Annual Performance Plan 2013/20163
Foreword by Minister Paul Mashatile
The National Development Plan (NDP) – Vision for 2030; our country’s development
blueprint, which aims to eliminate poverty and reduce inequality by 2030, has this to
say about the contribution of our sector to national development; “Culture, the arts
and other parts of the creative economy have a potential to generate employment
and export earnings. Foreigners visit South Africa to see, understand and learn
about its peoples and cultures. The arts and the related creative economy are thus
an asset that needs investment to promote opportunities for more people, often
outside the formal economy.”
In many ways, the Mzansi Golden Economy (MGE) Strategy is the vehicle through
which we will channel large scale public investment towards developing the arts
and the creative economy, which are identified correctly by the NDP as our “assets”.
The MGE Strategy outlines a number of high impact interventions aimed at
enhancing the contribution of the arts, culture and heritage sector towards the
national effort to grow the economy, create jobs and build sustainable livelihoods
especially for our artists.
In particular, the Strategy identifies measures throughout the education system,
including bringing back arts education in schools, as part of audience development
and stimulating demand. The Strategy also identifies the need to establish a
National Skills Academy for the Cultural and Creative industries, establish an Art
Bank to curate local artistic products, develop a Public Art programme, focus on our
liberation heritage, establish a sourcing company to provide access to new markets
for local artistic products and promote the development of Cultural Precincts
throughout the country. The Cultural Precincts will be funded nationally and will
feature year long performances. The Precincts are an integral part of our on-
going efforts to strengthen audience development and provide viable performance
spaces for our artists. The Strategy also speaks of the need to establish a Cultural
Observatory to collect, analyse and distribute data on our sector.
We are delighted that some progress has been made in implement initiatives outlined
in MGE. During 2013/14; a year we have declared as the year of the Mzansi Golden
Economy, we will move with greater speed in implementing the MGE Strategy.
In addition, we will continue to work with stakeholders in the music industry to
substantially increase local music content featured by public broadcaster.
We will also strengthen our partnership with local independent producers, to address
issues such as “needle-time” and broadly to create a conducive environment for
local independent producers to run growing and profitable music businesses.
Work will also continue to protect the rights of all our artists, including musicians,
ensuring that they are not exploited and are able to earn a decent living from their
artistic talent.
We will continue to insist on a substantial representation of local artists in all the
major international festivals we support.Working with the Department of Trade and
Industry, the law enforcement agencies and our artists we will intensify the fight
against piracy.
Noting that film and video production is a critical component of the creative industry,
with a potential to create massive employment opportunities, we will strengthen the
support we are offering to local film and video makers and producers. Through this
intervention we will also create more opportunities for the South African story to be
told by local artists.
Annual Performance Plan 2013/20164
We will do all of these things as part of our on-going contribution towards ensuring
that government successfully completes its 2009 elections mandate and lays a firm
basis for the next term of governance.
The Annual Performance Plans of the Department of Arts and Culture detail the
practical things we will do to strengthen our sector’s contribution to the national
economy, job creation and the building of sustainable livelihoods.
We reiterate that MGE is not only a strategy of government or the Department of
Arts and Culture; it is a sector wide strategy. We will therefore work with all our
stakeholders in its implementation.
Guided by our Annual Performance Plans, and working with our stakeholders, we
will do more to raise the profile of our sector; ensuring that it takes its rightful place
as one of the key drivers of national development, social cohesion, nation building
and national healing.
I take this opportunity to thank the Deputy Minister, Dr Joe Phaahla, the Director
General, Mr Sibusiso Xaba, the entire staff of the Department of Arts and Culture,
its agencies and institutions for their on-going contribution to the growth and
development of our sector.
Paul Mashatile
Minister of Arts and Culture
Annual Performance Plan 2013/20165
Official sign-off
It is hereby certified that this Annual Performance Plan –
• was developed by the management of the Department of Arts and Culture
under the guidance of Mr Paul Mashatile, the Minister of Arts and Culture;
• takes into account all the relevant policies, legislation and other mandates for
which the Department of Arts and Culture is responsible; and
• accurately reflects the performance targets the Department of Arts and
Culture will endeavour to achieve given the resources made available in the
budgets for 2013/14 to 2015/16.
Ms Ntombi Skhosana
Act Chief Financial Officer
___________________________
Ms Veliswa Baduza
Chief Operating Officer
___________________________
Mr Sibusiso Xaba
Director-General
___________________________
Dr Joe Phaahla
Deputy Minister for Arts and Culture
___________________________
Mr Paul Mashatile
Minster for Arts and Culture
___________________________
Annual Performance Plan 2013/20166
Table of contents
Foreword by Minister Paul Mashatile 3
Official sign-off 5
Acronyms and abbreviations 7
A. STRATEGIC OVERVIEW 9
1 Vision 10
2 Mission 10
3 Values 10
4 Revisions to legislative and other mandates 10
5 Situational analysis 11
6 Goals oriented towards strategic outcomes 16
B. STRATEGIC OBJECTIVES 19
7 Programme 1: Administration 22
8 Programme 2: Performing Arts 35
9 Programme 3: National Language Service 42
10 Programme 4: Cultural Development 53
11 Programme 5: Heritage Promotion 76
12 Programme 6: National Archives and Library Services 88
C. LINKS TO OTHER PLANS 95
13 Conditional grants 96
14 Public entities 97
Annual Performance Plan 2013/20167
Acronyms and abbreviations
ACH CBO Arts, culture and heritage community-based organisation
ASDY Arts, Social Development and Youth
AIRCO Association of Independent Recording Companies of South Africa
APP Annual Performance Plan
AWHF African World Heritage Fund
BBB-EE Broad Based Black Economic Empowerment
CACF Community Arts Culture Forum
CAPS Curriculum and assessment policy statement
CDIR Chief Director: International Relations
CD/NA Chief Director: National Archives
CFO Chief Financial Officer
CIGS Cultural Industries Growth Strategy
CL 3RD Cultural Laws Third Amendment Bill
CME&GG Coordination Monitoring Evaluation and Good Governance
DAC Department of Arts and Culture
DBE Department of Basic Education
DG Director-General
DIRCO Department of International Relations and Cooperation
DMS Document management system
EMT Executive Management Team
GCIS Government Communication and Information System
H Heraldry
HED Higher Education Department
HLT Human language technologies
HRM Human Resources Management
HSEMS Human, social, economic and management sciences
ICT Information and communications technology
IT Information technology
ITE Integrated Translation Environment
IVR Interactive voice response
IP Intellectual property
IR International relations
KZN KwaZulu-Natal
MGE Mzansi Golden Economy Strategy
MinMEC Ministers and Members of Executive Council
MoA Memorandum of agreement
MSP Master systems plan
MT Machine translation
MTEF Medium-term Expenditure Framework
NA National Archives
Annual Performance Plan 2013/20168
NAB National Art Bank
NaCISA National Cultural Industries Skills Academy of South Africa
NBW National Book Week
NCOP National Council of Provinces
NHC National Heritage Council
NWU North-West University
ODA Overseas development assistance
PA Personal assessment
PanSALB The Pan South African Language Board
POA Programme of action
PMDS Performance Management and Development System
PDP Personal development plan
RMA Resource management agency
SADC Southern African Development Community
SALA South African Literary Awards
SALPC South African Language Practitioners’ Council
SAPLIS South African Public Library and Information Services
SARA South African Roadies Association
SAHRA South African Heritage Resources Agency
SASCE Southern African Society for Cooperative Education
SCM Supply Chain Management
SE Sourcing enterprise
SLA Service Level Agreement
SMART Self-monitoring, analysis and reporting technology
SMMEs Small, medium and micro enterprises
SMS Senior Management Service
TMS Terminology management system
ToR Terms of reference
WIPO World Intellectual Property Organisation
Annual Performance Plan 2013/201610
4.1 Review of the White Paper on Arts and Culture
A review of the White Paper on Arts and Culture was initiated in 2005. Intense
consultations held between national departments, provincial departments, local
government, and arts, culture and heritage institutions have resulted in the
formulation of a number of recommendations that will be aligned with Vision 2016
of the Mzansi Golden Economy Strategy (MGE).
4.2 Cultural Laws Amendment Bill
The main objectives of the Cultural Laws Third Amendment Bill are to eliminate
duplications and overlaps amongst and between Acts, to eliminate the wastage of
public resources, to remove confusion and tension between or amongst institutions
and to clarify roles and responsibilities. It is hoped that the suggested amendments,
if they are approved by Parliament, will unlock human and financial resources for
service delivery and thereby significantly enhance operational efficiencies in the
heritage sector.
4.3 Community Library and Information Bill
The purpose of the Community Library and Information Bill is to establish a
framework through which norms and standards will be determined for the provision
of community and information services. The Bill also seeks to address the
inequalities and disparities that exist in the provision of community libraries and
resources across the country.
4.4 South African Language Practitioners’ Council Bill
The South African Language Practitioners’ Council Bill will be processed further
during the 2013/14 financial year. The aim of the Bill is to raise the status of the
language profession and safeguard the quality of its products, as well as to protect
members of the public who make use of language services.
A. STRATEGIC OVERVIEW
1. VISIOn
We are a thriving arts, culture and heritage sector contributing to sustainable
economic development, leveraging on partnerships for a socially cohesive nation.
2. MISSIOn
We enhance job creation by preserving, protecting and developing arts, culture and
heritage to sustain our democracy and build our nation.
3. VALuES
Accountability
Integrity
Results-driven
Professionalism
Humility
Batho Pele
4. REVISIOnS TO LEGISLATIVE And OThER MAndATES
The following policy initiatives are underway and will be finalised during this period
with a view to strengthening the governance of public institutions in the sector.
Annual Performance Plan 2013/201611
The second major shift, driven by the implementation of an outcomes-based
approach in government, is the process of alignment to specific government
outcomes. Implicit in this approach is the need for consultation and collaboration.
DAC is fully aware that it can only achieve its vision through cooperation with a
range of public and private-sector institutions and stakeholders. The development
and implementation of the MGE is an example of how the department intends to
mobilise the resources of all stakeholders in the sector.
A third major shift is the increasing recognition that arts, culture and heritage are not
only social in nature, but are contributing significantly to the growth of the economy.
Entrepreneurship, the growth of new business models, product development and
the creation of new markets are increasingly pervasive across the various segments
of the creative industry and need support through high-impact development
programmes.
5.1 Performance environment
The vision of the Department of Arts and Culture springs from the Constitution,
and more specifically from Article 27 of the Universal Declaration of Human Rights:
“Everyone shall have the right to freely participate in the cultural life of the community
[and] to enjoy the arts ...” It is within this context that DAC operates and seeks to
develop policies that ensure the survival and development of all art forms and/or
genres, cultural diversity with mutual respect and tolerance, heritage recognition
and advancement, skills development in arts and culture, universal access to
funding, equitable human resource development policies, and the promotion of
literature and cultural industries.
Social cohesion and nation-building are at the core of the department’s programmes.
Both these objectives are geared towards fostering a sense of pride and knowledge
in all aspects of South African culture, heritage and the arts, with the aim of
encouraging mutual respect, tolerance and intercultural exchange between the
5. SITuATIOnAL AnALySIS
Opportunities in, and benefits from, arts and culture are not only social in nature,
but can also be economic. The arts and culture sector applies creative practice to
projects involving other sectors in ways that generate social and economic benefits.
The sector contributes to the economy through creative thinking, employment,
sales, exports and cultural tourism. New opportunities are emerging through
cross art-form practices, digital technologies and platforms, and value-adding
partnerships with other industries. The changing economic climate is leading to
increased entrepreneurship, new business models and a greater understanding of
the sector’s place in global and local markets.
To realise the economic value of arts and culture, it is crucial that the whole value
chain is managed holistically. Enhancement of the creative capacity of this sector
will stimulate creativity, demand, audience development and the consumption of
arts and culture products. Implied in this is the need for the sector to improve the
quality of its product to meet the expectations of its audiences and communities, an
area in which government wants to invest. The success of the arts and culture sector
will also be reliant on good governance, infrastructure development, the acquisition
of new skills, successful partnerships, research and a sharing of information, and
enterprise development.
In this context, the Department of Arts and Culture (DAC) aims to support a number
of emergent shifts in the sector over the next three years through the implementation
of the strategy proposed here. The shifts have the potential to increase the growth
and development of the sector significantly.
First among these shifts is the recognition that a number of inadequacies in the
policy and regulatory environment need to be addressed to strengthen governance
in the sector, increase investment and improve the availability of information and
statistics to allow for more effective planning and decision-making. The work
undertaken through the policy review process provides an important basis for this.
Annual Performance Plan 2013/201612
5.1.2 Heritage promotion and preservation
DAC will continue to implement strategies to ensure that the celebration and
commemoration of national days, historic events and festivals are inclusive of
all population groups and contribute to national reconciliation, nation-building
and social cohesion. The department will continue to support education-oriented
activities through programmes and events hosted by museums, libraries, galleries,
theatres, archives, playhouses and community art centres.
In pursuit of the goal to transform the national heritage landscape, DAC through
the National Heritage Council of South Africa will implement the National Liberation
Heritage Route Programme. This programme is intended to preserve history by
identifying sites, people and ideas that played a pivotal role in the struggle for
freedom and liberation.
Through the Bureau of Heraldry DAC has played a pivotal role in transforming
national symbols to reflect the values of democracy. National symbols that were
designed in the new dispensation are the epitome of an inclusive, diverse and non-
racial society that appreciates and celebrates indigenous heritage. The Bureau
of Heraldry will continue to disseminate and popularise knowledge about national
symbols by means of education, workshops, the development of publications and
exhibitions, and the distribution and installation of flags in schools, public buildings
and homes.
DAC will continue to provide funding for Declared Cultural Institutions. This
initiative recognises the fact that museums have the potential to play a vital role
in the development of arts, culture and heritage in South Africa. The cultural
institutions provide opportunities for life-long learning and promote tourism and
other entrepreneurial activities. The DAC will continue to give financial support to
other types of heritage organisations, such as section 21 companies under the
Companies Act of 1973. All these organisations are important elements in the
strategy to develop the heritage sector.
various cultures and art forms so as to facilitate the emergence of a shared cultural
identity constituted by diversity. Job creation is an integral aspect of this.
The main considerations and performance-related issues pertaining to the key
strategic thrusts of the department are elaborated below. These include the
development, preservation and promotion of arts and culture, heritage promotion
and preservation, access to information and the promotion of linguistic diversity.
5.1.1 Development, preservation and promotion of the arts, culture and
heritage sector
The sector realises that the future of arts and cultural expression lies in the
development of new audiences and markets. To this end, the department initiated a
process to reposition and unleash the potential of the sector and to secure its role
as a contributor to job creation and economic growth.
This process culminated in the unveiling of the Mzansi Golden Economy Strategy
(MGE) by DAC. The strategy outlines in detail how the arts, culture and heritage
sector will contribute to the national goal of creating five million jobs within the next
ten years. The intention is that the creative industries will play a bigger role than
they have up to now in realising the objective of sustainable job creation by focusing
on a strategy that will realise the vast economic potential of the arts.
Some of the spin-offs envisaged from rolling out the MGE include skills transfer, small
business development and broad-based black economic empowerment (BEE).
The department will continue to help promote local cultural industries by facilitating
access to international networking platforms. It has a robust skills development and
training programme that is targeted at vulnerable groups such as women, youth
and the disabled in particular, which will help to ensure the sustainable growth of
the creative sectors.
Annual Performance Plan 2013/201613
5.2 Organisational environment
The following key enablers have been identified as part of the planning framework
for DAC’s organisational environment.
5.2.1 Governance
DAC and the wide range of public-sector institutions established to develop the arts,
culture and heritage sector need to work with one another closely in the interest
of achieving the broad development goals of the sector, rather than concentrating
on the narrow interests of the specific subsectors such institutions represent. This
will require establishing a shared vision and working towards the same goals.
Accountability, transparency and collaboration will be key features of this process.
5.2.2 Human capital development
Individuals are the driving force behind the arts and culture sector. One of the
conclusions of the 2011 consultative conference on arts and culture was the need
to establish a system of whole-of-career-cycle support. Ongoing professional
development is an important catalyst for creative renewal, as is a strengthening
of connections with the education sector. Both these are essential building blocks
for long-term viability. Efforts will therefore be directed at developing initiatives that
nurture the whole lifecycle of individual artists and workers in the sector. This will
include support for existing leaders and the development of new leaders.
Through its skills development efforts, DAC seeks to develop individual talent
and enhance and harness the rich and diverse expression of South Africa’s arts,
culture and heritage for social and economic benefit. It is hoped new talent will be
discovered and doors opened for many aspiring artists. The aim is to equip a new
generation of South African artists with the tools that are essential for developing
works that reflect South African society and the society it seeks to create in the
future. The department is already contributing to skills development through many
arts and culture programmes, including the provision of bursaries. Plans for the
5.1.3 Access to information
The National Archives and Records Service continues to support and guide records
and information management procedures across government to ensure that
records of enduring value will be permanently preserved in the archives. Over
the medium term, the national automated archival information retrieval system will
be upgraded to simplify access to information. The transformation of the library
sector will continue with the implementation of the community library services
conditional grant.
DAC will maintain its focus on revitalising the country’s community libraries by
assisting municipalities and provinces to build new facilities and upgrade existing
infrastructure. There will be a special focus on rural areas. Through this work, the
department seeks to entrench a culture of reading and writing, and thus realise
the goal of a well-informed and well-read nation. Greater efforts will be made to
encourage more young South Africans to read by inspiring them to join community
libraries.
