Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations...

77
2009 - 2010 Annual Report

Transcript of Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations...

Page 1: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

2009 - 2010

Annual Report

Page 2: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

CONTENTS

1. Scheduled Energy and Bills from

CPSU and CTU ------ Page 2 - 9

2. Power Trading through IEX ------ Page 10 - 16

3. Bilateral Trading (STOA) ------ Page 17 - 21

4. Status of UI Account ------ Page 22 - 37

5. Status of Reactive Energy Account ------ Page 38 - 52

6. Local Generation data ------ Page 53 - 55

7. Tripping & Outage of State

Transmission Line (132kV level) ------ Page 56 - 63

8. Bar Chart of Actual Drawal of Power ------ Page 64 - 76

Page 1

Page 3: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Scheduled Energy & Bills

From

CPSU and CTU

Page 2

Page 4: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

PGCIL

Total Energy

Scheduled

Total Bill

Amount

Transmission

charge

( in MU ) ( Rupees in Lakhs ) ( Rupees in Lakhs )

Apr-09 19.35 401.67 81.52 483.19

May-09 22.51 427.20 81.71 508.91

Jun-09 28.51 457.86 80.28 538.14

Jul-09 33.72 513.39 87.77 601.16

Aug-09 35.75 538.41 85.20 623.61

Sep-09 30.31 501.21 85.20 586.41

Oct-09 31.66 537.94 92.20 630.14

Nov-09 24.98 464.08 83.48 547.56

Dec-09 23.90 405.83 86.45 492.28

Jan-10 20.63 435.74 87.10 522.84

Feb-10 17.73 434.04 79.71 513.75

Mar-10 19.83 405.26 80.42 485.68

G.TOTAL 308.88 5522.63 1011.04 6533.67

Months Total

ABSTRACT OF MONTHLY BILLS FROM CPSU AND CTU

NEEPCO / NHPC / TSECL

Percentage of Bills from CPSU and CTU during 2009 - 2010 :

TSECL

12%

PGCIL

15%

NEEPCO

69%

NHPC

4%

Page 3

Page 5: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month : April, 2009

(a) Power Stations

Name of Stations AgenciesScheduled

Energy in MU

Bill Amount

in LakhsRemarks

Ranaganadi HEP NEEPCO 3.38 82.27

Kopili HEP NEEPCO 0.79 12.80

Kopili - II HEP NEEPCO 0.10 3.18

Khandong HEP NEEPCO 0.08 1.71

Doyang HEP NEEPCO 0.17 13.11

AGBPP NEEPCO 7.47 155.43

AGTPP NEEPCO 3.24 58.99

15.23 327.49

Loktak HEP NHPC 0.84 10.56

Baramura TSECL 3.28 63.62

19.35 401.67

(b) Transmission Charge & NER-ULDC Charge

Bill Amount

in LakhsRemarks

81.52

For the Month : May, 2009

(a) Power Stations

Name of Stations AgenciesScheduled

Energy in MU

Bill Amount

in LakhsRemarks

Ranaganadi HEP NEEPCO 5.34 107.21

Kopili HEP NEEPCO 1.59 10.11

Kopili - II HEP NEEPCO 0.24 6.88

Khandong HEP NEEPCO 0.32 4.92

Doyang HEP NEEPCO 0.06 5.74

AGBPP NEEPCO 7.74 158.96

AGTPP NEEPCO 3.26 57.87

18.55 351.69

Loktak HEP NHPC 0.73 12.71

Baramura TSECL 3.23 62.80

22.51 427.20

(b) Transmission Charge & NER-ULDC Charge

Bill Amount

in LakhsRemarks

81.71

NEEPCO Total =

TOTAL

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

MONTHWISE ENERGY SCHEDULED, TRANSMISSION CHARGE AND TOTAL BILL AMOUNT

NEEPCO Total =

TOTAL

Power Grid Corporation of India Ltd (PGCIL)

Name of Agencies

Page 4

Page 6: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month : June, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 5.40 105.54Kopili HEP NEEPCO 3.52 21.91Kopili - II HEP NEEPCO 0.59 9.06Khandong HEP NEEPCO 0.65 6.45Doyang HEP NEEPCO 0.44 17.71AGBPP NEEPCO 7.70 161.73AGTPP NEEPCO 3.25 58.84

21.55 381.24Loktak HEP NHPC 3.55 10.49Baramura TSECL 3.41 66.13

28.51 457.86

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

80.28

For the Month : July, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 9.16 136.74Kopili HEP NEEPCO 3.11 19.08Kopili - II HEP NEEPCO 0.79 11.45Khandong HEP NEEPCO 0.93 8.16Doyang HEP NEEPCO 1.07 30.80AGBPP NEEPCO 7.87 166.83AGTPP NEEPCO 3.36 60.65

26.29 433.71Loktak HEP NHPC 3.94 11.88Baramura TSECL 3.49 67.80

33.72 513.39

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

87.77Power Grid Corporation of India Ltd (PGCIL)

Power Grid Corporation of India Ltd (PGCIL)

NEEPCO Total =

TOTAL

Name of Agencies

MONTHWISE ENERGY SCHEDULED, TRANSMISSION CHARGE AND TOTAL BILL AMOUNT

NEEPCO Total =

TOTAL

Name of Agencies

Page 5

Page 7: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month : August, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 11.81 157.21Kopili HEP NEEPCO 4.47 24.02Kopili - II HEP NEEPCO 0.98 13.47Khandong HEP NEEPCO 1.31 10.06Doyang HEP NEEPCO 2.19 48.17AGBPP NEEPCO 6.77 140.90AGTPP NEEPCO 3.31 59.84

30.84 453.67Loktak HEP NHPC 1.54 19.37Baramura TSECL 3.37 65.37

35.75 538.41

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

85.20

For the Month : September, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 5.99 110.09Kopili HEP NEEPCO 4.43 24.03Kopili - II HEP NEEPCO 0.84 11.82Khandong HEP NEEPCO 0.90 8.04Doyang HEP NEEPCO 1.80 39.18AGBPP NEEPCO 7.00 149.07AGTPP NEEPCO 3.26 58.93

24.22 401.16Loktak HEP NHPC 2.82 36.61Baramura TSECL 3.27 63.44

30.31 501.21

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

85.20

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

NEEPCO Total =

TOTAL

MONTHWISE ENERGY SCHEDULED, TRANSMISSION CHARGE AND TOTAL BILL AMOUNT

NEEPCO Total =

TOTAL

Page 6

Page 8: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month : October, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 5.15 105.76Kopili HEP NEEPCO 4.68 24.61Kopili - II HEP NEEPCO 0.82 11.89Khandong HEP NEEPCO 0.82 7.94Doyang HEP NEEPCO 1.77 39.12AGBPP NEEPCO 8.52 184.36AGTPP NEEPCO 3.34 60.44

25.10 434.12Loktak HEP NHPC 3.17 37.94Baramura TSECL 3.39 65.88

31.66 537.94

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

92.20

For the Month : November, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 2.85 83.96Kopili HEP NEEPCO 3.86 20.97Kopili - II HEP NEEPCO 0.27 6.89Khandong HEP NEEPCO 0.30 5.55Doyang HEP NEEPCO 0.56 22.61AGBPP NEEPCO 8.10 173.25AGTPP NEEPCO 3.30 59.61

19.24 372.84Loktak HEP NHPC 2.41 26.52Baramura TSECL 3.33 64.72

24.98 464.08

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

83.48

TOTAL

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

TOTAL

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

NEEPCO Total =

MONTHWISE ENERGY SCHEDULED, TRANSMISSION CHARGE AND TOTAL BILL AMOUNT

NEEPCO Total =

Page 7

Page 9: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month : December, 2009(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 2.32 75.98Kopili HEP NEEPCO 3.52 20.08Kopili - II HEP NEEPCO 0.16 6.00Khandong HEP NEEPCO 0.21 5.25Doyang HEP NEEPCO 0.31 20.59AGBPP NEEPCO 8.36 124.73AGTPP NEEPCO 3.44 61.64

18.32 314.27Loktak HEP NHPC 2.07 23.33Baramura TSECL 3.51 68.23

23.90 405.83

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

86.45

For the Month : January, 2010(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 1.71 65.33Kopili HEP NEEPCO 1.11 12.20Kopili - II HEP NEEPCO 0.12 5.11Khandong HEP NEEPCO 0.38 5.40Doyang HEP NEEPCO 0.26 17.65AGBPP NEEPCO 8.35 175.62AGTPP NEEPCO 3.51 62.97

15.44 344.28Loktak HEP NHPC 1.70 23.66Baramura TSECL 3.49 67.80

20.63 435.74

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

87.10

NEEPCO Total =

TOTAL

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

NEEPCO Total =

TOTAL

Name of Agencies

Power Grid Corporation of India Ltd (PGCIL)

MONTHWISE ENERGY SCHEDULED, TRANSMISSION CHARGE AND TOTAL BILL AMOUNT

Page 8

Page 10: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month : February, 2010(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 1.33 58.49Kopili HEP NEEPCO 0.46 8.65Kopili - II HEP NEEPCO 0.00 0.05Khandong HEP NEEPCO 0.01 0.08Doyang HEP NEEPCO 0.20 12.25AGBPP NEEPCO 8.14 218.58AGTPP NEEPCO 3.18 57.60

13.32 355.70Loktak HEP NHPC 1.26 17.14Baramura TSECL 3.15 61.20

17.73 434.04

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

79.71

For the Month : March, 2010(a) Power Stations

Name of Stations Agencies Scheduled Energy in MU

Bill Amount in Lakhs Remarks

Ranaganadi HEP NEEPCO 3.76 89.04Kopili HEP NEEPCO 0.67 12.61Kopili - II HEP NEEPCO 0.00 0.00Khandong HEP NEEPCO 0.00 0.00Doyang HEP NEEPCO 0.19 13.55AGBPP NEEPCO 6.79 141.69AGTPP NEEPCO 3.34 60.24

14.75 317.13Loktak HEP NHPC 1.64 21.33Baramura TSECL 3.44 66.80

19.83 405.26

(b) Transmission Charge & NER-ULDC Charge Bill Amount

in Lakhs Remarks

80.42Power Grid Corporation of India Ltd (PGCIL)

Power Grid Corporation of India Ltd (PGCIL)

NEEPCO Total =

TOTAL

Name of Agencies

MONTHWISE ENERGY SCHEDULED, TRANSMISSION CHARGE AND TOTAL BILL AMOUNT

NEEPCO Total =

TOTAL

Name of Agencies

Page 9

Page 11: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Power Trading

through IEX

Page 10

Page 12: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

(MWH) ( Rs. ) (MWH) ( Rs. )

Apr-09 0.00 0.00 410.10 3466148.32

May-09 0.00 0.00 975.00 5748849.39

Jun-09 0.00 0.00 390.00 1536635.11

Jul-09 0.00 0.00 0.00 0.00

Aug-09 2043.54 11198281.59 0.00 0.00

Sep-09 296.41 1859965.43 0.00 0.00

Oct-09 434.68 2288223.51 0.00 0.00

Nov-09 40.00 173977.87 0.00 0.00

Dec-09 0.00 0.00 150 395939.77

Jan-10 0.00 0.00 0.00 0.00

Feb-10 0.00 0.00 360.00 1029603.35

Mar-10 0.00 0.00 120.00 402133.53

TOTAL 2814.63 15520448.40 2405.10 12579309.47

Energy Purchase

during the monthAmount Expense

MONTHLY ABSTRACT OF POWER TRADING / PURCHASE THROUGH

INDIAN ENERGY EXCHANGE

Months

Energy Sold

during the month

Amount

Received

Page 11

Page 13: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Month : April, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )1-Apr-09 0.00 0.00 67.51 549565.092-Apr-09 0.00 0.00 75.00 591125.913-Apr-09 0.00 0.00 15.00 128291.304-Apr-09 0.00 0.00 2.47 28775.408-Apr-09 0.00 0.00 5.00 52236.249-Apr-09 0.00 0.00 40.00 341415.9910-Apr-09 0.00 0.00 31.00 251084.3511-Apr-09 0.00 0.00 40.00 288884.5012-Apr-09 0.00 0.00 15.00 131896.3813-Apr-09 0.00 0.00 5.00 43838.7916-Apr-09 0.00 0.00 5.00 44129.4518-Apr-09 0.00 0.00 6.71 68641.8419-Apr-09 0.00 0.00 10.00 88941.5520-Apr-09 0.00 0.00 10.00 87693.7021-Apr-09 0.00 0.00 20.00 172185.3222-Apr-09 0.00 0.00 5.00 44061.8123-Apr-09 0.00 0.00 5.00 44426.9225-Apr-09 0.00 0.00 20.61 202171.9430-Apr-09 0.00 0.00 31.80 306781.84

TOTAL 0.00 0.00 410.10 3466148.32

Month : May, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )1-May-09 0.00 0.00 15.00 138372.652-May-09 0.00 0.00 15.00 112280.403-May-09 0.00 0.00 5.00 51765.854-May-09 0.00 0.00 5.00 43711.045-May-09 0.00 0.00 21.00 185600.746-May-09 0.00 0.00 13.00 111214.477-May-09 0.00 0.00 5.00 46001.808-May-09 0.00 0.00 45.00 373831.959-May-09 0.00 0.00 61.00 416665.0010-May-09 0.00 0.00 13.00 108597.4211-May-09 0.00 0.00 13.00 109277.7912-May-09 0.00 0.00 61.00 475837.4713-May-09 0.00 0.00 61.00 456467.3514-May-09 0.00 0.00 61.00 389902.8015-May-09 0.00 0.00 21.00 126956.6316-May-09 0.00 0.00 40.00 197059.8117-May-09 0.00 0.00 40.00 287938.4618-May-09 0.00 0.00 40.00 282222.4019-May-09 0.00 0.00 40.00 280610.3520-May-09 0.00 0.00 40.00 233680.9321-May-09 0.00 0.00 40.00 207168.9622-May-09 0.00 0.00 40.00 17104.7123-May-09 0.00 0.00 40.00 88386.4424-May-09 0.00 0.00 40.00 114158.3725-May-09 0.00 0.00 40.00 91739.4126-May-09 0.00 0.00 40.00 113288.0027-May-09 0.00 0.00 40.00 206742.2028-May-09 0.00 0.00 40.00 256256.1329-May-09 0.00 0.00 40.00 226009.86

TOTAL 0.00 0.00 975.00 5748849.39

Amount Expense

Amount Expense

Energy Purchase during the month

DateEnergy Sold

during the monthAmount

Received

DateEnergy Sold

during the monthAmount

Received

Energy Purchase during the month

POWER TRADING / PURCHASE THROUGH INDIAN ENERGY EXCHANGE

Page 12

Page 14: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Month : June, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )2-Jun-09 0.00 0.00 40.00 92438.773-Jun-09 0.00 0.00 40.00 101321.024-Jun-09 0.00 0.00 40.00 173934.755-Jun-09 0.00 0.00 40.00 160743.397-Jun-09 0.00 0.00 40.00 136313.498-Jun-09 0.00 0.00 40.00 121589.279-Jun-09 0.00 0.00 40.00 153407.65

10-Jun-09 0.00 0.00 35.00 168209.6211-Jun-09 0.00 0.00 35.00 183452.9714-Jun-09 0.00 0.00 40.00 245224.18

TOTAL 0.00 0.00 390.00 1536635.11

Month : July, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )

NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00

Month : August, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )3-Aug-09 64.00 167951.20 0.00 0.004-Aug-09 30.13 102937.44 0.00 0.005-Aug-09 144.00 578454.01 0.00 0.006-Aug-09 139.00 583052.37 0.00 0.007-Aug-09 136.46 566071.27 0.00 0.008-Aug-09 137.00 574345.65 0.00 0.009-Aug-09 131.00 692248.22 0.00 0.00

10-Aug-09 139.00 727170.39 0.00 0.0011-Aug-09 127.00 692355.87 0.00 0.0012-Aug-09 139.00 951519.17 0.00 0.0013-Aug-09 72.00 428472.15 0.00 0.0014-Aug-09 12.00 164911.40 0.00 0.0018-Aug-09 85.90 386476.88 0.00 0.0019-Aug-09 115.00 644993.62 0.00 0.0020-Aug-09 78.00 550002.43 0.00 0.0021-Aug-09 116.00 772309.04 0.00 0.0022-Aug-09 102.00 574939.97 0.00 0.0023-Aug-09 112.00 872180.17 0.00 0.0024-Aug-09 88.00 571548.90 0.00 0.0025-Aug-09 18.00 185269.85 0.00 0.0026-Aug-09 18.00 147715.50 0.00 0.0027-Aug-09 18.00 130042.75 0.00 0.0028-Aug-09 18.00 111967.30 0.00 0.0029-Aug-09 4.05 21346.04 0.00 0.00

TOTAL 2043.54 11198281.59 0.00 0.00

DateEnergy Purchase during the month Amount Expense

DateEnergy Sold

during the monthAmount

Received

Energy Purchase during the month Amount Expense

Energy Sold during the month

Amount Received

DateEnergy Sold

during the monthAmount

Received

Energy Purchase during the month Amount Expense

POWER TRADING / PURCHASE THROUGH INDIAN ENERGY EXCHANGE (Contd.)

