Annexxure of Pp Module - Benefits

3
Annexxure-I The List of Production Documents & usage of Pre-Printed forms with cost are listed with following table. I. Stationery for each sale order requirement.. Production documents Paper Cost per Sale order Sl . Name of the Documents Forms used No.of pages/Sa le order (approx. ) No.of copies PL No. Unit Pric e (Rs. ) Total cost (Rs.) 1 List of Part (LOP) Paper list of parts 37x25 cms. 75-100 4 sets 83059829 1.18 472.00 2 Assembly LOP 75-100 4 sets 472.00 3 Retain for certificatio n (RFC) Computer paper 15 x 12 (2 ply) 350-400 4 set 83048443 1.09 1744.00 4 Job pass through 250-300 4 set 1.09 1308.00 5 Product structure list Single ply 38.50x31c m 40-50 1 set 83048601 0.46 23.00 Total stationery cost per Sale order 4019.0 0 II. Stationery Annual requirement for sale orders… No. of sale orders per year (approx.) Stationery Cost per sale order (Rs) Total Stationery Cost per year (Rs) 65-70 4019.00 2,81,330.00 (Excluding the cost of Computer peripherals and Human resources)

description

Annexure of SAP PP module

Transcript of Annexxure of Pp Module - Benefits

Page 1: Annexxure of Pp Module - Benefits

Annexxure-I

The List of Production Documents & usage of Pre-Printed forms with cost are listed with following table.

I. Stationery for each sale order requirement..

Production documents Paper Cost per Sale orderSl. Name of the

DocumentsForms used No.of

pages/Sale order (approx.)

No.of copies

PL No. Unit Price (Rs.)

Total cost (Rs.)

1List of Part (LOP) Paper list of

parts 37x25 cms.

75-100 4 sets83059829 1.18

472.00

2 Assembly LOP 75-100 4 sets 472.00

3Retain for certification (RFC)

Computer paper 15 x 12 (2 ply)

350-400 4 set

83048443

1.09 1744.00

4Job pass through

250-300 4 set 1.09 1308.00

5Product structure list

Single ply 38.50x31cm

40-50 1 set 83048601 0.46 23.00

Total stationery cost per Sale order 4019.00

II. Stationery Annual requirement for sale orders…

No. of sale orders per year (approx.)

Stationery Cost per sale order (Rs)

Total Stationery Cost per year (Rs)

65-70 4019.00 2,81,330.00

(Excluding the cost of Computer peripherals and Human resources)

Ref: MFPL/151, dt-24.02.2015

Page 2: Annexxure of Pp Module - Benefits

Integral Coach Factory

Chennai- 600038

MFPL/151 Office of the CWE/Fur

15.04.2015

Sr.EDPM / IT centre

Sub: Elimination of Printouts of Production documents viz, List of parts, Retain for certifications, Job pass through, Product structure list –Reg.

Ref: 1. Note No. MFPL/151, Dated-24.02.2015. (copy enclosed&soft copy available at-Railnet-Dept-Mech-Processplg/F-

Plgmechgroups-SAPadmin1-ITcentre.)

With reference to the above, the following Production documents such as List of parts (LOP), Assembly LOP, Retain for certifications (RFC), Job pass through (JPT) and Product structure list (PSL), Scroll sheet, (operation list-work centre wise, shop wise & Plant wise), (other than RC & JC) for Furnishing division are not required to be printed from April-2015 onwards.

This has the approval of the Competent Authority.

Note: 1.The above documents may be printed and sent to the concerned, whenever request raised from user’s department.( request thro’ their ERP-login)

2.The above documents may please be uploaded in Railnet-PP module area-whenever the sale order on release for viewed by user dept.

Dy.CME/F-II

Copy/- GM, CME, FA&CAO, GM/Cris-for Very kind information please.

Page 3: Annexxure of Pp Module - Benefits

DY.CME/F-I, Dy.CEE/P, Dy.CME/Plg&IE- for kind information pl..Sr.AFA/Costing/Shell-for kind information pl..

WM/A/F,WM/Pain/F,SME/Mrvs/F-for information. PE/PL/F,PE/PR/F,AWM/A/F,AEE/F,-for information