5.1.4 Promotion of linguistic diversity
Section 6 of the Constitution provides the principal legal framework for the promotion
of multilingualism, official languages and respect and tolerance for South Africa’s
linguistic diversity. It determines the language rights of citizens, which must be
honoured by means of national language policies. The National Language Policy
Framework (2003) caters adequately for the harmonisation of language policy at
all three levels of government. It articulates clear policy positions on the status and
use of the indigenous official languages in South Africa’s nine provinces. DAC is in
the process of finalising the South African Language Practitioners Bill, which aims
to raise the status of language professionals. This follows the passing of the Use
of Official Languages Act in 2012 to comply with the constitutional requirement of
regulating the use of official languages.
Annual Performance Plan 2013/201614
5.2.4 Partnerships and funding
Forging national and international partnerships that are mutually beneficial will
ensure the sustainable development of the arts and culture sector. Future success
will rely not only on the inherent creativity and diversity of the sector, but also on
the strength and quality of collaborations and partnerships forged by government
and the sector. Leadership then becomes a shared responsibility, with each party
contributing its strengths and resources for the good of the sector as a whole.
DAC will continue to highlight the importance of cultural diplomacy in international
relations and expand South Africa’s network with the world through strategic
relations. In the forthcoming period, the intention is to extract greater value from
cultural agreements and to foster initiatives with other countries in order to address
the issue of skills development.
Special emphasis will also be placed on building South-South relations and the
Africa agenda in the arts, culture and heritage arena.
establishment of a National Cultural Industries Skills Academy of South Africa
(NACISA), through which DAC will build the necessary skills base to support the
growth and development of the arts, culture and heritage sector, are being finalised.
The goal is to enable more people to find employment in the field of arts and culture
and to sustain themselves and their families through their artistic endeavours.
DAC has also embarked on a process to align its structure to the available budget
and to implement a more realistic functional structure that supports its core
objectives. This is part of a broader organisational development initiative. Currently,
the department’s establishment comprises 444 filled positions. The vacancy rate
with reference to the available budget is not a reflection of current needs.
5.2.3 Infrastructure provision
The infrastructure needs of the sector include creative spaces and places. These
are dedicated arts and cultural facilities such as theatres, libraries and museums,
as well as natural environments and public spaces. A well-designed and managed
infrastructure, as well as the availability of spaces for making and presenting art,
play an important role in maintaining public access to artistic programmes, cultural
heritage and collections. Demand-driven investment in cultural infrastructure will
ensure that the state’s creative spaces remain accessible, functional and lively
places for artists and communities.
Annual Performance Plan 2013/201615
5.3 Overview of the budget and MTEF estimates for the period
Summary per Programme
Audited outcome
(R’000)
Adjusted
appropriation
(R’000)
Medium-term expenditure estimate
(R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Administration 162 850 190 798 210 944 212 732 234 017 247 409 259 970
Performing Arts 490 781 530 799 562 647 641 686 719 117 753 051 788 101
National Language Services 85 918 92 207 98 734 112 233 123 692 132 375 138 857
Cultural Development 119 435 138 863 121 087 158 928 221 896 275 202 287 876
Heritage Promotion 803 252 716 406 690 554 745 215 834 582 885 559 927 158
National Archives and Library Services 562 695 579 746 721 866 801 676 781 473 1 234 511 1 573 413
Total 2 224 931 2 248 819 2 405 832 2 672 470 2 914 777 3 528 107 3 975 375
Summary per Economic Classification
Audited outcome (R’000) Adjusted
appropriation
(R’000)
Medium-term expenditure estimate (R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Current payments 380 545 361 219 413 206 539 835 666 097 756 218 794 203
Compensation of employees 146 271 152 833 163 731 183 008 196 364 209 060 221 700
Goods and services 234 274 208 386 249 475 356 827 469 733 547 158 572 503
Transfers and subsidies 1 839 249 1 885 161 1 988 975 2 125 602 2 241 701 2 764 491 3 173 434
Provinces and municipalities 440 600 462 445 569 934 564 574 597 786 1 016 210 1 340 562
Departmental agencies and accounts 1 210 030 1 235 616 1 247 832 1 436 992 1 535 906 1 640 622 1 720 261
Non-profit institutions 10 518 11 304 12 258 12 873 13 581 14 396 15 058
Households 178 101 175 796 158 951 111 163 94 428 93 263 97 553
Payments for capital assets 4 463 2 207 3 591 7 033 6 979 7 398 7 738
Other machinery and equipment 4 463 2 207 3 591 7 033 6 979 7 398 7 738
Payments for financial assets 674 232 60
Total 2 224 931 2 248 819 2 405 832 2 672 470 2 914 777 3 528 107 3 975 375
Annual Performance Plan 2013/201616
Knowledge management and innovation – DAC will adopt innovative models
around knowledge management, a programme of research and innovation that
will inform and improve service delivery models. Knowledge management and the
process of building capacity through shared learning will be central to the notion of
innovation. To this end, the department will tackle the development and promotion
of arts, culture and heritage through knowledge management and innovation.
6. GOALS ORIEnTEd TOWARdS STRATEGIC OuTCOMES
There are 12 outcomes in the government’s programme of action (POA) that drive
the plans and action of all government departments:
Outcome 1: Improved quality of basic education
Outcome 2: A long and healthy life for all South Africans
Outcome 3: All people in South Africa are and feel safe
Outcome 4: Decent employment through inclusive growth
Outcome 5: A skilled and capable workforce to support an inclusive growth path
Outcome 6: An efficient and responsive economic infrastructure network
Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all
Outcome 8: Sustainable human settlements and improved quality of household life
Outcome 9: A responsible, accountable, effective and efficient local government system
Outcome 10: Environmental assets and natural resources are protected and enhanced
Outcome 11: Creating a better South Africa and contributing to a better and safer Africa in a better world
Outcome 12: An efficient, effective and development-oriented public service and an empowered, fair and inclusive citizenship
5.4 description of the strategic planning process
After consultation with key senior managers in the department and with the
agreement with the DG, a workshop was organised to help senior managers to
understand the department’s mandate and current strategy, and to review progress
on the strategy and Annual Performance Plan (APP). Following robust debate and
discussion, the workshop resulted in a revised vision, mission, key strategic goals
and values for the department.
The following areas were chosen as a basis on which DAC’s strategy should be
built:
Public participation – It is imperative that government introduces programmes
that give practical expression to the constitutional principle of public participation.
The department is therefore committed to developing and implementing broader
programmes that focus on public participation.
Stakeholder mobilisation – Stakeholder mobilisation has been an implicit and
explicit part of the way the department does its business. This has, however, not
been driven by any systematic approach or institutional mechanism. The department
will therefore develop a specific capability to ensure that stakeholder mobilisation is
formally incorporated into its model of operation and management.
Monitoring, reporting and evaluation – Accountable governance is a national
imperative. Key elements of this process include the capacity to monitor and
report on performance, evaluate the results obtained through the department’s
programmes, and communicate the successes and challenges in a manner that
demonstrates accountability and builds credibility among citizens and stakeholders.
Based on the guidance given by the Monitoring and Evaluation Unit within the
Presidency, monitoring, reporting and evaluation of the department’s programmes
will be clearly communicated, and information will be kept up to date and relevant.
Annual Performance Plan 2013/201617
DAC has built its strategic goals, set out below, around five of the 12 outcomes of the POA. The six strategic goals set out below have guided the development of this
strategy, and the setting of the performance indicators and milestones.
Strategic Goal 1 Job creation
Goal statement Create 150 000 decent jobs in arts, culture and heritage by March 2016
Link to national
outcomes
Outcome 4: Output 1 – Faster and sustainable inclusive growth and sector strategies to support the growth of labour-intensive sectors
Outcome 5: A skilled and capable workforce to support an inclusive growth path
This goal will guide the investment of resources and activities towards the identification and development of talent through skills development; facilitate the expansion of
high-impact programmes with the potential to maximise growth and employment in the sector; and enhance existing production capacity and stimulate demand for products
from the cultural industries sector.
Strategic Goal 2 Human capital development
Goal statement Implement targeted programmes that are geared towards human capital development in the arts, culture and heritage sector by 2014
Link to national
outcomes
Outcome 12b: Outputs 5, 6 and 7 – Nation-building and national identity; citizen participation; social cohesion
Outcome 5: A skilled and capable workforce to support an inclusive growth path
Outcome 7: Output 3 and 4 – Rural services and sustainable livelihoods; and rural job creation linked to skills training and the promotion of
economic livelihoods
Human capital development will be a key driver and catalyst for stimulating the development, protection and preservation of arts, culture and heritage.
Strategic Goal 3 Access to information
Goal statement Enhance access by citizens and public institutions to accurate, reliable and timely information in their language of choice though the provision of
archives, libraries and language services
Link to national
outcomesOutcome 12b: Output 6 – Citizen participation
This goal directs the efforts to develop the archival information resources of South Africa in support of good governance and socio-economic development. The provision
of content will form an important aspect of the work undertaken in this regard. Furthermore, the enhancement of critical knowledge through co-production and citizen
participation can only take place with the requisite infrastructure and information networks in place.
Annual Performance Plan 2013/201618
Strategic Goal 4 Linguistic diversity
Goal statement Entrench linguistic diversity in a manner that facilitates equitable cultural expression by citizens and communities
Link to national
outcomesOutcome 12b: Outputs 5 and 6 – Nation-building and national identity; citizen participation
This goal focuses attention on the transformation of the arts, culture and heritage sector and facilitating access to socio-economic opportunities. In addition, it aims to
encourage participation by all in nation-building initiatives, improve perceptions of democracy and increase satisfaction with governance.
Strategic Goal 5 Development, protection, preservation and promotion of arts, culture and heritage
Goal statement Enhance the capacity of the sector through equitable and sustainable development, and the protection and preservation of arts, culture and
heritage through policy development, legislative promulgation and implementation
Link to national
outcomes
Outcome 12b: Outputs 5, 6 and 7 – Nation-building and national identity; citizen participation; social cohesion
Outcome 5: A skilled and capable workforce to support an inclusive growth path
Outcome 7: Outputs 3 and 4 – Rural services and sustainable livelihoods; rural job creation linked to skills training and the promotion of economic
livelihoods
Initiatives to increase the number of people accessing museums, theatres, festivals and other arts and culture resources will be prioritised. The availability of infrastructure
necessary to support the development and preservation activities in the sector could further contribute to the growth of the sector. Human capital development will be a
key driver and catalyst for stimulating the development, and protecting and preserving arts, culture and heritage.
Strategic Goal 6 Governance and accountability
Goal statement Align public-sector art, culture and heritage institutions around a shared vision, a common mandate, and strong governance and accountability
Link to national outcomes Outcome 12a and b: An efficient, effective and development-oriented public service and an empowered, fair and inclusive citizenship
The streamlining and aligning of mandates and institutions around a shared vision and goals will be a key focus during the period. In addition, DAC will invest in capacity and capability to
strengthen the governance and accountability of institutions in the sector.
Annual Performance Plan 2013/201620
7. PROGRAMME 1: AdMInISTRATIOn
The purpose of this programme is to provide the DAC with core support services, including administrative, financial, human resources, communications, marketing, and
monitoring and evaluation services.
Because of the transversal nature of the programme, it supports delivery against all six of the department’s strategic goals. However, the programme provides direct support
for the achievement of the following goals:
Goal 1: Job creation
Goal 3: Access to information
Goal 6: Governance and accountability
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Governance and accountability
Provide for a capable and skilled public- oriented workforce
Provide employees with 500 targeted training opportunities per annum as per the PDPs
Number of training opportunities provided
HRM1 1 500 352 404 536 500 500 500 500
Improve the implementation of the PMDS and the management of employee relations
% of PAs submitted HRM2 100% 84% 95% 96% 98% 100% 100% 100%
% of employees assessed against their PAs
HRM3 100% 84% 73% 90% 95% 100% 100% 100%
% of disciplinary and grievance processes completed within prescribed timelines
HRM4 100% 41% 50% 90% 95% 100% 100% 100%
Annual Performance Plan 2013/201621
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Maintain an overall vacancy rate of less than 10% per annum
Vacancy rate HRM5 10% 26,8% 27,6% 9,5% 10% 10% 10% 10%
Maintain a representative workforce
% of female representatively at Senior Management Service
HRM6 50% 47,6% 46,3% 40% 43% 50% 50% 50%
% of people with disabilities
HRM7 2% 1,8% 1,5% 1,6% 1,7% 2,0% 2,0% 2,0%
Develop systems, processes and controls to ensure operational efficiency and effectiveness
Maintain adequate control systems to ensure improved DAC performance, effective and efficient use of resources and a clean audit report
% spent against approved budget
FM1 98% 85% 92% 95% 98% 98% 98% 98%
Audit opinion FM2 Clean audit Unqualified audit
Unqualified audit
Unqualified audit
Unqualified audit
Unqualified audit
Unqualified audit
Clean audit
% of APP targets successfully attained
CME&GG1 100% n/a 44% 58% 80% 90% 100% 100%
Maintain adequate control systems to ensure improved departmental performance
% of service providers paid within 30 days
SCM1 100% n/a n/a n/a 95% 100% 100% 100%
Annual Performance Plan 2013/201622
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Procure goods and services in a manner that is fair, equitable, transparent, competitive and cost-effective
% total value of orders awarded to BEE-compliant service providers
SCM2 70% n/a 60% 70% 70% 70% 70% 70%
Improve the management of DAC service delivery complaints (Presidential Hotline)
% of reported service delivery complaints internally resolved within the set parameters
RM1 100% 100% 42% 72% 80% 90% 100% 100%
Improve the management and resolution of fraud allegations (Public Service Commission)
% of reported fraud/ corruption allegations internally resolved within the set parameters
RM2 100% n/a 58% 50% 80% 90% 100% 100%
Improve governance and oversight over DAC’s associated institutions
Number of quarterly reports submitted and analysed
CME&GG2 312 104 104 104 104 104 104 104
% of councils that are fully constituted
CME&GG3 100% 80% 80% 80% 80% 100% 100% 100%
Number of annual reports submitted and analysed
CME&GG4 78 26 26 26 26 26 26 26
Annual Performance Plan 2013/201623
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Ensure secure and innovative information management through the efficient use of information and communications technology ( ICT) systems
Information technology (IT) service continuity (% uptime)
ICT1 95 % 70% 95% 95% 95% 95% 95% 95%
% of secured information systems and infrastructure
ICT2 98% 98% 98% 98% 98% 98% 98% 98%
Number of business processes automated
ICT3 8 3 3 3 3 3 3 2
Maintain an effective and efficient ministry
Provide the ministry with strategic and operational support
Number MinMEC meetings convened
MIN1 9 2 3 2 2 3 3 3
Number of Chairpersons’ Forums convened
MIN2 6 n/a n/a n/a 2 2 2 2
Number of izimbizo held
MIN3 60 4 20 7 4 20 20 20
Number of pieces of legislation submitted to Parliament in line with the approved legislative programme
MIN4 4 n/a n/a n/a 1 3 1 n/a
Annual Performance Plan 2013/201624
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Job creation Provide arts, culture and heritage infrastructure
Construct new and upgrade existing infrastructure of DAC and its public entities
% of capital works budget spent
FCM1 100% 65% 85% 94% 100% 100% 100% 100%
Number of jobs created through infrastructure initiatives
FCM2 3 300 476 649 1 657 900 1 000 1 100 1 200
Number of infrastructure projects supported
FCM3 114 59 24 43 41 39 35 40
Coordinate and lead in the implementation of the social cohesion framework
Coordinate the holding of the 2014 National Social Cohesion Feedback Summit
National Social Cohesion Feedback Summit steering committee established
SC1 National Social Cohesion Feedback Summit
National Social Cohesion Colloquium
n/a n/a National Social Cohesion Summit
National Social Cohesion Feedback Summit steering committee
n/a n/a
National Social Cohesion Feedback Summit held
SC1 (a) National Social Cohesion Feedback Summit
National Social Cohesion Colloquium
n/a n/a National Social Cohesion Summit
N/A National Social Cohesion Feedback Summit
Review of the Nation-al Social Cohesion Feedback Summit
Develop social cohesion manual and toolkit
Number of manuals and toolkits for social cohesion produced
SC2 50 000 n/a n/a n/a n/a 15 000 20 000 15 000
Conduct community dialogues/conversations in the provinces
Number of community dialogues/conversations held
SC3 90 n/a n/a n/a 49 30 30 30
Expand existing awards to recognise individuals, organisations and communities promoting social cohesion
Number of awards presented
SC4 70 n/a n/a n/a N/A 10 30 30
Annual Performance Plan 2013/201625
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Access to information Promote the public profile of DAC and its programmes
Implement the media liaison plan
Number of media liaison initiatives implemented
COM1 45 n/a n/a 17 16 15 15 15
Number of social media platforms activated
COM2 5 n/a n/a n/a 1 2 2 1
Conduct media monitoring, analysis and public perception surveys
Number of media monitoring and analysis reports generated
COM3 12 1 n/a 1 1 4 4 4
Number of public perception surveys conducted
COM4 3 1 n/a n/a n/a 1 1 1
Implement the Corporate Brand Building Strategy
Application of the brand elements across DAC’s associated institutions
M&PR1 28 n/a n/a n/a Brand positioning statement approved
9 9 10
Number of marketing campaigns implemented
M&PR2 3 n/a n/a n/a n/a 1 1 1
Implement an integrated public relations, marketing and events plan
Number of events implemented (return on public relations value)
M&PR3 90 50 45 47 34 30 30 30
Strengthening partnership with DAC’s associated institutions and provinces
Establish marketing and communication forums with DAC’s institutions and provincial arts and culture units
Number of marketing and communications forums held
M&PR4 12 n/a n/a n/a 1 4 4 4
Annual Performance Plan 2013/201626
7.1 Operational plan
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of training opportunities provided
HRM 500 Annually Approved/signed training requests and reports
50 150 150 150 1 964 (1% of employee compensation budget)
% of PAs submitted HRM 100% Quarterly Reports on signed agreements
100% n/a n/a n/a n/a
% of employees assessed against their PAs
HRM 100% Annually Assessments processed and approved
50% 100% n/a n/a n/a
% of disciplinary and grievance processes completed within prescribed timelines
HRM 100% Quarterly Labour relations database
100% 100% 100% 100% n/a
Vacancy rate HRM 10% Quarterly Establishment report (number of vacancies vs. approved)
15% 13% 12% 10% n/a
% of female representativity at SMS
HRM 50% Quarterly Representativity statistics
44% 45% 47% 50% n/a
% of people with disabilities
HRM 2.0% Quarterly Representativity statistics
1,8% 1,8% 1,9% 2,0% n/a
% spent against approved budget
CFO 98% Quarterly Quarterly expenditure reports
20% 45% 70% 98% n/a
Audit opinion CFO Unqualified audit Annually Audited financial statements
n/a Unqualified audit opinion
n/a n/a n/a
% of APP targets successfully attained
CME&GG 90% Quarterly Quarterly reports 60% 70% 80% 90% n/a
Annual Performance Plan 2013/201627
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
% of service providers paid within 30 days
SCM 100% Quarterly Quarterly reports 100% 100% 100% 100% n/a
% total value of orders awarded to BEE-compliant service providers
SCM 70% Quarterly Quarterly reports 70% 70% 70% 70% n/a
% of reported service delivery complaints internally resolved within the set parameters
Risk Management and Line Function Units
90% Quarterly Quarterly reports 70% 70% 70% 100% n/a
% of reported fraud/ corruption allegations internally resolved within the set parameters
Risk Management and Internal Audit
90% Quarterly Quarterly reports 70% 70% 70% 100% n/a
Number of quarterly reports submitted and analysed
CME&GG 104 Quarterly Reports, analysis, submissions
26 26 26 26 n/a
% of councils that are fully constituted
CME&GG 100% Quarterly Boards/councils database; appointment letters
100% 100% 100% 100% 1 000
Number of annual reports submitted and analysed
CME&GG 26 Annually Reports, analysis, submissions
n/a n/a 26 n/a n/a
IT service continuity (% uptime)
ICT 95% Quarterly System reports and statistics
95% 95% 95% 95% 6 000
% of secured information systems and infrastructure
ICT 98% Quarterly System reports and statistics; security breaches
98% 98% 98% 98% 5 000
Number of business processes automated
ICT 3 Quarterly Project progress reports
n/a n/a n/a 3 5 000
Annual Performance Plan 2013/201628
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of MinMEC meetings convened
Ministry 3 Quarterly Minutes 1 1 n/a 1 200
Number of Chairpersons’ Forums convened
Ministry 2 Bi-annual Minutes 1 n/a n/a 1 70
Number of izimbizo held
Ministry 20 Quarterly Report per imbizo 5 5 5 5 3 000
Number of pieces of legislation submitted to Parliament in line with the approved legislative programme
Ministry South African Language Practitioners ‘ Council (SALP) Bill
Quarterly Progress report and draft Bill
n/a Bill submitted to Parliament
n/a n/a n/a
South African Public Library and Information Services (SAPLIS) Bill
Quarterly Progress report and draft Bill
n/a Bill submitted to Cabinet
n/a n/a n/a
Cultural Laws Third Amendment (CL 3RD) BILL
Quarterly Progress report and draft Bill
n/a Bill submitted to Parliament
n/a n/a n/a
% of capital works budget spent
FCM 1 100% Quarterly Expenditure report 25% 50% 75% 100% n/a
Number of jobs created through infrastructure initiatives
FCM 2 1 000 (cumulative) Quarterly Quarterly reports 250 500 750 1 000 n/a
Number of infrastructure projects supported
FCM 3 39 Quarterly Quarterly reports 10 10 9 10 n/a
National Social Cohesion Feedback Summit steering committee established.
