1 Annexure Form-2 APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE 1 Details of Project a. Name of the Project (s) Common Effluent Treatment Plant for Ajrakhpur Block Printing Cluster. b. Name of the Company / Organization Ajrakhpur Hastkala Vikas Sangathan (AHVS) c. Registered Address Common Effluent Treatment Plant, Ajrakhpur Block Printing Cluster. Common Plot No 1 of Survey No. 694 of Paddhar- Ajrakhpur Village d. Legal Status of the Company The land falls in the industrial area and the proposed project site is earmarked for CETP. e. Joint Venture (Yes/No) No If Yes, - (i) No. of JV Partners (Multiple Entries Allowed) - Name of the JV Partner Share of the JV Partner Address of the JV Partner Email Id of JV Partner Mobile No. of JV Partner 2 Address for the correspondence a Name of the applicant Dr. Ismail Mohmed Khatri b Designation (Owner / Partner / CEO) President c. Address Common Plot No 1 of Survey No. 694 of Paddhar- Ajrakhpur Village d Pin code 370105 e e-mail [email protected] f. Telephone No. +91-9925169313 g. Fax No. 0091 2832 269786 3 Category of the Project/Activity as per Schedule of EIA Notification,2006 a. Project / Activity [1(a)(i) / 1(a)(ii) / 1(b) / 1(c) / 1(d) / 1 (e) / 2(a) / 2(b) / 3(a) / 3(b) / 4(a) / 4(b)(i)/ 4(b) (ii) / 4(c) / 4(d) / 4(e) / 4(f) / 5(a) / 5(b) / 5(c) / 5(d) / 5(e) / 5(f) / 5(g) / 5(h) / 5(i) / 5(j) / 6(a) / 6(b) / 7(a) / 7(b)/ 7 (c) / 7 (d) / 7 (da) / 7 (e) / 7 (f) / 7 (g) / 7 (h) / 7 (i) / 8 (a) / 8 (b) 7(h) b. Category (A/B1/B2) B If B1 or B2 -

Transcript of Annexure Form-2 APPLICATION FOR PRIOR …€¦ · 5 SPCB / UTPCC from which certified report on...

1

AnnexureForm-2

APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE

1 Details of Projecta. Name of the Project (s) Common Effluent Treatment Plant for

Ajrakhpur Block Printing Cluster.b. Name of the Company / Organization Ajrakhpur Hastkala Vikas Sangathan (AHVS)c. Registered Address Common Effluent Treatment Plant, Ajrakhpur

Block Printing Cluster.Common Plot No 1 of Survey No. 694 ofPaddhar- Ajrakhpur Village

d. Legal Status of the Company The land falls in the industrial area and theproposed project site is earmarked for CETP.

e. Joint Venture (Yes/No) NoIf Yes, -(i) No. of JV Partners (Multiple EntriesAllowed)

-

Name of the JVPartner

Share of the JVPartner

Address of theJV Partner

Email Id ofJV Partner

Mobile No. ofJV Partner

2 Address for the correspondencea Name of the applicant Dr. Ismail Mohmed Khatrib Designation (Owner / Partner / CEO) President

c. Address Common Plot No 1 of Survey No. 694 of

Paddhar- Ajrakhpur Village

d Pin code 370105

e e-mail [email protected]

f. Telephone No. +91-9925169313

g. Fax No. 0091 2832 2697863 Category of the Project/Activity as per Schedule of EIA Notification,2006

a. Project / Activity[1(a)(i) / 1(a)(ii) / 1(b) / 1(c) / 1(d) / 1 (e) /2(a) / 2(b) / 3(a) / 3(b) / 4(a) / 4(b)(i)/ 4(b)(ii) / 4(c) / 4(d) / 4(e) / 4(f) / 5(a) / 5(b) /5(c) / 5(d) / 5(e) / 5(f) / 5(g) / 5(h) / 5(i) /5(j) / 6(a) / 6(b) / 7(a) / 7(b)/ 7 (c) / 7 (d) /7 (da) / 7 (e) / 7 (f) / 7 (g) / 7 (h) / 7 (i) / 8(a) / 8 (b)