Page 13

Page 15: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Month : September, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )1-Sep-09 8.00 45095.80 0.00 0.0015-Sep-09 5.00 21491.80 0.00 0.0016-Sep-09 18.00 74754.49 0.00 0.0017-Sep-09 15.00 65756.16 0.00 0.0018-Sep-09 10.00 45184.86 0.00 0.0020-Sep-09 8.00 44045.60 0.00 0.0021-Sep-09 13.00 58523.76 0.00 0.0022-Sep-09 38.00 191392.09 0.00 0.0023-Sep-09 20.00 145809.03 0.00 0.0024-Sep-09 20.00 152825.46 0.00 0.0025-Sep-09 30.00 221096.80 0.00 0.0026-Sep-09 30.00 207383.15 0.00 0.0027-Sep-09 24.00 155321.48 0.00 0.0028-Sep-09 21.41 156070.82 0.00 0.0029-Sep-09 20.00 151409.14 0.00 0.0030-Sep-09 16.00 123804.99 0.00 0.00

TOTAL 296.41 1859965.43 0.00 0.00

Month : October, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )1-Oct-09 31.00 218025.18 0.00 0.002-Oct-09 16.00 123680.00 0.00 0.003-Oct-09 12.00 92355.23 0.00 0.004-Oct-09 6.00 44937.02 0.00 0.0012-Oct-09 32.00 145012.72 0.00 0.0013-Oct-09 17.00 79934.96 0.00 0.0014-Oct-09 51.66 256278.87 0.00 0.0015-Oct-09 53.00 305290.17 0.00 0.0021-Oct-09 4.00 15420.08 0.00 0.0022-Oct-09 4.00 16437.88 0.00 0.0023-Oct-09 18.00 77080.91 0.00 0.0024-Oct-09 6.02 25464.61 0.00 0.0025-Oct-09 30.00 136918.10 0.00 0.0026-Oct-09 30.00 141553.98 0.00 0.0027-Oct-09 30.00 149630.16 0.00 0.0028-Oct-09 30.00 155639.77 0.00 0.0029-Oct-09 30.00 146750.78 0.00 0.0030-Oct-09 30.00 141259.66 0.00 0.0031-Oct-09 4.00 16553.43 0.00 0.00

TOTAL 434.68 2288223.51 0.00 0.00

Month : November, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )1-Nov-09 8.00 35079.23 0.00 0.002-Nov-09 8.00 37047.47 0.00 0.003-Nov-09 8.00 36998.00 0.00 0.004-Nov-09 8.00 33235.20 0.00 0.005-Nov-09 4.00 15668.70 0.00 0.008-Nov-09 4.00 15949.27 0.00 0.00

DateEnergy Sold

during the monthAmount

Received

Amount Received

Energy Purchase during the month

Energy Purchase during the month Amount Expense

Energy Purchase during the month Amount Expense

Amount Expense

DateEnergy Sold

during the month

DateEnergy Sold

during the monthAmount

Received

POWER TRADING / PURCHASE THROUGH INDIAN ENERGY EXCHANGE (Contd.)

Page 14

Page 16: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

TOTAL 40.00 173977.87 0.00 0.00

Month : December, 2009

(MWH) ( Rs. ) (MWH) ( Rs. )23-Dec-09 0.00 0.00 30.00 75414.1824-Dec-09 0.00 0.00 30.00 68335.7025-Dec-09 0.00 0.00 30.00 69378.1030-Dec-09 0.00 0.00 30.00 94144.1131-Dec-09 0.00 0.00 30.00 88667.68

TOTAL 0.00 0.00 150.00 395939.77

Month : January, 2010

(MWH) ( Rs. ) (MWH) ( Rs. )

NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00

Month : February, 2010

(MWH) ( Rs. ) (MWH) ( Rs. )5-Feb-10 0.00 0.00 15.00 41264.586-Feb-10 0.00 0.00 15.00 37172.867-Feb-10 0.00 0.00 15.00 37679.718-Feb-10 0.00 0.00 15.00 38170.809-Feb-10 0.00 0.00 15.00 35720.0010-Feb-10 0.00 0.00 15.00 36671.7011-Feb-10 0.00 0.00 15.00 48442.4112-Feb-10 0.00 0.00 15.00 47208.8213-Feb-10 0.00 0.00 15.00 38934.9514-Feb-10 0.00 0.00 15.00 48787.1315-Feb-10 0.00 0.00 15.00 46348.6216-Feb-10 0.00 0.00 15.00 47205.4217-Feb-10 0.00 0.00 15.00 44244.3118-Feb-10 0.00 0.00 15.00 49477.7719-Feb-10 0.00 0.00 15.00 48622.8420-Feb-10 0.00 0.00 15.00 42448.0321-Feb-10 0.00 0.00 15.00 43633.1522-Feb-10 0.00 0.00 15.00 43343.4523-Feb-10 0.00 0.00 15.00 41551.4324-Feb-10 0.00 0.00 15.00 44849.2025-Feb-10 0.00 0.00 15.00 44806.4226-Feb-10 0.00 0.00 15.00 44860.8027-Feb-10 0.00 0.00 15.00 39067.3528-Feb-10 0.00 0.00 15.00 39091.60

TOTAL 0.00 0.00 360.00 1029603.35

DateEnergy Sold

during the monthAmount

Received

Amount Expense

DateEnergy Sold

during the monthAmount

Received

DateEnergy Sold

during the monthAmount

Received

POWER TRADING / PURCHASE THROUGH INDIAN ENERGY EXCHANGE (Contd.)

Energy Purchase during the month Amount Expense

Energy Purchase during the month Amount Expense

Energy Purchase during the month

Page 15

Page 17: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Month : March, 2010

(MWH) ( Rs. ) (MWH) ( Rs. )1-Mar-10 0.00 0.00 15.00 46127.472-Mar-10 0.00 0.00 15.00 42060.103-Mar-10 0.00 0.00 15.00 41000.644-Mar-10 0.00 0.00 15.00 44272.915-Mar-10 0.00 0.00 15.00 55506.556-Mar-10 0.00 0.00 15.00 54328.057-Mar-10 0.00 0.00 15.00 59900.508-Mar-10 0.00 0.00 15.00 58937.31TOTAL 0.00 0.00 120.00 402133.53

Energy Purchase during the month Amount ExpenseDate

Energy Sold during the month

Amount Received

POWER TRADING / PURCHASE THROUGH INDIAN ENERGY EXCHANGE (Contd.)

Page 16

Page 18: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bilateral Trading

through STOA

Page 17

Page 19: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Energy Amount Energy Amount Transmission

charges etc.

Total

Amount

(MWH) ( Rs. ) (MWH) ( Rs. ) ( Rs. ) ( Rs. )

Apr-09 0.00 0.00 0.00 0.00 0.00 0.00

May-09 0.00 0.00 0.00 0.00 0.00 0.00

Jun-09 0.00 0.00 0.00 0.00 0.00 0.00

Jul-09 0.00 0.00 0.00 0.00 0.00 0.00

Aug-09 0.00 0.00 0.00 0.00 0.00 0.00

Sep-09 540.00 2511000.00 0.00 0.00 0.00 0.00

Oct-09 180.00 837000.00 0.00 0.00 0.00 0.00

Nov-09 0.00 0.00 0.00 0.00 0.00 0.00

Dec-09 0.00 0.00 600.00 2790000.00 73000.00 2863000.00

Jan-10 0.00 0.00 120.00 558000.00 18600.00 576600.00

Feb-10 0.00 0.00 0.00 0.00 0.00 0.00

Mar-10 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 720.00 3348000.00 720.00 3348000 91600.00 3439600.00

Energy Purchase through STOA

MONTHLY ABSTRACT OF BILATERAL TRADING THROUGH

SHORT TERM OPEN ACCESS DURING 2009 - 2010

Months

Energy Sold through STOA

Page 18

Page 20: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Month : April, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Month : May, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Month : June, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Month : July, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Month : August, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Energy Purchase through STOA

DateEnergy Sold through STOA

DateEnergy Sold through STOA

Energy Sold through STOA

DateEnergy Sold through STOA

Date

MONTHWISE BILATERAL TRADING THROUGH STOA DURING 2009 - 2010

Energy Purchase through STOA

Energy Purchase through STOA

Energy Purchase through STOA

Energy Purchase through STOA

DateEnergy Sold through STOA

Page 19

Page 21: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Month : September, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

22-Sep-09 60.00 279000.00 NIL NIL NIL

23-Sep-09 60.00 279000.00 NIL NIL NIL

24-Sep-09 60.00 279000.00 NIL NIL NIL

25-Sep-09 60.00 279000.00 NIL NIL NIL

26-Sep-09 60.00 279000.00 NIL NIL NIL

27-Sep-09 60.00 279000.00 NIL NIL NIL

28-Sep-09 60.00 279000.00 NIL NIL NIL

29-Sep-09 60.00 279000.00 NIL NIL NIL

30-Sep-09 60.00 279000.00 NIL NIL NIL

TOTAL 540.00 2511000.00 0.00 0.00 0.00

Month : October, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

1-Oct-09 60.00 279000.00 NIL NIL NIL

2-Oct-09 60.00 279000.00 NIL NIL NIL

3-Oct-09 60.00 279000.00 NIL NIL NIL

TOTAL 180.00 837000.00 0.00 0.00 0.00

Month : November, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Month : December, 2009

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

22-Dec-09 0.00 0.00 60.00 279000.00

23-Dec-09 0.00 0.00 60.00 279000.00

24-Dec-09 0.00 0.00 60.00 279000.00

25-Dec-09 0.00 0.00 60.00 279000.00

26-Dec-09 0.00 0.00 60.00 279000.00

27-Dec-09 0.00 0.00 60.00 279000.00

28-Dec-09 0.00 0.00 60.00 279000.00

29-Dec-09 0.00 0.00 60.00 279000.00

30-Dec-09 0.00 0.00 60.00 279000.00

31-Dec-09 0.00 0.00 60.00 279000.00

TOTAL 0.00 0.00 600.00 2790000.00 73000.00

DateEnergy Sold through STOA Energy Purchase through STOA

DateEnergy Sold through STOA Energy Purchase through STOA

DateEnergy Sold through STOA Energy Purchase through STOA

MONTHWISE BILATERAL TRADING THROUGH STOA DURING 2009 - 2010 (Contd.)

DateEnergy Sold through STOA Energy Purchase through STOA

Page 20

Page 22: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

MONTHWISE BILATERAL TRADING THROUGH STOA DURING 2009 - 2010 (Contd.)

Month : January, 2010

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

1-Jan-10 0.00 0.00 60.00 279000.00

2-Jan-10 0.00 0.00 60.00 279000.00

TOTAL 0.00 0.00 120.00 558000.00 18600.00

Month : February, 2010

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

Month : March, 2010

Energy (MWH) Amount ( Rs. ) Energy (MWH) Amount ( Rs. ) Trans. charges etc.

NIL NIL NIL NIL NIL NIL

TOTAL 0.00 0.00 0.00 0.00 0.00

DateEnergy Sold through STOA Energy Purchase through STOA

DateEnergy Sold through STOA Energy Purchase through STOA

DateEnergy Sold through STOA Energy Purchase through STOA

Page 21

Page 23: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Status of

UI Account

Page 22

Page 24: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

(MWH) (MWH) (Rs.) (Rs.) (Rs.) (Rs.)

1 30-03-2009 to 05-04-2009 4424.994 4800.464 -942357.33 -89628.57 -1031985.9

2 06.03-2009 to 12-04-2009 4457.418 5175.546 -2078242.18 -20289.76 -2098531.94

3 13-04-2009 to 19-04-2009 4286.535 5085.252 -4582188.47 -847482.27 -5429670.74

4 20-04-2009 to 26-04-2009 4564.764 5120.520 -3236172.56 -461470.06 -3697642.62

5 27-04-2009 to 03-05-2009 4397.436 5506.733 -6537278.27 -787441.25 -7324719.52

6 04-05-2009 to 10-05-2009 4861.249 5584.942 -3779019.63 -295656.3 -4074675.93

7 11-05-2009 to 17-05-2009 4999.670 5308.736 -610311.67 -43528.68 -653840.35

8 18-05-2009 to 24-05-2009 4746.290 5137.492 -1511557.86 -34686.01 -1546243.87

9 25-05-2009 to 31-05-2009 5925.014 5485.665 -21366.00 -21366.00 2021174.54

10 01-06-2009 to 07-06-2009 5410.259 5448.464 -1279.91 -1279.91 301611.37

11 08-06-2009 to 14-06-2009 5592.130 5374.002 -14110.1 -14110.10 1217195.01

12 15-06-2009 to 21-06-2009 5977.468 5229.791 -127868.83 -127868.83 3631234.28

13 22-06-2009 to 28-06-2009 5723.623 4838.315 -85421.76 -85421.76 5065003.9

14 29-06-2009 to 05-07-2009 7357.656 5368.723 0.00 0.00 7254574.01

15 06-07-2009 to 12-07-2009 6532.369 5211.709 -3728.32 -3728.32 5221408.76

16 13-07-2009 to 19-07-2009 6087.152 5292.814 -3987.95 -3987.95 3260160.70

17 20-07-2009 to 26-07-2009 5813.562 5344.024 -5210.2 -5210.2 2045263.55

18 27-07-2009 to 02-08-2009 7440.640 5665.411 -598.13 -598.13 7397903.08

19 03-08-2009 to 09-08-2009 7036.390 5511.092 -23096.340 -23096.34 10024119.990

20 10-08-2009 to 16-08-2009 7492.148 5511.662 -36651.83 -36651.83 10430561.99

21 17-08-2009 to 23-08-2009 7442.810 5544.418 -51173.06 -51173.06 9629849.670

22 24-08-2009 to 30-08-2009 7446.579 5539.947 -184.46 -184.46 8424892.16

23 31-08-2009 to 06-09-2009 6622.996 5574.902 0.00 0.00 3269691.98

24 07-09-2009 to 13-09-2009 6791.917 5428.412 0.00 0.00 4268829.38

25 14-09-2009 to 20-09-2009 6436.026 5456.412 -16088.49 -16088.49 5409262.5

26 21-09-2009 to 27-09-2009 6883.294 5074.121 -70240.37 -70240.37 11515350.17

27 28-09-2009 to 04-10-2009 6440.563 5676.527 -48157.98 -48157.98 3148800.62

28 05-10-2009 to 11-10-2009 7969.728 5670.897 0.00 0.00 7535717.06

29 12-10-20090 to 18-10-2009 6592.216 5250.159 -11329.13 -11329.13 4986036.18

Sub Total ( Week 1 to 29) 175752.896 155217.152 -23277127.97 -3100675.76 -26377803.73 116058640.90

Additional

Payable

STATUS OF UI ACCOUNT FOR THE YEAR 2009 - 2010

Schedule PeriodWeek No

Amount

Receiveable

Total Amount

Payable

Amount

Payable

Actual

Drawal

Page 23

Page 25: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

(MWH) (MWH) (Rs.) (Rs.) (Rs.) (Rs.)

B.F (For Week 1 - 29) 175752.896 155217.152 -23277127.97 -3100675.76 -26377803.73 116058640.90

30 15-10-2009 to 25-10-2009 6648.863 5795.529 0.00 -5637.86 -5637.86 3066467.36

31 26-10-2009 to 01-11-2009 6136.548 5958.576 0.00 -67416.33 -67416.33 513710.20

32 02-11-2009 to 08-11-2009 6303.037 6324.476 -94176.93 0.00 -94176.93 0.00

33 09-11-2009 to 15-11-2009 5578.270 6404.889 -1964128.73 0.00 -1964128.73 0.00

34 16-11-2009 to 22-11-2009 5523.447 6481.612 -2118644.31 0.00 -2118644.31 0.00

35 23-11-2009 to 29-11-2009 5099.079 6259.843 -3641829.56 0.00 -3641829.56 0.00

36 30-11-2009 to 06-12-2009 5194.166 6282.637 -3933671.54 0.00 -3933671.54 0.00

37 07-12-2009 to 13-12 2009 5340.087 6316.846 -3751469.89 0.00 -3751469.89 0.00

38 14-12-2009 to 20-12-2009 5266.941 6186.070 -3578813.52 0.00 -3578813.52 0.00

39 21-12-2009 to 27-12-2009 5853.949 6992.420 -3257313.34 0.00 -3257313.34 0.00

40 28-12-2009 to 03-01-2010 5293.155 6853.920 -4662533.87 0.00 -4662533.87 0.00

41 04-01-2010 to 10-01-2010 4869.980 6309.815 -6941646.14 -235616.72 -7177262.86 0.00

42 11-01-2010 to 17-01-2010 4211.912 6017.271 -6386980.34 -14581.00 -6401561.34 0.00

43 18-01-2010 to 24-01-2010 4414.323 6026.599 -6717268.16 -33745.54 -6751013.70 0.00

44 25-01-2010 to 31-01-2010 4433.145 6235.340 -6285955.48 -37397.87 -6323353.35 0.00

45 01-02-2010 to 07-02-2010 4466.495 6052.184 -5224964.43 0.00 -5224964.43 0.00

46 08-02-2010 to 14-02-2010 4505.868 5641.088 -2615746.16 0.00 -2615746.16 0.00

47 15-02-2010 to 21-02-2010 4574.315 5693.449 -3528995.66 0.00 -3528995.66 0.00

48 22-02-2010 to 28-02-2010 3929.245 5933.306 -7022243.02 0.00 -7022243.02 0.00

49 01-03-2010 to 07-03-2010 4173.261 5831.200 -5418582.49 -70095.36 -5488677.85 0.00

50 08-03-2010 to 14-03-2010 4178.203 6106.286 -9151471.68 -192361.00 -9343832.68 0.00

51 15-03-2010 to 21-03-2010 4162.156 5855.011 -9252380.21 -888808.73 -10141188.94 0.00

52 22-03-2010 to 28-03-2010 4593.811 6119.290 -6994252.54 -299183.37 -7293435.92 0.00

G.Total 290503.152 296894.809 -125820195.97 -4945519.54 -130765715.52 119638818.46

Additional

Payable

Actual

Drawal

STATUS OF UI ACCOUNT FOR THE YEAR 2009 - 2010 ( Contd. )