Social Cohesion 3 National Social Cohesion Feedback Summit steering committee meetings convened
Quarterly Minutes of the steering committee meetings
Terms of reference of the steering committee and action plan approved
Steering committee convened to implement the action plan.
Steering committee convened to implement action plan
Steering committee convened to implement action plan
500
Annual Performance Plan 2013/201629
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of manuals and toolkits for social cohesion produced
Social Cohesion 15 000 Quarterly Manuals and toolkits Service provider appointed
Production and distribution of 3 000 manuals and toolkits
Marketing and distribution of 6 000 manuals and toolkits
Marketing and distribution of 6 000 manuals and toolkits
3 000
Number of community dialogues/conversations held
Social Cohesion 30 Quarterly Community conversation reports
Service provider/s appointed
10 community dialogues/conversations held
10 community dialogues/conversation held
10 community dialogues/conversations held
3 000
Number of awards presented
Social Cohesion 10 Quarterly Awards presentation reports
Service provider appointed and design of awards approved
Awards criteria approved and nominations conducted
5 awards presentations held
5 awards presentations held
1 000
Number of media liaison initiatives implemented
Communication 15 Quarterly Media relations exit reports
5 4 3 3 3 000
Number of social media platforms activated
Communication 2 Quarterly Quarterly reports 0 1 1 - 250
Number of media monitoring and analysis reports generated
Communication 4 Quarterly Media analysis reports 1 1 1 1 700
Number of public perceptions surveys conducted
Communication 1 Annually Survey report N/A Survey scope identified and service provider appointed
Survey research plan developed and implemented
Final survey report developed
1 000
Application of the brand elements across DAC’s associated institutions
Marketing 9 Quarterly Reports on branding implementation done
Consultation with institutions and development of the creative rationale
3 3 3 300
Number of marketing campaigns implemented
Marketing 1 Quarterly Report on media buy, ROI and audience reach
Campaign idea generated and approved
Agency briefed and phase 1 of the campaign implemented
Phase 2 of the campaign implemented
Final phase implemented and campaign review report generated
350
Annual Performance Plan 2013/201630
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of events implemented (return on PR value)
Marketing 30 Quarterly Post-project reports and DAC’s events calendar
10 10 5 5
Number of marketing and communications forums held
Marketing 4 Quarterly Minutes of forum meetings
1 1 1 1 350
Annual Performance Plan 2013/201631
7.2 Resource considerations
Administration
Audited outcome
(R’000)
Adjusted appropriation
(R’000)
Medium-term expenditure estimate
(R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Subprogrammes
Ministry 3 025 3 244 3 468 3 669 3 871 4 103 4 291
Management 39 695 38 815 37 543 50 959 53 230 56 424 59 020
Corporate Services 68 892 89 350 111 766 82 886 95 276 100 344 106 140
Office Accommodation 51 238 59 389 58 167 75 218 81 640 86 538 90 519
Total 162 850 190 798 210 944 212 732 234 017 247 409 259 970
Economic classification
Current payments 157 729 190 108 206 306 208 763 227 038 240 011 252 232
Compensation of employees 58 656 64 781 71 246 81 465 86 467 91 137 96 658
Goods and services 99 073 125 327 135 060 127 298 140 571 148 874 155 574
Transfers and subsidies 2 708 284 1 893 - - - -
Departmental agencies and accounts 432 157 227
Households 2 276 127 1 666 - - -
Payments for capital assets 2 249 381 2 728 3 969 6 979 7 398 7 738
Other machinery and equipment 2 249 381 2 728 3 969 6 979 7 398 7 738
Payments for financial assets 164 25 17 - - -
Total 162 850 190 798 210 944 212 732 234 017 247 409 259 970
Annual Performance Plan 2013/201632
7.3 Key Risks
APP REFERENCE
STRATEGIC GOAL STRATEGIC OBJECTIVES RISKS CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
MIN1; MIN3 Goal 6-Governance and Accountability
Maintain an effective and efficient Ministry
Customer Wants Risk Common customer needs and wants change and the organization isn’t aware.
1. Annual calendar for Min-Mec and, Chairperson’s Forum in place 2. Focus groups are targeted aligned to the DAC’s mandate 3. Political Manifesto and Minister’s Performance Agreement used as a guideline on delivery
1. Conduct “izimbizo’s once a month, for Minister and Deputy Minister 2. Community visits and report back 3. Conduct follow-up on Ministerial Commitments 4. Conduct research prior to stakeholder engagements
High
HRM5 Goal 6-Governance and Accountability
Provide for a capable and skilled public orientated workforce
Cycle Time Risk Protracted recruitment and selection processes.
Vacancy Management Plan 1. Implementation of a vacancy management plan. 2. Project plan to be developed for all advertised positions
High
ICT1 Goal 6-Governance and Accountability
Develop systems, processes and controls to ensure operational efficiency and effectiveness.
Business Interruption Inability to sustain business operations due power failure and untimely business support from SITA.
1. Business Continuity Plan in place ( UPS, and back-up systems in place)
Implementation and testing of the disaster recovery plan
High
ICT2 Goal 6-Governance and Accountability
Develop systems, processes and controls to ensure operational efficiency and effectiveness.
Infrastructure risk Antiquated server infrastructure and systems at National Archives Infrastructure.
1. Revamp of NAAIRS commenced, new infrastructure for NARSA
1. Implementation of the new NAAIRS 2. Start with small scale digitisation 3. Develop and implement Enterprise Architecture
High
RM2 Goal 6-Governance and Accountability
Develop systems, processes and controls to ensure operational efficiency and effectiveness.
Compliance Risk 1. Open -ended fraud allegations (Public Entities) leading to reputational risks. 2. Non-compliance to set targets to complete investigations.
1. Internal Investigation Policy in place 2. Preliminary investigations allocated to internal audit unit. 3. CEO Forums for public entities in place
1.Draft Investigation Strategy for public entities and table for approval internally at Executive Management level. 2.Communicate roll-out to public entities via Governance Unit
High
Annual Performance Plan 2013/201633
APP REFERENCE
STRATEGIC GOAL STRATEGIC OBJECTIVES RISKS CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
FM1 Goal 6-Governance and Accountability
Develop systems, processes and controls to ensure operational efficiency and effectiveness
Compliance (Regulatory and other) Risk Treasury Regulations, PFMA, Procurement Framework, not complied to. Management Fraud Risk ( Misstatement of financial Statements Possible misstatement of transactions leading to financial misrepresentation
1. Exception Report (cash flows, trial balance and financial disclosure notes) are available to corroborate the final statement. 2. Segregation of financial processing information (capturing, checking and authorisation are segregated) 3.Monthly LOGIS exception reports monitored for discrepancies 4. Appointment of a contracts Manager 5. Centralised contract database
1. Establish centralised payment unit 2. Continuous training on accruals, commitments etc. at a Departmental level
High
FM1 Goal 1- Job Creation Provide arts, culture and heritage infrastructure
Efficiency Risk: Lack of efficient systems
1. Transfer of funds to Public Entities to implement their projects. The process of appointing the Technical Assistant (TA) is underway by TAU. The TA will be assisting the Facilities Management Unit to develop the suitable systems based on the diagnosis analysis
1.New projects will be implemented by Public Entities not the DPW 2. The diagnosis analysis was completed in December 2013 Procurement of the web based system
High
HRM1 Goal 6-Governance and Accountability
Provide for a capable and skilled public oriented workforce
Alignment Risk Non-aligned training interventions to the strategic development areas of the department.
1. Prior approval granted by immediate supervisor 2. Training requests verified with PDP 3.PMDS and PDP training instrument used to consolidate the training plan for the Department 4. CD: HRM approves global training plan
Training needs identification form to be completed and submitted before the 31st May annually
High
HRM2 Goal 6-Governance and Accountability
Provide for a capable and skilled public oriented workforce
Compliance Risk Non-compliance with the policy framework re: submission of PAs and assessments.
Numerous reminders, workshops for employees and managers.
Revision of the PMDS policy re: submission of agreements and assessments (exclusion from any performance incentive)
High
Annual Performance Plan 2013/201634
APP REFER-ENCE
STRATEGIC GOAL
STRATEGIC OBJECTIVES
MEASURABLE OBJECTIVE ( HOW ARE YOU GETTING THERE?)
RISKS CAT-EGORY AND DESCRIPTION
CONTRIBUTING FACTORS
CURRENT CONTROLS IN PLACE
PLANNED MIT-IGATION
DUE DATE RISK RATING (1 TO 5) ( IMPACT)
RISK RATING (1-5) ( LIKE LIHOOD)
RISK MEA-SURE-MENT
RISK MAGNI-TUDE
CGME 1 Governance and Accountability
Develop systems, processes and controls to ensure operational efficiency and effectiveness.
1.2.2 Maintain adequate control systems to ensure improved departmental performance.
Performance Gap Risk Under achievement against set targets
1. Misalignment of resources and targeted outputs 2. Lack of synergy between budgeting and planning processes. 3. Remedial action on the performance gap not applied timeously at programme level
1. Quarterly performance reviews are conducted at a Departmental level
2. The Planning Framework is in place
Rollout integrated budgeting and planning processes
Monthly monitoring of remedial action between reporting timeframes
30 June 2013, 30 Sep,2013. 31Dec,2013, 30 Mar2013
4=High impact on the achievement of strategic objectives and targets relating to the organisational plan.
4=High-Will occur frequently, 1 out ten times (Probability= 50 - 100% p.a)
16 High
Annual Performance Plan 2013/201635
8. PROGRAMME 2: PERFORMInG ARTS
This programme is responsible for mainstreaming the role of arts, culture and heritage in social and economic development. It plays a special role in facilitating opportunities
for women, youth and people with disabilities. The programme aligns closely with the following DAC goals:
Goal 1: Job Creation
Goal 5: Development, protection, preservation and promotion of arts, culture and heritage
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Job creation Implement programmes that promote socio-economic development for targeted groups
Implement public art development programmes for targeted groups
Number of public art development programmes implemented
ASDY 1 24 5 3 5 8 8 8
Implement targeted groups’ enrichment programmes
Number of targeted groups enrichment programmes supported
ASDY2 15 2 2 3 6 5 5 5
Development, protection, preservation and promotion of arts, culture and heritage
Increase participation and access to arts and culture programmes by targeted groups
Implement the arts and culture education programme
Number of art practitioners placed in schools
ASDY3 680 50 100 100 150 200 240 240
Collaborative arts education projects with Department of Basic Education (DBE)
ASDY 4 12 3 3 2 2 4 4 4
National Arts Week implemented with DBE
ASDY 5 3 0 0 0 0 1 1 1
Arts, culture and heritage youth development and support
DAC bursary scheme for youth in ACH CBOs and high schools
ASDY2 75 0 0 2 2 20 25 30
Annual Performance Plan 2013/201636
STRATEGIC PLAN PERFORMANCE INDICATORS AND ANNUAL TARGETS
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year
target
Baseline Estimated perfor-mance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Conduct dialogues/talks for the benefit of the targeted groups
Youth enrichment workshops/ symposiums
ASDY 6 9 1 1 1 2 3 3 3
Women, people with disabilities and senior citizens/elderly economic empowerment workshops
ASDY 7 9 2 2 2 2 3 3 3
Implement a National Youth Service Programme
Number of trendsetters placed in province
ASDY 8 200 0 0 0 0 66 67 67
Provide support for community arts sector
Number of provincial programmes supported though each community arts and culture forum (CACF)
ASDY 9 27 0 1 1 0 9 9 9
Promote arts access in correctional facilities
Juvenile arts access programme implemented
ASDY10 3 1 1 2 2 1 1 1
Female arts access programme implemented
ASDY11 3 1 1 1 0 1 1 1
Annual Performance Plan 2013/201637
8.1 Operational plan
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Number of public art development programmes implemented
Arts, Social Development and Youth
8 Annually Report approved and business plan
Consultations held and approvals given
4 programmes implemented
4 programmes implemented
Quarter Reports received
17 500
(MGE)
Number of targeted group enrichment programmes supported
Arts, Social Development and Youth
5 Annually Reports Approval of projects and conclusion of agreements with partners/beneficiaries
2 programmes supported
3 programmes supported
Quarter Reports received
8 000
Number of art practitioners placed in schools
Arts, Social Development and Youth
160 Annually Report and approved business plan
Consultations held with artists, approval of sites/beneficiary schools, and placement of 160 artists
Quarter reports received
Interim progress report Plan for 2014/15
Quarter Reports received
5 000
(MGE)
Collaborative arts education projects with DBE
Arts, Social Development and Youth
4 Annually Reports on Curriculum and Assessment Policy Statement (CAPS) and Southern African Society for Cooperative Education (SASCE)
Approval of projects and conclusion of agreements with stakeholders
2 collaborative arts education projects implemented
2 collaborative arts education projects implemented
Quarter Reports received
2 500 (MEG and Goods & Services)
National Arts Week implemented with DBE
Arts, Social Development and Youth
1 Annually Approved business plan
Approval of National Arts Week Conclusion of agreements with partners/beneficiaries and service providers
Hold and pilot first National Arts Week
Quarter Reports received
Quarter Reports received
1 600 (Goods & Services)
Annual Performance Plan 2013/201638
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
DAC bursary scheme for youth in ACH CBOs and high schools
Arts, Social Development and Youth
20 Annually Develop bursary scheme strategy for approval
Call for applications Selection Develop submission and contracts
Allocate bursaries to 20 students
Quarter Reports from received
Quarter Reports received.
Seek approval for the 2014 bursary scheme
1 000
Youth enrichment workshops/symposiums
Arts, Social Development and Youth
3 Annually Reports 1 dialogue held 1 dialogue held 1 dialogue held
Consolidated Reports for workshops .