7(h)

b. Category (A/B1/B2) BIf B1 or B2 -

2

Reason for application at Central Level /State level (in case of B2 projects)If Others NA

c. Please Specify -d. EAC concerned (for category A Projects

only)(Coal Mining / Non-coal Mining / Thermal/ River Valley & Hydro / Industry-I /Industry-II / Infrastructure-I /Infrastructure-II / Nuclear & Defence /CRZ

Infrastructure-I

e. New / Expansion /Modernization / OneTime Capacity expansion (only for CoalMining) / Expansion under Para 7(ii) /Modernization under Para 7(ii) / Change ofProduct Mix under Para 7(ii))

New

4 Location of the Projecta. Plot / Survey / Khasra No. Common Plot No 1 of Survey No. 694 of

Paddhar- Ajrakhpur Village

b. Village Ajrakhpur

c. Tehsil Bhuj

d. District Kutch

e. State Gujarat

f. Pin Code 370105

g. Bounded Latitudes (North)From 23°13'53.11"NTo

h. Bounded Longitudes (East) 69°47'41.35"EFromTo

i. Survey of India Topo Sheet No. F42D16j. Upload Topo Sheet File (Upload pdf only) Uploaded with EIA Reportk. Maximum Elevation Above Means Sea

Level (AMSL)114 m amsl

l. Upload (kml) File (Upload kml only) Uploaded with EC applicationm. Distance of Nearest HFL from the project

boundary within the study arean. Seismic Zone (Zone: 1 / 2 / 3 / 4 / 5) 5

5 Whether project is executed in multiple States(Yes / No)?

No

If Yes

3

a. Number of States in which Project will beExecuted(e.g. 1,2,3,4,5,6)

1

b. Main State of the Project Gujaratc. Other State (Multiple Entries Allowed)

(If the project to be executed, does notbelong to any state, then state categorycould be selected as 'Other')

-

State District Tehsil Village- - - -

6 Details of Terms of Reference (ToR)a. Whether ToR is mandatory for submitting

application (Yes / No)?Yes

If Yes -b. Date of issue of ToR / Standard ToR 19.07.2017c. MoEF & CC / SEIAA File No. File no. SIA/GJ/73507/2017

Proposal No. SIA/GJ/MIS/19556/2017

d. Upload ToR letter (PDF only) Submitted with EIA report on Pg. no.XIII.7 Details of Public Consultation

a. Whether the Project Exempted from PublicHearing (Yes/No)?

No

If yes,Reason

b. Supporting Document (upload pdf only)c. Whether details of Public Hearing

available (Yes/No)?Yes

If No, -d. Reason thereof -

Supporting Document (upload pdf only) Submitted with EIA report asAnnexure –X

If Yes,e. Date of Advertisement of Public Hearing 6.04.2018f. Copy of advertisement in English (Upload

PDF only)Attached as Annexure 1 with this form

g. Whether Public hearing was presided overby an officer of the rank of AdditionalDistrict Magistrate or above (Yes/No)?

Yes

If yesh. Designation of Presiding Officer (District

Magistrate / District Collector / DeputyCommissioner / others - please specify)

Shri D.R. Patel, G.A.S., AdditionalDistrict Magistrate and AdditionalDistrict Collector

i. Copy of duly signed Proceedings of PublicHearing in English (Upload pdf only)

Attached as Annexure X

j. Date of Public Hearing 8.05.18

4

k. Venue of Public Hearing:

Village Ajrakhpur

Tehsil Bhuj

District Kutch

State Gujarat

l. Distance of Public Hearing Venue from theProposed Project (km)

At the site

m. No. of people attended 99

n. If the multiple public hearings conducted

Pl give the details of each PH as per (e) to(o) above

8 Details of Project Configuration / Product (Multiple Entries Allowed)

a. Whether the project is New (Yes/No?) Yes

If yes, -

b. Project Configuration -

Plant / Equipment / Facility Configuration Remarks if anyCommon effluent treatment plant 150 KLD -

c. Product :

Product / Activity(Capacity /

Area)

Quantity Unit Mode of Transport /Transmission of Product

Total Plot area is1102.5 Sq. m.