Week No PeriodSchedule

Amount

Payable

Total Amount

Payable

Amount

Receiveable

Page 24

Page 26: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

30-Mar-2009 593.187 738.119 -346140.55 0 -346140.55

31-Mar-2009 560.829 541.325 139461.83 0 139461.83

1-Apr-2009 779.036 595.678 841333.89 0 841333.89

2-Apr-2009 688.114 777.384 -268516.83 -22843.64 -291360.47

3-Apr-2009 661.041 732.362 -228926.59 -13437.53 -242364.12

4-Apr-2009 578.139 745.247 -836016.04 -49490.61 -885506.65

5-Apr-2009 564.648 670.349 -243553.05 -3856.79 -247409.84

4424.994 4800.464 -942357.34 -89628.57 -1031985.91

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

6-Apr-2009 556.272 722.412 -528097.39 0 -528097.39

7-Apr-2009 555.798 754.772 -689921.54 0 -689921.54

8-Apr-2009 696.827 774.932 -193619.36 0 -193619.36

9-Apr-2009 655.036 762.041 -149832.17 0 -149832.17

10-Apr-2009 681.604 725.918 -53638.39 0 -53638.39

11-Apr-2009 705.266 692.262 112211.27 0 112211.27

12-Apr-2009 606.615 743.209 -575344.59 -20289.76 -595634.35

4457.418 5175.546 -2078242.17 -20289.76 -2098531.93

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

13-Apr-2009 601.648 736.650 -851589.61 -204795.25 -1056384.87

14-Apr-2009 575.250 668.390 -494193.08 -107151.43 -601344.52

15-Apr-2009 539.091 724.928 -1089558.95 -199414.35 -1288973.30

16-Apr-2009 556.246 773.093 -1346921.95 -212795.89 -1559717.84

17-Apr-2009 526.665 820.534 -1534791.05 -123316.85 -1658107.90

18-Apr-2009 752.815 689.796 252702.09 -8.50 252693.59

19-Apr-2009 734.820 671.861 482164.10 0 482164.10

4286.535 5085.252 -4582188.47 -847482.27 -5429670.74

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

20-Apr-2009 675.398 713.545 -132401.48 -15069.61 -147471.09

21-Apr-2009 610.323 731.606 -663452.29 -33514.83 -696967.12

22-Apr-2009 630.845 708.566 -492315.34 -59173.38 -551488.72

23-Apr-2009 875.553 706.525 999396.12 -2871.79 996524.33

24-Apr-2009 597.454 673.351 -528058.66 -113471.82 -641530.48

25-Apr-2009 589.691 778.043 -1176155.31 -131702.51 -1307857.82

26-Apr-2009 585.500 808.884 -1243185.59 -105666.1 -1348851.69

4564.764 5120.520 -3236172.550 -461470.040 -3697642.590

30th March. 2009 to 5th April. 2009 (Week - 1)

(Vide No. NERPC/COM/UI/2009/1841-61 Dt.9th July 2009 ) - Revised 1

6th April. 2009 to 12th April. 2009 (Week - 2)

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010

(Vide No.NERPC/COM/UI/2009/2002-22 Dt.17th July 2009 ) - Revised 1

13th April. 2009 to 19th April. 2009 (Week - 3)

(Vide No.NERPC/COM/UI/2009/2023-43 Dt.17th July 2009 ) - Revised 1

20th April. 2009 to 26th April. 2009 (Week - 4)

(Vide No.110/6/NERPC/ABT-UI/2009/ 180-200 Dt.7th May 2009 )

Page 25

Page 27: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

27-Apr-2009 625.590 731.840 -671566.44 -104802.35 -776368.79

28-Apr-2009 614.280 819.166 -1277834.94 -205473.4 -1483308.34

29-Apr-2009 572.280 780.39 -1625528.14 -219184.45 -1844712.59

30-Apr-2009 600.319 807.264 -1396577.69 -186953.55 -1583531.24

1-May-2009 677.099 815.281 -652664.99 -23543.61 -676208.60

2-May-2009 639.817 796.673 -579587.44 -47483.87 -627071.31

3-May-2009 668.051 756.119 -333518.62 0 -333518.62

4397.436 5506.733 -6537278.260 -787441.230 -7324719.490

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

4-May-2009 737.177 702.630 144659.12 -2414.66 142244.46

5-May-2009 657.886 801.742 -489648.77 -16227.38 -505876.15

6-May-2009 685.091 778.658 -465170.41 -34552.61 -499723.02

7-May-2009 682.821 840.229 -903172.06 -62739.88 -965911.94

8-May-2009 694.498 833.173 -852086.79 -94592.43 -946679.22

9-May-2009 692.474 865.026 -1013042.68 -77780.21 -1090822.89

10-May-2009 711.302 763.484 -200558.04 -7349.14 -207907.18

4861.249 5584.942 -3779019.630 -295656.310 -4074675.940

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

11-May-2009 472.217 633.704 -671174.50 -19388.19 -690562.69

12-May-2009 719.220 752.688 36795.99 0 36795.99

13-May-2009 744.019 745.747 106613.13 -3144.74 103468.39

14-May-2009 838.937 795.971 352478.47 0 352478.47

15-May-2009 818.809 822.964 -28394.6 -15666.31 -44060.91

16-May-2009 719.545 765.936 -214045.44 -5329.43 -219374.87

17-May-2009 686.923 791.726 -192584.72 0 -192584.72

4999.670 5308.736 -610311.670 -43528.670 -653840.340

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

18-May-2009 658.479 790.690 -429988.10 -4855.16 -434843.26

19-May-2009 593.666 687.748 -536066.02 -29830.85 -565896.87

20-May-2009 667.938 713.862 -185745.31 0 -185745.31

21-May-2009 658.668 746.532 -294439.5 0 -294439.50

22-May-2009 704.554 726.548 -45061.96 0 -45061.96

23-May-2009 758.335 748.642 10832.97 0 10832.97

24-May-2009 704.650 723.470 -31089.93 0 -31089.93

4746.290 5137.492 -1511557.850 -34686.010 -1546243.860

(Vide No.110/6/NERPC/ABT-UI/2009/1044-64 Dt.2nd June 2009 )

(Vide No.110/6/NERPC/ABT-UI/2009/806-26 Dt.21st May 2009 )

11th May. 2009 to 17th May 2009 (Week - 7)

(Vide No.110/6/NERPC/ABT-UI/2009/ 937-57 Dt.26th May 2009 )

18th May. 2009 to 24th May 2009 (Week - 8)

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

27st April. 2009 to 03th May. 2009 (Week - 5)

(Vide No.110/6/NERPC/ABT-UI/2009/684-704 Dt.11th May 2009 )

04th May. 2009 to 10th May 2009 (Week - 6)

Page 26

Page 28: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs25-May-2009 667.438 754.045 -111802.09 0 -111802.0926-May-2009 794.303 698.501 424197.41 0 424197.4127-May-2009 1117.799 766.793 1511235.92 -570.98 1510664.9428-May-2009 849.038 823.471 8110.26 -20795.02 -12684.7629-May-2009 875.985 820.267 108726.89 0 108726.8930-May-2009 899.100 814.867 207184.75 0 207184.7531-May-2009 721.351 807.721 -126478.60 0 -126478.60

5925.014 5485.665 2021174.540 -21366.000 1999808.540

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs1-Jun-2009 668.114 797.987 -369125.00 0 -369125.002-Jun-2009 838.517 784.148 247421.72 -1279.91 246141.813-Jun-2009 781.081 786.136 -30784.59 0 -30784.594-Jun-2009 763.751 783.443 -62886.33 0 -62886.335-Jun-2009 819.541 727.765 349024.38 0 349024.386-Jun-2009 791.070 798.311 110981.01 0 110981.017-Jun-2009 748.185 770.674 56980.18 0 56980.18

5410.259 5448.464 301611.370 -1279.910 300331.460

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs8-Jun-2009 918.260 806.976 456420.30 0 456420.309-Jun-2009 762.616 704.225 442276.06 -29.88 442246.18

10-Jun-2009 774.539 760 159391.7 0 159391.7011-Jun-2009 748.436 761.724 -26546.96 -5249.97 -31796.9312-Jun-2009 784.991 779.22 82614.18 -4743.59 77870.5913-Jun-2009 805.385 795.73 44365.66 -4086.65 40279.0114-Jun-2009 797.903 766.127 58674.07 0 58674.07

5592.130 5374.002 1217195.010 -14110.090 1203084.920

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs15-Jun-2009 949.338 788.414 702521.21 0 702521.2116-Jun-2009 1053.220 641.005 1642439.29 -113.25 1642326.0417-Jun-2009 870.719 825.055 340863.59 -16328.35 324535.2418-Jun-2009 797.622 736.794 427819.28 -53222.66 374596.6219-Jun-2009 775.020 720.475 372920.32 -26171.28 346749.0420-Jun-2009 801.836 774.878 153302.02 -32033.29 121268.7321-Jun-2009 729.713 743.170 -8631.43 0 -8631.43

5977.468 5229.791 3631234.280 -127868.830 3503365.450

01th June. 2009 to 07th June 2009 (Week - 10)(Vide No.110/6/NERPC/ABT-UI/2009/1280-1300 Dt. 17th June 2009 )

08th June 2009 to 14th June 2009 (Week - 11)(Vide No.110/6/NERPC/ABT-UI/2009/1371-91 Dt.23rd June 2009 )

15th June 2009 to 21th June 2009 (Week - 12)(Vide No.110/6/NERPC/ABT-UI/2009/1657-77 Dt.1st July 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

25th May. 2009 to 31st May 2009 (Week - 9)(Vide No.110/6/NERPC/ABT-UI/2009/1174-94 Dt.8th June 2009 )

Page 27

Page 29: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs22-Jun-2009 770.449 696.049 485734.90 -9890.75 475844.1523-Jun-2009 753.471 714.280 232068.03 -24475.53 207592.5024-Jun-2009 749.567 714.899 231947.17 -17360.45 214586.7225-Jun-2009 771.788 687.564 541287.45 -20530.14 520757.3126-Jun-2009 798.999 626.278 1156140.27 -4025.73 1152114.5427-Jun-2009 889.724 665.302 1237843.58 -9139.15 1228704.4328-Jun-2009 989.625 733.943 1179982.50 0 1179982.50

5723.623 4838.315 5065003.900 -85421.750 4979582.150

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs29-Jun-2009 986.797 744.016 1194498.68 0 1194498.6830-Jun-2009 1064.374 784.598 650548.62 0 650548.621-Jul-2009 1152.328 756.27 1222208.83 0 1222208.832-Jul-2009 1130.757 818.449 884024.13 0 884024.133-Jul-2009 1060.818 769.59 1253870.27 0 1253870.274-Jul-2009 975.457 772.153 921386.92 0 921386.925-Jul-2009 987.125 723.647 1128036.56 0 1128036.56

7357.656 5368.723 7254574.010 0.000 7254574.010

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs6-Jul-2009 969.630 751.046 963125.82 0 963125.827-Jul-2009 983.462 774.864 1123333.25 -3728.32 1119604.938-Jul-2009 942.077 739.969 940670.16 0 940670.169-Jul-2009 901.322 760.086 405004.78 0 405004.78

10-Jul-2009 899.246 730.958 588740.16 0 588740.1611-Jul-2009 935.290 755.464 596473.6 0 596473.6012-Jul-2009 901.342 699.322 604060.99 0 604060.99

6532.369 5211.709 5221408.760 -3728.320 5217680.440

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs13-Jul-2009 866.948 754.240 322264.08 0 322264.0814-Jul-2009 935.989 788.152 557627.74 0 557627.7415-Jul-2009 806.839 749.689 246130.96 0 246130.9616-Jul-2009 923.156 764.482 598625.16 0 598625.1617-Jul-2009 914.473 742.172 760212.85 0 760212.8518-Jul-2009 789.714 743.342 190860.6 -3987.95 186872.6519-Jul-2009 850.033 750.737 584439.31 0 584439.31

6087.152 5292.814 3260160.700 -3987.950 3256172.750

29th June 2009 to 05th July 2009 (Week - 14)(Vide No.110/6/NERPC/ABT-UI/2009/1971-91 Dt.15th July 2009 )

22nd June 2009 to 28th June 2009 (Week - 13)(Vide No.110/6/NERPC/ABT-UI/2009/1765-85 Dt.7th July 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

06th July 2009 to 12th July 2009 (Week - 15)(Vide No.110/6/NERPC/ABT-UI/2009/2169-89 Dt.21st July 2009 )

13th July. 2009 to 19th July 2009 (Week - 16)(Vide No.NERPC/COM/UI/2009/731-51 Dt. 28-07-2009 )

Page 28

Page 30: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs20-Jul-2009 856.586 750.845 581970.26 0 581970.2621-Jul-2009 821.273 762.952 342897.64 -5210.2 337687.4422-Jul-2009 886.803 805.334 361496.14 0 361496.1423-Jul-2009 955.360 799.488 437832.93 0 437832.9324-Jul-2009 788.960 708.98 295148.38 0 295148.3825-Jul-2009 719.800 777.341 -152439.87 0 -152439.8726-Jul-2009 784.780 739.084 178358.07 0 178358.07

5813.562 5344.024 2045263.550 -5210.200 2040053.350

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs27-Jul-2009 992.659 784.624 601014.70 0 601014.7028-Jul-2009 1057.449 844.362 498464.80 0 498464.8029-Jul-2009 1062.954 827.748 690877.17 0 690877.1730-Jul-2009 1133.157 839.711 1133977.46 0 1133977.4631-Jul-2009 1097.896 842.224 1230640.67 0 1230640.671-Aug-2009 1064.996 772.456 1647941.8 -598.13 1647343.672-Aug-2009 1031.529 754.286 1594986.48 0 1594986.48

7440.640 5665.411 7397903.080 -598.130 7397304.950

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs3-Aug-2009 998.950 828.720 1115720.25 -13430.91 1102289.344-Aug-2009 995.701 820.825 1218116.30 -2509.14 1215607.165-Aug-2009 1076.921 788.792 1605729.93 0 1605729.936-Aug-2009 1015.701 775.267 1406511.81 0 1406511.817-Aug-2009 1002.369 746.554 1855999.19 0 1855999.198-Aug-2009 1015.362 798.44 1614398.89 -1412.55 1612986.349-Aug-2009 931.386 752.494 1207643.62 -5743.74 1201899.88

7036.390 5511.092 10024119.990 -23096.340 10001023.650

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs10-Aug-2009 883.390 770.753 803124.61 -10103.74 793020.8711-Aug-2009 852.259 798.700 386151.00 -18104.01 368046.9912-Aug-2009 927.841 741.794 1339608.4 -8444.08 1331164.3213-Aug-2009 1171.343 774.533 2615151.95 0 2615151.9514-Aug-2009 1231.248 823.378 2262888.77 0 2262888.7715-Aug-2009 1230.313 840.362 1688988.29 0 1688988.2916-Aug-2009 1195.754 762.142 1334648.97 0 1334648.97

7492.148 5511.662 10430561.990 -36651.830 10393910.160

20th July. 2009 to 26th July 2009 (Week - 17)(Vide No.110/6/NERPC/ABT-UI/2009/ Dt. 2009 )

10thAugust to 16thAugust. 2009 (Week - 20)(Vide No.NERPC/COM/UI/2009/2692-712 Dt.24th August 2009 )

27th July. 2009 to 2nd August 2009 (Week - 18)(Vide No.NERPC/COM/UI/2009/ 2458-78 Dt. 12th August2009 )

3rd August to 9th August . 2009 (Week - 19)(Vide No.NERPC/COM/UI/2009/2610-30 Dt.18th August 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 29

Page 31: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs17-Aug-2009 1281.005 728.518 2122335.41 0 2122335.4118-Aug-2009 1256.981 762.602 2394480.82 0 2394480.8219-Aug-2009 968.876 794.873 886137.57 -601.7 885535.8720-Aug-2009 1016.073 808.344 1148234.47 -208.87 1148025.6021-Aug-2009 1016.204 834.653 1104799.27 -2918 1101881.2722-Aug-2009 992.485 826.589 1170444.9 -43306.33 1127138.5723-Aug-2009 911.186 788.839 803417.23 -4138.16 799279.07

7442.810 5544.418 9629849.670 -51173.060 9578676.610

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs24-Aug-2009 1063.797 752.224 1990446.68 -184.46 1990262.2225-Aug-2009 1063.797 755.284 1616847.30 0 1616847.3026-Aug-2009 1063.797 760.133 1679512.48 0 1679512.4827-Aug-2009 1063.797 775.073 1298719.73 0 1298719.7328-Aug-2009 1063.797 795.15 618984.35 0 618984.3529-Aug-2009 1063.797 841.435 818747.81 0 818747.8130-Aug-2009 1063.797 860.648 401633.81 0 401633.81

7446.579 5539.947 8424892.160 -184.460 8424707.700

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs31-Aug-2009 998.672 809.780 570809.99 0.00 570809.991-Sep-2009 993.622 765.587 1027308.21 0.00 1027308.212-Sep-2009 902.713 793.944 418997.13 0.00 418997.133-Sep-2009 907.590 767.452 331641.55 0.00 331641.554-Sep-2009 949.617 796.525 420347.89 0.00 420347.895-Sep-2009 939.278 824.461 195623.32 0.00 195623.326-Sep-2009 931.504 817.153 304963.89 0.00 304963.89

6622.996 5574.902 3269691.980 0.000 3269691.980

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs7-Sep-2009 940.071 775.033 657032.60 0.00 657032.608-Sep-2009 942.397 825.275 630745.36 0.00 630745.369-Sep-2009 992.356 740.369 698600.18 0.00 698600.1810-Sep-2009 925.876 764.478 444372.81 0.00 444372.8111-Sep-2009 910.790 765.324 257856.06 0.00 257856.0612-Sep-2009 1045.017 813.874 633564.21 0.00 633564.2113-Sep-2009 1035.410 744.059 946658.16 0.00 946658.16

