AOA ENVIRONMENT CONFERENCE
PLANNING & NOISE
Jon BottomleyPrincipal Planner M.A.G
![Page 2: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/2.jpg)
ICAO BALANCED APPROACH - PLANNING
• Planning Instruments – Interventionist, noise zoning, transfer of development rights, acquisition•Mitigation Instruments – Building Regulations, SIGS, land acquisition & relocation, transaction assistance, local searches, physical mitigation• Financial Instruments – Tax incentives, noise related charges, funding mitigation and community measures
2
![Page 3: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/3.jpg)
3
REDUCING NOISE CONTOURS
![Page 4: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/4.jpg)
4
POPULATION ENCROACHMENT
•Where contours have shrunk land has become available for development – largely in the outer contours (9% increase). Most significant at LHR
![Page 5: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/5.jpg)
5
PLANNING POLICY
• UK system – plan led – nationally – 1990 Act, 2012 NPPF• Other national policy – Aviation Policy Framework, EIA Directive, EU Noise Directive etc etc…• Regional planning?• Local Plans – the statutory starting point. Development must accord unless there are material considerations that indicate otherwise
![Page 6: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/6.jpg)
6
DEVELOPMENT CONTROL
• Airports are consultees for developments in the local area. Statutory for safeguarding, but important stakeholders for other developments.• Conditions must be; necessary; relevant to planning; relevant to the development; enforceable; precise; and reasonable.• Standard policies for noise sensitive development – Noise Exposure Categories – PPG24
![Page 7: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/7.jpg)
7
IS THE PLANNING SYSTEM DELIVERING?
• The NPPF is now 65 pages, scope for challenge on interpretation• Other areas of regulation remain – Sustainability Appraisals, EIA Regs etc. Proportionate to the policy / development• Increasing quantity of material required to support planning applications and associated procedures• Statutory Consultees (EA, NE, HA)• Caution in decision-making?• Judicial Review
![Page 8: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/8.jpg)
8
THE NEED FOR BETTER PLANNING GUIDANCE
• PPG24 has been deleted – its aim was to ensure noise sensitive development is compatible with existing noisy developments• Noise Exposure Categories gave a national mechanism for controlling land use around airports• Better planning and control of inappropriate development• Risk of inconsistent national and local policy on noise
![Page 9: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/9.jpg)
9
A LACK OF CONSISTENCY?
• Aviation Policy Framework – to minimise and where possible reduce the number of people affected by aircraft noise• Population encroachment• LGW – new housing development in the 66dB contour• LHR – some new planning policy does not recognise the Airport’s noise contours as a development constraint• Safeguarding future airport capacity
![Page 10: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/10.jpg)
10
A NEW APPROACH IS NEEDED
• A simplified NPPF is welcomed• National metrics – provide a common starting point for LPA’s and certainty for airports• To be included in DfT Aviation policy – a material consideration when determining applications?• To be led by SA – national metrics; based on contours; guidance on policy and mitigation• Cannot be delivered by airports alone – DCLG, LGA, LPA’s
![Page 11: AOA ENVIRONMENT CONFERENCE PLANNING & NOISE Jon Bottomley Principal Planner M.A.G.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649e6b5503460f94b690fc/html5/thumbnails/11.jpg)
11
CONCLUSIONS
• Significant noise improvements around airports have been achieved• There is a need to protect areas affected by existing or future noise from population encroachment• A consistent approach to planning policy in respect of noise sensitive development• Shaping future local planning policy• Consistency between Noise Action Plans and Master Plans