2 000 (Goods & Services and Households)
Women, people with disabilities and senior citizens/elderly economic empowerment workshops
Arts, Social Development and Youth
3 Annually Reports Concept plan approved
1 Women, people with disabilities and senior citizens/elderly economic empowerment workshops held
2 Women, people with disabilities and senior citizens/elderly economic empowerment workshops held
Close-out report
Plan for 2014 female dialogues
7 958
Number of trendsetters placed in province
Arts, Social Development and Youth
66 Annually Report and submission
Placement of 66 trendsetters in provinces
Quarter Reports received
Quarter Reports received
Finalise plans and obtain approval of the 2014 trendsetter initiative programme
4 500
Number of provincial programmes supported though each Provincial Community Arts Centres Forum (CACF)
Arts, Social Development and Youth
9 Quarterly Report Business plans and contracts approved
Provincial programmes implemented in all provinces
Quarter Reports received
Quarter Reports received
3 600
Juvenile arts access programme implemented
Arts, Social Development and Youth
1 Quarterly Report Concept plan refined and approval given for arts access programme in juvenile and female correctional services facilities
Consultations on the juvenile arts access programmes
One juvenile arts access programme held
Produce close-out reports for both arts access programmes Finalise plans and obtain approval of juvenile and female arts access programmes for 2014
2 000
Female arts access programme implemented
Arts, Social Development and Youth
1 Annually Reports Consultation on the female arts access programmes
One female arts access programme held
Annual Performance Plan 2013/201639
8.2 Resource considerations
Performing Arts
Audited outcome
(R’000)
Adjusted
appropriation
(R’000)
Medium-term expenditure estimate
(R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Subprogrammes
Promotion of performing arts 136 910 82 463 99 816 120 670 136 893 141 265 148 159
National Arts Council 78 522 65 625 68 485 87 527 87 554 92 815 97 090
Arts Institutions 165 183 310 337 315 467 332 753 342 038 361 604 378 803
National Film and Video Foundation 39 136 48 859 74 879 86 442 105 223 111 588 116 721
Capital Works of Playhouses 71 030 23 515 4 000 14 294 47 409 45 779 47 328
Total 490 781 530 799 562 647 641 686 719 117 753 051 788 101
Economic classification
Current payments 38 918 31 380 35 186 66 314 91 520 100 862 105 897
Compensation of employees 10 492 12 105 7 469 9 518 10 257 10 960 11 615
Goods and services 28 426 19 275 27 717 56 796 81 263 89 902 94 282
Transfers and subsidies 451 761 499 349 527 386 575 076 627 597 652 189 682 204
Departmental agencies and accounts 348 418 442 472 456 687 514 478 575 326 604 474 632 294
Non-profit institutions 5 453 5 864 6 225 6 538 6 898 7 312 7 648
Households 97 890 51 013 64 474 54 060 45 373 40 403 42 262
Payments for capital assets 95 69 62 296 - - -
Machinery and equipment 95 69 62 296 - - -
Payments for financial assets 7 1 13 - - -
Total 490 781 530 799 562 647 641 686 719 117 753 051 788 101
Annual Performance Plan 2013/201640
8.2 Key risks
APP REF STRATEGIC GOAL STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
ASDY1 Goal 1- Job Creation Implement programmes that promote socio- economic development for targeted groups
Alignment Risk Possible ‘misalignment ‘ of plans between National and Provincial Government
1. Intergovernmental Relations Act in 2.Minmec, TIC in place to discuss outcomes 3. Sectorial Forums and CEO’s in place
1. Escalate targeted group agenda to TIC and MinMec 2. Fast-track communication with Provinces, using forums such as TIC & MINMEC to garner support & collaborations on programmes. 3. Targeted groups agenda to be escalated to Sectorial Forums
Medium
ASDY2 Goal 1- Job Creation Implement programmes that promote socio- economic development for targeted groups
Partnering Risk Community Based Organisation and Government Departments partially supporting DAC mandate
None 1. Escalate targeted groups to the following Forums- IDC on Youth Affairs; Gender Machinery; CAC Forums 2. Development of Memorandum of Understanding of Agreement 2.1 National Youth Development Agency- Youth Day 2.2 Department of Basic Education Arts Enrichment Programmes and Curriculum 2.3 Department of Correction Services- Arts Access 2.4 Community Based Organisations-Targeted Groups 3. Develop a DAC -wide Framework for programmes/ projects for Targeted Groups
Medium
ASDY3 Goal 5-Development, protection, preservation, promotion of Arts ,Culture heritage
Increase participation and access to arts and culture programmes by targeted groups
Partnering Risks: Community Based Organisation and Government Departments partially supporting DAC mandate
Framework of Collaboration with Department of Basic Education in place
Review of the current Framework of Collaboration
Medium
ASDY9 Goal 5-Development, protection, preservation, promotion of Arts ,Culture heritage
Increase participation and access to arts and culture programmes by targeted groups
Alignment Risk/ Measurement Risk Possible ‘misalignment ‘ of plans between National and Provincial Government
Management structures for Forums established and in place
Develop Memorandum of Agreement with all Provincial Arts Forums
Medium
Annual Performance Plan 2013/201641
APP REF STRATEGIC GOAL STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
ADY10 Goal 5-Development,
protection,
preservation,
promotion of Arts
,Culture heritage
2.1 Increase participation and
access to arts and culture
programmes by targeted
groups
Partnering Risk
Community Based Organisation
and Government Departments
partially supporting DAC
mandate
MOU with Department of Correctional
Services is in place
Joint planning to be rolled out in
implementing and monitoring the Arts
Access programme
Medium
Annual Performance Plan 2013/201642
9. PROGRAMME 3: nATIOnAL LAnGuAGE SERVICE
This programme is designed to develop, promote and protect the official languages of South Africa and enhance the linguistic diversity of the country through policy
formulation and implementation. The programme renders translation and editing services to government services, coordinates and monitors government language structures,
and develops multilingual terminologies to support communication in the official languages. The programme contributes to the following DAC goals:
Goal 2: Human Capital development
Goal 3: Access to information
Goal 4: Linguistic diversity
Strategic Plan Performance Indicators And Annual Targets
DAC strategic
goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Linguistic diversity
Promote linguistic diversity and equity
Develop, promote and protect all offi-cial languages through policy formulation and imple-mentation
South African Language Practitioners’ Council (SALPC) Act promulgated
LPD 1 SALPC Act promulgated
Approved business case for establishment of the SALPC
National Treasury finalised approval of both business case and draft Bill
SALPC Bill was in abeyance to prioritise the Use of Official Languages Bill
Bill introduced to Cabinet
State Law Advisors’ certification on constitu-tionality of SALPC Bill obtained
Reports on Parliamentary processes or hearings on SALPC Bill
SALPC Act promulgated
Develop literature through translation
Number of books selected, translated and published in all official languages
LPD 2 One book selected, translated and published in all official languages
Approved national strategy for literature development through translation
Presentation of approved national strategy for literature development to stakeholders
Consultations with the Higher Education Department (HED) and DBE to brief them on the approved strategy and project for literature development: a children’s bilingual picture book
Book for translation selected
Translators workshop for translating the book
One book translated into 11 official languages
One book published in 11 official languages
Annual Performance Plan 2013/201643
Strategic Plan Performance Indicators And Annual Targets
DAC strategic
goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Provide specialised terminologies for all official languages
Develop terminologies in five domains
Number of terminologies developed per domain
TC1 (A) ARTS AND CULTURE 9603 terminologies developed
n/a n/a n/a ARTS AND CULTURE INT. PHASE 3490
ARTS AND CULTURE INT. PHASE 3490 terminologies developed
ARTS AND CULTURE INT. PHASE 3490 terminologies developed
ARTS AND CULTURE SNR. PHASE 2623 terminologies developed
TC1 (B) Human, socia,l economic and management sciences (HSEMS) 27727 terminologies developed
n/a n/a n/a HSEMS INT. PHASE 11593
HSEMS INT. PHASE 11593 terminologies developed
HSEMS INT. PHASE 11593 terminologies developed
HSEMS SNR. PHASE 4540 terminologies developed
TC1 (C) LIFE ORIEN-TATION 16030 terminologies developed
n/a n/a n/a LIFE ORIEN-TATION INT. PHASE 5963
LIFE ORIEN-TATION INT. PHASE 5963 terminologies developed
LIFE ORIEN-TATION INT. PHASE 5964 terminologies developed
LIFE ORIEN-TATION SNR. PHASE 4103 terminologies developed
TC1 (D ) ELECTION 3500 terminologies developed
n/a n/a n/a ELECTION 3500
ELECTION 3500 terminologies developed
TC1 (E) MATHEMAT-ICS 7407 Terminologies developed
n/a n/a n/a MATHEMATICS SNR. PHASE 3703
MATHEMATICS SNR. PHASE 3703 terminolo-gies developed
MATHEMATICS 3704 terminolo-gies developed
Human capital development
Build capacity in language practice
Award bursaries to students to develop skills in language practice
Number of bursaries awarded
LPD 4 280 annually (not cumulative)
100 100 120 280 280 280 n/a
Annual Performance Plan 2013/201644
Strategic Plan Performance Indicators And Annual Targets
DAC strategic
goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Access to information
Enhance access to information through translation and editing
Translate and edit official documents into and from official and foreign languages
Number of official documents translated into and edited in all official languages
TE 1 (A) 2 113 official documents
1 433 documents
931 documents 870 documents 895 documents 786 documents 705 documents 622 documents
Number of official documents translated into and edited in foreign languages
TE 1 (B) 144 official documents
44 documents 33 documents 38 documents 42 documents 45 documents 48 documents 51 documents
Number of official documents in foreign languages translated into and edited in official languages
TE 1 (C) 1 268 official documents
470 documents 599 documents 498 documents 372 documents 387 documents 426 documents 455 documents
Annual Performance Plan 2013/201645
Strategic Plan Performance Indicators And Annual Targets
DAC strategic
goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Enhance access to information through development of human language technologies (HLT) tools
Develop and implement Autshumato software and HLT impact tools, including a multilingual directory enquiry system
Number of Autshumato systems and softwares developed
HLT1 Two new MT systems and software update developed
Autshumato Integrated Translation Environment (ITE) and basic document management system (DMS) delivered
MT systems for three language pairs delivered
Terminology management system (TMS) delivered
Memorandum of Agreement (MoA) for Xitsonga MT system development signed with North-West University (NWU)
Xitsonga MT system (beta version) developed, software updated and training workshops held
Xitsonga MT system developed and installed
MT system developed for one official language
Number of HLT impact tools developed
HLT2 Two HLT impact tools developed
n/a n/a n/a MoA for multilingual directory enquiry system development signed with Molo Afrika
Eight components developed for multilingual directory enquiry system
Multilingual directory enquiry system developed and installed
One HLT impact tool developed
Expand the National Centre for HLT
Development and imple-mentation of Text Resource Development Phase II
HLT3 Business plan for Text Resource Development Phase II developed and implemented
Text Resource Development Phase I contract signed with NWU
Text resources developed for official languages: text corpora, tokenised and lemmatised text data, lemmatisation QC application
Text resources developed for official languages: POS tagged text data, POS tagger (beta), POS annotation QC application, morphological analysis QC application
Text resources developed for official languag-es: morpholog-ically analysed text data, lem-matiser, POS tagger (final), morphological decomposer, test suites
Text Resource Development Phase I completed and comprehensive business plan for Phase II developed
Business plan for Text Resource Development Phase II implemented
Business plan for Text Resource Development Phase II implemented
Annual Performance Plan 2013/201646
Strategic Plan Performance Indicators And Annual Targets
DAC strategic
goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Development and imple-mentation of Speech Resource Development Phase II
HLT4 Business plan for Speech Resource Development Phase II developed and implemented
Speech Resource Development Phase I contract signed with CSIR/Meraka
Speech resources developed for official languages: transcribed broadband speech corpora and pronunciation dictionaries (alpha)
Speech resources developed for official languages: transcribed broadband speech corpora and pronunciation dictionaries (beta), open source toolkits
Speech resources developed for official languages: transcribed broadband speech corpora and pronunciation dictionaries (final), statistical language models, test suites
Speech Re-source Devel-opment Phase I completed and comprehensive business plan for Phase II developed
Business plan for Speech Resource Development Phase II implemented
Business plan for Speech Resource Development Phase II implemented
Resource Management Agency (RMA – virtual platform) for text and speech resources maintained
HLT5 One virtual platform incorporating resource management, SA HLT Index, SA HLT Catalogue and awareness initiatives
n/a Blueprint for RMA (virtual platform) developed
Proposals for establishment of RMA (virtual platform) sought, received and reviewed MoA signed with NWU
RMA (virtual platform) for text and speech resources established
HLT resources collected, organised and warehoused, SA HLT Index and SA HLT Catalogue updated, awareness initiatives implemented
HLT resources collected, organised and warehoused, SA HLT Index and SA HLT Catalogue updated, awareness initiatives implemented
HLT resources collected, organised and warehoused, SA HLT Index and SA HLT Catalogue updated, awareness initiatives implemented
Collaborate on HLT capacity development with international partners
Number of joint HLT projects with Dutch Language Union
HLT6 Six joint HLT projects with Dutch Language Union
n/a Letter of intent for closer collaboration between SA and Dutch Language Union signed
Declaration, MoA and POC for HLT collaboration between SA and Dutch Language Union signed
Two joint HLT projects with Dutch Language Union
Two joint HLT projects with Dutch Language Union
Two joint HLT projects with Dutch Language Union
Two joint HLT projects with Dutch Language Union
Annual Performance Plan 2013/201647
9.1 Operational plan
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Programme performance
indicator
Code Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
SALPC Act promulgated
LPD 1 Language Planning and Development
State Law Advisors’ certification on constitutionality of SALPC Bill obtained
Quarterly Formal communication from State Law Advisor
State Law Advisor engaged on progress and report prepared
State Law Advisor engaged on progress and report prepared
State Law Advisor engaged on progress and report prepared
State Law Advisor’s certification on constitutionality of SALPC Bill obtained
n/a
Number of books selected, translated and published in all official languages
LPD 2 Language Planning and Development
Translators workshop for translating the book
Quarterly Attendance register and workshop report
Finalise logistics for the workshop and prepare . programme
Translators workshop conducted
Workshop report finalised
Workshop report presented to stakeholders and approved
900
Number of terminologies developed per domain
TC 1 (A)Terminology Coordination
ARTS AND CULTURE INT. PHASE 3490 terminologies developed
Quarterly Terminology lists ARTS AND CULTURE INT. PHASE 873 terminologies developed
ARTS AND CULTURE INT. PHASE 873 terminologies developed
ARTS AND CULTURE INT. PHASE 872 terminologies developed
ARTS AND CULTURE INT. PHASE 872 terminologies developed
458
TC1 (B) Terminology Coordination
HSEMS INT. PHASE 11593 terminologies developed
Quarterly Terminology lists HSEMS INT. PHASE 2898 terminologies developed
HSEMS INT. PHASE 2898 terminologies developed
HSEMS INT. PHASE 2898 terminologies developed
HSEMS INT. PHASE 2899 terminologies developed
n/a
TC1 (C) Terminology Coordination
LIFE ORIENTATION INT. PHASE 5963 terminologies developed
Quarterly Terminology lists LIFE ORIENTATION INT. PHASE 1491 terminologies developed
LIFE ORIENTATION INT. PHASE 1491 terminologies developed
LIFE ORIENTATION INT. PHASE 1491 terminologies developed
LIFE ORIENTATION INT. PHASE 1490 terminologies developed
n/a
TC1 (D ) Terminology Coordination
ELECTION 3500 terminologies developed
Quarterly Multilingual list published on DAC website
ELECTION 1400 terminologies developed
ELECTION 700 terminologies developed
ELECTION 700 terminologies developed
ELECTION 700 terminologies developed
n/a
TC1 (E) Terminology Coordination
MATHEMATICS SNR. PHASE 3703 terminolo-gies developed
Quarterly Terminology lists MATHS SNR. PHASE 926 terminologies developed
MATHS SNR. PHASE 926 terminologies developed
MATHS SNR. PHASE 925 terminologies developed
MATHS SNR. PHASE 926 terminologies developed
n/a
Annual Performance Plan 2013/201648
Programme performance
indicator
Code Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Number of bursaries awarded
LPD 4 Language Planning and Development
280 Bi-annually Reports on bursary programme
Transfer funds to participating universities
Monitoring visits to universities
Bursary awards made to 280 students
Financial reports 4 000
Number of official documents translated into and edited in all official languages
TE 1 (A) Translation and Editing
786 documents Quarterly Document registers 113 documents 157 documents 284 documents 232 documents 500
Number of official documents translated into and edited in foreign languages
TE 1 (B) Translation and Editing
45 documents Quarterly Document registers Eight documents 13 documents 15 documents Nine documents n/a
Number of official documents in foreign languages translated into and edited in official languages
TE 1 (C) Translation and Editing
387 documents Quarterly Document registers 71 documents 114 documents 127 documents 75 documents n/a
Number of Autshumato systems and softwares developed
HLT1 Human Language Technologies
Xitsonga MT system (beta version) developed, software updated and training workshops held as per MoA with developers
Quarterly Progress reports and software demonstration
Xitsonga data collected and processed
Baseline Xitsonga MT system installed and tested
Beta version of monolingual corpus and parallel corpus Release of updated Autshumato software
Autshumato training workshops held
n/a
Annual Performance Plan 2013/201649
Programme performance
indicator
Code Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Number of HLT impact tools developed
HLT2 Human Language Technologies
Eight components developed for multilingual directory enquiry system
Quarterly Progress reports and software demonstration
Two components: state-of-the-art review document of directory enquiry applications, extended interactive voice response (IVR) platform for directory enquiry application
Two components: speech recognition pipeline, extended multilingual speech corpus
One component: language models
Three components: user interface design, pronunciation lexicons, and exploratory user test results
2 300
Development and implementation of Text Resource Development Phase II
HLT3 Human Language Technologies
Text Resource Development Phase I completed and comprehensive business plan for Phase II developed
Quarterly Progress reports and text resources
Finalisation of Text Resource Development Phase I: final deliverables and report received and review commenced
Text Resource Development Phase II: HLT Expert Panel review finalised, recommendation and specifications document for Phase II (first draft of business plan)
Text Resource Development Phase II: business plan finalised
Text Resource Development Phase II: implementation agent appointed and contract signed
1 500
Development and implementation of Speech Resource Development Phase II
HLT4 Human Language Technologies
Speech Resource Development Phase I completed and comprehensive business plan for Phase II developed
Quarterly Progress reports and speech resources
Finalisation of Speech Resource Development Phase I: final deliverables and report received and review commenced
Speech Resource Development Phase II: HLT Expert Panel review finalised, recommendation and specifications document for Phase II (first draft of business plan)
Speech Resource Development Phase II: business plan finalised
Speech Resource Development Phase II: implementation agent appointed and contract signed
2 500
Annual Performance Plan 2013/201650
Programme performance
indicator
Code Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Resource Management Agency (RMA – virtual platform) for text and speech resources maintained
HLT5 Human Language Technologies
HLT resources collected, organised and warehoused, SA HLT Index and SA HLT Catalogue updated, awareness initiatives implemented
Quarterly Progress reports HLT resources collected, organised and warehoused
Updated SA HLT Index and SA HLT Catalogue, awareness initiatives implemented
HLT resources collected, organised and warehoused
Updated SA HLT Index and SA HLT Catalogue, awareness initiatives implemented
1 600
Number of joint HLT projects with Dutch Language Union
HLT6 Human Language Technologies
Two joint HLT projects with Dutch Language Union
Annual Annual reports n/a n/a Two new joint HLT projects with Dutch Language Union selected and supported.