Proposed CETP havingcapacity 150KLD

KLD Conveyance Pipeline system

- Unit:- (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per Day(KLD),Tons Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km), Million Liters perDay(MLD), Others)

- Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, Pipe Conveyor,

Arial Ropeway, combination of two or three modes, Others)9 If Expansion / Modernisation / One Time Capacity expansion (only for Coal Mining) /

Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mixunder Clause 7(ii)))a. Details of environmental clearance granted

earlier(i) Date of issue of environmental

clearance(ii) MoEFCC / SEIAA File Number

(iii) Upload EC Letter

b. Details of certified report on compliance ofearlier environmental clearance conditions

-

(i) Details of Regional Office ofMoEFCC / Zonal Office of CPCB /

5

SPCB / UTPCC from whichcertified report on compliance ofearlier environmental clearanceconditions obtained

(ii) Letter No

(iii) Status of Compliance

(iv) Certified report on compliance ofearlier environmental clearanceconditions (Including MonitoringReport) (Upload pdf only)

(v) Date of site visit -

c. Details of Consent to Operate -

(i) Whether Consent to operateobtained (Yes/No)?

-

If yes, -

(ii) Upload Copies of all Consent tooperate obtained since inception(Upload pdf only)

-

(iii) Date of issue -

(iv) Valid up to -

(v) File No. -

(vi) Application No. -

(vii) Upload Copy of Consent to operatevalid as on date (Upload pdf only)

-

d. Details of Capacity Expansion (MultipleEntries Allowed)

-

Product/Activity(Capacity/Area)

Quantity From Quantity To Unit Mode of Transport/ Transmission of

Product- - - - -

- Unit:- (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre perDay(KLD), Tons Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km),Million Liters per Day(MLD), Others)

- Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, Pipe

Conveyor, Arial Ropeway,combination of two or three modes, Others)e. Details of Configuration (Multiple Entries Allowed)

Plant / Equipment /Facility

ExistingConfiguration

ProposedConfiguration

Finalconfiguration

after expansion

Remarks ifany

10 Project Cost

6

a. Total Cost of the Project at current pricelevel (in Lakhs)

1.46 cr

b. Funds Allocated for EnvironmentManagement (Capital) (in Lakhs)

Capital Cost is 11 Lakhs

c. Funds Allocated Towards ESC(Entrepreneur Social Responsibility) (inLakhs)

d. Funds Allocated for EnvironmentManagement Plan (EMP) (Recurring perAnnum) (in Lakhs)

3 lac per Year is operating Cost

11 Whether project attracts the GeneralCondition specified in the Schedule of EIANotification (Yes/No)? [provide name ofWL/CPA/ESA/Inter-state boundary /International boundary and distance from theproject

No

If Yes

a. Protected Area Notified Under the WildLife(Protection) Act,1972

No

b. Critically Polluted Areas as identified bythe Central Pollution Control Board fromTime to Time

No

c. Notified Eco-Sensitive Areas No

d. Inter-State Boundaries and InternationalBoundaries

No

12 Whether projects attract the SpecificCondition specified in the Schedule of EIANotification (Yes/No)?

-

If Yes

a. If any Industrial Estate/Complex / Exportprocessing Zones /Special EconomicZones/Biotech Parks / Leather Complexwith homogeneous type of industries suchas Items 4(d), 4(f), 5(e), 5(f), or thoseIndustrial estates with pre-defined set ofactivities (not necessarily homogeneous,obtains prior environmental clearance,individual industries including proposedindustrial housing within such estates/complexes will not be required to takeprior environmental clearance, so long asthe Terms and Conditions for the industrialestate/complex are complied with (Suchestates/complexes must have a clearlyidentified management with the legal

No

7

responsibility of ensuring adherence to theTerms and Conditions of priorenvironmental clearance, who may be heldresponsible for violation of the samethroughout the life of the complex/estate

13 Raw Material / Fuel Requirement (Multiple Entries Allowed)

a. Details of Raw Material / Fuel Requirement

RawMaterial /

Fuel

Quantityper Annum

Unit Source(incase of

Import,pleasespecifycountry

and Nameof the portfrom which

RawMaterial /

Fuel isreceived)

