Ansaldo Energia AE94.2 Upgrading Project

20
AE94.2 UPGRADING PROJECT Stefano Traverso Federico Bonzani Product Development Product Development AE94.2 Project Manager Head of Turbomachinery [email protected] [email protected] 19 th AE94 2 Users Conference 19 AE94.2 Users Conference Kuala Lumpur, December 2 nd 2010

Transcript of Ansaldo Energia AE94.2 Upgrading Project

Page 1: Ansaldo Energia AE94.2 Upgrading Project

AE94.2 UPGRADING PROJECT

Stefano Traverso Federico BonzaniProduct DevelopmentProduct Development

AE94.2 Project Manager Head of [email protected] [email protected]

19th AE94 2 Users Conference19 AE94.2 Users ConferenceKuala Lumpur, December 2nd 2010

Page 2: Ansaldo Energia AE94.2 Upgrading Project

Contents

New development for Ansaldo Energia AE94.2New development for Ansaldo Energia AE94.2

F D l t d P d t O iFrame Development and Product Overview

AE94.2-Evo1 details

AE94.2-Evo2 overview

Summary and Conclusiony

Pag. 1Ansaldo Enegia 2010. All rights reserved

Page 3: Ansaldo Energia AE94.2 Upgrading Project

Contents

New development for Ansaldo Energia AE94.2New development for Ansaldo Energia AE94.2

F D l t d P d t O iF D l t d P d t O iFrame Development and Product OverviewFrame Development and Product Overview

AE94.2-Evo1 details

AE94.2-Evo2 overview

Summary and Conclusiony

Pag. 2Ansaldo Enegia 2010. All rights reserved

Page 4: Ansaldo Energia AE94.2 Upgrading Project

Product Development Roadmap

1075°C 33MAC1090°C 33MAC

UP TO 1075°C 41MAC

Availability Optimized

AE94 2 Evo2

Future Upgrades

1060°C 41MACUP TO 1075 C 41MAC

AE94 2 6+

AE94.2-Evo1

AE94.2-Evo2

New Compressorolut

ion

94.2-3

94.2-6

AE94.2-6+

TT1+

HCO

Opt.Comp.

Opt. HGP components.

New Burner 15ppm (methane)

New 3D Turbine B&V

1090°CEvo

94.2 3 TT1

CMF+

1075°C

Basis

1060°C

p p

1075°C 1090°C

Pag. 3Ansaldo Enegia 2010. All rights reserved

2010 201320071999÷2004Year of introduction

Page 5: Ansaldo Energia AE94.2 Upgrading Project

Technical Features for new AE94.2 Evo1/Evo2

Evo1/2Burner (HW7 package)

15ppm@1090°CISO

Evo1/2Mixing chamber (HW3 package)

Evo2Turbine (HW4 package)

Evo1/2extensive TBC protecting layer

Evo2New AE3D Turbine (I-IV stages)

Evo1Turbine (HW2 package)

Optimized Turbine (I-II stages)

Evo2Compressor (HW5 package)

New AE3D Compressor (I-V stages)

p ( g )

Evo1/2Hot Gas Casing (HW3 package)

extensive TBC protecting layer Optimized cooling flowsOptimized cooling flows

Upgrades Packages Upgrades Packages AE94 2 itAE94 2 it

TT1 1090TT1 1090°°C C or or

Pag. 4Ansaldo Enegia 2010. All rights reserved

over AE94.2 unitsover AE94.2 units ooMAC41@up to 1075MAC41@up to 1075°°CC

Page 6: Ansaldo Energia AE94.2 Upgrading Project

AE94.2 : Development Packages Benefits

@

94.2-6 94.2-6+ 94.2-Evo1 94.2-Evo215°C 15°C 30°C 30°C

GT VersionΔTT1 Benefit expected over 94.2-3@1060°C

Single Cycle, ISO conditions, Natural gas firing

+15°C +15°C +30°C +30°C

+7.3MW +10.6MW +14.6MW +29MW

+0.2pt% +0.5pt% +0.6pt% +2.0pt%

ΔTT1

ΔPower(*)

ΔEfficiency(*)

