Antonoil Rig Service Introduction

14
Antonoil Rig Service Introduction

Transcript of Antonoil Rig Service Introduction

Page 1: Antonoil Rig Service Introduction

Antonoil Rig Service Introduction

Page 2: Antonoil Rig Service Introduction

2

Contents

01

02

03

Equipment Fleet

Service Model

Important Accomplishment

Page 3: Antonoil Rig Service Introduction

3

Equipment Fleet

Total Management of 25 Rigs 8 sets ( 1500HPX6, 2000HPX2) –Self-Owned

Page 4: Antonoil Rig Service Introduction

4

ChongqingChengdu

Lanzhou

Huhehaote

Xian

BeijingSulige gas field

Southwest oil&gas field

Yanchang oilfield

Changqingoilfield

Main Markets:

Southwest oil & gas

field

Changqing oilfield

Sulige gas field

Yanchang oilfield

Iraq Halfaya oilfield

Shengli oilfield

Equipment Fleet

Page 5: Antonoil Rig Service Introduction

5

Contents

01

02

03

Equipment Fleet

Service Model

Important Accomplishment

Page 6: Antonoil Rig Service Introduction

6

RIG SERVICE

Day Rate Drilling Service

ZJ50LDB

ZJ50DB

ZJ70DB

Lump Sum Contract

Drilling Service

Lump Sum for Drilling

Engineering

Vertical Well

Horizontal Well

Deviated Well

Pad Well

Risk Management

Rig Management

Rig Evaluation, Design and Consulting

Technical Supervision

Training

QHSE Management

Service Model

Page 7: Antonoil Rig Service Introduction

7

Plain/mountainous area/desert/marsh

Exploration/Development well

Shallow/Deep/Ultra-deep well

Vertical/Horizontal well

Lateral well

Sidetrack drilling

Gas storage

Coal bed methane

Shale gas

Brine, etc. 2018 Footage:20,5200 m

Service Model

Terrain

Well Type

Page 8: Antonoil Rig Service Introduction

8

Contents

01

02

03

Equipment Fleet

Service Model

Important Accomplishment

Page 9: Antonoil Rig Service Introduction

9

99

No Year Name Service Content Well No.

1 2011Sulige Gas Field dual-lateral horizontal well drilling & completion and multi-staged fracturing IPM service

Program design 、integrated drilling engineering service (rig,technique, bit, down-hole tool)、directional drilling and Geo-steering service, mud service 、5 stagefracturing service

1

2 2011Shenhua CCS project,Drilling & completion and CO2injection IPM service

Program design 、integrated drilling engineering service、Mud logging、WL logging、Mud service、formation test、cementing 、perforation、fracturing、Casing supply、Pneumatic Sealing Test, CO2 injection.

2

3 2011 Daqing Oilfield UBD side-tracking horizontal well drilling & completion IPM service

Program design 、Side-tracking in casing 、integrated drilling engineering service、OBM service、DP logging、UBD service、multi-staged completion service

1

4 2012 Daqing Oilfield Coal-gas development IPM service for whole block

Program design , site construction、、integrated drilling engineering service、foam drilling fluid、WL Coring service、dual-staged cementing 、waste disposal

10

5 2012 Xingjiang Kelamayi side-tracking horizontal well drilling & completion IPM service

Program design , Side-tracking in casing 、Geo-steeringservice、integrated drilling engineering service 、drilling and completion fluid service、DP logging、Staged fraturing service、well test.

1

6 2012 TWE Coal-gas well drilling& completion IPM Service

Program design , site construction、integrated drilling engineering service 、drilling and completion fluidservice, Mud logging、WL logging、Cementing、waste disposal

2

Quick Response Careful Preparation Timetable

Important accomplishment

Page 10: Antonoil Rig Service Introduction

10

10

No Year Name Service Content Well No.

7 2013 Geothermal Drilling IPM service in Tianjin

Integrated drilling engineering service (rig, technique, bit, down-hole tools, fishing ),directional drilling service, Mud service, Casing Running & Cementing

5

8 2013 Sichuan horizontal well drilling &completion Service

Program design , directional drilling and Geo-steering service、Mud service, completion 5

9 2013Yanchang oilfield side-tracking horizontal well drilling & completion and fracturing IPM service

Geological analysis, well pattern arrangement, Well program design 、Integrated drilling engineering service 、directional drilling and Geo-steering service、Mud service、 side-tracking in casing、multi-staged fracturing、well test

2

10 2014 Geothermal Drilling IPM service in Beijing

Integrated drilling engineering service (rig, technique, bit, downhole tools, fishing ),directional drilling service, Mud service, Casing Running & Cementing , waste disposal

4

11 2014Xingjiang Kelamayi side-tracking horizontal well drilling & completion and fracturing IPM service

Program design、Integrated drilling engineering service 、Side-tracking、directional drilling and Geo-steering service、mud service、WL logging、multi-staged completion and fracturing.