6791.917 5428.412 4268829.380 0.000 4268829.380

24th August to 30th August. 2009 (Week - 22)(Vide No.NERPC/COM/UI/2009/2888-908 Dt.8th September 2009 )

17thAugust to 23rd August. 2009 (Week - 21)(Vide No.NERPC/COM/UI/2009/2743-63 Dt.1st September 2009 )

7th to 13th September. 2009 (Week - 24)(Vide No.NERPC/COM/UI/2009/877-97 Dt.22nd September 2009 )

31st August to 6th September. 2009 (Week - 23)(Vide No.NERPC/COM/UI/2009/3010-30 Dt.15th September 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 30

Page 32: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs14-Sep-2009 759.550 776.113 -37963.58 0.00 -37963.5815-Sep-2009 918.775 805.547 519345.80 0.00 519345.8016-Sep-2009 968.561 774.472 1027854.19 0.00 1027854.1917-Sep-2009 950.888 767.930 831623.05 0.00 831623.0518-Sep-2009 974.133 772.502 1168095.99 0.00 1168095.9919-Sep-2009 894.908 779.314 806006.04 -16088.49 789917.5520-Sep-2009 969.211 780.534 1094301.01 0.00 1094301.01

6436.026 5456.412 5409262.50 -16088.490 5393174.010

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs21-Sep-2009 1000.043 745.949 1576185.74 0.00 1576185.7422-Sep-2009 1182.800 734.108 2879970.21 -2527.60 2877442.6123-Sep-2009 885.538 707.249 1038527.3 -62928.39 975598.9124-Sep-2009 932.536 736.996 1312099.01 -4784.38 1307314.6325-Sep-2009 932.016 715.658 1506885.89 0.00 1506885.8926-Sep-2009 969.016 738.367 1557122.9 0.00 1557122.9027-Sep-2009 981.345 695.794 1644559.12 0.00 1644559.12

6883.294 5074.121 11515350.17 -70240.37 11445109.80

(Vide No.NERPC/COM/UI/2009/ 3398-18 Dt 13th October 2009 )Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs

28-Sep-2009 978.100 709.639 752227.20 0.00 752227.2029-Sep-2009 951.595 797.011 837642.87 -1250.69 836392.1830-Sep-2009 876.394 821.07 422259.73 -32127.87 390131.861-Oct-2009 851.803 835.333 182914.93 -11504.93 171410.002-Oct-2009 870.414 847.62 224062.22 -50.91 224011.313-Oct-2009 928.860 847.48 477957.07 -3223.58 474733.494-Oct-2009 983.397 818.374 251736.60 0.00 251736.60

6440.563 5676.527 3148800.62 -48157.98 3100642.64

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs5-Oct-2009 1066.046 826.204 509079.61 0.00 509079.616-Oct-2009 1106.963 759.190 1157229.66 0.00 1157229.667-Oct-2009 1132.522 767.236 1059353.73 0.00 1059353.738-Oct-2009 1258.986 760.550 1587784.29 0.00 1587784.299-Oct-2009 1272.062 830.218 1751216.50 0.00 1751216.5010-Oct-2009 1093.270 914.209 787570.90 0.00 787570.9011-Oct-2009 1039.879 813.290 683482.37 0.00 683482.37

7969.728 5670.897 7535717.06 0.00 7535717.06

28th September to 4th October. 2009 (Week - 27)

14th to 20th September. 2009 (Week - 25)(Vide No.NERPC/COM/UI/2009/3212-32 Dt.1st October 2009 )

21st to 27th September. 2009 (Week - 26)(Vide No.NERPC/COM/UI/2009/ 3275-95 Dt 6th October 2009 )

5th to 11th October. 2009 (Week - 28)(Vide No.NERPC/COM/UI/2009/ 3495-3515 Dt 19th October 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 31

Page 33: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs12-Oct-2009 1058.937 811.174 871664.62 0.00 871664.6213-Oct-2009 938.606 828.731 408650.83 -11329.13 397321.7014-Oct-2009 904.362 705.154 854440.98 0.00 854440.9815-Oct-2009 881.208 601.020 1211308.13 0.00 1211308.1316-Oct-2009 865.167 672.844 813998.83 0.00 813998.8317-Oct-2009 954.900 849.258 291372.95 0.00 291372.9518-Oct-2009 989.036 781.978 534599.84 0.00 534599.84

6592.216 5250.159 4986036.18 -11329.13 4974707.05

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs19-Oct-2009 1006.572 785.477 708726.08 0.00 708726.0820-Oct-2009 961.193 844.470 473331.32 0.00 473331.3221-Oct-2009 959.621 838.303 495504.63 0.00 495504.6322-Oct-2009 897.599 829.966 185759.51 -4673.33 181086.1823-Oct-2009 936.911 801.666 497933.09 0.00 497933.0924-Oct-2009 959.842 876.424 319327.71 -603.02 318724.6925-Oct-2009 927.125 819.223 385885.02 -361.51 385523.51

6648.863 5795.529 3066467.36 -5637.86 3060829.50

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs26-Oct-2009 871.949 816.185 253046.46 -48937.02 204109.4427-Oct-2009 872.400 868.208 -25790.02 -5521.66 -31311.6828-Oct-2009 879.002 867.265 6628.07 -9720.37 -3092.3029-Oct-2009 856.658 855.641 -39493.77 0.00 -39493.7730-Oct-2009 864.261 832.284 106910.02 0.00 106910.0231-Oct-2009 885.854 884.459 -19607.75 -3237.28 -22845.031-Nov-2009 906.424 834.534 232017.19 0.00 232017.19

6136.548 5958.576 513710.20 -67416.33 446293.87

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs2-Nov-2009 940.245 856.242 278403.22 0.00 278403.223-Nov-2009 932.796 859.478 298723.12 0.00 298723.124-Nov-2009 888.921 914.191 -122752.25 0.00 -122752.255-Nov-2009 882.265 923.184 -171782.41 0.00 -171782.416-Nov-2009 916.036 915.653 -54795.97 0.00 -54795.977-Nov-2009 880.674 964.94 -265048.18 0.00 -265048.188-Nov-2009 862.100 890.788 -56924.46 0.00 -56924.46

6303.037 6324.476 -94176.93 0.00 -94176.93

12th to 18th October. 2009 (Week - 29)(Vide No.NERPC/COM/UI/2009/ 3575-95 Dt 26th October 2009 )

19th to 25th October. 2009 (Week - 30)(Vide No.NERPC/COM/UI/2009/ 3672 -92 Dt 3rd November 2009 )

26thOctober to1st November 2009 (Week - 31)(Vide No.NERPC/COM/UI/2009/ 3732 -52 Dt9th November 2009 )

2nd November to 8th November 2009 (Week - 32)(Vide No.NERPC/COM/UI/2009/4012 - 32 Dt18th November 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 32

Page 34: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs9-Nov-2009 844.547 899.732 -166924.25 0.00 -166924.25

10-Nov-2009 802.321 933.347 -358451.64 0.00 -358451.6411-Nov-2009 760.484 925.942 -288442.92 0.00 -288442.9212-Nov-2009 765.999 815.882 -130708.08 0.00 -130708.0813-Nov-2009 771.284 929.999 -437443.97 0.00 -437443.9714-Nov-2009 801.369 962.003 -418669.22 0.00 -418669.2215-Nov-2009 832.266 937.984 -163488.65 0.00 -163488.65

5578.270 6404.889 -1964128.73 0.00 -1964128.73

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs16-Nov-2009 861.876 911.844 -142822.55 0.00 -142822.5517-Nov-2009 832.449 965.246 -333491.57 0.00 -333491.5718-Nov-2009 814.458 978.962 -324236.56 0.00 -324236.5619-Nov-2009 787.229 930.002 -253301.35 0.00 -253301.3520-Nov-2009 722.617 854.723 -309853.36 0.00 -309853.3621-Nov-2009 736.382 926.388 -446932.84 0.00 -446932.8422-Nov-2009 768.436 914.447 -308006.08 0.00 -308006.08

5523.447 6481.612 -2118644.31 0.00 -2118644.31

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs23-Nov-2009 749.786 862.024 -307898.82 0.00 -307898.8224-Nov-2009 685.318 864.868 -535965.78 0.00 -535965.7825-Nov-2009 704.233 929.614 -709357.67 0.00 -709357.6726-Nov-2009 757.608 926.492 -592331.91 0.00 -592331.9127-Nov-2009 770.109 915.188 -551120.99 0.00 -551120.9928-Nov-2009 712.801 884.758 -597090.37 0.00 -597090.3729-Nov-2009 719.224 876.899 -348064.02 0.00 -348064.02

5099.079 6259.843 -3641829.56 0.00 -3641829.56

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs30-Nov-2009 776.168 896.292 -372302.17 0.00 -372302.171-Dec-2009 752.417 930.150 -649112.73 0.00 -649112.732-Dec-2009 734.352 892.134 -559235.87 0.00 -559235.873-Dec-2009 722.819 881.842 -573648.50 0.00 -573648.504-Dec-2009 713.673 881.971 -672092.06 0.00 -672092.065-Dec-2009 746.821 910.724 -701358.66 0.00 -701358.666-Dec-2009 747.916 889.524 -405921.55 0.00 -405921.55

5194.166 6282.637 -3933671.54 0.00 -3933671.54

30th November to 6th December 2009 (Week - 36)(Vide No.NERPC/COM/UI/2009/ 4494 -514 Dt 11th December 2009 )

23rd November to29th November 2009 (Week - 35)(Vide No.NERPC/COM/UI/2009/ 4383-4403 Dt 8th December 2009 )

16th November to 22nd November 2009 (Week - 34)(Vide No.NERPC/COM/UI/2009/ 4258 -78 Dt 1st December 2009 )

9th November to 15th November 2009 (Week - 33)(Vide No.NERPC/COM/UI/2009/ 4126 -46 Dt 23rd November 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 33

Page 35: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs7-Dec-2009 790.352 903.100 -318206.74 0.00 -318206.748-Dec-2009 783.494 921.233 -524168.59 0.00 -524168.599-Dec-2009 766.108 884.898 -485839.46 0.00 -485839.4610-Dec-2009 772.693 899.086 -540384.47 0.00 -540384.4711-Dec-2009 741.133 913.306 -657737.86 0.00 -657737.8612-Dec-2009 745.217 899.532 -651346.77 0.00 -651346.7713-Dec-2009 741.090 895.691 -573786.00 0.00 -573786.00

5340.087 6316.846 -3751469.89 0.00 -3751469.89

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs14-Dec-2009 745.244 836.136 -399048.91 0.00 -399048.9115-Dec-2009 740.000 897.156 -563170.00 0.00 -563170.0016-Dec-2009 735.332 890.215 -600283.17 0.00 -600283.1717-Dec-2009 725.346 880.315 -692716.27 0.00 -692716.2718-Dec-2009 744.523 906.75 -563768.34 0.00 -563768.3419-Dec-2009 779.687 904.802 -512115.68 0.00 -512115.6820-Dec-2009 796.809 870.696 -247711.15 0.00 -247711.15

5266.941 6186.070 -3578813.52 0.00 -3578813.52

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs21-Dec-2009 769.825 944.669 -442189.98 0.00 -442189.9822-Dec-2009 823.785 984.614 -468792.90 0.00 -468792.9023-Dec-2009 830.930 1028.336 -610663.16 0.00 -610663.1624-Dec-2009 872.127 1078.884 -594843.26 0.00 -594843.2625-Dec-2009 871.155 1011.287 -395124.57 0.00 -395124.5726-Dec-2009 865.502 965.308 -329572.56 0.00 -329572.5627-Dec-2009 820.625 979.322 -416126.91 0.00 -416126.91

5853.949 6992.420 -3257313.34 0.00 -3257313.34

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs28-Dec-2009 749.780 977.548 -836979.11 0.00 -836979.1129-Dec-2009 748.247 970.808 -817559.44 0.00 -817559.4430-Dec-2009 744.822 1046.750 -735010.10 0.00 -735010.1031-Dec-2009 797.486 1057.136 -842169.31 0.00 -842169.311-Jan-2010 794.874 954.068 -435572.55 0.00 -435572.552-Jan-2010 757.708 913.694 -348040.71 0.00 -348040.713-Jan-2010 700.238 933.916 -647202.65 0.00 -647202.65

5293.155 6853.920 -4662533.87 0.00 -4662533.87

14th December to 20th December 2009 (Week - 38)(Vide No.NERPC/COM/UI/2009/4782-102 Dt 29th December 2009 )

28th December 2009 to 3rd January 2010 (Week - 40)(Vide No.NERPC/COM/UI/2010/5073-93 Dt12th January 2010 )

21st December to 27th December 2009 (Week - 39)(Vide No.NERPC/COM/UI/2009/4931-51 Dt4th January 2010 )

7th December to 13th December 2009 (Week - 37)(Vide No.NERPC/COM/UI/2009/4751-71 Dt 22nd December 2009 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 34

Page 36: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs4-Jan-2010 711.832 941.684 -846157.36 0.00 -846157.365-Jan-2010 682.387 909.130 -1123127.49 -22802.92 -1145930.416-Jan-2010 706.767 961.463 -1440590.84 -79186.35 -1519777.197-Jan-2010 706.293 821.020 -579666.06 -12745.59 -592411.658-Jan-2010 707.314 927.389 -1023319.42 -28391.50 -1051710.929-Jan-2010 680.088 913.252 -1154867.25 -85672.70 -1240539.95

10-Jan-2010 675.299 835.877 -773917.72 -6817.66 -780735.384869.980 6309.815 -6941646.14 -235616.72 -7177262.86

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs11-Jan-2010 554.365 755.086 -846361.89 -7352.09 -853713.9812-Jan-2010 584.003 917.752 -1339706.27 0.00 -1339706.2713-Jan-2010 613.542 874.246 -906509.83 0.00 -906509.8314-Jan-2010 551.409 841.471 -787516.54 0.00 -787516.5415-Jan-2010 602.330 923.504 -944581.06 0.00 -944581.0616-Jan-2010 656.840 897.239 -918817.29 0.00 -918817.2917-Jan-2010 649.423 807.973 -643487.46 -7228.91 -650716.37

4211.912 6017.271 -6386980.34 -14581.00 -6401561.34

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs18-Jan-2010 643.699 858.010 -932063.40 -5804.14 -937867.5419-Jan-2010 648.246 882.882 -986920.79 0.00 -986920.7920-Jan-2010 593.331 708.034 -456054.96 -4743.07 -460798.0321-Jan-2010 579.660 784.793 -768948.96 -3801.30 -772750.2622-Jan-2010 645.860 904.237 -1130980.52 -6735.61 -1137716.1323-Jan-2010 638.544 958.039 -1446897.53 -12661.42 -1459558.9524-Jan-2010 664.983 930.604 -995402.00 0.00 -995402.00

4414.323 6026.599 -6717268.16 -33745.54 -6751013.70

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs25-Jan-2010 651.495 880.402 -765356.75 0.00 -765356.7526-Jan-2010 636.753 937.926 -977444.51 -6203.56 -983648.0727-Jan-2010 596.150 853.193 -1011045.40 -447.52 -1011492.9228-Jan-2010 638.492 922.302 -1175364.74 -30746.79 -1206111.5329-Jan-2010 617.164 863.978 -840871.61 0.00 -840871.6130-Jan-2010 636.071 885.733 -896991.39 0.00 -896991.3931-Jan-2010 657.020 891.806 -618881.08 0.00 -618881.08

4433.145 6235.340 -6285955.48 -37397.87 -6323353.35

4th January- 10th January 2010 (Week - 41) Revised(Vide No.NERPC/COM/UI/2010/5314-34 Dt2nd February 2010 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

11th January- 17th January 2010 (Week - 42)(Vide No.NERPC/COM/UI/2010/5245-65 Dt27th January 2010 )

18th January- 24th January 2010 (Week - 43)(Vide No.NERPC/COM/UI/2010/5271-91 Dt1st February 2010 )

25th January- 31st January 2010 (Week - 44)(Vide No.NERPC/COM/UI/2010/5487-507 Dt 8th February 2010 )

Page 35

Page 37: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs1-Feb-2010 620.023 835.603 -679515.05 0.00 -679515.052-Feb-2010 625.173 893.848 -989194.97 0.00 -989194.973-Feb-2010 637.980 861.070 -958235.33 0.00 -958235.334-Feb-2010 638.815 861.163 -693889.02 0.00 -693889.025-Feb-2010 623.698 850.36 -679779.85 0.00 -679779.856-Feb-2010 659.930 883.552 -745924.12 0.00 -745924.127-Feb-2010 660.876 866.588 -478426.09 0.00 -478426.09

4466.495 6052.184 -5224964.43 0.00 -5224964.43

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs8-Feb-2010 639.062 807.332 -375657.85 0.00 -375657.859-Feb-2010 647.568 871.024 -416202.08 0.00 -416202.0810-Feb-2010 638.180 843.865 -467336.93 0.00 -467336.9311-Feb-2010 650.479 843.044 -416854.31 0.00 -416854.3112-Feb-2010 662.937 849.341 -445410.09 0.00 -445410.0913-Feb-2010 647.066 541.638 261454.11 0.00 261454.1114-Feb-2010 620.576 884.844 -755739.01 0.00 -755739.01