2004 2008 2010 2013Availability- Upgrading Packages

TT1+ TT1+

CMF+ CMF+

HCO Hydraulic Clearence Optimisation

6+ IGV & CV16 Optimized

HW2 Enhanced Turbine B&V coatings

HW3Enhanced inner casing coatings

Enhanced mixing chamber coatings

HW7 New Burner 15ppm (methane)HW7 New Burner 15ppm (methane)

HW5 New 3D compressor

HW4 New 3D turbine Blades & Vanes

Pag. 5Ansaldo Enegia 2010. All rights reserved

All Upgrades Packages are Fully Retrofittable over 94.2-3 / 94.2-6

Page 7: Ansaldo Energia AE94.2 Upgrading Project

Contents

New development for Ansaldo Energia AE94.2New development for Ansaldo Energia AE94.2

F D l t d P d t O iFrame Development and Product Overview

AE94.2AE94.2--Evo1 detailsEvo1 details

AE94.2-Evo2 overview

Summary and Conclusiony

Pag. 6Ansaldo Enegia 2010. All rights reserved

Page 8: Ansaldo Energia AE94.2 Upgrading Project

HW2 : Vanes and Blades package

New coatings (BC and TBC)

Improve thermo-mechanical behavior

+15°C TT1 @ 33MAC

TARGETS

Vane #1 Vane #2

+15°C TT1 @ 33MAC

+5°C TT1 @ 41MAC

Potential life extension for Blade 1 and Blade 2.

33MAC @ 1090°C

41MAC @ 1065°C

Pag. 7Ansaldo Enegia 2010. All rights reserved

Blade #1 Blade #2New HW2 vs previous design

Page 9: Ansaldo Energia AE94.2 Upgrading Project

HW3 : Improved combustion chamber

New coatings on IC and MC

Reduced thermal stresses

I d li bilitImproved reliability

Reduced damages

Red ced maintenance cost

Inner casing

Reduced maintenance cost

Pag. 8Ansaldo Enegia 2010. All rights reserved

Mixing chamber

Page 10: Ansaldo Energia AE94.2 Upgrading Project

HW7 : New Low NOx Burner

Benefit (natural gas firing)

Compared to HR3-Burner further NOx reduction

NOx emission below 15ppm

Enhanced combustion stability

F rther flashback resistanceFurther flashback resistance

Scope

New diagonal swirlerNew diagonal swirler

Enhanced pilot flame system

Enhanced ignition system

Pag. 9Ansaldo Enegia 2010. All rights reserved

Page 11: Ansaldo Energia AE94.2 Upgrading Project

AE94.2 Evo1 : Summary

Upgrade Scope (HW2 & HW3 upgrade packages)

Advanced coatings (BC & TBC) on turbine blades and vanes

Advanced coatings (BC & TBC) on mixing chamber and inner casing

New advanced low NOx burner for natural gas firingNew advanced low NOx burner for natural gas firing

Benefit

Turbine inlet temperature increase from 1075°C to 1090°CTurbine inlet temperature increase from 1075 C to 1090 C

Open/Combined cycle improvements:

Increase in GT power output

Increase in GT exhaust energy / Combined Cycle efficiency

NOx emission below 15ppm (natural gas firing)

Maintenance Interval Extension 41MAC @ 1065°C (for base load units):

Increased efficiency & power output (+5°C TT1 respect to MAC41@ 1060°C)

Pag. 10Ansaldo Enegia 2010. All rights reserved

Reduction of maintenance costs

Page 12: Ansaldo Energia AE94.2 Upgrading Project

Contents

New development for Ansaldo Energia AE94.2New development for Ansaldo Energia AE94.2

F D l t d P d t O iFrame Development and Product Overview

AE94.2-Evo1 details

AE94.2AE94.2--Evo2 overviewEvo2 overview

Summary and Conclusiony

Pag. 11Ansaldo Enegia 2010. All rights reserved

Page 13: Ansaldo Energia AE94.2 Upgrading Project

HW4 : New AE3D GT Blades & Vanes

New aerodynamic features

Reduced stage losses by fully 3D design

reduction of trailing edge thickness

y

Expansion line optimization

8 l t l 3D bl d & V8 completely new 3D blades & Vanes

New GT application on Evo2

Retrofit on AE94.2-3 and AE94.2-6 Increased power and efficiencyIncreased maintenance intervals @1075°C (41MAC@1075°C)