15

12 2014Yanchang oilfield side-tracking horizontal well drilling & completion and fracturing IPM service

Geological analysis, well pattern arrangement, Well program design 、Integrated drilling engineering service 、directional drilling and Geo-steering service、Mud service、 side-tracking in casing、multi-staged fracturing、well test

2

13 2014 Tarim dual-lateral horizontal well Drilling & completion IPM service

Drilling program design、Integrated drilling engineering service、directional drilling service,RSS + LWD service ,multi-staged completion

1

14 2014 Salt well drilling/completion IPM service

Site/ road construction、Integrated drilling engineering service 、Drilling fluid、Coring service、Directional drilling and RMRS service、Cementing、WL logging、Mud logging、Casing, well-head supply、Waste disposal

2+2

Important accomplishment

Page 11: Antonoil Rig Service Introduction

11

No Year Name Service Content Well No.

15 2014North Sulige horizontal drilling& completion and multi-staged fracturing IPM service

Geological analysis/program design/integrated drilling engineering service/WBM service、directional drilling and geo-steering service、Cementing 、Multi-staged fracturing、well test、waste disposal

1

16 2014Jingmen shale gas well drilling & completion, fracturing,, well test IPM service

Program design, integrated drilling engineering service, WBM service, directional drilling, mud logging ,WL logging , Cementing, Multi-staged fracturing, well test, waste disposal

1

17 2015Yanchang oilfield horizontal 、Xinjiang Oilfield horizontal well Drilling IPM service

Integrated drilling engineering service (rig, technique, bit, downhole tools, fishing ),directional drilling service, Mud service, Casing Running & Cementing , waste disposal

6

18 2016IRAQ Halfaya oilfield Drilling IPM service

Integrated drilling engineering service (rig, technique, bit, downhole tools, fishing ),directional drilling service, Mud service, Casing Running & Cementing , waste disposal 4

19 2016 IPM service for POLY-GCL in Ethiopia

Integrated drilling engineering service (rig, technique, bit, downhole tools, fishing ),directional drilling service, Mud service, Casing Running & Cementing , waste disposal

10

20 2017 Total south sulige block Drilling engineering IPM service

Integrated drilling engineering service (rig, technique, bit, downhole tools, fishing ),directional drilling service, Mud service, Casing Running & Cementing , waste disposal

6

21 2018 Southwest Shale gas IPM service Integrated drilling service, completion service, Fracturing service,testing service

Important accomplishment

Page 12: Antonoil Rig Service Introduction

12

Well Name Su77-18-40H2 ClientCNPC XiBu Drilling

Engineering Company Limited

Service Mode Turnkey Drilling Service

Type of Well Development Well Type of Well bore Horizontal Well

Tentative TD 5309.54m Total Depth 5304m

Target Formation Lower He 8, Shihezi Fm Landing Formation Lower He 8, Shihezi Fm

Tentative Completion Design Open Hole Completion Completion Method Open Hole Completion

Date Spud-in 2013/7/27 Date Drilling Completed 2013.11.15

Date Final Completion 2013/11/22 Complete Period 86 days

Wellbore quality Qualified Cementing Quality Qualified

Long horizontal section drilling - Su77-18-40H2

Important accomplishment

Page 13: Antonoil Rig Service Introduction

13

Challenges Hard to control wellbore quality without

centralizer during spud-in and intermediatesection.

Unconsolidated formation (Yan’an Formation,Yanchang Formation mainly composed of silt) atintermediate section to cause unstable wellbore.

Unstable Lower Liujiagou Formation to causeloss of circulation and well kick.

Unstable wellbore in build-up section(Shiqianfeng formation and Shihezi Formation)to cause hole collapse.

Long intermediate open section, bringingdifficulty for casing running.

Expected slow ROP at build-up section andhorizontal section.

Solutions & Results Wellbore quality achieved desired well design. Well drilled at 5306M TD with 2028M horizontal

section.

Important accomplishment

Page 14: Antonoil Rig Service Introduction

www.antonoil.com

Helping others succeed…

THANKS!