Annual report on joint HLT projects with Dutch Language Union
600
Annual Performance Plan 2013/201651
9.2 Resource considerations
National Language Services
Audited outcome
(R’000)
Adjusted appropriation
(R’000)
Medium-term expenditure estimate
(R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Subprogrammes
National Language Services 35 762 39 336 42 615 42 753 45 512 48 878 51 519
Pan South African Language Board 50 156 52 871 56 119 69 480 78 180 83 497 87 338
Total 85 918 92 207 98 734 112 233 123 692 132 375 138 857
Economic classification
Current payments 26 010 22 471 24 466 31 938 29 715 32 132 34 003
Compensation of employees 17 301 18 883 20 336 23 521 26 102 28 337 30 033
Goods and services 8 709 3 588 4 130 8 417 3 613 3 795 3 970
Transfers and subsidies 59 845 69 694 73 695 79 321 93 977 100 243 104 854
Departmental agencies and accounts 50 156 52 871 56 119 69 480 78 180 83 497 87 338
Households 9 689 16 823 17 576 9 841 15 797 16 746 17 516
Payments for capital assets 59 34 573 974 - - -
Machinery and equipment 59 34 573 974 - - -
Payments for financial assets 4 8 - - - - -
Total 85 918 92 207 98 734 112 233 123 692 132 375 138 857
Annual Performance Plan 2013/201652
9.3 Key risks
APP REF STRATEGIC GOAL STRATEGIC OBJECTIVE RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
LPD1 Goal 4-Linguistic Diversity
Promote linguistic diversity and equity
Regulatory Risk: Language profession not regulated
Bill has been submitted to State Law Advisors for certification on constitutionality
Continuous engagement with the State Law Advisors on progress and prepare reports
Low
LPD2 Goal 4-Linguistic Diversity
Promote linguistic diversity and equity
Opportunity Loss Risk: Undeveloped children’s literature
Books for translation selected, CV’s for potential translators submitted
Training workshops already planned Low
LPD4 Goal 2- Human Capacity Development
Build capacity in language practice
Measurement Risk: High dropout rates
Universities requested to enter into contracts with individual students
Monitoring visits planned Low
TE1(a) Goal 3-Access to Information
Enhance access to information through translation and editing
Performance Gap Risk: Inability to deliver on all demanded languages
Freelance translators database in place
Updating of the database Low
HLT1 Goal 3-Access to Information
Enhance access to information through development of human language technologies (HLT) tools
Resource Allocation Risk: HLT tools not widely adopted
Contractual agreement in place for developers to train end users
Continuous engagement with the developers on progress
Low
HLT3 Goal 3-Access to Information
Enhance access to information through development of human language technologies (HLT) tools
Communications Risk: Lack of awareness about NC for HLT
Contractual agreement in place to create awareness among targeted audience
Continuous engagement with the implementing agency and reporting on progress
Low
HLT6 Goal 3-Access to Information
Enhance access to information through development of human language technologies (HLT) tools
Industry Risk: Undeveloped capacity in HLT
Collaboration on HLT capacity development with international partner
Sourcing of joint HLT projects Low
TC1 Goal 4-Linguistic
Diversity
Provide specialised
terminologies for all official
languages
Technological Innovation
Risk:
Lack of specialised
terminologies
Linkage and collaboration with subject
specialists
Collaborative meetings with subject specialists
planned
Low
Annual Performance Plan 2013/201653
10. PROGRAMME 4: CuLTuRAL dEVELOPMEnT
This programme aims to make a contribution to job creation, poverty reduction, skills transfer and wealth creation. The purpose of the programme is to stimulate the
development of opportunities in South African arts and culture through mutually beneficial partnerships that will result in the sustainability of the sector. The programme
recognises that the future of cultural expression lies in the development of new audiences and markets. The programme is aligned to the following DAC goals:
Goal 1: Job creation
Goal 3: Access to information
Goal 5: Development, protection, preservation and promotion of arts, culture and heritage
Goal 6: Governance and accountability
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Job Creation
Support the implementation of projects aimed at job creation
Provide financial support for cultural events
Number of cultural events supported
CD 1 54 cultural events supported
7 cultural events supported
6 cultural events supported
7 cultural events supported
15 cultural events supported
18 cultural events supported
18 cultural events supported
18 cultural events supported
Number of jobs created through cultural events
CD 2 54 000 jobs created through cultural events
7 000 jobs created through cultural events
60 jobs created through cultural events
7 000 jobs created through cultural events
18 000 short- term jobs
18 000 short-term jobs
18 000 short-term jobs
18 000 short-term jobs
Provide a cultural programme in support of national day celebrations and events
Number of cultural programmes supporting national days and events
CD 3 21 cultural programmes supporting national days and events
n/a n/a n/a 6 programmes supporting national days and events
7 programmes supporting national days and events
7 programmes supporting national days and events
7 programmes supporting national days and events
Annual Performance Plan 2013/201654
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Provide financial support for touring-venture projects
Number of touring-venture projects supported
CD 4 61 n/a n/a n/a 6 touring-venture projects supported
17 touring-venture projects supported
20 touring-venture projects supported
24 touring-venture projects supported
Number jobs created through touring-venture programme
CD 5 2 745 n/a n/a n/a 320 jobs created through touring- programme
765 jobs created through touring-venture programme
900 jobs created through touring-venture programme
1 080 jobs created through touring-venture programme
Development, protection, preservation and promotion of arts, culture and heritage
Develop coherent integrated five- year sector-specific strategies and implementation plans aligned to development and macro-policy interventions
Develop sector strategies and implementation plans for the cul-tural industries
Number of sec-tor strategies and implemen-tation plans approved
CD 6 6 sector strat-egies and implementation plans approved
Visual arts, design, technical services research reports and choral music strategy
n/a Recommen-dations on visual arts and performing arts consul-tations and reports
National performing arts database, concept document on crafts, visual arts task team, approved research report on technical services
6 cultural in-dustry sector strategies and implementation plans approved
3 cultural industries sector strategies implemented
3 cultural industries sector strategies implemented
Review Cultural Industries Growth Strategy (CIGS)
Review CIGS One CIGS reviewed
CD 7 One CIGS reviewed and recommenda-tions
CIGS 2008 n/a n/a n/a Report on the review of CIGS
3 Recommen-dations of the CIGS report implemented
3 Recommen-dations of the CIGS report further imple-mented
Annual Performance Plan 2013/201655
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Support programmes in the cultural industries
Support targeted programmes that address entrepreneur-ship, job creation and skills in the cul-tural industries
Number of programmes to support a culture of reading
CD 8 Three National Book Weeks (NBW) supported in six provinces
n/a One NBW One NBW NBW programmes hosted in three provinces
NBW programmes supported and staged in four provinces
NBW programmes hosted in one provinces
NBW programmes hosted in one provinces
Number of jobs created during NBW
CD 9 360 jobs created
n/a n/a 134 jobs created
128 new jobs created to make a total of 262 jobs in two years
120 jobs created during NBW
120 jobs created during NBW
120 jobs created during NBW
South African Literary Awards (SALA) hosted and writers recognised for their contribution
CD 10 Three SALA hosted and a total of 140 writers recognised.
A total of 66 writers recognised since inception
A total of 82 writers recognised since inception
SALA hosted as an annual event since 2005 A total of 101 writers recognised
SALA hosted and writers recognised in 11 different categories A total of 114 writers recognised
SALA hosted and a total of 120 writers recognised
SALA hosted and a total of 130 writers recognised
SALA hosted and a total of 140 writers recognised
Number of jobs created during SALA
CD 11 600 jobs created during SALA
n/a 430 new jobs created to make a
total of 789 in two years
372 new jobs created to make a total of 1 161 in three years
1 042 new jobs created to make a total of 2 203 in four years
200 new jobs created during SALA
200 new jobs created during SALA
200 new jobs created during SALA
Annual Performance Plan 2013/201656
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Implement tar-geted programmes that support entrepreneur-ship, job creation and skills in the cul-tural industries
Number of music sector initiatives supported for skills development and promotion
CD 12 3 music capacity-building programmes supported for Association of Independent Recording Companies of South Africa (AIRCO)
n/a n/a Support AIRCO provincial shows
Support AIRCO provincial shows
1 music industry institutional capacity-building programme
1 music industry institutional capacity-building programme supported
One music industry institutional capacity-building programme supported
Number of jobs created during AIRCO
CD 13 30 jobs created during AIRCO capacity-building
n/a n/a n/a 10 jobs created during AIRCO road shows
10 jobs created during AIRCO programme
10 jobs created during AIRCO programme
10 jobs created during AIRCO programme
Implement tar-geted programmes that support entrepreneur-ship, job creation and skills in the cul-tural industries
Number of Moshito conferences staged
CD 14 3 Moshito music conferences/events/exhibitions
Moshito music conference and exhibition
Moshito music conference and exhibition
Moshito music conference and exhibition
Stage 1 Moshito music conference and exhibition
Stage 1 Moshito music conference and exhibition
Stage 1 Moshito music conference and exhibition
Stage one Moshito music conference and exhibition
Number of jobs created during Moshito conference
CD 15 540 jobs created during Moshito conference
140 150 150 171 jobs created during Moshito conference
180 jobs created during Moshito conference
180 jobs created during Moshito conference
180 jobs created during Moshito conference
Number of visual arts skills development programmes implemented
CD 16 3 visual arts programmes implemented
n/a n/a n/a 1 visual arts skills training programme implemented
1 visual arts skills training programme on arts adminis-tration imple-mented
1 visual arts skills training programme on arts adminis-tration imple-mented
1 visual arts skills training programme on conservation implemented
Annual Performance Plan 2013/201657
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Number of visual arts beneficiaries trained
CD 17 30 beneficiaries trained in visual arts programmes
n/a n/a n/a 10 beneficiaries trained in visual arts programmes
10 beneficiaries trained in visual arts programmes
10 beneficiaries trained in visual arts programmes
10 beneficiaries trained in visual arts programmes
Number of skills development and promotion programmes supported in the design sectors
CD 18 7 design programmes supported
One fashion programme supported
n/a Three pro-grammes: Emerging Creatives, Thuthuka Jewellery and Eco Design
3 programmes: Emerging Creatives and Young Simulcast (YS) , Thuthuka Jewellery and Eco Design
3 programmes: partner with Emerging Creatives YS, support Thuthuka Jewellery and Modilla Design projects
2 programmes: partner with Emerging Creatives YS, support and Modilla Design projects
2 programmes: partner with Emerging Creatives YS, support and Modilla Design projects
Number of entrepreneurs supported in design programmes
CD 19 6 900 en-trepreneurs supported in the design pro-grammes
n/a n/a n/a 1 450 entrepreneurs supported in the design programmes
1 800 en-trepreneurs supported in the design pro-grammes
2 400 entrepre-neurs support-ed in the design programmes
2 700 en-trepreneurs supported in the design programmes
Number of business manuals developed and distributed
CD 20 6 000 business manuals
n/a n/a n/a n/a 2 000 business manuals developed and distributed
2 000 manuals distributed
2 000 manuals distributed
Number of film skills training programmes supported
CD 21 Six film programmes supported
n/a n/a Support one programme: Big Fish/Script to Screen
Continue the partnership with Big Fish/Script to Screen project
Support 1 Script to Screen project and implement 1 film skills project
Support 1 Script to Screen project and implement 1 film skills project
Support 1 Script to Screen project and implement 1 film skills project
Annual Performance Plan 2013/201658
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Number of jobs created during film skills training programme
CD 22 687 jobs created during film skills training programme
n/a n/a 120 jobs created during film skills training
120 jobs created during film skills training
197 jobs created during film skills training
230 jobs created during film skills training
260 jobs created during film skills training
Number of events and technical services initiatives supported
CD 23 3 events and technical services initiatives supported
n/a n/a 1 events and technical services initiative supported with South African Rodies Association (SARA)
n/a 1 events and technical services initiative supported (SARA)
1 events and technical services initiative supported (SARA)
1 new events and technical services initiative supported
Number of skilled beneficiaries in technical services
CD 24 45 young people skilled through SARA programme
n/a n/a n/a n/a 15 young people skilled through SARA programme
15 young people skilled through SARA programme
15 young people skilled through an event & technical service programme
Annual Performance Plan 2013/201659
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Number of international cultural industries events and projects staged and supported
CD 25 9 international cultural industries events/projects supported
n/a n/a Two international events/projects staged/supported: Venice Biennale partner with Angola and Algeria
One international event staged in craft, film, fashion and visual arts: Olympics
3 international events/projects staged/supported: Venice Biennale partner with Angola and Algeria
3 events supported/staged/partnered in cultural industries
3 events supported/staged/partnered in cultural industries
Number of jobs created through international events/initiatives
CD 26 1 500 jobs created through international events and initiatives
n/a n/a 600 jobs created through international events/initiatives
600 jobs created through international events/initiatives
500 jobs created through international events/initiatives
500 jobs created through international events/initiatives
500 jobs created through international events/initiatives
Improve the infrastructure of distribution channels for cultural industries products
Establish a National Art Bank (NAB)
NAB established CD 27 NAB established
n/a n/a Begin process of establishing an NAB for South Africa
NAB concept business plan produced Draft Cabinet memorandum Commence with transfer of National Arts Bank from City of Johannesburg
Cabinet mem-orandum on NAB approved
Finalise establishment of entity (NAB)
Commence with acquisition and leasing of art works
Annual Performance Plan 2013/201660
Strategic Plan Performance Indicators and Annual Targets
DAC strategic goal
Strategic objective
Measureable objective
Performance indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Establish a sourcing enterprise (SE)
SE established CD 28 SE established Finalise the concept document for the SE
Approve terms of reference (ToR) Advertise for appointment of a service provider for technical systems for the SE portal
Set up and launch SE portal
Investigate the physical enterprise
Evaluate the sourcing enterprise portal.
