Annual Instrument Updates
Annual Instrument Updates
The Support AstronomersW. M. Keck Observatory
2011 February 15
The Support AstronomersW. M. Keck Observatory
2011 February 15
photo © B. Schaefer
2
LRISLRIS
Marc KassisLRIS Red III team: Connie
Rockosi, Chris Lockwood, Mike Peck, David Cowley, Bob Kibrick,
Richard Stover
Marc KassisLRIS Red III team: Connie
Rockosi, Chris Lockwood, Mike Peck, David Cowley, Bob Kibrick,
Richard Stover
33
Commissioned LRIS Red IIICommissioned LRIS Red III
Retains all advantages of the first upgrade
Recovered full FOV for multi-slit and imaging programs
Installation was seamless to observers and the schedule
Red Polarimetry mode available again
Retains all advantages of the first upgrade
Recovered full FOV for multi-slit and imaging programs
Installation was seamless to observers and the schedule
Red Polarimetry mode available again VRI false color image of Stephan’s Quintet
44
PerformancePerformance
M67 open cluster photometric measurements
Instrument throughput with 831 line grating
Release Notes Available on the web
M67 open cluster photometric measurements
Instrument throughput with 831 line grating
Release Notes Available on the web
Filter N-stars ZP-mean 1-sigmaI 16 27.80 0.09V 40 27.86 0.02
5
Throughput Time Evolution
Throughput Time Evolution
5
6
CosmeticsCosmetics Sensitivity is
more uniform than original CCDs
Defect map Hot pixels & Traps
(yellow)
Glue voids
Column channel failures (red)
Sensitivity is more uniform than original CCDs
Defect map Hot pixels & Traps
(yellow)
Glue voids
Column channel failures (red)
77
Minor DisadvantagesMinor Disadvantages Slightly higher
RN Readout time 2
min. vs 1.5 min.
Slightly higher RN
Readout time 2 min. vs 1.5 min.
L-Red Vid 1
Vid 2 Vid 3 Vid 4
I 6.1 6.3
II 4.67 3.79 2.97 3.10
III 4.64 4.76 4.54 4.61
• Red Side Gap 30” (+3”)• Linear to ~38,000 ADU • Long slit on Vid 4
88
2010 Minor Upgrades and Problems
2010 Minor Upgrades and Problems
Blue shutter failed and repaired Blue side compass rose shows correct PA Found and repaired flexure in MAGIQ
offset guider folding mirror mount that contributed to 1” drift over a full rotation.
Released Arc and Flat Calibration Tool – similar to DEIMOS.
“On-demand” IQM focusing in regular use.
Blue shutter failed and repaired Blue side compass rose shows correct PA Found and repaired flexure in MAGIQ
offset guider folding mirror mount that contributed to 1” drift over a full rotation.
Released Arc and Flat Calibration Tool – similar to DEIMOS.
“On-demand” IQM focusing in regular use.
99
Slitmask Alignment ToolSlitmask Alignment Tool
Replaces IRAF/xbox
DEIMOS style guider coarse alignment
More efficient mask alignments
Replaces IRAF/xbox
DEIMOS style guider coarse alignment
More efficient mask alignments
1010
2011 Tasks2011 Tasks Slitmask design software upgrades
Disable pickoff mirrors Depiction of LRIS Red and Blue gaps
Long term monitoring of CTE Manual methods Eventually an IPM task
LRIS Red optimization Improve linearity Work with Lick when LRIS is off sky
Adjust alignment of dichroics (blue) and gratings (red)
MAGIQ “continuous focus” mode
Slitmask design software upgrades Disable pickoff mirrors Depiction of LRIS Red and Blue gaps
Long term monitoring of CTE Manual methods Eventually an IPM task
LRIS Red optimization Improve linearity Work with Lick when LRIS is off sky
Adjust alignment of dichroics (blue) and gratings (red)
MAGIQ “continuous focus” mode
NIRSPECNIRSPEC
Jim LykeJim Lyke
12
NIRSPECNIRSPEC
Mixed year for NIRSPEC Thermal NIRSPAO Guiding drift
Upcoming dewar service Cold head replacement Warm pumping to remove ice Changes to fix drift?
Mixed year for NIRSPEC Thermal NIRSPAO Guiding drift
Upcoming dewar service Cold head replacement Warm pumping to remove ice Changes to fix drift?