Mode ofTransport

Distance ofSource from

Project Site (inKilo meters)(In case of

import, distancefrom the port

from which theraw material /

fuel is received

Type ofLinkage

(Linkage /Fuel

SupplyAgreement/ e-auction

/ MoU /LOA /

Captive /Open

market /Others)

Lime 2.250

Ferrous

sulphate

1.35

Poly

Electrolyte

0.0045

Other

chemicals

2.250

In case of expansion proposals, total requirement of raw material / fuel shall be given- Unit:- (Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre per Day(KLD),

Tons Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km), Million Liters perDay(MLD), Others)

- Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, Pipe Conveyor,

Arial Ropeway, combination of two or three modes, Others)b. Upload copy of Linkage / Fuel Supply

Agreement / e-auction / Memorandum ofUnderstanding / Letter of Allocation /Captive source / others.

:

14 Baseline Data (Air / Water / Noise / Soil / Ground water table/ Others)

a. Period of Base Line Data Collection Mid Sept 2017 – Mid Dec 2017

From (DD/MM/YYYY) Mid Oct 2016

To (DD/MM/YYYY) Mid Dec 2016

8

b. Season (Summer / Pre-monsoon / Post-monsoon / Winter)

Post-monsoon

c. No. of Ambient Air Quality (AAQ)Monitoring Locations

8 locations

d. Details of AAQ Monitoring (Multiple Entries Allowed)

Location detail Ambient Air Quality Data A-1 (Project Site)

Particulars PM 2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 25.45 60.95 11.27 8.02 4.18 BDL BDL

Maximum 27.86 69.75 13.42 9.89 6.34 BDL BDL

98 Percentile 27.79 69.75 13.35 9.78 6.3 BDL BDL

Average 26.86 65.15 12.48 8.76 5.42 BDL BDL

Location detail Ambient Air Quality Data A-2 (Padhar)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 24.08 63.83 10.09 7.25 3.39 BDL BDL

Maximum 28.24 69.02 13.43 9.76 5.83 BDL BDL

98 Percentile 28.08 69.01 13.21 9.76 5.79 BDL BDL

Average 26.34 67.33 11.68 8.79 4.7 BDL BDL

Location detail Ambient Air Quality Data A-3 (Kukma)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 17.2 49.11 8.55 6.37 4.18 BDL BDL

Maximum 21.86 66.02 11.13 8.39 6.41 BDL BDL

98 Percentile 21.8 65.28 11.01 8.37 6.38 BDL BDL

Average 19.53 57.68 10.17 7.44 5.43 BDL BDL

Location detail Ambient Air Quality Data A-4 (Reldi Moti)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 18.32 57.95 8.46 6.38 4.01 BDL BDL

Maximum 22.09 65.85 10.7 8.39 6.05 BDL BDL

98 Percentile 21.89 65.8 10.66 8.34 5.98 BDL BDL

Average 20.15 62.25 9.45 7.54 5.06 BDL BDL

Location detail Ambient Air Quality Data A-5 (Lakhond)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 20.39 60.15 10.09 7.37 3.48 BDL BDL

9

Maximum 25.1 70.95 12.48 9.39 5.9 BDL BDL

98 Percentile 25.04 70.74 12.41 9.38 5.83 BDL BDL

Average 22.97 66.61 11.37 8.38 4.74 BDL BDL

Location detail Ambient Air Quality Data A-6 (Bhujodi)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 19.14 60.24 9.55 7.16 4.58 BDL BDL

Maximum 25.94 70.79 12.57 9.49 7.35 BDL BDL

98 Percentile 25.7 70.72 12.5 9.43 6.71 BDL BDL

Average 23.01 67.74 11.25 8.55 5.08 BDL BDL

Location detail Ambient Air Quality Data A-7 (Ler)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 25.39 63.19 13.1 8.27 4.45 BDL BDL

Maximum 28.98 72.02 16.02 10.31 6.57 BDL BDL

98 Percentile 28.91 71.91 15.87 10.28 6.45 BDL BDL

Average 27.17 69.84 14.63 9.35 5.53 BDL BDL

Location detail Ambient Air Quality Data A-8 (Vadvara)

Particulars PM2.5 PM10 NO2 SO2 O3 CO Benzene(VOC)