Develop and implement a dedicated academy to support scarce and critical skills in the creative sector
Functional National Cultural Industries Skills Academy (NaCISA)
NaCISA established
CD 29 NaCISA established
n/a n/a Business plan and concept document
Approve imple-mentation plan Commence legal process for establishment of NaCISA entity
Launch NaCISA project strategy Appoint board members
Construction of NaCISA physical building started
Launch of NaCISA
Develop a coherent and integrated research agenda and knowledge management system
Develop mechanism to collect and disseminate information on the creative sector
Cultural observatory mechanisms developed and approved
CD 30 Cultural observatory mechanisms developed and approved
n/a n/a Concept document for cultural observatory
Approved business plan for cultural observatory
Approved out-comes of the mapping stud-ies to guide the establishment of the cultural observatory
Cultural observatory established
Report on the operations of the cultural observatory
Approved framework for cultural statistics
CD 31 Functional framework for cultural statistics established by end March 2016
n/a n/a Concept document for cultural statistics
Framework for cultural statistics developed
Outcomes of the framework cultural statistics pilot
Framework for cultural statistics approved
Annual Performance Plan 2013/201661
PROGRAMME 4b: International relations
Strategic Plan Performance Indicators And Annual Targets
DAC strategic Goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicatorCode
Three-year target
BaselineEstimated
performanceMedium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Job creation and Development, protection, preservation and promotion of arts, culture and heritage
Build key strategic relations aimed at exposing South African arts, culture and heritage to the international community
Build strategic partnerships for the benefit of the arts, culture and heritage sector
Number of continental events participated in
IR 1 12 major continental festivals
3 4 3 4 4 4 4
Number of international events participated in
IR 2 10 international events
3 3 3 4 4 3 3
Number of cultural programmes and activities supported towards servicing of agreements
IR 3 45 10 10 10 20 15 15 15
Number of meetings and events of regional organisations attended
IR 4 Six meetings and events attended
1 1 1 3 2 2 2
Build key strategic relations for broader SA government agenda
Number of continental solidarity and cohesion events participated in
IR 5 10 continental solidarity and cohesion events
1 1 1 2 4 3 3
Annual Performance Plan 2013/201662
Strategic Plan Performance Indicators And Annual Targets
DAC strategic Goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicatorCode
Three-year target
BaselineEstimated
performanceMedium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Development, protection, preservation and promotion of arts, culture and heritage
Harmonise international and domestic policies that seek to protect and promote arts, culture and heritage
Implement the Convention on Cultural Diversity
Number of workshops conducted on the Cultural Diversity Convention
IR 6 Nine workshops conducted on the Cultural Diversity Convention
n/a n/a n/a 5 3 3 3
Develop policies to guide the arts, culture and heritage sector on its international engagements
Cabinet approval and ratification of the Charter for African Cultural Renaissance
IR 7 Ratification of the Charter
n/a n/a n/a Signing of the Charter
Cabinet approval for ratification of the Charter
n/a n/a
Progress report on the imple-mentation of the Charter
IR 8 Two progress reports
n/a n/a n/a n/a n/a 1 1
DAC framework on overseas development assistance (ODA) developed and approved
IR 9 ODA framework approved by DAC
n/a n/a n/a Daft framework ODA framework approved by DAC
Development of guidelines
Develop DAC ODA booklet
DAC international relations (IR) policy developed and approved
IR 10 Approved IR policy
n/a n/a n/a Concept document
Consultation with relevant stakeholders
IR policy approved
Review of IR policy
Annual Performance Plan 2013/201663
Strategic Plan Performance Indicators And Annual Targets
DAC strategic Goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicatorCode
Three-year target
BaselineEstimated
performanceMedium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
World Intellectual Property Organisation (WIPO) treaty on audio-visual performances approved by Cabinet
IR 11 Cabinet approval for ratification
n/a n/a n/a n/a Workshop consultations with relevant stakeholders
Workshop consultations with relevant stakeholders
Cabinet processes
Annual Performance Plan 2013/201664
10.1 Operational plan
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of cultural events supported
Performing Arts 18 cultural events supported
Quarterly 18 business plans for cultural events approved, submission and MoAs approved
Approval of business plans and four events supported
Six cultural events supported
Three cultural events supported
Five cultural events supported Prepare close-out reports
56 187 (MGE allocation)
Number of jobs created through cultural events
Performing Arts 18 000 short-term jobs
Quarterly 18 impact reports on cultural events
Approved data collection system
Reports on the supported events
Reports on the supported events
Monitor and collect data on number of jobs, consolidate data and produce close-out report
As above
Number of cultural programmes supporting national days and events
Performing Arts Seven cultural programmes supporting national days and events
Quarterly Seven reports on cultural programmes supporting national days and events
Obtain approvals to support cultural projects Hold consultations with relevant stakeholders Support two national days/months with a cultural programme
Support three national days/months with cultural programmes
Support one national day/month with cultural programme
Support one national day/month
1 500 (Programme 2 budget)
Number of touring projects supported
Cultural Development
17 touring projects supported
Annually 17 touring projects supported
Obtain approval to implement Touring Venture i.e. Obtain proposals from earmarked institutions
Process transfer of funds for proposed projects
Reports on supported touring projects
Reports on supported touring projects
24 000 (MGE allocation)
Number jobs created through touring programme
Cultural Development
765 jobs created through touring programme
Quarterly Copies of signed contracts of jobs created through 17 institutions
100 jobs created through touring projects
221 jobs created through touring projects
253 jobs created through touring projects
191 jobs created through touring projects
As above
Annual Performance Plan 2013/201665
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of sector strategies and implementation plans approved
Multimedia, Multi- Discipline and Performing Arts
Seven cultural industry sector strategies and implementation plans approved
Quarterly Progress reports, minutes of meetings
Process to appoint the service providers to produce sector strategies and implementation plans for completion by 30 June 2014
Service provider to produce sector strategies and implementation plans to be appointed by 30 September 2013
Strategies and implementation plans for the sectors finalised by 30 December 2013
Strategies and implementation plans for the sectors approved by Executive Management Team by 30 March 2014
5 800
One Cultural Industries Growth Strategy (CIGS) reviewed
Cultural Development
One CIGS reviewed Annually Report of CIGS review
Process to appoint the service providers to conduct CIGS review by 30 June 2014
Service providers to conduct CIGS review to be appointed by 30 September 2013
Draft report of CGIS review submitted to DAC by 30 December 2013
Final report on CIGS review presented to EMT by 30 March 2014
R1 000
Number of programmes to support a culture of reading
Multi-Disciplinary National Book Week (NBW) programmes supported and staged in four provinces by 30 March 2014
Quarterly Annual NBW reports and minutes of meetings
Stakeholder engagement on the upcoming NBW and necessary approvals Budget and plans by 30 June 2013
NBW programmes staged by 30 September 2013
Draft report on the staging of NBW by December 2013
Final NBW reports Start strategic planning for the next NBW by 30 March 2014
3 000(MGE budget)
Number of jobs created during NBW
Multi-Disciplinary 120 jobs created during NBW
Annually n/a n/a 120 jobs created during NBW
n/a n/a As above
South African Literary Awards (SALA) hosted and writers recognised for their contribution
Multi-Disciplinary SALA hosted and a total of 120 writers recognised and 200 jobs created
Quarterly Correspondence, media statements and newspaper clippings
Call for entries sent out in the public domain via the media by 30 June 2013
Selection and adjudication of entries by 30 September 2013
Hosting of the awards by 30 December 2013
Presentation and review of the report of the SALA awards by 30 March 2014
3 400 (Cultural Events)
Number of jobs created during SALA
Multi-Disciplinary 1 050 jobs created Annually Proposal, MOA submissions and report
n/a n/a 200 new jobs created
1 050 As above
Annual Performance Plan 2013/201666
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of music sector initiatives supported for skills development and promotion
Multi-Disciplinary One music capacity-building programme supported for AIRCO, 30 March 2014
Quarterly Reports and approved documentation and contracts on AIRCO
AIRCO strategic plan developed and submitted by 30 June 2013
AIRCO plans approved by the accounting officer and contracts finalised by 30 September 2013
AIRCO programme implemented and status report finalised by 30 December 2013
Submission of final report on AIRCO capacity-building programme to DAC by 30 March 2014
700
Number of jobs created during AIRCO
Multi-Disciplinary 10 jobs created during AIRCO road shows
Annually Reports and approved documentation and contracts on AIRCO
n/a n/a 10 jobs created during AIRCO programme
n/a As above
Number of Moshito conferences staged
Multi-Disciplinary Stage one Moshito music conference and exhibition
Quarterly Reports and approved documentation and contracts on Moshito
DDG approval of Moshito partnership and support, and logistics by June 2013
Hosting Moshito 2013 music conference, exhibition and live performances by September 2013
Project management team reviews Moshito 2013 Draft report by 30 December 2013
Submission of final report on Moshito to DAC by 30 March 2014
2 475
Number of jobs created during Moshito conference
Multi-Disciplinary 180 jobs created during Moshito conference
Annually Reports and approved documentation and contracts on Moshito
n/a 180 jobs created during Moshito conference
n/a n/a As above
Number of visual arts skills development programmes implemented
Multi-Media One skills training programme on visual arts administration implemented by 30 March 2014
Quarterly Reports and approved documentation and contracts on visual arts training programme
Prepare necessary approvals, call for stakeholders to implement the visual arts skills training programme by 30 June 2013
Conclude contract arrangements with service provider to implement the visual art skills programme by 30 September 2013
Monitor and evaluate visual art training programme by 30 December 2013
Collate and submit report on the visual arts skills training programme by 30 March 2014
300
Number of beneficiaries trained in visual arts programme
Multi-Media 10 beneficiaries trained in visual arts programme
Annually Reports and approved documentation and contracts on visual arts training programme
n/a n/a n/a 10 beneficiaries trained in visual arts programme
As above
Annual Performance Plan 2013/201667
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of skills development and promotion programmes supported in the design sector
Multi-Media Three programmes: partner with Emerging Creatives(EC) and Young Simulcast (YS), support Thuthuka Jewellery and Modilla Design projects by end March 2014
Quarterly Reports and approved documentation and contracts on Thuthuka, Modilla and Emerging Creatives and YS projects
Prepare necessary approvals for the support of Thuthuka and Modilla projects by 30 June 2013
Conclude contract arrangements and payment process for Thuthuka Jewellery and Modilla projects by 30 September 2013
Progress report on Thuthuka Jewellery and Modilla projects by 30 December 2013
Submission of Thuthuka and Modilla project report and implementation of EC and YS project by 30 March 2014
3 300
Number of entrepreneurs supported in design programmes
Multi-Media 1 800 entrepreneurs supported in design programmes
Annually Reports and approved documentation and contracts on Thuthuka, Modilla and Emerging Creatives and YS projects
598 entrepreneurs supported for Emerging Creatives project
n/a n/a 1 202 entrepreneurs supported in Thutuka Jewellery and Modilla Design programmes
As above
Number of business manuals developed and distributed
Multi-Disciplinary Develop and distribute 2 000 business manuals by 30 March 2014
Annually Project progress reports and business manuals developed
Develop ToR and obtain DG’s project and budget approval
Production of training content and manuals
Distribution of 1 000 manuals
Distribution of 1 000 manuals and project evaluation by 30 March 2014
300
Number of film skills training programmes supported
Multi-Media Support one Script-to- Screen project and one skills project
Quarterly Reports and approved documentation and contracts for Script-to- Screen and film project
Obtain necessary approval for (Script-to-Screen and film skills project)
Conclude contract arrangements and payment process (Script-to-Screen and film skills project)
Progress reports (Script-to-Screen and film skills project)
Final Reports (Script-to-Screen and film skills project)
1 500
Number of jobs created during film skills training programmes
Multi-Media 197 jobs created during film skills training
Annually Reports, approved documentation and contracts on Script-to- Screen project
n/a n/a n/a 197 jobs created during film skills training
As above
Annual Performance Plan 2013/201668
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of events and technical services initiatives supported
Multi-Disciplinary One event and technical services initiative supported (SARA)
Quarterly Reports and approved documentation and contracts on SARA project
Proposal from SARA received, approved, first payment transferred Implementation commenced by 30 June 2013
SARA training programme started by 30 September 2013
Beneficiary progress report received by 30 December 2013
Beneficiary final report received 30 March 2014
1 000
Number of skilled beneficiaries in technical services
Multi-Disciplinary 15 young people skilled through SARA programme
Annually Reports and approved documentation and contracts on SARA project
n/a n/a n/a 15 young people skilled through SARA programme
As above
Number of international creative industries events and projects staged and supported
Multi-Disciplinary and Multi -Media
Three international events/projects staged/supported: Venice Biennale partner with Angola and Algeria
Quarterly Reports and approved documentation and contracts
Stage Venice Biennale Identify events to be staged/supported/ partnered Prepare necessary approvals by 30 June 2013
Conclude contract arrangements and payment process for stakeholders and partners by 30 September 2013
Two international events staged by 30 December 2013
Collate and submit report on the international events by 30 March 2014
10 000 (MGE)
Number of jobs created through international events/initiatives
Multi-Disciplinary and Multi -Media
500 jobs created through international events/ initiatives
Quarterly Reports and approved documentation and contracts
50 jobs created through international events
n/a 300 jobs created through international events
150 jobs created through international events
National Art Bank (NAB) established
Multi-Media Cabinet memorandum on NAB approved and legal entity established
Monthly Cabinet memorandum approved
Submit cabinet memorandum to cluster, NCOP and National Assembly for approval
Start process of securing space for the NAB
Start of process of registering legal entity
Finalise legal requirements for establishment of the NAB
3 000(MGE)
Establish a sourcing enterprise (SE)
Cultural Development
Set up the technical platform for the SE portal and launch by 30 March 2014
Monthly Documents, reports and technical systems
Conclude the appointment of service providers for the webmaster, marketing and operations services by 30 June 2013
Approve work plan of the Sourcing Enterprise by Executive Team Management by 30 September 2013
Progress report on setting up of SE portal by 30 December 2013
Launch the SE portal by 30 March 2014
9 500(MGE)
Annual Performance Plan 2013/201669
Performance indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
NaCISA established Multi-Disciplinary Launch of NaCISA project strategy and appointment of board members by 30 March 2014
Quarterly Documents and reports
Process to appoint board members commenced and core consultants contract renewed by 30 June 2013
Appointment of board members completed by 30 September 2013
Secure strategic partnerships and submit report on NaCISA activities by 30 December 2013
Launch NaCISA project strategy and inaugurate board members by 30 March 2014
10 000(MGE)
Cultural observatory mechanisms established and approved
Multi-Disciplinary Establish operational cultural observatory with the outcomes of the mapping studies by the end of March 2014
Quarterly Reports, minutes and attendance registers
Policy advisory committee and research management team appointed by the end of June 2013
Programme for mapping of cultural industries developed by the end of September 2013
Progress mapping exercise by the end of December 2013
Operational cultural observatory established with the outcomes of the mapping studies by the end of March 2014
10 000(MGE)
Approved framework for cultural statistics
Multi-Disciplinary A framework for cultural statistics to be developed by the end of March 2014
Quarterly Reports, meetings and minutes
Consultant to develop the framework to be appointed by end June 2013
Draft concept and classification framework for cultural statistics developed by the end of September 2013
National consultation on the framework for cultural statistics held by the end of December 2013
Framework on cultural statistics approved by 30 March 2014
700
Annual Performance Plan 2013/201670
International relations
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Number of continental events participated in
Africa and Middle East
Four events Quarterly Submissions and reports
Approval for participation in all four events
2 1 1 5 000
Number of international events participated in
Bilateral Unit Four events Quarterly Submissions and reports
1 1 1 One event and reports
2 000
Number of cultural programmes and activities supported towards servicing of agreements
Bilateral Unit and Africa and Middle East
15 programmes and activities
Quarterly Submissions and reports
3 4 4 4 4 400
Number of meetings and events of regional organisations attended
Bilateral Unit Two meetings and events
Quarterly Submissions and reports
1 1 2 000
Number of continental solidarity and cohesion events participated in
Africa and Middle East
Four continental solidarity and cohesion events
Quarterly Submissions and reports
2 2 Reports on events 4 700
Number of workshops conducted on the Cultural Diversity Convention
Multilaterals and Resourcing
Three workshops Quarterly Submissions and reports
1 1 1 Reports on workshops
800
Cabinet approval and ratification of the Charter for African Cultural Renaissance
Africa and the Middle East
Cabinet approval Quarterly Charter approved First draft of the implementation framework
Cabinet approval for ratification of Charter
Workshop the Charter and the implementation framework
Final report on the workshop
1 500
Annual Performance Plan 2013/201671
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)2013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
DAC Framework on ODA developed and approved
Multilaterals and Resourcing
DAC ODA framework approved
Quarterly Submissions and reports
Consultations Consultations Consultations Approval of the DAC ODA Framework
800
DAC IR policy developed and approved
CDIR Consultation with relevant stakeholders
Quarterly Workshop reports 1 1 1 1 500
World Intellectual Property Organisation (WIPO) treaty on audio-visual performances approved by Cabinet
Multilaterals and Resourcing
Workshop consultations with relevant stakeholders
Quarterly Submissions and reports
1 1 1 Reports on workshops
1 500
Annual Performance Plan 2013/201672
10.2 Resource considerations
Cultural Development
Audited outcome
(R’000)
Adjusted appropriation
(R’000)Medium-term expenditure estimate (R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Subprogrammes
Cultural Development 44 506 21 819 44 330 121 865 182 831 233 553 244 136
Investing in Culture 39 071 88 605 51 523
International Cooperation 35 858 28 439 25 234 37 063 39 065 41 649 43 740
Total 119 435 138 863 121 087 158 928 221 896 275 202 287 876
Economic classification
Current payments 67 303 43 204 57 117 122 354 202 944 255 219 266 974
Compensation of employees 22 402 18 325 25 053 21 714 23 407 24 997 26 509
Goods and services 44 901 24 879 32 064 100 640 179 537 230 222 240 465
Transfers and subsidies 51 536 95 381 63 857 36 063 18 952 19 983 20 902
Non-profit institutions - -
Households 51 536 95 381 63 857 36 063 18 952 19 983 20 902
Payments for capital assets 505 117 110 511 - - -
Machinery and equipment 505 117 110 511 - - -
Payments for financial assets 91 161 3 - - - -
Total 119 435 138 863 121 087 158 928 221 896 275 202 287 876
Annual Performance Plan 2013/201673
10.3 Key risks
PROGRAMME 04 (a)- CuLTuRAL dEVELOPMEnT
APP REF STRATEGIC GOAL STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
CD29 Goal 2- Human Capacity Development
Develop and implement a dedicated academy to support scarce and critical skills in the creative sector
Cycle Time Risk: Similar initiatives or projects run parallel at programme level
1. Consulting firm appointed to draft the Business Plan.
1. Review project deliverables to align to the revised timelines 2. Table and implement approved Business Plan 3. Establish a Board of Directors 4. Register the legal entity ( Nacisa) 5. Appoint and establish a Reference Group 6. Host three (3) Colloquium at Departmental, Sectorial, and Inter-governmental
High
CD28 Goal 1- Job Creation Improve the infrastructure as distribution channels for the creative Industries products
Industry Risk Changes in opportunities and threats, capabilities of competitor, affecting the organization’s industry and long-term viability.