13
Thermal NIRSPAOThermal NIRSPAO
Multiple reads Lower readnoise
Higher contrast Stable PSF
Multiple reads Lower readnoise
Higher contrast Stable PSF
Lower throughput Smaller pixels Fringing
Lower throughput Smaller pixels Fringing
14
NIRSPAONIRSPAO
Point source sensitivity M-band: ~1.5x higher than NIRSPEC L-band: ~1.8x lower than NIRSPEC
Lifting the campaign mode restriction
Thanks to G. Blake and team for analysis
Point source sensitivity M-band: ~1.5x higher than NIRSPEC L-band: ~1.8x lower than NIRSPEC
Lifting the campaign mode restriction
Thanks to G. Blake and team for analysis
15
NIRSPEC DriftNIRSPEC Drift
Drift of order 1.5”/hr PA mode, annular guider
Direction change with PA Same source, same night
30 min @ PA=3 22 min @ PA=93
Top: Y elongation Bottom: X elongation
4-5 pixels in 30 minutes 0.7–0.9 arcseconds
Larger than historic guiding/nodding issues Wait4center Slitnod widget
Drift of order 1.5”/hr PA mode, annular guider
Direction change with PA Same source, same night
30 min @ PA=3 22 min @ PA=93
Top: Y elongation Bottom: X elongation
4-5 pixels in 30 minutes 0.7–0.9 arcseconds
Larger than historic guiding/nodding issues Wait4center Slitnod widget
Star Centroids: PA=3
-5
-4
-3
-2
-1
0
1
2
3
4
-4 -3 -2 -1 0 1 2 3 4 5 6
SCAM X (pix)
SCAM Y (pix)
Star1
Star2
Star3
Star4
Star5
Star6
Star Centroids: PA=3
-5
-4
-3
-2
-1
0
1
2
3
4
-4 -3 -2 -1 0 1 2 3 4 5 6
SCAM X (pix)
SCAM Y (pix)
Star1
Star2
Star3
Star4
Star5
Star6
Star Centroids: PA=93
-5
-4
-3
-2
-1
0
1
2
3
4
-4 -3 -2 -1 0 1 2 3 4 5 6
SCAM X (pix)
SCAM Y (pix)
Star1
Star2
Star3
Star4
Star5
Star Centroids: PA=93
-5
-4
-3
-2
-1
0
1
2
3
4
-4 -3 -2 -1 0 1 2 3 4 5 6
SCAM X (pix)
SCAM Y (pix)
Star1
Star2
Star3
Star4
Star5
16
Drift InvestigationDrift Investigation
High Observatory priority Tiger Team formed to investigate Tested and cleared:
Telescope Az/El drives Guiding centroiding Gross pointing model
Tested and likely cleared: Pointing origins Rotator alignment to slit Field rotation on annular guider
Still possible issues: Rotator mechanism: slippage? flexure? Rotational alignment of annular guider
May affect large offsets
High Observatory priority Tiger Team formed to investigate Tested and cleared:
Telescope Az/El drives Guiding centroiding Gross pointing model
Tested and likely cleared: Pointing origins Rotator alignment to slit Field rotation on annular guider
Still possible issues: Rotator mechanism: slippage? flexure? Rotational alignment of annular guider
May affect large offsets
17
Data GatheringData Gathering
Tools by S. Kwok
18
NIRSPEC ServiceNIRSPEC Service
Planned 11B service mission Replace cold heads (preventative) Warm pumping to remove ice
Last replaced in 2005 after 6–7 years, and evidence of degradation in performance.
Cold heads run flat out, no margin if performance declines
Planned 11B service mission Replace cold heads (preventative) Warm pumping to remove ice
Last replaced in 2005 after 6–7 years, and evidence of degradation in performance.
Cold heads run flat out, no margin if performance declines
OSIRISOSIRIS
Jim LykeJim Lyke
20
OSIRISOSIRIS
DRP v2.3 released; fewer “bad spaxels.”
OSIRIS is fully calibrated Re-cal needed after K1 move
Deployed a faster DRP machine Grating upgrade waiting on results of
ATI grant
DRP v2.3 released; fewer “bad spaxels.”
