCS equipped Locomotives we‘ve been
forced to have capabilities to design Project packages together with our
supplier(s) and all other stakeholders – which means: highly qualified resources!
▪ The most significant impact on the investment side for the Upgrades of the
ES64F4 came from the re-homologation / re-authorization – in principle one
change request from one country have had impact on all other authorizations of
the affected homologation package!
Some project characteristics of the ETCS-Upgrades of MRCE’s fleet (2)
![Page 13: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/13.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 13Page 13
Mitsui Rail Capital Europe 2019 13
▪ The ETCS supplier intends to minimize the variety of development paths, each
STM supplier does the same - both facing independent changes of
regulations and resulting specifications
▪ The manufacturers of the Locomotives as system integrators have in the end
the same interests – keeping the development paths of configurations and
Software Releases as much harmonized as possible
▪ In the result, highly customized Projects – far away from an approach of
„Industrial Production“ – have been executed
Some Sector characteristics observed during MRCE’s ETCS-Upgrades
![Page 14: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/14.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 14Page 14
Mitsui Rail Capital Europe 2019 14
▪ Side effect: there is a „competition“ between the overlapping ETCS Upgrade
Projects – and with e.g. 94 Locomotives, you are normally not „Priority A“…
▪ Especially in the case of the „ETCS 2.3.0d Phase 2“ Project, there was no
added value for the operators (meaning: MRCE‘s customers) – the
Locomotives just kept the authorization of operating under ETCS 2.3.0d
Some Sector characteristics observed during MRCE’s ETCS-Upgrades
![Page 15: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/15.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 15Page 15
Mitsui Rail Capital Europe 2019 15
▪ From the perspective of a private investor, there is still no sufficient planning
reliability in place – therefore the ETCS deployment has to be further
harmonized as much as possible
▪ A continuation of the high frequency of ETCS Upgrades (including up to 5
weeks of stand still time for each single Locomotive) would be further
jeopardizing the Business Models within the Railway Sector in Europe
▪ Since we don‘t expect a significant decrease of the „vice versa impacts“ between
ETCS and STM requirements for the near future, the opportunities of enhanced
funding models for keepers / owners of ETCS equiped Rolling Stock Assets
have to be further evaluated
Some Lessons Learnt – and some requirements for the future… (1)
![Page 16: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/16.jpg)
MRCE Dispolok GmbH, Titel eingeben im Titelmaster, XX. Monat 20XX Seite 16Page 16
Mitsui Rail Capital Europe 2019 16
▪ We need on short term a clarification how the 4th Railway Package has to be
executed for Locomotives / Rolling Stock Assets, which were deployed without
any TSI homologation (in other words: how to deal with „grandfather rights“?)
▪ The concept of the „one stop shop“ for authorization has to be adapted
accordingly for „aging fleets“, which still have to run at least 20 additional
years…
There are still many open topics on the Agenda of the ERTMS deployment in
Europe – let‘s discuss later during the panel discussion…
Some Lessons Learnt – and some requirements for the future… (2)
![Page 17: “15 years of Mitsui Rail Capital Europe” · MRCE B.V. was founded in 2004 in Amsterdam ... aspects of the Regulation EU 445/2011 for Locomotives (future: EU 2016/798) 2016: introduction](https://reader034.fdocuments.us/reader034/viewer/2022042411/5f2996239edefd65404f72b7/html5/thumbnails/17.jpg)
Mitsui Rail Capital Europe B.V.
Barbara Strozzilaan 366
(Eurocenter Building 2, 5th Floor)
1083 HN Amsterdam
Netherlands
Tel.: + 31 (0) 20 70 85 910
Mitsui Rail Capital Europe GmbH
Landsberger Str. 312
80687 München
Germany
Tel.: +49 (0) 89 818 867 100
Milan Branch
Piazza del Liberty 2
20121 Milano, Italy
Tel.: +39 (0) 2 6223 501
www.mrce.eu