4505.868 5641.088 -2615746.16 0.00 -2615746.16

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs15-Feb-2010 660.230 566.822 273052.62 0.00 273052.6216-Feb-2010 652.335 871.123 -612785.90 0.00 -612785.9017-Feb-2010 648.712 851.238 -485042.01 0.00 -485042.0118-Feb-2010 647.013 856.318 -806145.91 0.00 -806145.9119-Feb-2010 656.494 824.815 -560328.14 0.00 -560328.1420-Feb-2010 652.338 842.677 -728960.70 0.00 -728960.7021-Feb-2010 657.193 880.456 -608785.62 0.00 -608785.62

4574.315 5693.449 -3528995.66 0.00 -3528995.66

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs22-Feb-2010 644.095 767.796 -395285.26 0.00 -395285.2623-Feb-2010 617.934 898.272 -754884.61 0.00 -754884.6124-Feb-2010 531.778 864.403 -1206722.59 0.00 -1206722.5925-Feb-2010 529.800 834.379 -1173796.40 0.00 -1173796.4026-Feb-2010 527.648 812.66 -1283449.47 0.00 -1283449.4727-Feb-2010 522.901 890.698 -1408650.11 0.00 -1408650.1128-Feb-2010 555.089 865.098 -799454.58 0.00 -799454.58

3929.245 5933.306 -7022243.02 0.00 -7022243.02

15th February- 21st February 2010 (Week - 47)(Vide No.NERPC/COM/UI/2010/5839-59 Dt 2nd March 2010 )

22nd February- 28th February 2010 (Week - 48)(Vide No.NERPC/COM/UI/2010/5919-39 Dt.8th March 2010 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

8th February- 14th February 2010 (Week - 46)(Vide No.NERPC/COM/UI/2010/5839-59 Dt 2nd February 2010 )

1st February- 7th February 2010 (Week - 45)(Vide No.NERPC/COM/UI/2010/5606-26 Dt 16th February 2010 )

Page 36

Page 38: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs1-Mar-2010 521.256 853.913 -372681.54 0.00 -372681.542-Mar-2010 514.282 748.184 -398225.45 0.00 -398225.453-Mar-2010 691.929 848.430 -256258.56 0.00 -256258.564-Mar-2010 614.771 832.457 -1054255.86 -17275.96 -1071531.825-Mar-2010 594.164 815.742 -1207731.25 -41751.17 -1249482.426-Mar-2010 609.444 888.026 -1401094.33 -11068.23 -1412162.567-Mar-2010 627.415 844.448 -728335.50 0.00 -728335.50

4173.261 5831.200 -5418582.49 -70095.36 -5488677.85

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs8-Mar-2010 575.515 861.764 -1175510.33 0.00 -1175510.339-Mar-2010 585.169 868.280 -1520052.56 -43767.94 -1563820.50

10-Mar-2010 587.121 801.158 -1097641.47 -27481.20 -1125122.6711-Mar-2010 619.937 895.259 -1429598.73 -21521.62 -1451120.3512-Mar-2010 609.643 881.629 -1290513.52 -14497.05 -1305010.5713-Mar-2010 603.291 908.046 -1637552.33 -78352.46 -1715904.7914-Mar-2010 597.527 890.150 -1000602.74 -6740.73 -1007343.47

4178.203 6106.286 -9151471.68 -192361.00 -9343832.68

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs15-Mar-2010 628.067 820.264 -1107896.01 -61209.33 -1169105.3416-Mar-2010 648.760 707.771 -299884.96 -28731.47 -328616.4317-Mar-2010 618.640 816.174 -1253076.90 -171082.53 -1424159.4318-Mar-2010 536.728 901.310 -2394195.94 -405634.93 -2799830.8719-Mar-2010 586.756 875.113 -1717274.46 -209826.02 -1927100.4820-Mar-2010 588.417 885.809 -1376800.97 -12324.45 -1389125.4221-Mar-2010 554.788 848.570 -1103250.97 0.00 -1103250.97

4162.156 5855.011 -9252380.21 -888808.73 -10141188.94

Date Shedule in MWh Actual in MWh UI in Rs. Addl. UI in Rs Net UI in Rs22-Mar-2010 554.653 877.705 -1682413.25 -65269.86 -1747683.1123-Mar-2010 393.504 830.012 -2302672.61 -148847.29 -2451519.9024-Mar-2010 706.557 898.830 -1059032.99 -68065.71 -1127098.7125-Mar-2010 721.627 879.120 -632979.05 0.00 -632979.0526-Mar-2010 817.761 911.801 -420791.69 -17000.51 -437792.2027-Mar-2010 737.979 880.236 -465168.55 0.00 -465168.5528-Mar-2010 661.730 841.586 -431194.40 0.00 -431194.40

4593.811 6119.290 -6994252.54 -299183.37 -7293435.92

1st March 2010 - 7th March 2010 (Week - 49)(Vide No.NERPC/COM/UI/2010/1979-99 Dt. 15th March 2010 )

22nd March 2010 - 28th March 2010 (Week - 52)(Vide No.NERPC/COM/UI/2010/20-40 Dt. 6th April 2010 )

8th March 2010 - 14th March 2010 Revised (Week - 50)(Vide No.NERPC/COM/UI/2010/6173-93 Dt. 25th March 2010 )

15th March 2010 - 21st March 2010 (Week - 51)(Vide No.NERPC/COM/UI/2010/ 6214-34 Dt.29th March 2010 )

UNSCHEDULE INTERCHANGE ACCOUNT FOR THE YEAR 2009 - 2010 (Contd.)

Page 37

Page 39: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Status of Reactive

Energy Account

Page 38

Page 40: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Rs. Rs.1 30-03-2009 to 05-04-2009 736.802 06.03-2009 to 12-04-2009 0.00 900.453 13-04-2009 to 19-04-2009 0.00 1807.114 20-04-2009 to 26-04-2009 3852.275 27-04-2009 to 03-05-2009 2529.546 04-05-2009 to 10-05-2009 5760.817 11-05-2009 to 17-05-2009 2684.798 18-05-2009 to 24-05-2009 3378.249 25-05-2009 to 31-05-2009 6721.2910 01-06-2009 to 07-06-2009 7714.8911 08-06-2009 to 14-06-2009 4239.3612 15-06-2009 to 21-06-2009 2043.0913 22-06-2009 to 28-06-2009 5719.4114 29-06-2009 to 05-07-2009 4262.1315 06-07-2009 to 12-07-2009 1099.1716 13-07-2009 to 19-07-2009 5288.8517 20-07-2009 to 26-07-2009 5160.5118 27-07-2009 to 02-08-2009 7290.5419 03-08-2009 to 09-08-2009 1891.9820 10-08-2009 to 16-08-2009 954.2721 17-08-2009 to 23-08-2009 6007.1422 24-08-2009 to 30-08-2009 6588.8123 31-08-2009 to 06-09-2009 2635.1124 07-09-2009 to 13-09-2009 5154.3025 14-09-2009 to 20-09-2009 0.00 852.8426 21-09-2009 to 27-09-2009 0.00 219.4227 28-09-2009 to 04-10-2009 7224.3028 05-10-2009 to 11-10-2009 10795.3129 12-10-20090 to 18-10-2009 2254.2330 15-10-2009 to 25-10-2009 3236.4431 26-10-2009 to 01-11-2009 440.9132 02-11-2009 to 08-11-2009 1539.8233 09-11-2009 to 15-11-2009 200.7934 16-11-2009 to 22-11-2009 126.2735 23-11-2009 to 29-11-2009 1159.2036 30-11-2009 to 06-12-2009 3249.9037 07-12-2009 to 13-12 2009 1996.7738 14-12-2009 to 20-12-2009 2225.2539 21-12-2009 to 27-12-2009 5338.5340 28-12-2009 to 03-01-2010 3887.4641 04-01-2010 to 10-01-2010 20.7042 11-01-2010 to 17-01-2010 1528.6943 18-01-2010 to 24-01-2010 1327.3944 25-01-2010 to 31-01-2010 1431.1445 01-02-2010 to 07-02-2010 117.9946 08-02-2010 to 14-02-2010 273.2447 15-02-2010 to 21-02-2010 6.2148 22-02-2010 to 28-02-2010 1656.0049 01-03-2010 to 07-03-2010 5373.7250 08-03-2010 to 14-03-2010 5731.8351 15-03-2010 to 21-03-2010 3214.7152 22-03-2010 to 28-03-2010 5357.16

G.Total 161427.26 3779.82

WEEKLY ABSTRACT OF REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009 - 2010

Week No PeriodAmount Payable Amount Receiveable

Page 39

Page 41: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 30-03-2009 to 05-04-2009 ( Week No-1 )(Vide No.110/7/CC-MVAR/NERPC/2009/1820-40 Dt. 8th July 2009(Revised) )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200 -16.13 -28.9 -918.72 1655.10

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200 0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600 0 0.00 0 0

For the period of 06-04-2009 to 12-04-2009 ( Week No-2 )

(Vide No.110/7/CC-MVAR/NERPC/2009/335-55 Dt. 20th April 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-29.63 -14 -1703.6 803.16

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 13-04-2009 to 19-04-2009 ( Week No-3 )

(Vide No.110/7/CC-MVAR/NERPC/2009/356-76 Dt. 29th April 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-57.42 -26 -3301.7 1494.5

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 20-04-2009 to 26-04-2009 (Week no- 4 )

(Vide No.110/7/CC-MVAR/NERPC/2009/201-281 Dt. 7th May 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-16.49 -83.5 -948.06 4800.3

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

Mizoram

Mizoram

Mizoram

Mizoram

State To

MVARH

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010

MVARH

MVARH

State To Meter code Meter No CT PT

Total Amount in Rs.

-900.45

-900.450.00

0.00

Total Amount =MVR HI + MVR

LO

Net Amount

-1807.11

-1807.11

Total Amount =MVR HI + MVR

LO

Net Amount

736.38

736.380.00

0.00

Meter code Meter No CT

State To Meter code Meter No CT

State To Meter code

PTTotal Amount

in Rs.Total Amount

=MVR HI + MVR LO

Net Amount

Meter No CT PTTotal Amount

in Rs.

0.00

0.00

PTTotal Amount

in Rs.MVARH Total Amount =MVR HI + MVR

LO

Net Amount

3852.27

3852.270.00

0.00

Page 40

Page 42: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 27-04-2009 to 03-05-2009 ( Week No - 5 )

(Vide No.110/7/CC-MVAR/NERPC/2009/705-25 Dt. 11th May 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-47.52 -91.5 -2732.4 5261.9

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 04-05-2009 to 10-05-2009 ( Week No - 6 )

(Vide No.110/7/CC-MVAR/NERPC/2009/827-47 Dt.21st May 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-40.43 -141 -2324.6 8085.4

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 11-05-2009 to 17-05-2009 ( Week No - 7 )

(Vide No.110/7/CC-MVAR/NERPC/2009/958-78 Dt.26th May 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-25.06 -71.8 -1440.7 4125.5

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 18-05-2009 to 24-05-2009 ( Week no - 8 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1023-43 Dt.2nd June 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-7.45 -66.2 -428.49 3806.7

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

Mizoram

Mizoram

Mizoram

MVARH PTState To Meter

code Meter No CT

0.00

Total Amount =MVR HI + MVR

LO

Net Amount

Mizoram

State To Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Net Amount

2529.54

2529.540.00

0.00

State To Meter code Meter No CT PT

MVARH Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

Net Amount

5760.81

5760.810.00

0.00

2684.790.00

0.00

Total Amount in Rs.

3378.24

3378.240.00

State ToTotal Amount

in Rs.Total Amount

=MVR HI + MVR LO

Meter code

2684.79

MVARH Meter No CT PT

Page 41

Page 43: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 25-05-2009 to 31-05-2009 ( Week No - 9 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1153-73 Dt.8th June 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-26.64 -144 -1531.8 8253.1

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 01-06-2009 to 07-06-2009 ( Week no - 10 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1259-79 Dt.17th June 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-8.03 -142 -461.61 8176.5

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 08-06-2009 to 14-06-2009 ( Week No - 11 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1392-1412 Dt.23rd June 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-27.47 -101 -1579.4 5818.8

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 15-06-2009 to 21-06-2009 ( Week No - 12 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1634-54 Dt.30th June 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-14.18 -49.7 -815.58 2858.7

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

Mizoram

Mizoram

Mizoram

State To

State To

Mizoram

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

MVARH Net Amount

6721.29

6721.29

State To Meter code

Net Amount

2043.09

2043.090.00

0.00

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH Meter code Meter No CT PT

4239.36

4239.360.00

0.00

Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH

Net Amount

7714.89

7714.890.00

0.00

Total Amount =MVR HI + MVR

LO

Net Amount

PTTotal Amount

in Rs.Total Amount

=MVR HI + MVR LO

Total Amount in Rs.MVARH

State To Meter code Meter No CT

0.00

0.00

Meter No CT PT

Page 42

Page 44: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 22-06-2009 to 28-06-2009 ( Week No - 13 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1786-806 Dt.7th July 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-5.47 -105 -314.64 6034.1

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 29-06-2009 to 05-07-2009 ( Week No - 14 )

(Vide No.110/7/CC-MVAR/NERPC/2009/1902-22 Dt.13th July 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-6.84 -81 -393.3 4655.4

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 06-07-2009 to 12-07-2009 ( Week No - 15 )

(Vide No.110/7/CC-MVAR/NERPC/2009/2190-210 Dt.21st July 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-8.89 -28 -511.29 1610.5

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

For the period of 13-07-2009 to 19-07-2009 ( Week No - 16 )

(Vide No.NERPC/COM/REACTIVE/2009/710-30 Dt.28-07- 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-0.47 -92.5 -26.91 5315.8

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0 0 0

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0 0.00 0 0

Mizoram

Mizoram

Mizoram

State To

State To

Mizoram

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Net Amount

5719.41

5719.41

5288.85

5288.850.00

0.00

Meter code Meter No CT PT

MVARH

1099.17

1099.170.00

0.00

Net Amount

Total Amount =MVR HI + MVR

LO

Total Amount =MVR HI + MVR

LO

MVARH

0.00

Net Amount

Meter code Meter No CT PT

State To Meter code Meter No CT

State To Meter code Meter No CT

Total Amount =MVR HI + MVR

LO

MVARH

PT

PTTotal Amount

in Rs.

MVARH

Total Amount in Rs.

Total Amount in Rs.

0.00

0.00

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

4262.13

4262.130.00

Page 43

Page 45: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 20-07-2009 to 26-07-2009 ( Week No - 17 )

(Vide No.NERPC/COM/REACTIVE/2009/2414-34 Dt.6th Aug. 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-5.22 -95 -300.15 5460.7

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 27- 07-2009 to 02- 08-2009 ( Week No - 18 )

(Vide No.NERPC/COM/REACTIVE/2009/ 2479-99 Dt.12- 08- 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

.3.96 -131 -227.7 7518.2

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 03- 08-2009 to 09- 08-2009 ( Week No - 19 )

(Vide No.NERPC/COM/REACTIVE/2009/2589- 609 Dt.18- 08- 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-32.65 -65.6 -1877.5 3769.5

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 10- 08-2009 to 16- 08-2009 ( Week No - 20 )

(Vide No.NERPC/COM/REACTIVE/2009/2671- 91 Dt.24- 08- 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-41.04 -57.6 -2359.8 3314.1

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

Mizoram

Mizoram

Mizoram

State To

State To

Mizoram

State To

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Net Amount

5160.51

Net Amount

954.27

954.270.00

0.00

Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH

Net Amount

1891.98

1891.980.00

0.00

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH

Meter code Meter No CT PT

Net Amount

7290.54

7290.540.00

0.00

Total Amount =MVR HI + MVR

LOState To Meter

code Meter No CT

5160.510.00

0.00

Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH

PT

MVARH

Total Amount in Rs.

Page 44

Page 46: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 17- 08-2009 to 23- 08-2009 ( Week No - 21 )

(Vide No.NERPC/COM/REACTIVE/2009/2764-84 Dt.1st September 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-21.82 -126 -1254.4 7261.6

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 24-08-2009 to 30-08-2009 ( Week No - 22 )

(Vide No.NERPC/COM/REACTIVE/2009/2867- 87 Dt.8th September 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-24.77 -139 -1424.2 8013

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 31- 08-2009 to 06- 09-2009 ( Week No - 23 )

(Vide No.NERPC/COM/REACTIVE/2009/2989-09 Dt.15th September 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-30.20 -76 -1736.7 4371.8

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 07- 09-2009 to 13- 09-2009 ( Week No - 24 )

(Vide No.NERPC/COM/REACTIVE/2009/3098-118 Dt.22nd September 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-7.45 -97.1 -428.49 5582.8

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

Mizoram

Mizoram

Mizoram

Mizoram

Total Amount in Rs.MVARH

State To Meter code Meter No CT PT

Total Amount =MVR HI + MVR

LO

Net Amount

5154.30

5154.300.00

0.00

State To Meter code Meter No CT PT

Total Amount in Rs.MVARH

Total Amount =MVR HI + MVR

LO

Net Amount

2635.11

2635.110.00

0.00

6588.81

6588.810.00

0.00

State To Meter code Meter No CT PT

MVARH

Net Amount

6007.14

6007.140.00

0.00

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

State To Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

MVARH

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Page 45

Page 47: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 14- 09-2009 to 20- 09-2009 ( Week No - 25 )

(Vide No.NERPC/COM/REACTIVE/2009/3202-11 Dt 1st October 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-55.04 -40.2 -3165 2312.2

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 21- 09-2009 to 27- 09-2009 ( Week No - 26 )

(Vide No.NERPC/COM/REACTIVE/2009/3296-3316 Dt 6th October 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-30.67 -26.9 -1763.6 1544.2

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 28- 09-2009 to 04- 10-2009 ( Week No - 27 )

(Vide No.NERPC/COM/REACTIVE/2009/3377-97 Dt13th October 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200 -8.53 -134 -490.59 7714.9

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200 0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600 0.00 0.00 0.00 0.00

For the period of 05- 10-2009 to 11- 10-2009 ( Week No - 28 )

(Vide No.NERPC/COM/REACTIVE/2009/3474-94 Dt19th October 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-42.66 -198 -2453 11410

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

-2.26 -34.23 -129.89 1968.31

State To

Mizoram

Mizoram

State To

Mizoram

State To

8956.89

0.00

1838.42

Net Amount

10795.31

Meter code Meter No CT

Total Amount in Rs. Total Amount

=MVR HI + MVR LO

PTMVARH

MVARH

MVARH

MVARH

PT

Meter code Meter No CT PT

Total Amount in Rs.