OSIRIS is fully calibrated Re-cal needed after K1 move
Deployed a faster DRP machine Grating upgrade waiting on results of
ATI grant
NIRC2NIRC2
Hien TranHien Tran
22
Time Lost to Faults(A good year for NIRC2)
Time Lost to Faults(A good year for NIRC2)
• ~1 hour time lost in 77 nights• < 0.2% of total time
• ~1 hour time lost in 77 nights• < 0.2% of total time
23
Service MissionService Mission
• All filters, including L and Y, in hand • Wollaston Prism not yet available; awaiting results of
ATI proposal• Scheduled for 2011B to install the filters only
• No polarimeter upgrade• ~ 5-week downtime in Sep–Oct• Factor in Galactic Center season, OSIRIS K1
move, MOSFIRE commissioning
• All filters, including L and Y, in hand • Wollaston Prism not yet available; awaiting results of
ATI proposal• Scheduled for 2011B to install the filters only
• No polarimeter upgrade• ~ 5-week downtime in Sep–Oct• Factor in Galactic Center season, OSIRIS K1
move, MOSFIRE commissioning
24
Efficiency ImprovementEfficiency Improvement• NIRC2 data acquisition scripts modified
• Reduce delays due to status checks • Telescope move parallel with data writing to disk
• Example: 25 sec saved for a bxy3 pattern• 15–45 min per night (5%–15% science time)
• “Side effects”: server crash ~ 1–2 times per night• Recovery takes ~5 min• Investigation ongoing• Scripts released to simplify recovery and reversion
• New scripts released on a shared-risk basis• Documentation/trouble-shooting page updated, SAs
trained• quicklook modified to handle faster image outputs
• NIRC2 data acquisition scripts modified• Reduce delays due to status checks • Telescope move parallel with data writing to disk
• Example: 25 sec saved for a bxy3 pattern• 15–45 min per night (5%–15% science time)
• “Side effects”: server crash ~ 1–2 times per night• Recovery takes ~5 min• Investigation ongoing• Scripts released to simplify recovery and reversion
• New scripts released on a shared-risk basis• Documentation/trouble-shooting page updated, SAs
trained• quicklook modified to handle faster image outputs
HIRESHIRES
Scott DahmScott Dahm
26
Current HIRES DemandCurrent HIRES Demand
HIRES use statistics: 2010
158 nights (144 HIRESr / 14 HIRESb) 126 nights (81%) exoplanet searches
2011 (Jan - Jul) 102 nights (88 HIRESr / 14 HIRESb) 60 nights (59%) exoplanet searches
HIRES use statistics: 2010
158 nights (144 HIRESr / 14 HIRESb) 126 nights (81%) exoplanet searches
2011 (Jan - Jul) 102 nights (88 HIRESr / 14 HIRESb) 60 nights (59%) exoplanet searches
27
HIRES UpdateHIRES Update JUL 2010: CCD Controller #1 could not pass diagnostics following power outage on the summit. Restored after reseating all boards and cables. SEP 2010: Successful test of the PSF Scrambler prototype designed and constructed by D. Fischer (Yale) and J. Spronck (Yale).
28
HIRES Future PlansHIRES Future Plans
Server upgrade April 2011
MAGIQ slit-viewing guide camera upgrade late summer 2011
New scrambler prototype
Server upgrade April 2011
MAGIQ slit-viewing guide camera upgrade late summer 2011
New scrambler prototype
ESIESI
Greg WirthGreg Wirth
30
ESI Current StatusESI Current Status
• ESI systems working well overall
• All mechanical stages fine
• Integral Field Unit is performing well and being used
Semester
Nights
2008B 5
2009A 4
2009B 3 (+1 eng)
2010A 7
2010B 13
2011A 8
ESI Usage
DEIMOSDEIMOS
Greg WirthGreg Wirth
32
DEIMOS Current StatusDEIMOS Current Status
DEIMOS continues to perform well overall
No significant operational problems
Effort planned with UCO/Lick on upgrading computers and FCS (flexure compensation system) software
33
Throughput ComparisonThroughput Comparison
LRIS >2x as efficient as DEIMOS at 1μ
LRIS vs. DEIMOS ThroughputG191B2B observed with 830 l/mm gratings
34
AO OperationsAO Operations
Randy CampbellRandy Campbell
3535
AO Ops HighlightsAO Ops Highlights
MLOG, First-on-target progress
Kramer (NSF) report on U.S. Strategic Command coordination
Efficiency improvements Laser pointing improvements EPICS upgrade Aircraft detection: TBAD, ASCAM
MLOG, First-on-target progress