Pag. 12Ansaldo Enegia 2010. All rights reserved

Page 14: Ansaldo Energia AE94.2 Upgrading Project

HW4 : AE3D Performance Benefits

Fully Retrofittable over 94.2-3 / 94.2-6

Optimized 3D d i

y

Enhanced base

aerodynamic airfoil design

Reduced

AE3D

AE3DAE3D

P (*) GT

Enhanced base material and

coatings

Reduced cooling/leakage

air flows

AE3D

AE3D AE3D

AE3DPower(*) GT

+8 MWEfficiency(*) GT

AE3D

AE3DAE3D

Efficiency GT +1.2pt%AE3D

3

AE3D

Pag. 13Ansaldo Enegia 2010. All rights reserved

(*) expected values for 94.2-6 upgrade @1075°C ISO conditions, Single Cycle, Methane firing.

Page 15: Ansaldo Energia AE94.2 Upgrading Project

HW4 : Roadmap toward AE3D Turbine B&V

12/13 : Product Validation

04/13 : AE3D Turbine Blades & Vanes available

04/12 : Product commercialization04/12 : Product commercialization

09/10 : Concurrent Engineering with casting suppliers startg pp

01/10 : Product specification

03/09 : Project Start

Pag. 14Ansaldo Enegia 2010. All rights reserved

Page 16: Ansaldo Energia AE94.2 Upgrading Project

HW5 : Fully 3D Compressor Blades & Vanes

Five front stages fully 3D designg y g

Completely retrofitable on AE94.2 range gas turbine with same rotor di kdisks too

+4% inlet mass flow @same efficiencyefficiency

Low mass flow variations against ambient temperatureambient temperature

High turndown capabilities

W t i bilitiWet compression capabilities

A il 12 P d t i li ti

Pag. 15Ansaldo Enegia 2010. All rights reserved

April 12 : Product commercialization

Page 17: Ansaldo Energia AE94.2 Upgrading Project

AE94.2 Evo2 : Summary

Upgrade Scope (HW4, HW3 and HW5 upgrade packages)

New Ansaldo Energia 3D turbine blades and vanes,

New aerodynamic optimized 1-5 compressor stages,

Advanced coatings (BC & TBC) on mixing chamber and inner casing

Benefit

Evo2 Turbine inlet temperature fixed to 1090°CEvo2 Turbine inlet temperature fixed to 1090 C

+10.0% increased power output in Simple Cycle(*)

+8.0% increased power output in Combined cycle(**)8.0% increased power output in Combined cycle( )

more than +1.4pt% increased efficiency in Simple Cycle (Up to 4.0% higher exhaust mass flow provide more power output in case of existing combined cycle or combined cycle extension compared to HW4 package only)cycle or combined cycle extension compared to HW4 package only)

Maintenance Interval Extension @ 1075°C (41MAC for base load units)

Pag. 16Ansaldo Enegia 2010. All rights reserved

(**) w/o design limit in Combined plant parts(*) ISO conditions, methane firing

Page 18: Ansaldo Energia AE94.2 Upgrading Project

Contents

New development for Ansaldo Energia AE94.2New development for Ansaldo Energia AE94.2

F D l t d P d t O iFrame Development and Product Overview

AE94.2-Evo1 details

AE94.2-Evo2 overview

Summary and ConclusionSummary and Conclusionyy

Pag. 17Ansaldo Enegia 2010. All rights reserved

Page 19: Ansaldo Energia AE94.2 Upgrading Project

Summary & Conclusion

Ansaldo Energia Upgrade present and future packages for AE94 2Ansaldo Energia Upgrade present and future packages for AE94.2 have been presented.

All upgrade packages are modular, can be combined and are completely retrofitable.

Extended maintenance interval MAC41 up to 1075°C ISO (by HW2 HW4 d HW3 k )or HW4 and HW3 packages).

Decreasing combustion emissions by new VeLoNoxTM low NOx Burner (15ppm for methane firing units)Burner (15ppm for methane firing units).

Further development is ensured.

Pag. 18Ansaldo Enegia 2010. All rights reserved

Page 20: Ansaldo Energia AE94.2 Upgrading Project

AE94.2 UPGRADING PROJECT

MANY THANKS FOR YOUR ATTENTION

19th AE94 2 Users Conference19 AE94.2 Users ConferenceKuala Lumpur, December 2nd 2010