1. Business Plan developed 2. Approved budget and service provider to develop the portal
1. Appoint a service provider that will set up the Portal to be advertised soon.
Medium
CD4 Goal 1- Job Creation Support the implementation of projects aimed at job creation
Alignment Risk Poor alignment by the Provincial government to the Departments objectives and strategies
1. Business Plans solicited and received from Provincial Departments
Position paper to be presented at TIC for approval and define alignment (24 000 000 Touring Venture and R56 000 000 for Cultural Events)
Medium
CD12 Goal 1- Job Creation Support programmes in the cultural industries
Cycle Time and Access Risk Delayed delivery of agreed targets due to external inefficiencies. Lack of access by Department’s stakeholders to external resourced agencies
Draft Stakeholder Engagement and Communication Policy developed
1. Formalize partnerships through Memorandum of Understanding ( e.g DTI) 2. Finalize Stakeholder Engagement and Communication Policy
Medium
CD6 Goal 5-Development, protection, preservation ,promotion of Arts ,Culture heritage
Develop coherent and integrated five year sector-specific strategies and implementation plans aligned to macro-policy interventions
Competition Risk: ( Similar initiatives addressed by other Departments)
1. Reprioritised policy work 2. On-going Consultations with partnering Departments
Partner with other Departments Review of current policies
Medium
Annual Performance Plan 2013/201674
APP REF STRATEGIC GOAL STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
CD30 Goal 5-Development, protection, preservation ,promotion of Arts ,Culture heritage
Develop a coherent and integrated research agenda and knowledge management system
Alignment Risk Failure to align business process objectives with enterprise-wide strategies.
1. Draft Business Plan developed 2. Budget for the Cultural Observatory already approved
1. Appoint the Policy Advisory Committee 2. Appoint the Research Task Team 2.1 Five (5) year Research Agenda to be developed 2.2 Define outputs for Cultural Observatory 3. Table the Business Plan for approval
Medium
CD27 Goal 1- Job Creation Improve the infrastructure as distribution channels for the creative Industries products
Cycle Time Risk
Delayed delivery of the set targets due to inefficiencies.
Business Plan for the Art Bank in place 1. Request City of Johannesburg to transfer or elevate the Provincial Art bank to a National entity
2. Information sessions ( MinMec, TAC, and at Cluster level) to be rolled out
3. Stakeholders Departments to be consulted to support the Artbank
4. Appoint a Task Team for the Artbank
Medium
Annual Performance Plan 2013/201675
PROGRAMME 4 (b) - International Co-operation
APP REF STRATEGIC GOAL STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT INTERNAL CONTROLS PLANNED MITIGATION RISK MAGNITUDE
IR1 Goal 5-Development,
protection,
preservation,
promotion of Arts
,Culture heritage
Building key strategic
relations aimed at exposing
South African arts, culture
and heritage to the
international community
Efficiency Risk:
-Projects planned not fully
implemented.
-Indefinite postponement of
events.
Unspent voted funds
Defer the implementation of projects 1. Re-prioritise events in the continent
and/or defer projects
2. Consult with SA Mission abroad in the
affected country.
Medium
IR3 Goal 1- Job Creation Building key strategic
relations aimed at exposing
South African arts, culture
and heritage to the
international community
Contract Commitment Risk
Delay in signing Programme of
Corporation and Agreements .
Rescheduling signing ceremonies. 1. Engage partners to fast track process
and target multilateral meetings for
signing.
2. Request Foreign representatives
in SA to sign off on behalf of the
government and vice versa
Medium
IR3 Goal 5-Development,
protection,
preservation,
promotion of Arts,
Culture heritage
Building key strategic
relations aimed at exposing
South African arts, culture
and heritage to the
international community
Partnering Risk:
Non servicing of international
agreements/partnerships
Engaging partners on implementing
partnerships.
1. High level official/ Diplomatic
interventions
Medium
IR6 Goal 5-Development,
protection,
preservation,
promotion of Arts,
Culture heritage
Harmonise international and
domestic policies that seeks
to protect and promote Arts,
Culture and Heritage
Cycle Time Risk:
Late submission of the Country
Report to Unesco
Dates for political schedule confirmed
and a revised consultation process with
focus groups finalized
Implementation as per revised schedule Medium
Annual Performance Plan 2013/201676
11. PROGRAMME 5: hERITAGE PROMOTIOn
This programme aims to develop and monitor the implementation of policy, legislation and strategic programmes for the identification, conservation and promotion of cultural
heritage for socio-economic development. The programme supports the following DAC goals:
Goal 1: Job creation
Goal 2: Human capital development
Goal 5: Development, protection, preservation and promotion of arts, culture and heritage
Goal 6: Governance and accountability
Strategic Plan Performance Indicators And Annual Targets
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Governance and accountability
Provide policy leadership for effective and efficient management of South Africa’s heritage and heraldry
Develop national policy and legislative frameworks
National Museums Policy developed and approved by minister and Cabinet
HPRD 1 1 Discussion document developed
- Draft policy developed and costed
Policy approved by minister and Cabinet
National Living Heritage Policy approved by minister and Cabinet
HPRD 2 1 National Living Heritage Policy developed
Draft policy costed
Policy approved by minister and Cabinet
National Policy on Underwater Cultural Heritage approved by minister and Cabinet
HPRD 3 1 National Underwater Cultural Heritage Policy developed
Draft policy costed
Policy approved by minister and Cabinet
Annual Performance Plan 2013/201677
Strategic Plan Performance Indicators And Annual Targets
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
National Policy on the Digitisation of Heritage Resources approved by minister and Cabinet
HPRD 4 1 National Policy on the Digitisation of Heritage Resources developed
Draft policy costed
Policy approved by minister and Cabinet
White Paper on Digitisation of Heritage Resources policy approved by Parliament
National Heritage Human Resources Development Strategy approved by minister and Cabinet
HPRD 5 1 Heritage Human Resources Development Strategy developed
Draft strategy costed
Strategy approved by minister and Cabinet
Cultural Laws Third Amendment Bill promulgated
HPRD 6 1 Cultural Laws Third Amendment Bill developed
Draft Bill Bill enacted into law
Strengthen and support projects in heritage institutions
Number of projects supported
HPRD 7 6 2 2 2 Two projects supported (Costing of the South African Heritage Resources Agency (SAHRA) Act on the Liberation Heritage Route)
Two projects supported (Costing of the SAHRA Act on the Liberation Heritage Route)
Two projects implemented
Two projects implemented
Annual Performance Plan 2013/201678
Strategic Plan Performance Indicators And Annual Targets
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Development, protection, preservation and promotion of arts, culture and heritage
Transform South Africa’s heritage and heraldry landscape through targeted programmes
Develop and implement legacy projects
Number of legacy projects developed
HID 1 9 1 4 2 3 4
Standardise and publish geographical names
Number of Government Gazettes published on geographical names
LH1 9 4 4 3 3 Three Government Gazettes published
Three Government Gazettes published
Three Government Gazettes published
To conduct provincial consultation on the intangible cultural heritage audit
Number of provincial consultation on the intangible cultural heritage audit
LH2 1 0 0 Audit report on the intangible cultural heritage
Concept document and research report finalised
Eight ( 8) provincial workshop held
Compilations of Tentative lists for submission to the UNESCO
Implementation of the National Policy on Living Heritage
Establish strategic partnerships to leverage resources for maximum impact of programmes
Support and strengthen the African World Heritage Fund (AWHF)
Annual financial support and number of programmes supported
HID 2 R1 million paid to the AWHF
R1 million One world heritage programme supported
R1 million One world heritage programme supported
R1 million One world heritage programme supported
Establish strategic partnerships through various collaborative initiatives
Number of joint programmes
HID 3 2 1 1 Interdepart-mental meet-ings for MOU and joint pro-grammes
MOU signed
Two joint programmes developed
One joint programme implemented
One joint programme implemented
Human Capital Development
Build capacity and enhance skills base to strengthen the management of the heritage sector
Award bursaries towards heritage studies
Number of bursaries awarded
HPRD 8 125 (cumulative)
31 65 106 120 125
Annual Performance Plan 2013/201679
Strategic Plan Performance Indicators And Annual Targets
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Development, protection, preservation and promotion of arts, culture and heritage
Promote national identity, nation-building and social cohesion through heritage and heraldry programmes
Host national days and historic events
Number of national days hosted
LH 3 9 3 3 3 3 3 3 3
Number of historic events hosted
LH4 3 1 1 1 1 1 1
Popularise primary national symbols
Number of flags installed
H1 7 500 - - 3 000 3 000 2 500 2 500 2 500
Number of research reports on the recognition levels and knowledge of primary national symbols
H2 1 1
Number of handheld flags distributed
H3 300 000 200 000 400 000 100 000 250 000 100 000 100 000 100 000
Number of workshops on national symbols held
H4 15 14 12 17 7 5 5 5
Annual Performance Plan 2013/201680
Strategic Plan Performance Indicators And Annual Targets
DAC strategic goal
Programme strategic objective
Programme measureable
objective
Programme performance
indicator
Code Three-year target
Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
National Order Award Ceremony coordinated
H5 3 2 1 1 2 1 1 1
Number of exhibitions on national symbols hosted
H6 9 5 4 6 5 3 3 3
Number of heraldic rep-resentations registered
H7 120 35 26 23 32 40 40 40
Number of register drawings painted
H9 120 10 12 12 20 40 40 40
Job creation Create jobs in heritage and heraldry
Create 12 500 indirect temporary jobs in heritage and heraldry by March 2016
Number of job opportunities in heritage and heraldry
.
HP 1 12 500 6 000 6 000 6 000 6 750 4 164 4 167 4 167
Annual Performance Plan 2013/201681
11.1 Operational plan
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
National Museums Policy developed and approved by minister and Cabinet
Heritage Policy Research and Development
Draft policy developed and costed
Quarterly Draft policy and minutes of meetings with panel of experts
Draft policy developed by 30 June 2013
Appointment of a service provider to conduct a cost analysis by 30 September 2013
Costing of Policy completed by 31 December 2013
Draft Policy developed and costed by 31 March 2014
1 230
National Living Heritage Policy approved by minister and Cabinet
Heritage Policy Research and Development
Policy approved by minister and Cabinet
Quarterly Ministerial submission and Cabinet minutes
Policy submitted to minister for approval by 30 June 2013
Policy submitted to Cabinet for approval by 30 September 2013
Presentation of policy to relevant portfolio committees by 31 December 2013
Policy approved by Minister and Cabinet by 31 March 2014
n/a
National Policy on Underwater Cultural Heritage approved by minister and Cabinet
Heritage Policy Research and Development
Policy approved by minister and Cabinet
Quarterly Ministerial submission and Cabinet minutes
Policy submitted to minister for approval by 30 June 2013
Policy submitted to Cabinet for approval by 30 September 2013
Presentation of policy to relevant portfolio committees by 31 December 2013
Policy approved by Minister and Cabinet by 31 March 2014
n/a
National Policy on the Digitisation of Heritage Resources approved by minister and Cabinet
Heritage Policy Research and Development
Policy submitted to Cabinet for approval and presented to the relevant portfolio committees
Quarterly Ministerial submission and Cabinet minutes
Finalisation of Cabinet memorandum by 30 June 2013
Policy submitted to minister for approval by 30 September 2013
Policy submitted to Cabinet for approval by 31 December 2013
Presentation of policy to relevant portfolio committees by 31 March 2014
n/a
Annual Performance Plan 2013/201682
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
National Heritage Human Resources Development Strategy approved by minister and Cabinet
Heritage Policy Research and Development
Strategy submitted to Cabinet for approval and presented to the relevant portfolio committees
Quarterly Ministerial submission and Cabinet minutes
Finalisation of Cabinet memorandum by 30 June 2013
Strategy submitted to minister for approval by 30 September 2013
Strategy submitted to Cabinet for approval by 31 December 2013
Presentation of strategy to relevant portfolio committees by 31 March 2014
n/a
Cultural Laws Third Amendment Bill promulgated
Heritage Policy Research and Development
Bill enacted into law and Cultural Laws Third Amendment Act published in the Government Gazette
Quarterly Cultural Laws Third Amendment Act published in Government Gazette
Research and finalisation of amendments by 30 June 2013
Submission of Bill to the minister and Cabinet for approval by 30 September 2013
Submission of Bill to Parliament for enactment into law by 31 December 2013
Bill enacted into law and Cultural Laws Third Amendment Act gazetted by 31 March 2014
500
Number of projects supported
Heritage Institutional Development
Two programmes (Costing of SAHRA Act completed and approved) Approval of Liberation Heritage Route (LHR) research and costed business plan
Quarterly Reports and minutes of meetings
Sign Service Level Agreement (SLA) with the appointed service provider Monitor performance of the service provider for the SAHRA Act
Facilitate LHR technical committee meeting
Final project report for the SAHRA Act received from service provider
Facilitate of Liberation Heritage Route ( LHR) inter-ministerial committee meeting
Final project report submitted to DAC for approval
Submit LHR for Cabinet approval
Final project report approved by DAC
Cabinet approval obtained for LHR costed business plan
1 000
Number of legacy projects developed
Heritage Institutional Development
Two − OR Tambo and the Union Building Project, which includes the Nelson Mandela statue and the Union Building centenary
Quarterly Photographs, reports, physical structures, minutes of meetings, SLAs and submissions
OR Tambo: approval of plans for the OR Tambo Interpretative Centre
OR Tambo: appointment of the contractor for the OR Tambo Interpretative Centre
OR Tambo: earth works and superstructure completed
OR Tambo: Interpretative Centre completed
63 000
Union Buildings: Mandela Statue − Cabinet memorandum approved and sculptor appointed
Union Buildings: Mandela Statue − wax model completed
Union Buildings: Mandela Statue − casting into bronze
Union Buildings: Mandela Statue − installation
14 000
Centenary: appointment of an events company
Centenary: events plan developed and budget approved
Centenary: appointment of all service providers
Centenary: event held
Budgeted for under Day of Reconciliation
Annual Performance Plan 2013/201683
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of Government Gazettes published on geographical names
Living Heritage Three Government Gazettes published
Quarterly Published Government Gazette
One Government Gazette published
One Government Gazette published
One Government Gazette published
Consolidation of published Government Gazettes for annual report
8 090
Number of provincial consultation held on the intangible cultural heritage audit .
Living Heritage Eight ( 8) provincial workshop held
Quarterly Report on workshops
Provincial Consultation in Limpopo and Mpumalanga
Provincial Consultation in Free- State and North West
Provincial Consultation in KwaZulu Natal and Eastern Cape
Provincial Consultation in Northern Cape and Western Cape
1000
Annual financial support and number of programmes supported
Heritage Institutional Development
R1 million
One world heritage programme supported
Quarterly Allocation letter, publication and submission communicating the DAC evaluation of the strategic plan
Service provider appointed for the publication of the outcomes of the 40th anniversary of the World Heritage Convention
Once-off transfer of R1 million
One world heritage programme supported (approval for 40th anniversary final publication obtained)
Published 40th anniversary report
Distributed to stakeholders
International immunity status for the fund obtained
Review DAC support for the fund and identify areas of continued support
1 000
Number of joint programmes
Heritage Institutional Development
Two joint programmes developed
Quarterly Project plans and minutes of meetings
Intradepartmental meeting convened to identify joint projects and set up DAC steering committee
Interdepartmental meeting to discuss joint projects and set up joint steering committee
Approval for joint projects obtained from the steering committee
Launch of approved joint projects
500
Number of bursaries awarded
Heritage Policy Research and Development
106 Bi-annually MOUs with universities and letters of award to students
Transfer funds to universities by 30 June 2013
Call for bursary applications
Selection interviews for new bursary recipients
Awarding of new bursaries and renewal of existing bursaries by 31 March 2014
4.500
Annual Performance Plan 2013/201684
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
Number of national days hosted
Living Heritage 3 Quarterly Submissions, minutes, steering committee meetings and reports on each commemorative day
Freedom Day celebrated 27 April 2012
Heritage Day celebrated 24 September 2012
Day of Reconciliation celebrated 16 December 2012
2 3000
Number of historic events hosted
Living Heritage 1 Quarterly Submissions, minutes, steering committee meetings and a report on Mandela Day
Mandela Day hosted on 18 July 2013
3 000
Number of flags installed
Heraldry 2 500 Quarterly Installation stubs and project exit report
Initiate the procurement process and appoint service providers
900 900 700 6 000
Number of research reports on the recognition levels and knowledge of primary national symbols
Heraldry 1 Quarterly Signed-off research report and documented research findings
Initiate the procurement process and appoint service providers
Submit the first research project status report
Submit the second research project status report
Submit the research project exit report with findings
500
Number of handheld flags distributed
Heraldry 100 000 Quarterly Records in the heraldry assets book for collections and courier stubs for those sent Letters of request and acknowledgement
30 000 20 000 30 000 20 000 500
Number of workshops on national symbols held
Heraldry 5 Quarterly Workshop reports, invitations and letters of acknowledgement
1 1 2 1 150
Annual Performance Plan 2013/201685
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual target Reporting frequency
Means of verification
Quarterly targets 2013/14 annual budget
(R’000)
2013/142013/14
Q12013/14
Q22013/14
Q32013/14
Q4
National Order Award Ceremony coordinated
Heraldry 1 Quarterly Pproject exit report and visual documentation of the event from Government Communication and Information System (GCIS)
1 500
Number of exhibitions on national symbols hosted
Heraldry 3 Quarterly Project exit reports and letters of acknowledgement
1 1 1 - R200
Number of heraldic representations registered
Heraldry 40 Quarterly Heraldic register 10 10 10 10 50
Number of register drawings painted
Heraldry 40 Quarterly Register drawings 10 10 10 10 30
Number of jobs opportunities in heritage and heraldry
Heritage Promotion 4 164 Quarterly Reports 1 041 2 082 1 041 23 000
Annual Performance Plan 2013/201686
11.2 Resource considerations
Heritage Promotion
Audited outcome (R’000)
Adjusted appropriation
(R’000)
Medium-term expenditure estimate
(R’000)
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Subprogrammes
Promotion of Heritage 52 002 40 139 50 874 65 031 69 283 74 733 78 445
Heritage Institutions 533 140 501 392 382 465 401 404 424 031 450 751 472 075
South African Heritage Resources Agency 33 845 36 204 85 526 41 037 43 666 46 417 48 552
South African Geographical Names Council 5 609 1 849 6 388 7 668 8 090 8 575 8 969
Capital Works of Heritage Institutions 178 656 136 822 165 301 230 075 289 512 305 083 319 117
Total 803 252 716 406 690 554 745 215 834 582 885 559 927 158
Economic classification
Current payments 42 717 30 061 45 879 61 311 64 506 68 694 72 128
Compensation of employees 9 820 9 558 13 510 15 726 16 941 18 277 19 392
Goods and services 32 897 20 503 32 369 45 585 47 565 50 417 52 736
Transfers and subsidies 760 446 686 314 644 581 683 510 770 076 816 865 855 030
Departmental agencies and accounts 745 425 674 194 633 046 672 257 756 936 801 962 839 442
Non-profit institutions 216 232 246 259 273 289 302
Households 14 805 11 888 11 289 10 994 12 867 14 614 15 286
Payments for capital assets 87 31 87 394 - - -
Machinery and equipment 87 31 87 394 - - -
Payments for financial assets 2 - 7 - - - -
Total 803 252 716 406 690 554 745 215 834 582 885 559 927 158
Annual Performance Plan 2013/201687
11.3 Key risk
APP REF STATEGIC GOAL STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
HID1 Goal 5-Development, protection, preservation, promotion of Arts ,Culture heritage
Transform South Africa’s heritage and heraldry landscape
Cycle Time Risk: Extended scope through unplanned projects (additional and complex activities) preventing the delivery of approved projects on time.