Kramer (NSF) report on U.S. Strategic Command coordination
Efficiency improvements Laser pointing improvements EPICS upgrade Aircraft detection: TBAD, ASCAM
36
TBAD Installed on the Keck Roof
TBAD Installed on the Keck Roof
Tom Murphy Bill ColesUCSD
TBADTBAD
37
6 Year LGSAO Averages6 Year LGSAO Averages
3838
TrendsTrends
3939
Trends, Faults OnlyTrends, Faults Only
HoursPer Night
4040
Science EfficiencyScience Efficiency
HoursPer Night
41
Weather loss by monthWeather loss by month
42
2011 Priorities2011 Priorities
K1LGS Science operations Efficiency Improvements Personnel issues
Train new Laser Tech, and replace Laser Engineer Critical for 2 lasers
AO Support Astronomer Misc problem solving, minor
improvements (punch list) SC Reboot, loops slow to close, UTT CLMP,
focus jumps, etc. K2 laser dye replacement TBAD (and ASCAM?) MLOG
K1LGS Science operations Efficiency Improvements Personnel issues
Train new Laser Tech, and replace Laser Engineer Critical for 2 lasers
AO Support Astronomer Misc problem solving, minor
improvements (punch list) SC Reboot, loops slow to close, UTT CLMP,
focus jumps, etc. K2 laser dye replacement TBAD (and ASCAM?) MLOG
Keck Observatory ArchiveKeck Observatory Archive
Hien TranHien Tran
44
KOA StatusKOA Status NIRSPEC data released (May 2010) Dedicated user interface for PIs
released (right) Listing of all available data in the
archive One-click download of each night’s
data Interface for selecting officials
(SOs) released NIRC2 feasibility study completed NIRC2 MOU signed New user survey completed Over 5 TB download
Eight refereed papers
NIRSPEC data released (May 2010) Dedicated user interface for PIs
released (right) Listing of all available data in the
archive One-click download of each night’s
data Interface for selecting officials
(SOs) released NIRC2 feasibility study completed NIRC2 MOU signed New user survey completed Over 5 TB download
Eight refereed papers
45
KOA Future PlansKOA Future Plans NIRC2 data release (spring 2012; includes level 1 for imaging)
Extracted spectra for NIRSPEC data
Interactive return page that allows sorting and paging of query
results
New weather data CFHT skyprobe
UH All-sky cam
MASS/DIMM
Split-night GUI; also for
ToO programs.
NIRC2 data release (spring 2012; includes level 1 for imaging)
Extracted spectra for NIRSPEC data
Interactive return page that allows sorting and paging of query
results
New weather data CFHT skyprobe
UH All-sky cam
MASS/DIMM
Split-night GUI; also for
ToO programs.
Mainland ObservingMainland Observing
Greg WirthGreg Wirth
47
Mainland Observing StatusMainland Observing Status
Usage continues to be strong
Yale added as first east-coast site
Switch to full-time VNC operation
Usage continues to be strong
Yale added as first east-coast site
Switch to full-time VNC operation
48
Process ImprovementsProcess Improvements
Web form for improved handling of mainland observing requests
Advisory committee held BOF session in conjunction with 2010 KSM; suggestions are being adopted
Web form for improved handling of mainland observing requests
Advisory committee held BOF session in conjunction with 2010 KSM; suggestions are being adopted
ManagementManagement
Bob GoodrichBob Goodrich
50
Personnel ChangesPersonnel Changes
Grant Hill, transition to Summit Lead Al Conrad departed. Hien Tran, new NIRC2 Instrument
Master Recruiting two replacements;
excellent group of applicants. Fourth Night Attendant hired,
Rodney Eisenhour.
Grant Hill, transition to Summit Lead Al Conrad departed. Hien Tran, new NIRC2 Instrument
Master Recruiting two replacements;
excellent group of applicants. Fourth Night Attendant hired,
Rodney Eisenhour.
51
All VNC All The TimeAll VNC All The Time
Now running instrument software under VNC every night.
Allows for mainland eavesdrops or control.
Better troubleshooting, training. ToOs from mainland sites have
nearly instantaneous access to running software.
Now running instrument software under VNC every night.
Allows for mainland eavesdrops or control.
Better troubleshooting, training. ToOs from mainland sites have
nearly instantaneous access to running software.