-852.84

-852.840.00

0.00

Total Amount =MVR HI + MVR

LO

Net Amount

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Total Amount in Rs.

Total Amount in Rs.

State To Meter code Meter No

Meter code Meter No CT PT

CT

Mizoram

Total Amount =MVR HI + MVR

LO

Net Amount

7224.30

7224.300.00

0.00

Total Amount =MVR HI + MVR

LO

Net Amount

-219.42

-219.420.00

0.00

Page 46

Page 48: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of12- 10-2009 to 18- 10-2009 ( Week No - 29 )Vide No.NERPC/COM/REACTIVE/2009/3554-74 Dt 26th October 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-13.86 -53.1 -796.95 3051.2

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 19- 10-2009 to 25- 10-2009 ( Week no - 30 )

(Vide No.NERPC/COM/REACTIVE/2009/3713 Dt 3rd November 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-3.38 -44.6 -194.58 2562.7

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 -15.10 0.00 868.36

For the period of 26- 10-2009 to01- 11-2009 ( Week No - 31 )

(Vide No.NERPC/COM/REACTIVE/2009/3753-73 Dt 9th November 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-9.90 -17.6 -569.25 1010.2

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 02- 11-2009 to 08- 11-2009 ( Week No - 32 )

(Vide No.NERPC/COM/REACTIVE/2009/ Dt 18th November 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-3.20 -24.3 -184.23 1399.3

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

-0.01 -5.66 -0.78 325.51

State To

Mizoram

Mizoram

Mizoram

Mizoram

State To

MVARH

MVARH

Net Amount

1539.820.00

State To Meter code Meter No CT

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Total Amount =MVR HI + MVR

LOState To Meter

code Meter No CT PT

Total Amount in Rs.

1215.09

440.910.00

0.00

Meter No CT PT

324.73

PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

2254.23

2254.230.00

0.00

Meter code Meter No CT PT

Total Amount in Rs.MVARH Total Amount

=MVR HI + MVR LO

MVARH

Total Amount =MVR HI + MVR

LO

Total Amount in Rs.

Net Amount

2368.08

3236.440.00

868.36

Net Amount

440.91

Meter code

Page 47

Page 49: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 09- 11-2009 to 15- 11-2009 ( Week No - 33 )

(Vide No.NERPC/COM/REACTIVE/2009/ 4147- 67 Dt 23rd November 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-7.20 -1069 -414 614.79

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

(Vide No.NERPC/COM/REACTIVE/2009/ 4237- 57 Dt 1st December 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-5.58 -7.78 -320.85 447.12

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 23- 11-2009 to 29- 11-2009 ( Week No - 35 )

(Vide No.NERPC/COM/REACTIVE/2009/ 4404- 24 Dt 8th December 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-1.58 -21.7 -91.08 1250.3

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 30- 11-2009 to 06- 12-2009 ( Week No - 36 )

(Vide No.NERPC/COM/REACTIVE/2009/ 4474- 94 Dt 11th December 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

0.00 -56.5 0 3249.9

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

Meter No CT

Mizoram

Mizoram

Mizoram

State To

Total Amount =MVR HI + MVR

LO

Net Amount

1159.20

1159.20

Mizoram

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

PTState To Meter code Meter No

State To

Total Amount in Rs.

MVARH

PT

Meter code

Meter code Meter No CT

MVARH

PT

MVARH Total Amount in Rs.

0.00

0.00

Total Amount in Rs. Total Amount

=MVR HI + MVR LO

State To

Total Amount =MVR HI + MVR

LO

For the period of 15- 11-2009 to 22- 11-2009 ( Week No - 34 )

Net Amount

200.79

200.790.00

0.00

CT

MVARH Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

Net Amount

3249.90

3249.900.00

0.00

126.27

126.270.00

0.00

Page 48

Page 50: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 07- 12-2009 to 13- 12-2009 ( Week No - 37 )

(Vide No.NERPC/COM/REACTIVE/2009/ 4730- 50 Dt 22nd December 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-0.11 -29.8 -6.21 1711.9

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 -5.06 0.00 291.09

For the period of 14- 12-2009 to 20- 12-2009 ( Week No - 38 )

(Vide No.NERPC/COM/REACTIVE/2009/ 47103- 123 Dt 29th December 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-1.48 -40.2 -84.87 2310.1

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 21- 12-2009 to 27- 12-2009 ( Week No - 39 )

(Vide No.NERPC/COM/REACTIVE/2009/ 4952- 72 Dt 4th January 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-0.83 -93.7 -47.61 5386.1

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 28- 12-2009 to 03- 01-2010 ( Week No - 40 )

(Vide No.NERPC/COM/REACTIVE/2010/ 5052- 72 Dt 12th January 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-0.94 -68.5 -53.82 3941.3

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

Mizoram

Mizoram

Mizoram

State To

State To

Meter code Meter No CT

Meter code Meter No

Mizoram

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

MVARH

Total Amount =MVR HI + MVR

LO

Net Amount

2225.25

2225.250.00

0.00

State To Meter code Meter No CT PT

Total Amount in Rs.MVARH

PT

Total Amount in Rs. Total Amount

=MVR HI + MVR LO

State To Meter code Meter No CT Net

Amount

1705.68

1996.770.00

291.09

PT

Total Amount in Rs.MVARH

Total Amount in Rs.MVARH

Total Amount =MVR HI + MVR

LO

Net Amount

5338.53

5338.530.00

0.00

CT PT Net Amount

3887.46

Total Amount =MVR HI + MVR

LO

3887.46

0.00

0.00

Page 49

Page 51: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 04-01-2010 to 10- 01-2010 ( Week No - 41 )

(Vide No.NERPC/COM/REACTIVE/2010/ 5022- 42 Dt 18th January 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-9.22 -9.58 -529.92 550.62

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 11- 01-2010 to 17- 01-2010 ( Week No - 42 )

(Vide No.NERPC/COM/REACTIVE/2010/ 5224- 44 Dt 27th January 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

0.00 -20.9 0 1200.6

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

-0.30 -6.01 -17.34 345.43

For the period of 18- 01-2010 to 24- 01-2010 ( Week No - 43 )

(Vide No.NERPC/COM/REACTIVE/2010/ 5292- 5312 Dt1st February 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-1.94 -18.1 -111.78 1039.1

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200 0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

-0.08 -7.04 -4.66 404.69

For the period of 25- 01-2010 to 31- 01-2010 ( Week No - 44 )

(Vide No.NERPC/COM/REACTIVE/2010/ 5627- 27 Dt 16th February 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-0.65 -22.3 -37.26 1279.3

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

-0.41 -3.70 -23.55 212.69

Mizoram

Mizoram

Mizoram

State To Meter No CT

State To

Meter code

MVARH

Net Amount

1242.00

1431.140.00

189.14

State To Meter code Meter No CT PT

Total Amount in Rs.MVARH Total Amount

=MVR HI + MVR LO

Net Amount

927.36

1327.390.00

400.03

Meter code Meter No CT PT

Total Amount in Rs.MVARH

Total Amount =MVR HI + MVR

LO

Total Amount =MVR HI + MVR

LO

Mizoram

Net Amount

1200.60

1528.690.00

328.09

State To Meter code Meter No CT PT

Total Amount in Rs.MVARH

Total Amount =MVR HI + MVR

LO

20.70

0.00

0.00

Total Amount in Rs.PT

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Net Amount

20.70

Page 50

Page 52: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 01- 02-2010 to 07- 02-2010 ( Week No - 45 )

(Vide No.NERPC/COM/REACTIVE/2010/ 5508- 28 Dt 8th February 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-3.46 -5.51 -198.72 316.71

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 08- 02-2010 to 14- 02-2010 ( Week No - 46 )

(Vide No.NERPC/COM/REACTIVE/2010/1754- 74 Dt 23rd February 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-1.76 -6.52 -101.43 374.67

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

For the period of 15- 02-2010 to 21- 02-2010 ( Week No - 47 )

(Vide No.NERPC/COM/REACTIVE/2010/5818-38 Dt 2nd March 2009 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-8.39 -8.5 -482.31 488.52

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

0.00 0.00 0.00 0.00

(Vide No.NERPC/COM/REACTIVE/2010/5898-918 Dt 8th March 2010 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200 -27.50 -56.3 -1581.5 3237.5

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200 0.00 0.00 0.00 0.00

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600 0.00 0.00 0.00 0.00

Mizoram

Mizoram

Mizoram

State To Meter code

Mizoram

State To Meter code

State To Meter code

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

Total Amount in Rs.

Meter No

MVARH Meter No CT PT

Net Amount

1656.00

1656.000.00

0.00

CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Total Amount =MVR HI + MVR

LO

MVARH

MVARH

For the period of 22- 02-2010 to 28- 02-2010 ( Week No - 48 )

State To Meter code

Net Amount

6.21

6.210.00

0.00

Meter No CT PT

Total Amount in Rs.

117.99

117.990.00

0.00

Total Amount =MVR HI + MVR

LO

Net Amount

Meter No CT PT

Total Amount in Rs.MVARH Total Amount

=MVR HI + MVR LO

Net Amount

273.24

273.240.00

0.00

Page 51

Page 53: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the period of 01- 03-2010 to 07- 03-2010 ( Week No - 49 )

(Vide No.NERPC/COM/REACTIVE/2010/1958 - 78 Dt 15th March 2010 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-21.20 -14 -1219.2 840.42

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

8.35 -0.90 480.24 51.75

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

90.79 0.00 5220.54 0.00

For the period of 08- 03-2010 to 14- 03-2010 ( Week No - 50 )

(Vide No.NERPC/COM/REACTIVE/2010/6101 - 21 Dt 19th March 2010 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-14.94 -25.2 -859.05 1449.00

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

11.48 -8.03 660.33 461.61

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

72.43 2.52 4164.84 -144.90

For the period of 15- 03-2010 to 21- 03-2010 ( Week No - 51 )

(Vide No.NERPC/COM/REACTIVE/2010/6235 - 55 Dt 19th March 2010 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200

-3.28 -40.5 -188.37 2330.82

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200

2.27 -11.48 130.41 660.33

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600

22.10 17.21 1270.98 -989.46

For the period of 22- 03-2010 to 28- 03-2010 ( Week No - 52 )

(Vide No.NERPC/COM/REACTIVE/2010/ 37 - 57 Dt.7th April 2010 )

HI LO MVR.HI MVR.LO

MZ-01 NP-0867-A AIZAWL END OF ZEMABAWK 300 1200 -15.70 -24.3 -902.52 1395.18

MZ-03 NP-2505-A BAIRABI END OF KOLASIB 150 1200 6.62 -17.35 380.88 997.74

MZ-07 NP-0445-A BAWKTLANG END OF 132/66 KV TRF 75 600 60.70 0.07 3490.02 -4.14

Mizoram

Mizoram

Mizoram

Mizoram

State To

State To

Meter code Meter No CT PT

Total Amount in Rs.MVARH Total Amount

=MVR HI + MVR LO

Net Amount

-378.81

5373.72531.99

5220.54

State To Meter code Meter No CT

Meter code Meter No CT PT

Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

MVARH

2142.45

3214.71790.74

281.52

State To Meter code Meter No CT PT

MVARH Total Amount in Rs.

Total Amount =MVR HI + MVR

LO

Net Amount

492.66

5357.161378.62

3485.88

WEEKLY REACTIVE ENERGY ACCOUNT FOR THE YEAR 2009-2010 (Contd.)

589.95

5731.831121.94

4019.94

PTTotal Amount

in Rs.Total Amount

=MVR HI + MVR LO

Net Amount

MVARH

Page 52

Page 54: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Local Generation

Page 53

Page 55: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Gross Aux Net Gross Aux Net Gross Aux Net Gross Aux Net Gross Aux Net

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 Apr-09 0 0 0 0 0 0 84395 564 83831 29389 1469 27920 78480 2478 76003

2 May-09 0 0 0 0 0 0 3130 554 2576 35336 1767 33569 98460 3775 94685

3 Jun-09 0 0 0 40470 4103 36367 144256 2554 141702 109542 5477 104065 214020 5960 208060

4 Jul-09 46036 589 45447 250700 4735 245965 430112 3925 426187 158063 7903 150160 217440 5628 211813

5 Aug-09 13326 698 12628 273473 5104 268369 525724 4316 521408 210939 10547 200392 71820 3405 68415

6 Sep-09 17586 846 16740 273722 5312 268410 402635 5307 397328 0 0 0 118440 6173 112268

7 Oct-09 14253 943 13310 311303 5326 305977 390860 3218 387642 0 0 0 81360 3774 77587

8 Nov-09 14253 943 13310 89446 2358 87088 1398040 4616 1393424 230305 11515 218790 98640 5310 93330

9 Dec-09 1660 968 692 12902 1045 11857 43911 810 43101 76725 3836 72889 94680 5018 89663

10 Jan-10

11 Feb-10

12 Mar-10

107114 4987 102127 1252016 27983 1224033 3423063 25864 3397199 850299 42514 807785 1073340 41519 1031822

0.107 0.005 0.102 1.252 0.028 1.224 3.423 0.026 3.397 0.850 0.043 0.808 1.073 0.042 1.032

Gross Aux Net Gross Aux Net Gross Aux Net Gross Aux Net Gross Aux Net

1 2 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

1 Apr-09 0 0 0 0 0 0 0 0 0 0 0 0 192264 4511 187754

2 May-09 0 0 0 0 0 0 0 0 0 0 0 0 136926 6096 130830

3 Jun-09 0 0 0 215870 386 215484 0 0 0 0 0 0 724158 18480 705678

4 Jul-09 0 0 0 521680 869 520811 166452 217 166235 193750 173 193577 1984233 24039 1960195

5 Aug-09 0 0 0 196560 867 195693 170472 15 170457 0 0 0 1462314 24952 1437362

6 Sep-09 0 0 0 676240 894 675346 243504 62 243443 1507500 1339 1506161 3239627 19932 3219695

7 Oct-09 0 0 0 646980 861 646119 219300 64 219237 1141705 1073 1140632 2805761 15258 2790503

8 Nov-09 0 0 0 148550 340 148210 99208 78 99130 228097 240 227857 2306539 25400 2281139

9 Dec-09 0 0 0 40500 93 40407 1089 582 507 93036 124 92912 364503 12476 352028

10 Jan-10

11 Feb-10

12 Mar-10

0 0 0 2446380 4310 2442070 900025 1017 899008 3164088 2949 3161139 13216325 151143 13065183

0.000 0.000 0.000 2.446 0.004 2.442 0.900 0.001 0.899 3.164 0.003 3.161 13.216 0.151 13.065

Note : Data for January to March 2010 not available at the time of preparation of this report

TOTAL

Sl No. Months

(in MU)

(in MU)

TOTAL

Maicham-I(2.0MW)

Small Hydel Prjects

Khawiva(1.05MW) Lamsial(0.5MW) Maicham-II(3.0MW)TOTAL(SHP)

Months

LOCAL GENERATION DURING 2009-10

Serlui-A(1.0MW) Tuipui(0.5MW) Teirei(3.0MW) Kautlabung(3.0MW)

Small Hydel Prjects

Tuipang(3.0MW)Sl No.

Page 54

Page 56: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Gross Aux Net Gross Aux Net Gross Aux Net Gross Aux Net

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Apr-09 823892 7810 816082 1960 20 1940 825852 7830 818022 1018116 12341 1005776

2 May-09 0 0 0 1270 20 1250 1270 20 1250 138196 6116 132080

3 Jun-09 212193 2110 210083 2228 20 2208 214421 2130 212291 938579 20610 917969

4 Jul-09 407971 3701 404270 1265 20 1245 409236 3721 405515 2393469 27760 2365710

5 Aug-09 0 0 0 1262 20 1242 1262 20 1242 1463576 24972 1438604

6 Sep-09 0 0 0 986 20 966 986 20 966 3240613 19952 3220661

7 Oct-09 0 0 0 1538 20 1518 1538 20 1518 2807299 15278 2792021

8 Nov-09 0 0 0 848 20 828 848 20 828 2307387 25420 2281967

9 Dec-09 0 0 0 710 20 690 710 20 690 365213 12496 352718

10 Jan-10

11 Feb-10

12 Mar-10

1444056 13621 1430435 12067 180 11887 1456123 13801 1442322 14672448 164944 14507505

1.444 0.014 1.430 0.012 0.000 0.012 1.456 0.014 1.442 14.672 0.165 14.508

Note : Data for January to March 2010 not available at the time of preparation of this report

(in MU)

TOTAL

Sl No. Months

GRAND TOTAL

( SHP + Thermal )

LOCAL GENERATION DURING 2009-10 (Contd.)

