ANY LOCATION - krydon.comkrydon.com/wp-content/uploads/2015/07/Pepro-Integrated-Fixed-Sites... ·...
Transcript of ANY LOCATION - krydon.comkrydon.com/wp-content/uploads/2015/07/Pepro-Integrated-Fixed-Sites... ·...
ANY LOCATION
ANY ENVIRONMENT
We are the leading manufacturer of patented* shielded enclosure systems for
your communication needs. The Bureau of Land Management, National Park
Service, U.S. Forest Service and other government and state agencies rely on
Pepro’s Fixed Radio Sites to provide uninterrupted communication in extremely
hostile environments.
Protect Your Vital Communication Capabilities with a Secure Fixed Radio Site from Pepro.
Organ Pipe Cactus National Monument, AZ
Clearwater NF, ID
North Central, PA
North Carolina Tower Site Mt. Hood NF, OR
Olympic NF, WA
ANY TERRAIN
Pepro’s Integrated Fixed Radio Sites are your complete site solution: Shelter, Anchoring, Grounding systems and optional towers.
Through computer analysis and component selection, Pepro will customize a total site to meet your equipment needs with the lowest completed cost in the industry.
We offer different size enclosures depending on your equipment requirements.
When Performance Isn’t Optional!
671 Colbert Avenue • Oil City, PA 16301P: (814) 676-5688 • F: (814) 676-3729 [email protected] • www.peprollc.com
Our patented unguyed articulating towers (patent #7,385,147) can withstand up to 120 mph
winds depending on deployment configuration. Meets TIA/EIA-222-G Windload standards.
Shelter Sizes 10’ 20’ 30’ 40’ 52’
Micro � �6 x 6 � � �6 x 8 � � �8 x 8 � � � �8 x 10 � � � �8 x 12 � � � �8 x 16 � � � �10 x 12 � � � �10 x 16 � � � �10 x 20 � � � �
Optional Tower Sizes
Available Shelter Sizes
Micro SitesThe Pepro Micro Site (as pictured) contains
one, 27 rack unit that is accessible from the
front and back. The frame of the Micro Site can be outfitted with an optional axle and tongue for deployment purposes.
Pepro’s Innovative Deployment System provides for a GREEN SOLUTION that helps meet federal regulationsPepro’s integrated fixed radio sites require no foundation and
no excavation, this eliminates the need for geo-technical,
environmental impact and/or archeological studies.*
Pepro radio sites can be installed and removed in less than
a day and never leave a footprint.
• Little to no ground disturbance
• No excavation
• No permanent foundation
*After initial site selection approval.
RFI70 dB rating from
20 MHz to 3.29 GHz
LIGHTNING Over 1 Million volt, 82,000 amp
direct strike on enclosure with less than 10 microjoule penetration inside enclosure.
EMI 40dB
Magnetic Field
Technical Specifications Independent Laboratory-Tested Protection Levels
Grounding System
All Pepro shelters utilize our patented Faraday Cage technology (patent #5,749,178) and come with a complete grounding system specified by Lightning Technologies, Inc., an independent testing laboratory. The Ufer grounding pad meets NEC 250.52 specifications.
Cable Entry Gland(patent # 7,046,521)
Power Entry Module Ufer Grounding Pad
Anchoring Systems
Extended Outrigger w/Ballast Basket
Short Outrigger
Angle Bracket bolted to existing foundation
Ventilation Options
Passive Ventilation Fan Ventilation A/C
Testing performed by Lightning Technologies, Inc. and National Technical Systems, Inc.Meets all applicable NEC and OSHA clearance standards.
Over 20 years in the industry without a single failure or upset due to lightning.
Complete Turnkey Site Installation Services
Quality installations in a timely manner
Professional safety minded installation crew
Field Engineer works directly with site coordinator
Company owned transportation and installation equipment
Lowest completed cost in the industry
PEPRO LLC • 671 Colbert Avenue • Oil City, PA 16301P: (814) 676-5688 • F: (814) 676-3729 • [email protected] www.peprollc.com
Copyright © PEPRO LLC 2012, all rights reserved. IFRSv3 PC2/12
*These products are covered under patent #’s 5,749,178; 7,046,521; 7,385,147 and 7,688,595 and all patents pending.Due to continuous product improvements, specifications and/or equipment changes may be made without prior notification.
Contracting qualifies for 8a, American Indian, HUBZone Disadvantaged and Woman-Owned Small Business