1. Re-alignment of project plans to revise Departmental Strategic Goals 2. Terms of Reference already in place for the identification and appointment of service providers
1. Develop long-term plans for legacy projects over the MTEF period 2.Environmental applications need to be completed early on in the project life-cycle.
High
HID2 Goal 5-Development, protection, preservation, promotion of Arts ,Culture heritage
Establish strategic partnerships to leverage resources for maximum impact of programmes
Contract Commitment Risk: DAC not fulfilling its obligation as stated in the agreement with UNESCO
1. A request to National Treasury to assist DAC to meet its obligations has been forwarded 2. Internal support from International Relations in seeking funds
DG to meet to seek funding from other Departments ( Tourism, Basic Education, Environmental Affairs and Treasury and DIRCO) to seek additional financial support
High
LH1 Goal 5-Development, protection, preservation ,promotion of Arts ,Culture heritage
Transform South Africa’s heritage and heraldry landscape
Partnership Risk: Lack of awareness and support of standardisation initiatives from municipalities
1. National workshops conducted for provincial officials responsible for geographical names. 2. Four provinces ( KZN, EC, Gauteng and Limpopo) consultation and capacity building was done
Capacity building and workshops planned for official responsible for geographical names in all municipalities.
High
HP1 Goal 1- Job Creation Create jobs in the heritage and heraldry sector
Measurement Risk: External factors influence the job creation target set
1. Budget with targeted numbers per project already approved
1. Develop a job creation strategy 2. Quarterly monitoring of targets met by each project
High
Annual Performance Plan 2013/201688
12. PROGRAMME 6: nATIOnAL ARChIVES And LIBRARy SERVICES
The aim of this programme is to develop the archival and information resources of South Africa and in so doing to strengthen good governance through full and open access
to such resources. This programme supports the following DAC goals:
Goal 3: Access to information
Goal 5: Development, protection and preservation of arts, culture and heritage
Strategic Plan Performance Indicators And Annual Targets
DAC Strategic
Goal
Programme Strategic Objective
Programme Measureable
Objective
Programme performance
indicator
Code 3 Year Target Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Access to information
Regulate the management of records across the public service
Identify, acquire and preserve records and materials of national significance with enduring value
Number Oral history projects conducted
NA 1 9 Oral history projects conducted by March 2016
3 4 4 3 3 3 3
Number of Library materials purchased by provinces
LPC 1 1 200 000 library purchased by provinces by March 2016
345 194 656 205 343 887 525 000 350 000 400 000450 000
Implement preventive and curative interventions to safeguard archival and library materials
Number of collections inventories compiled
NA 2 3 collections inventories compiled by March 2016
1 2 2 2 1 1 1
Annual Performance Plan 2013/201689
Strategic Plan Performance Indicators And Annual Targets
DAC Strategic
Goal
Programme Strategic Objective
Programme Measureable
Objective
Programme performance
indicator
Code 3 Year Target Baseline Estimated performance
Medium-term targets
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
.
Number of audio-visual formats inventoried
NA 3 1200 audio-visual formats inventoried by 31 March 2016
8802 9310 5524 1500 400 400 400
Promote the existence and use of archival and library resources/services
Number of Archival outreach programmes presented
NA 4 12 Archival Outreach programmes presented by March 2016
4 6 6 6 4 4 4
number of Oral History Conferences workshops/seminars organised
NA 5 3 Oral History Conferences workshops/seminars organised by 31 March 2016
1 1 1 1 1 1 1
Development, protection preservation and promotion of arts, culture and heritage
Provide adequate and modern infrastructure for archives and libraries
Acquire and implement technologies to enhance preservation, promotion and access to archival and library services
National Archives Digitisation strategy approved and implemented
NA 6 National Archives Digitisation strategy approved and implemented by 31 March 2016
- - - - Approved by Act CD/NA Digitisation Strategy by 31 March 2014
1 Digitisation Project Initiated
1 Digitisation Project Implemented
Number of new libraries built
LPC 2 51 new libraries built by March 2016
7 10 13 15 16 17 18
Number of Libraries upgraded
LPC3 135 libraries to be upgraded by 31 March 2016
43 56 51 50 40 45 50
Annual Performance Plan 2013/201690
12.1 Operational plan
Unless, otherwise specified, all the annual targets are due to be completed by the end of the financial year (31 March 2014).
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual Target Reporting Frequency
Means of Verification
Quarterly Targets 2013/14 Annual Budget
R’0002013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Number Oral history projects conducted
National Archives 3 Quarterly Minutes, submissions, reports
- 1 1 1 R 150 000
Number of library materials purchased by provinces
Library Policy and Coordination
350 000 Quarterly Quarterly reports 20 000 40 000 90 000 200 000 Grant funding R60m
Number of collections inventories compiled
National Archives ( Reading Room )
1Inventory Quarterly (progress) Register Progress report on arrangement and description
Progress report on arrangement and description
Progress report on arrangement and description
Completion of 1 Inventory
All work will be done internally and o extra resources will be required
Number of audio visual formats Inventoried
NFVSA 400 Monthly/quarterly/annually
Inventory/Registers 100 100 100 100 All work will be done internally and no extra resources will be required
Number of Archival outreach programmes presented
National Archives ( Repository )
4 Quarterly Minutes, submissions, reports
1 1 1 1 R 848 000
number of Oral History Conference/workshops/seminars organised
National Archives ( Repository )
1 Quarterly Minutes, submissions, reports
Organised planning meeting with the provincial archives, draw venue specifications
Appoint a service provider for the venue
1 Oral History Conference hosted
Conference evaluation and drafting of a conference report
R 804 000
National Archives Digitisation strategy approved and implemented
National Archives ( Preservation )
Strategy Approved and one project initiated
Quarterly Monthly Reports Progress report on the approval process
Completed strategy document
Approval of the National Archives Digitisation strategy by the Act. CD/NA by 31 Dec ember 2013
Implementation of 1 digitisation project by 31 March 2014
l work will be done internally and o extra resources will be required
Number of new libraries built
Library Policy and Coordination
16 Quarterly Quarterly reports 0 0 2 14 Grand Funding R157 156m
Annual Performance Plan 2013/201691
Operational Plan For 2013/14
Programme performance
indicator
Responsible business unit
Annual Target Reporting Frequency
Means of Verification
Quarterly Targets 2013/14 Annual Budget
R’0002013/14
2013/14 Q1
2013/14 Q2
2013/14 Q3
2013/14 Q4
Number of libraries upgraded
Library Policy and Coordination
40 Quarterly Quarterly reports 0 5 10 25 R33 772 m
Annual Performance Plan 2013/201692
12.2 Resource considerations
National Archives and Library Services
Audited outcome
Adjusted appropriation
Medium-term expenditure estimate
R thousand 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Subprogrammes
National Archive Services 51 647 46 271 44 439 50 249 51 813 60 817 64 556
National Library Services 70 448 71 030 87 475 88 503 91 874 107 484 115 995
Community Library Services 440 600 462 445 569 934 564 574 597 786 1 016 210 1 340 562
Capital Works of Libraries - - 20 018 98 350 40 000 50 000 52 300
Total 562 695 579 746 721 866 801 676 781 473 1 234 511 1 573 413
Economic classification
Current payments 47 868 43 995 44 252 49 155 50 374 59 300 62 969
Compensation of employees 27 600 29 181 26 117 31 064 33 190 35 352 37 493
Goods and services 20 268 14 814 18 135 18 091 17 184 23 948 25 476
Transfers and subsidies 512 953 534 139 677 563 751 632 731 099 1 175 211 1 510 444
Provinces and municipalities 440 600 462 445 569 934 564 574 597 786 1 016 210 1 340 562
Departmental agencies and accounts 65 599 65 822 101 706 180 777 125 464 150 689 161 187
Non-profit institutions 4 849 5 208 5 787 6 076 6 410 6 795 7 108
Households 1 905 664 136 205 1 439 1 517 1 587
Payments for capital assets 1 468 1 575 31 889 - - -
Machinery and equipment 1 468 1 575 31 889 - - -
Payments for financial assets 406 37 20 - - - -
Total 562 695 579 746 721 866 801 676 781 473 1 234 511 1 573 413
Annual Performance Plan 2013/201693
12.3 Key risks
APP REF STRATEGIC GOALS STRATEGIC OBJECTIVES RISK CATEGORY AND DESCRIPTION
CURRENT CONTROLS IN PLACE PLANNED MITIGATION RISK MAGNITUDE
NA1 Access to information 1.1 Regulate the management of records across the public service
Customer Wants Risk Inability to accept records transfers from client offices for archival purposes ( including audio visual collections)
1. HVAC (Heating, Ventilation and Air-conditioning -Fires , Security and Shelving)- WCS048495 Project awarded; Old Library Building revamping project 2. Private storage companies are recommended to clients as an interim measure.
1. Usage of upgraded strong-rooms (mobile and compact) 2. Usage the Old Library for storage purposes
High
NA2 Access to information 1.1 Regulate the management of records across the public service
Compliance (Regulatory and other) Risk Lack of proper record keeping practices by Governmental bodies
1. Memorandum of Understanding between AG SA and the National Archives; posting of updated records management manuals and guideline on the revamped Archives website; updated NAAIRS.
1. AGSA to include records management compliance in their audit scope on a National scale. 2. Regulatory requirements to be communicated through NARSA website.
High
NA6 Access to information 1.2 Provide adequate and modern infrastructure for archives and libraries
Technological Innovation Risk Possible delays in the roll out of digitisation at the National Archives
1. A pilot was conducted with the Nelson Mandela Centre for Memory for digitising the Rivonia trial (transfer of skills and training) 2. National Archives Digitisation Strategy developed (draft)
1. Finalise, approve and implement the National Archives Digitisation Strategy 2. Acquire audio-visual and digitisation equipment 3. Submit revised procurement plan for National Archives
High
NA6 Access to information 1.1 Regulate the management of records across the public service
Infrastructure Risk Inadequate IT equipment for capturing and preserving information
1. NAAIRS and Archives website currently being upgraded 2. Task Team ( ( National Archives, ICT, and SITA) established ,Archives and SITA working on new initiatives to implement to implement the new NAAIRS plan.
1. Submit procurement plans of required equipment and systems.
High
LPC2; LPC3 Access to information Provide adequate and modern infrastructure for libraries
Outsourcing Risk
Late appointments of contractors
The DAC facilitates the business plans from all the provinces and monitors timelines and expenditure of the project ( at national level, TIC and Min-Mec)
1. Quarterly learning networks to be conducted with Provinces to improve performance
2. Bilateral with province on specific challenges by province, with the Technical Assistance Unit.
3. Allow 5% of grant funds for capacity building at Provincial level.
4. Conduct an evaluation of all projects and consolidate a report to National Treasury by Jul y each year.
High
Annual Performance Plan 2013/201696
13. COndITIOnAL GRAnTS
Name of Grant Community Library Service Grant
Purpose The purpose of the grant is to transform urban and rural community library infrastructure, facilities and services (primarily targeting
previously disadvantaged communities) through a recapitalized programme at provincial level in support of local government and national
initiatives
Performance Indicator Number of libraries structures established or upgraded;
In the financial period 2011-2012, the community libraries structures were established or upgraded as follows;
13 new libraries as at 30 March 2012
56 existing libraries were upgraded
Number of library material purchased
343 887 library materials purchased
Continuation The grant will be continued during the MTEF period. Provincial allocations for the MTEF have been finalised by National Treasury
Motivation The disparities in service provision across provinces have not yet been addressed. This grant is intended to address backlogs that have
accumulated over the years as a result of past discriminatory practices.
Annual Performance Plan 2013/201697
14. PuBLIC EnTITIES
Name of Public Entity Enabling Legislation Output Budget Allocation
2013/14 (‘000)
Arts Institutions
Artscape Cultural Institutions Act no 119 of 1998 Staging of productions 47 821
Market Theatre Foundation Cultural Institutions Act no 119 of 1998 Staging of productions 26 196
National Arts Council (NAC) National Arts Council Act no 56 of 1997 Grant-making to Artists and Arts Communities 87 554
Performing Arts Centre of the Free State Cultural Institutions Act no 119 of 1998 Staging of productions 35 487
KZN Playhouse Company Cultural Institutions Act no 119 of 1998 Staging of productions 40 570
The South African State Theatre Cultural Institutions Act no 119 of 1998 Staging of productions 42 393
Windybrow Cultural Institutions Act No. 119 of 1998 Staging of productions 10 082
National Film and Video Foundation
National Film and Video Foundation –
Development of local film industry
National Film and Video Foundation
Act No 73 of 1997
Funding for the film and video Industry.
Mandate to spearhead the equitable growth
and development of the South African film and
video industry.
105 223
Heritage Institutions
Die Afrikaanse Taalmuseum – Paarl Constitutional mandates; Legislative
mandates; Cultural Institutions
Act No 119 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
4 963
Freedom Park – Pretoria Constitutional mandates:
Legislative mandates Cultural Institutions
Act No 119 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institutions in its outreach,
educational and public programmes
66 372
Annual Performance Plan 2013/201698
Name of Public Entity Enabling Legislation Output Budget Allocation
2013/14 (‘000)
Iziko Museums - Cape Town Constitutional mandates:
Legislative mandates Cultural Institutions
Act No 1 19 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
61 515
Luthuli Museum – Stanger Constitutional mandates :
Legislative mandates Cultural Institutions
Act No 1 19 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
7 465
KwaZulu-Natal Museum – Pietermaritzburg Constitutional mandates:
Legislative mandates
Cultural Institutions
Act No 1 19 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
16 359
National Heritage Council (NHC) Constitutional mandates:
Legislative mandates National Heritage
Council Act 1999
The core function of the NHC is set out in the
NHC Act. These core functions inform the
day to day operations of the organisation and
will therefore be pre - eminent in the strategic
initiatives and their related objective
52 714
National Museum – Bloemfontein Constitutional mandates:
Legislative mandates Cultural Institutions
Act No 119 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
38 415
Nelson Mandela Museum – Mthatha Constitutional mandates :
Legislative mandates Cultural Institutions
Act No 1 19 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
18 900
Annual Performance Plan 2013/201699
Name of Public Entity Enabling Legislation Output Budget Allocation
2013/14 (‘000)
Robben Island Museum – Cape Town Constitutional mandates :
Legislative mandates Cultural Institutions
Act No 119 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
61 586
South African Heritage
Resources Agency ( SAHRA)
Constitutional mandates :
Legislative mandates National Heritage
Resources Act of 1999
Deliver Heritage Conservation and
Management as legislated
(NHRA, No. 25 of 1999)
Maximise the performance and effectiveness
of SAHRA management and employees
Implement good corporate governance
43 666
The National English Literary
Museum – Grahamstown
Constitutional mandates Legislative mandates
Cultural Institutions Act No 119, 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
8 148
Voortrekker/Msunduzi
Museum – Pietermaritzburg
Constitutional mandates
Legislative mandates Cultural Institutions
Act No 119, 1998.
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
11 236
War Museum of the Boer
Republics – Bloemfontein
Constitutional mandates :
Legislative mandates Cultural Institutions
Act No 119, 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
8 022
William Humphreys Art
Gallery – Kimberly
Constitutional mandates :
Legislative mandates Cultural Institutions
Act No 1 19, 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
5 613
Annual Performance Plan 2013/2016100
Name of Public Entity Enabling Legislation Output Budget Allocation
2013/14 (‘000)
Ditsong Museum – Pretoria Constitutional mandates :
Legislative mandates Cultural Institutions
Act No 1 19 of 1998
Collections, conservation, research of the
collections, design relevant exhibitions, which
will support the institution in its outreach,
educational and public programmes
62 450
Libraries
National Library of South
Africa
National Library of South Africa Act,
Act No. 92 of 1998
The core functions and strategies are
legislated by the Act, i.e. to collect, record,
preserve and make available the national
documentary heritage and to promote an
awareness and appreciation thereof, by
fostering information literacy, and by facilitating
access to the country’s information resources
68 117
South African Library for the Blind The South African Library for the Blind Act,
Act No. 91 of 1998
The core functions and strategies are
legislated by the Act, i.e. to provide a national
library and information service to serve blind
and print-handicapped readers in South Africa,
by collecting, recording, providing access
and bibliographic service to the readers, to
produce documents in Braille and audio and to
preserve this heritage, to research standards
and technology for the production of the
material
15 626
Constitutional Institutions
The Pan South African Language Board
(PANSALB)
Pan South African Language Board
Act No. 59 of 1995
Promote multi-lingualism in South Africa 78 180