Bairabi(22.92MW) Lengpui Airport(0.50MW) TOTAL(Thermal/Diesel)

Thermal / Diesel

Page 55

Page 57: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Tripping & Outage of

State Transmission line

(132kV level)

Page 56

Page 58: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of : April 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks10/4/2009 Zuangtui to Bukpui 132 kV line 14:48 14:53 Earth fault Earth fault relay11/4/2009 Zuangtui to Bukpui 132 kV line 11:52 12:10 Earth fault Earth fault relay15/4/2009 Zuangtui to Bukpui 132 kV line 15:04 15:08 Earth fault Earth fault relay15/4/2009 Bukpui to Khawiva 132 kV line 15:04 15:23 Earth fault Earth fault relay22/4/2009 Zuangtui to Bukpui 132 kV line 9:00 10:00 Maintenance of line23/4/2009 Bukpui to Khawiva 132 kV line 20:17 14:00 Earth fault Earth fault relay27/4/2009 Luangmual to 132 kV line 10:20 10:50 Earth fault Earth fault relay30/4/2009 Zuangtui to Bukpui 132 kV line 9:00 16:30 Maint. of line

For the Month of : May 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks12/5/2009 Zuangtui to Bukpui 132 kV line 15:42 16:31 Earth fault Earth fault relay

23-05-2009 Zuangtui to Bukpui 132 kV line 13:34 13:38 Earth fault Earth fault relay24-05-2009 Zuangtui to Bukpui 132 kV line 14:30 15:05 Earth fault Earth fault relay

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL) DURING THE YEAR 2009 - 2010

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 57

Page 59: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of : June 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks13-06-2009 Zuangtui to Bukpui 132 kV line 13:40 13:45 Earth fault Earth fault relay16-06-2009 Zuangtui to Bukpui 132 kV line 8:00 20:45 Maintenance Shut down23-06-2009 Zuangtui to Bukpui 132 kV line 12:03 12:10 Earth fault Earth fault relay

For the Month of : July 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks3/7/2009 Bukpui to khawiva 132 kV line 13:00 13:10 Earth fault Earth fault relay3/7/2009 Bukpui to khawiva 132 kV line 13:20 13:45 Earth fault Earth fault relay4/7/2009 Zuangtui to Bukpui 132 kV line 10:46 10:55 Earth fault Earth fault relay5/7/2009 Bukpui to khawiva 132 kV line 9:50 10:03 Earth fault Earth fault relay8/7/2009 Zuangtui to Bukpui 132 kV line 10:22 10:28 Earth fault Earth fault relay8/7/2009 Bukpui to khawiva 132 kV line 12:44 12:50 Earth fault Earth fault relay

28/2/2009 Bukpui to khawiva 132 kV line 13:00 13:40 Earth fault Earth fault relay12/7/2009 Zuangtui to Saitual 132 kV line 13:41 13:45 Earth fault Earth fault relay13/7/2009 Zuangtui to Bukpui 132 kV line 9:25 9:33 Earth fault Earth fault relay13/07/2009 Bukpui to khawiva 132 kV line 11:15 11:20 Earth fault Earth fault relay16/07/2009 Zuangtui to Saitual 132 kV line 12:10 12:16 Earth fault Earth fault relay17/07/2009 Bukpui to khawiva 132 kV line 11:30 11:38 Earth fault Earth fault relay26/07/2009 Zuangtui to Bukpui 132 kV line 16:52 16:59 Earth fault Earth fault relay

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 58

Page 60: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of : August, 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks7/8/2009 Bukpui to khawiva 132 kV line 10:15 10:30 Earth fault Earth fault relay7/8/2009 Bukpui to khawiva 132 kV line 11:01 11:12 Earth fault Earth fault relay7/8/2009 Bukpui to khawiva 132 kV line 12:10 12:45 Earth fault Earth fault relay

16/08/2009 Zuangtui to Bukpui 132 kV line 11:48 11:55 Earth fault Earth fault relay25/08/2009 Zuangtui to Bukpui 132 kV line 14:59 15:01 Earth fault Earth fault relay25/08/2009 Zuangtui to Saitual 132 kV line 9:20 9:35 Earth fault Earth fault relay25/08/2009 Zuangtui to Saitual 132 kV line 15:29 16:00 Earth fault Earth fault relay26/08/2009 Zuangtui to Bukpui 132 kV line 14:05 14:09 Earth fault Earth fault relay

For the Month of : September, 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks2/9/2009 Zuangtui to Bukpui 132 kV line 12:43 12:50 Earth fault Earth fault relay3/9/2009 Zuangtui to Bukpui 132 kV line 12:45 12:47 Earth fault Earth fault relay7/9/2009 Bukpui to khawiva 132 kV line 14:30 14:45 Earth fault Earth fault relay

16/9/2009 Zuangtui to Bukpui 132 kV line 5:42 5:49 Gas refilled17/9/2009 Zuangtui to Saitual 132 kV line 10:02 10:05 Earth fault Earth fault relay21/9/2009 Zuangtui to Bukpui 132 kV line 10:04 10:11 Earth fault Earth fault relay23/9/2009 Zuangtui to Bukpui 132 kV line 5:30 5:37 Gas refilled25/9/2009 Zuangtui to Bukpui 132 kV line 13:55 14:08 Earth fault Earth fault relay26/9/2009 Zuangtui to Saitual 132 kV line 10:50 11:00 Earth fault Earth fault relay26/9/2010 Zuangtui to Bukpui 132 kV line 6:16 6:24 Earth fault Earth fault relay27/9/2009 Zuangtui to Bukpui 132 kV line 12:01 12:29 Earth fault Earth fault relay28/9/2009 Zuangtui to Bukpui 132 kV line 10:57 18:18 Earth fault Earth fault relay29/9/2009 Zuangtui to Saitual 132 kV line 11:20 11:24 Earth fault Earth fault relay

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 59

Page 61: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of : October, 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks1/10/2009 Zuangtui to Bukpui 132 kV line 12:54 13:03 Earth fault Earth fault relay3/10/2009 Zuangtui to Saitual 132 kV line 13:04 13:10 Earth fault Earth fault relay4/10/2009 Zuangtui to Saitual 132 kV line 12:30 16:37 Earth fault Earth fault relay5/10/2009 Zuangtui to Bukpui 132 kV line 22:44 22:46 Earth fault Earth fault relay7/10/2009 Zuangtui to Bukpui 132 kV line 5:48 6:05 Gas refilled12/10/2009 Zuangtui to Bukpui 132 kV line 10:05 10:15 Earth fault Earth fault relay14/10/2009 Zuangtui to Bukpui 132 kV line 5:45 5:51 Gas refilled14/10/2010 Zuangtui to Bukpui 132 kV line 12:40 12:50 Earth fault Earth fault relay14/10/2011 Zuangtui to Bukpui 132 kV line 15:56 17:39 Conductor snapping Earth fault relay17/10/2012 Zuangtui to Bukpui 132 kV line 23:10 23:30 Earth fault Earth fault relay18/10/2009 Zuangtui to Bukpui 132 kV line 8:05 8:17 Earth fault Earth fault relay23/10/2009 Zuangtui to Bukpui 132 kV line 8:05 8:08 Earth fault Earth fault relay26/10/2009 Zuangtui to Bukpui 132 kV line 11:28 12:49 Earth fault Earth fault relay26/10/2010 Bukpui to Khawiva 132kV line 11:28 13:07 Earth fault Earth fault relay29/10/2009 Zuangtui to Bukpui 132 kV line 13:00 13:08 Earth fault Earth fault relay

For the Month of : November, 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks2/11/2009 Zuangtui to Bukpui 132 kV line 15:40 15:43 Earth fault Earth fault relay2/11/2009 Bukpui to Khawiva 132kV line 15:58 17:05 Earth fault Earth fault relay12/11/2009 Bukpui to Khawiva 132kV line 6:37 7:45 Earth fault Earth fault relay17/11/2009 Zuangtui to Bukpui 132 kV line 7:50 7:55 Earth fault Earth fault relay18/11/2009 Zuangtui to Bukpui 132 kV line 5:53 5:57 Gas refilled

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 60

Page 62: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of : December, 2009

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks - NIL - - - -

For the Month of : January, 2010

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks6/1/2010 Zuangtui to Bukpui 132 kV line 6:00 6:15 Gas refilled

17/1/2010 Zuangtui to Bukpui 132 kV line 12:30 12:32 Earth fault Earth fault relay19/1/2010 Zuangtui to Bukpui 132 kV line 6:00 6:15 Gas refilled22/1/2010 Zuangtui to Bukpui 132 kV line 12:22 14:13 Earth fault Earth fault relay27/1/2010 Zuangtui to Bukpui 132 kV line 6:05 6:17 Gas refilled

For the Month of :February, 2010

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks3/2/2010 Zuangtui to Bukpui 132 kV line 6:13 6:19 Gas refilled

10/2/2010 Zuangtui to Bukpui 132 kV line 6:19 6:24 Gas refilled13/2/2010 PGCIL to Luangmual 132 kV line 8:09 17:07 Stringing of 132kV line13/2/2010 PGCIL to Zuangtui 132 kV line 8:09 17:07 Stringing of 132kV line15/2/2010 PGCIL to Luangmual 132 kV line 8:02 17:44 Stringing of 132kV line15/2/2010 PGCIL to Zuangtui 132 kV line 8:02 17:44 Stringing of 132kV line17/2/2010 Zuangtui to Bukpui 132 kV line 6:10 6:20 Gas refilled25/2/2010 Zuangtui to Bukpui 132 kV line 18:01 18:15 Due to tripping of PGCIL 25/2/2010 Zuangtui to Saituali 132 kV line 18:01 18:18 to Zuangtui 132kV line25/2/2010 Bukpui to Khawiva 132kV line 18:01 18:20

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 61

Page 63: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of :March, 2010

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks2/3/2010 Zuangtui to Bukpui 132 kV line 12:18 12:24 Earth Fault Earth Fault Relay2/3/2010 Zuangtui to Bukpui 132 kV line 13:57 14:06 Earth Fault Earth Fault Relay3/3/2010 Zuangtui to Bukpui 132 kV line 12:39 12:43 Earth Fault Earth Fault Relay3/3/2010 Zuangtui to Bukpui 132 kV line 12:52 13:48 Earth Fault Earth Fault Relay3/3/2010 Zuangtui to Bukpui 132 kV line 14:20 14:26 Earth Fault Earth Fault Relay4/3/2010 Zuangtui to Bukpui 132 kV line 14:36 15:25 Due to Jungle Clearance5/3/2010 Zuangtui to Bukpui 132 kV line 14:27 14:33 Earth Fault Earth Fault Relay

10/3/2010 Zuangtui to Bukpui 132 kV line 6:10 6:24 Gas refilled10/3/2010 Zuangtui to Bukpui 132 kV line 8:31 8:37 Earth Fault Earth Fault Relay10/3/2010 Zuangtui to Bukpui 132 kV line 12:07 12:17 Due to Jungle Clearance10/3/2010 Zuangtui to Bukpui 132 kV line 12:25 12:32 Earth Fault Earth Fault Relay10/3/2010 Zuangtui to Bukpui 132 kV line 13:25 18:30 Earth Fault Earth Fault Relay11/3/2010 Zuangtui to Bukpui 132 kV line 6:40 7:00 Earth Fault Earth Fault Relay11/3/2010 Zuangtui to Bukpui 132 kV line 8:30 8:45 Earth Fault Earth Fault Relay13/3/2010 Zuangtui to Bukpui 132 kV line 10:30 11:20 Earth Fault Earth Fault Relay14/3/2010 Zuangtui to Bukpui 132 kV line 9:50 10:00 Earth Fault Earth Fault Relay14/3/2010 Zuangtui to Bukpui 132 kV line 13:48 13:55 Earth Fault Earth Fault Relay17/3/2010 Zuangtui to Bukpui 132 kV line 6:02 6:04 Gas refilled17/3/2010 Zuangtui to Bukpui 132 kV line 12:30 12:33 Earth Fault Earth Fault Relay17/3/2010 Zuangtui to Bukpui 132 kV line 12:42 13:00 Grid Fail17/3/2010 Bukpui to Khawiva 132 kV line 12:42 13:00 Grid Fail17/3/2010 Zuangtui to Saitual 132 kV line 12:42 13:00 Grid Fail19/3/2010 Zuangtui to Bukpui 132 kV line 13:45 13:50 Earth Fault Earth Fault Relay20/3/2010 Zuangtui to Bukpui 132 kV line 12:20 13:17 Earth Fault Earth Fault Relay20/3/2010 Zuangtui to Bukpui 132 kV line 13:32 14:26 Earth Fault Earth Fault Relay20/3/2010 Zuangtui to Bukpui 132 kV line 14:40 14:50 Earth Fault Earth Fault Relay21/3/2010 Zuangtui to Bukpui 132 kV line 13:36 14:50 Earth Fault Earth Fault Relay

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 62

Page 64: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

For the Month of :March, 2009 ( Contd. )

Date Element Name Outage time Restoration time Reason of Outage Relay operated Remarks23/3/2010 Zuangtui to Bukpui 132 kV line 0:55 1:30 Grid Fail23/3/2010 Bukpui to Khawiva 132kV line 0:55 1:30 Grid Fail23/3/2010 Zuangtui to Saitual 132 kV line 0:55 1:30 Grid Fail24/3/2010 Zuangtui to Bukpui 132 kV line 5:58 6:03 Gas refilled27/3/2010 Zuangtui to Bukpui 132 kV line 4:40 6:20 Grid Fail27/3/2010 Zuangtui to Khawiva 132 kV line 4:40 6:20 Grid Fail27/3/2010 Zuangtui to Saitual 132 kV line 4:40 6:20 Grid Fail28/3/2010 Zuangtui to Bukpui 132 kV line 0:13 0:20 Earth Fault Earth Fault Relay29/3/2010 Zuangtui to Bukpui 132 kV line 0:30 5:27 Earth Fault Earth Fault Relay29/3/2010 Zuangtui to Bukpui 132 kV line 5:40 5:47 Earth Fault Earth Fault Relay29/3/2010 Zuangtui to Bukpui 132 kV line 21:14 21:32 Earth Fault Earth Fault Relay29/3/2010 Zuangtui to Saitual 132 kV line 21:22 21:30 Earth Fault Earth Fault Relay

TRIPPING AND OUTAGE OF STATE OWNED TRANSMISSION LINE (132kV LEVEL)

Page 63

Page 65: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual Drawal

of Power

Page 64

Page 66: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during APRIL 2009

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average Average

Average

Average Average

Average

Average

0

5

10

15

20

25

30

35

40

45

50

55

601-Apr

2-Apr

3-Apr

4-Apr

5-Apr

6-Apr

7-Apr

8-Apr

9-Apr

10-Apr

11-Apr

12-Apr

13-Apr

14-Apr

15-Apr

16-Apr

17-Apr

18-Apr

19-Apr

20-Apr

21-Apr

22-Apr

23-Apr

24-Apr

25-Apr

26-Apr

27-Apr

28-Apr

29-Apr

30-Apr

Page 65

Power in MW ----

Maximum 40.7 49.6 48.8 52.8 51.9 50.2 47.4 54.4 51.2 50.7 50.7 53.5 49.0 48.0 54.5 52.0 53.0 54.1 40.1 46.9 45.7 49.3 43.7 45.4 49.4 46.5 50.3 52.5 46.1 52.5

Minimum 13.9 20.0 22.1 21.9 21.2 21.5 23.2 23.8 21.9 20.3 20.3 17.9 20.6 19.9 19.5 22.5 22.7 21.6 19.0 18.8 11.9 19.8 11.3 16.6 19.4 23.0 2.6 19.9 23.0 22.8

Average 25.4 33.2 32.8 32.8 32.9 33.4 33.2 33.7 33.4 32.5 32.5 32.4 32.2 29.9 31.3 33.2 32.8 32.7 27.6 29.1 29.9 29.4 30.7 27.0 31.1 32.8 29.7 33.6 31.8 32.9

1-

Apr

2-

Apr

3-

Apr

4-

Apr

5-

Apr

6-

Apr

7-

Apr

8-

Apr

9-

Apr

10-

Apr

11-

Apr

12-

Apr

13-

Apr

14-

Apr

15-

Apr

16-

Apr

17-

Apr

18-

Apr

19-

Apr

20-

Apr

21-

Apr

22-

Apr

23-

Apr

24-

Apr

25-

Apr

26-

Apr

27-

Apr

28-

Apr

29-

Apr

30-

Apr

Page 67: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during MAY 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

1-May

2-May

3-May

4-May

5-May

6-May

7-May

8-May

9-May

10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May

Page 66

Power in MW ----

Maximum 55.6 52.0 49.5 48.5 55.1 53.3 56.6 54.8 54.5 49.6 46.2 50.3 53.7 53.2 52.0 52.9 49.0 49.9 46.4 44.6 48.5 47.7 49.7 41.8 48.2 47.7 50.9 50.9 50.7 48.8 47.0

Minimum 21.9 12.4 20.5 16.0 22.3 15.5 21.3 22.2 25.9 2.38 6.5 16.3 19.3 20.2 22.2 20.4 21.8 21.5 18.7 14.2 18.7 7.4 15.9 15.9 20.3 14.0 17.1 25.9 23.6 23.3 21.9

Average 33.1 32.5 31.0 28.5 32.4 31.6 34.2 33.1 35.5 31.7 27.4 31.0 30.4 32.6 33.2 31.6 32.4 32.3 28.0 28.7 30.4 30.1 31.0 30.3 31.0 28.2 31.5 33.7 33.5 33.1 32.6

1-

May

2-

May

3-

May

4-

May

5-

May

6-

May

7-

May

8-

May

9-

May

10-

May

11-

May

12-

May

13-

May

14-

May

15-

May

16-

May

17-

May

18-

May

19-

May

20-

May

21-

May

22-

May

23-

May

24-

May

25-

May

26-

May

27-

May

28-

May

29-

May

30-

May

31-

May

Page 68: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during JUNE 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0

5

10

15

20

25

30

35

40

45

50

55

60

1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun

Page 67

Power in MW ----

Maximum 45.2 47.6 47.6 45.8 46.2 53.3 46.2 51.0 39.7 51.1 49.2 50.3 53.7 53.8 49.0 43.5 49.3 48.6 45.9 44.8 47.3 42.8 46.6 50.5 47.0 50.5 48.2 47.1 48.0 49.8

Minimum 22.1 23.3 19.4 19.5 22.5 20.4 3.9 20.0 20.9 19.6 21.1 16.3 19.3 22.4 21.5 16.2 22.9 20.1 21.9 20.3 19.7 18.8 18.4 14.5 2.8 16.9 12.0 19.2 20.8 19.5

Average 32.2 31.8 31.6 30.8 30.3 32.1 31.3 32.9 29.1 31.0 31.0 31.0 30.4 31.9 31.6 25.8 33.3 30.1 29.1 31.2 30.4 28.5 29.2 29.4 28.6 27.5 29.0 31.3 32.0 33.2

1-

Jun

2-

Jun

3-

Jun

4-

Jun

5-

Jun

6-

Jun

7-

Jun

8-

Jun

9-

Jun

10-

Jun

11-

Jun

12-

Jun

13-

Jun

14-

Jun

15-

Jun

16-

Jun

17-

Jun

18-

Jun

19-

Jun

20-

Jun

21-

Jun

22-

Jun

23-

Jun

24-

Jun

25-

Jun

26-

Jun

27-

Jun

28-

Jun

29-

Jun

30-

Jun

Page 69: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during JULY 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul

10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

Page 68

Power in MW ----

Maximum 51.6 51.7 53.9 55.3 47.6 51.0 52.8 47.9 53.0 51.9 53.1 47.5 46.2 47.9 50.5 49.7 47.6 54.8 42.3 46.2 50.1 51.2 49.5 38.7 49.7 46.2 51.3 52.0 48.8 46.9 47.0

Minimum 17.1 19.9 19.5 14.3 18.4 19.7 20.8 21.3 19.9 19.8 18.9 17.4 20.0 22.0 20.4 18.5 20.4 2.3 18.2 20.3 18.1 20.0 20.7 15.0 19.9 20.5 22.8 19.0 19.6 23.3 21.9

Average 32.7 34.1 32.6 32.7 30.5 31.9 32.3 31.4 32.0 30.8 32.2 29.7 30.9 32.5 31.3 31.4 30.3 31.4 30.3 30.0 31.2 32.7 32.5 28.4 31.5 30.0 31.9 33.0 33.3 34.1 32.6

1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul10-

Jul

11-

Jul

12-

Jul

13-

Jul

14-

Jul

15-

Jul

16-

Jul

17-

Jul

18-

Jul

19-

Jul

20-

Jul

21-

Jul

22-

Jul

23-

Jul

24-

Jul

25-

Jul

26-

Jul

27-

Jul

28-

Jul

29-

Jul

30-

Jul

31-

Jul

Page 70: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during AUGUST 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

8-Aug

9-Aug

10-Aug

11-Aug

12-Aug

13-Aug

14-Aug

15-Aug

16-Aug

17-Aug

18-Aug

19-Aug

20-Aug

21-Aug

22-Aug

23-Aug

24-Aug

25-Aug

26-Aug

27-Aug

28-Aug

29-Aug

30-Aug

31-Aug

Page 69

Power in MW ----

Maximum 53.3 47.5 51.7 51.4 50.8 47.0 50.7 51.0 46.6 50.5 52.9 47.2 50.2 50.5 53.2 50.4 49.3 53.6 53.7 52.9 53.1 53.5 51.1 48.5 52.8 49.0 51.5 51.8 53.2 53.0 52.5

Minimum 17.9 18.9 21.9 21.1 22.9 19.9 19.3 17.5 19.8 18.7 21.6 19.7 20.0 21.7 18.9 20.0 18.7 20.0 20.2 20.2 18.9 19.5 19.2 16.5 17.7 19.3 19.6 20.3 20.5 23.5 21.4

Average 32.8 30.5 33.8 33.3 32.9 31.3 30.3 32.4 30.0 31.3 32.4 30.4 31.9 33.6 34.6 31.6 30.1 31.4 32.6 33.5 34.0 34.0 32.6 30.6 30.8 31.5 31.7 32.3 34.1 35.4 33.0

1-

Aug

2-

Aug

3-

Aug

4-

Aug

5-

Aug

6-

Aug

7-

Aug

8-

Aug

9-

Aug

10-

Aug

11-

Aug

12-

Aug

13-

Aug

14-

Aug

15-

Aug

16-

Aug

17-

Aug

18-

Aug

19-

Aug

20-

Aug

21-

Aug

22-

Aug

23-

Aug

24-

Aug

25-

Aug

26-

Aug

27-

Aug

28-

Aug

29-

Aug

30-

Aug

31-

Aug

Page 71: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during SEPTEMBER 2009Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

1-Sep

2-Sep

3-Sep

4-Sep

5-Sep

6-Sep

7-Sep

8-Sep

9-Sep

10-Sep

11-Sep

12-Sep

13-Sep

14-Sep

15-Sep

16-Sep

17-Sep

18-Sep

19-Sep

20-Sep

21-Sep

22-Sep

23-Sep

24-Sep

25-Sep

26-Sep

27-Sep

28-Sep

29-Sep

30-Sep

Page 70

Power in MW ----

Maximum 49.6 46.5 52.3 49.1 53.9 48.6 49.3 55.5 53.9 49.5 49.4 53.1 52.3 50.5 54.0 48.5 46.5 51.6 51.3 54.1 50.3 52.0 47.2 48.0 43.2 46.4 42.4 45.0 49.9 53.0

Minimum 20.2 22.9 19.5 21.4 18.4 22.4 19.1 21.9 21.9 13.0 19.1 18.1 17.5 18.3 18.5 19.9 20.9 19.4 17.4 20.5 17.9 16.3 19.4 19.8 19.4 19.0 17.9 20.1 20.9 23.5

Average 32.7 32.7 31.4 32.8 34.2 33.5 31.9 33.9 34.3 31.5 31.4 33.0 30.5 31.9 33.2 32.1 31.8 31.9 32.5 32.0 30.7 30.1 29.5 31.0 30.0 30.9 28.7 29.7 32.7 35.4

1-

Sep

2-

Sep

3-

Sep

4-

Sep

5-

Sep

6-

Sep

7-

Sep

8-

Sep

9-

Sep

10-

Sep

11-

Sep

12-

Sep

13-

Sep

14-

Sep

15-

Sep

16-

Sep

17-

Sep

18-

Sep

19-

Sep

20-

Sep

21-

Sep

22-

Sep

23-

Sep

24-

Sep

25-

Sep

26-

Sep

27-

Sep

28-

Sep

29-

Sep

30-

Sep

Page 72: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during OCTOBER 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

1-Oct

2-Oct

3-Oct

4-Oct

5-Oct

6-Oct

7-Oct

8-Oct

9-Oct

10-Oct

11-Oct

12-Oct

13-Oct

14-Oct

15-Oct

16-Oct

17-Oct

18-Oct

19-Oct

20-Oct

21-Oct

22-Oct

23-Oct

24-Oct

25-Oct

26-Oct

27-Oct

28-Oct

29-Oct

30-Oct

31-Oct

Page 71

Power in MW ----

Maximum 51.6 51.2 53.5 49.8 54.1 51.2 50.8 51.0 53.5 49.1 54.9 56.1 40.9 42.6 54.0 46.3 55.1 50.9 54.6 57.3 58.1 58.2 58.1 60.0 55.2 55.3 59.1 54.7 55.4 54.7 58.0

Minimum 23.0 22.4 20.7 20.9 18.5 2.8 20.4 19.8 17.5 20.8 23.8 18.4 12.9 2.1 18.5 15.3 19.4 21.0 19.6 20.1 21.8 21.5 21.4 21.1 22.9 19.0 24.8 24.0 21.1 23.0 20.9

Average 34.6 34.9 34.5 33.7 34.2 31.0 31.7 31.6 34.3 33.4 37.5 33.5 24.8 28.9 33.2 27.8 35.0 32.5 33.0 34.9 34.9 34.4 33.8 36.5 33.7 33.3 36.0 35.8 35.7 34.6 36.7

1-

Oct

2-

Oct

3-

Oct

4-

Oct

5-

Oct

6-

Oct

7-

Oct

8-

Oct

9-

Oct

10-

Oct

11-

Oct

12-

Oct

13-

Oct

14-

Oct

15-

Oct

16-

Oct

17-

Oct

18-

Oct

19-

Oct

20-

Oct

21-

Oct

22-

Oct

23-

Oct

24-

Oct

25-

Oct

26-

Oct

27-

Oct

28-

Oct

29-

Oct

30-

Oct

31-

Oct

Page 73: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during NOVEMBER 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

1-Nov

2-Nov

3-Nov

4-Nov

5-Nov

6-Nov

7-Nov

8-Nov

9-Nov

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

Page 72

Power in MW ----

Maximum 55.4 58.4 57.7 57.4 56.2 57.1 60.6 52.3 54.8 51.6 54.9 53.9 53.0 55.1 54.0 54.4 56.5 55.2 56.1 55.7 54.9 53.3 50.3 56 53.8 52.2 54.0 54.6 51.4 51.9

Minimum 23.2 2.5 21.0 23.8 4.0 25.1 22.4 13.2 23.7 26.0 24.8 17.3 25.1 25.6 18.5 20.4 26.5 26.5 25.4 20.9 13.9 23.2 24.2 23.2 27.1 19.0 25.4 27.2 24.8 23.8

Average 34.3 34.9 35.5 37.7 38.0 37.9 39.1 35.9 36.9 38.0 37.8 33.6 37.8 39.7 33.2 37.1 39.5 40.5 38.7 34.7 38.1 37.1 35.7 36.4 38.5 35.0 37.6 37.0 36.3 36.4

1-

Nov

2-

Nov

3-

Nov

4-

Nov

5-

Nov

6-

Nov

7-

Nov

8-

Nov

9-

Nov

10-

Nov

11-

Nov

12-

Nov

13-

Nov

14-

Nov

15-

Nov

16-

Nov

17-

Nov

18-

Nov

19-

Nov

20-

Nov

21-

Nov

22-

Nov

23-

Nov

24-

Nov

25-

Nov

26-

Nov

27-

Nov

28-

Nov

29-

Nov

30-

Nov

Page 74: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during DECEMBER 2009Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

1-Dec

2-Dec

3-Dec

4-Dec

5-Dec

6-Dec

7-Dec

8-Dec

9-Dec

10-Dec

11-Dec

12-Dec

13-Dec

14-Dec

15-Dec

16-Dec

17-Dec

18-Dec

19-Dec

20-Dec

21-Dec

22-Dec

23-Dec

24-Dec

25-Dec

26-Dec

27-Dec

28-Dec

29-Dec

30-Dec

31-Dec

Page 73

Power in MW ----

Maximum 52.7 51.5 51.9 52.0 50.0 50.7 55.3 53.5 54.6 54.5 52.9 58.0 53.4 52.6 51.5 52.1 52.6 50.6 57.3 48.7 51.3 59.5 63.0 64.0 62.0 59.2 59.5 59.9 59.5 65.0 63.0

Minimum 25.3 26.6 26.0 26.3 25.6 24.9 26.3 26.8 17.1 25.9 24.0 23.3 22.1 17.5 25.1 25.4 25.6 26.1 9.2 26.7 25.5 26.4 27.4 24.1 29.1 26.0 25.5 24.4 27.8 28.1 26.1

Average 38.1 37.0 36.9 36.5 37.4 36.5 37.3 37.7 35.4 36.9 37.6 36.7 37.0 34.1 34.9 36.5 35.9 36.5 37.9 35.5 38.0 40.0 42.0 44.2 41.5 39.3 39.8 40.0 39.7 42.9 43.0

1-

Dec

2-

Dec

3-

Dec

4-

Dec

5-

Dec

6-

Dec

7-

Dec

8-

Dec

9-

Dec

10-

Dec

11-

Dec

12-

Dec

13-

Dec

14-

Dec

15-

Dec

16-

Dec

17-

Dec

18-

Dec

19-

Dec

20-

Dec

21-

Dec

22-

Dec

23-

Dec

24-

Dec

25-

Dec

26-

Dec

27-

Dec

28-

Dec

29-

Dec

30-

Dec

31-

Dec

Page 75: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during January 2010Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

1-Jan

2-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan

10-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan

31-Jan

Page 74

Power in MW ----

Maximum 57.3 57.1 57.6 55.7 55.1 55.2 54.8 55.0 50.9 51.2 57.9 53.4 55.3 54.9 55.0 54.0 53.8 54.8 52.0 45.1 45.1 58.1 55.8 55.3 56.1 59.2 56.1 57.5 55.6 60.4 54.1

Minimum 27.9 25.3 24.8 22.4 24.8 26.2 20.3 26.2 24.5 23.4 6.48 27.1 25 22.7 24.1 26.1 8.4 26.6 24.7 20.5 20.5 22.5 27.3 24.8 26.4 26.0 21.2 23.4 19.8 23.0 23.7

Average 38.7 37.7 38.2 38.7 36.4 39.2 34.0 38.4 37.4 34.0 29.0 38.0 35.5 34.3 37.5 36.9 33.7 35.5 35.9 29.1 29.1 37.6 39.9 38.9 36.6 40.6 35.2 38.2 35.7 36.1 36.7

1-

Jan

2-

Jan

3-

Jan

4-

Jan

5-

Jan

6-

Jan

7-

Jan

8-

Jan

9-

Jan

10-

Jan

11-

Jan

12-

Jan

13-

Jan

14-

Jan

15-

Jan

16-

Jan

17-

Jan

18-

Jan

19-

Jan

20-

Jan

21-

Jan

22-

Jan

23-

Jan

24-

Jan

25-

Jan

26-

Jan

27-

Jan

28-

Jan

29-

Jan

30-

Jan

31-

Jan

Page 76: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during February 2010Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

1-Feb

2-Feb

3-Feb

4-Feb

5-Feb

6-Feb

7-Feb

8-Feb

9-Feb

10-Feb

11-Feb

12-Feb

13-Feb

14-Feb

15-Feb

16-Feb

17-Feb

18-Feb

19-Feb

20-Feb

21-Feb

22-Feb

23-Feb

24-Feb

25-Feb

26-Feb

27-Feb

28-Feb

Page 75

Power in MW ----

Maximum 50.0 49.2 48.9 48.8 48.3 56.2 54.8 52.7 53.4 52.4 49.6 47.6 57.5 53.4 58.4 54.0 53.8 54.4 53.9 58.4 56.6 52.1 57.4 52.8 59.0 53.7 51.9 53.2

Minimum 23.2 25.3 25.3 25.3 26.0 24.3 20.3 24.4 25.5 24.3 25.2 23.2 2.0 25.7 1.7 26.8 8.4 23.6 23.4 25.8 26.9 19.9 26.2 24.3 24.0 21.0 24.7 23.7

Average 34.1 37.0 35.1 35.4 34.8 38.2 34.6 34.9 36.9 36.4 36.1 29.8 23.7 37.1 25.6 38.1 33.7 37.0 35.5 36.6 38.4 33.7 38.6 36.5 36.3 35.4 38.5 37.3

1-

Feb

2-

Feb

3-

Feb

4-

Feb

5-

Feb

6-

Feb

7-

Feb

8-

Feb

9-

Feb

10-

Feb

11-

Feb

12-

Feb

13-

Feb

14-

Feb

15-

Feb

16-

Feb

17-

Feb

18-

Feb

19-

Feb

20-

Feb

21-

Feb

22-

Feb

23-

Feb

24-

Feb

25-

Feb

26-

Feb

27-

Feb

28-

Feb

Page 77: Annual Report - Mizoram · For the Month : September, 2009 (a) Power Stations Name of Stations Agencies Scheduled Energy in MU Bill Amount in Lakhs Remarks Ranaganadi HEP NEEPCO 5.99

Bar Chart of Actual drawal of Power during March 2010Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum

Maximum Maximum

Maximum

Maximum

Maximum Maximum

Minimum

Minimum Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Minimum

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

Average

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

1-Mar

2-Mar

3-Mar

4-Mar

5-Mar

6-Mar

7-Mar

8-Mar

9-Mar

10-Mar

11-Mar

12-Mar

13-Mar

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar

30-Mar

31-Mar

Page 76

Power in MW ----

Maximum 55.5 57.1 60.4 59.3 53.0 54.5 51.6 57.4 61.3 54.6 58.8 48.5 56.7 53.4 59.1 52.1 58.0 55.7 60.8 58.0 56.4 59.2 51.2 60.4 61.2 57 63.1 54.2 47.2 37.7 44.2

Minimum 23.9 13.8 19.1 25.0 23.5 24.3 22.7 23.8 25.5 21.4 24 23.2 23.7 25.7 5.5 13.7 6.9 25.7 15.9 25.8 23.2 25.9 23.9 24.7 22 25.7 4.9 21.3 4.6 3 5.05

Average 36.9 32.2 36.1 35.6 35.2 38.0 35.7 36.5 36.7 34.8 37.7 29.9 37.8 37.1 34.9 31.5 35.7 38.4 37.7 38.1 36.3 37.9 35.6 39.4 38.2 38.5 38.3 35.9 24.2 20.8 19.6

1-

Mar

2-

Mar

3-

Mar

4-

Mar

5-

Mar

6-

Mar

7-

Mar

8-

Mar

9-

Mar

10-

Mar

11-

Mar

12-

Mar

13-

Mar

14-

Mar

15-

Mar

16-

Mar

17-

Mar

18-

Mar

19-

Mar

20-

Mar

21-

Mar

22-

Mar

23-

Mar

24-

Mar

25-

Mar

26-

Mar

27-

Mar

28-

Mar

29-

Mar

30-

Mar

31-

Mar