Minimum 25.57 60.57 13.26 8.33 4.36 BDL BDL

Maximum 28.8 72.12 16.16 10.21 6.83 BDL BDL

98 Percentile 28.79 72.06 16.11 10.11 6.54 BDL BDL

Average 27.26 68.54 14.82 9.19 5.43 BDL BDL

Criteria Pollutants: - (PM10, PM2.5, SO2, NOx,Others parameters specific to sector)

- Unit: - (Micro Gram per Meter Cube,Nano Gram per Meter Cube,Mili Gram per MeterCube, NA)

e. No. of Ground Water MonitoringLocations (Multiple Entries Allowed)

8/ locations

f. Details of Ground Water Monitoring

S.No Parameters

Limit as perIS:10500

Unit GW1 GW2 GW 3 GW4 GW5

GW6

GW7 GW8

Desirable Limit

Permissible

Limit

Projectsite

Village

Padhar

VillageLakhond

VillageKukma

VillageReldiMoti

VillageLer

VillageBhujodi

VillageVadvara

1 Colour 5 15 Hazen <5 <5 <5 <5 <5 <5 <5 <5

10

2 Odour Agreeable

Agreeable

- Agreeable

Agreeable

Agreeable

Agreeable

Agreeabl

e

Agreeabl

e

Agreeable

Agreeable

3 Turbidity 1 5 NTU <5 <5 <5 <5 <5 <5 <5 <5

4 pH 6.5-8.5 NoRelaxation

- 7.75 7.71 7.63 7.75 7.68 7.73 7.65 7.7

5 TotalHardness(asCaCO3)

200 600 mg/l 598 372 297 402 407 317 392 427

6 Calcium(as Ca)

75 200 mg/l 125 95 62 117 95 95 87 123

7 Magnesium (as Mg)

30 100 mg/l 70 33 34 27 42 20 43 29

8 Chlorides(as CI)

250 1000 mg/l 458.68

293.76 329.84 230.2 286.89

307.51

238.79

264.56

9 PhenolicCompounds (asC6H50H)

0.001 0.002 mg/l BDL(DL=0.001)

BDL(DL=0.001)

BDL(DL=0.001)

BDL(DL=0.001)

BDL(DL=0.001

)

BDL(DL=0.001

)

BDL(DL=0.001)

BDL(DL=0.001)

10 TotalDissolved Solids

500 2000 mg/l 1588 988 1046 878 1034 1064 908 1040

11 Sulphate(as S04)

200 400 mg/l 184.3 117.8 106.9 101.9 121.9 103.9 103.7 104.7

12 Iron (asFe)

0.3 NoRelaxation

mg/l 0.02 BDL(0.01)BDL(0.01)BDL(0.01)

BDL(0.01)

BDL(0.01)

BDL(0.01)

0.02

13 Nitrate(as NO3)

45 NoRelaxation

mg/l 13.22 1.57 0.14 2.83 1.87 0.89 1.66 0.16

14 Fluoride(as F)

1 1.5 mg/l BDL(0.1)

BDL(0.1) BDL(0.1) BDL(0.1)BDL(0.1)

BDL(0.1)

BDL(0.1)BDL(0.1)

15 TotalAlkalinity (asCaCO3)

200 600 mg/l 215.2 223.66 202.56 198.34 223.66 215.22 215.22 221.13

16 Copper(as Cu)

0.05 1.5 mg/l BDLDL=0.02)

BDL(DL=0.02)

BDL(DL=0.02)

BDL(DL=0.02

)

BDL(DL=0.0

2)

BDL(DL=0.0

2)

BDL(DL=0.02)

BDL(DL=0.02)

17 Nickel(Ni)

0.02 -- mg/l BDLDL=0.01)

BDL(DL=0.01)

BDL(DL=0.01)

BDL(DL=0.01)

BDL(DL=0.01)

BDL(DL=0.01)

BDL(DL=0.01)

BDL(DL=0.01)

18 Zinc(as Zn)

5 15 mg/l 0.03 0.02 0.02 0.02 0.02 0.01 0.02 0.01

19 Conductivity

-- - µmhos/cm

2646 1646 1743 1463 1723 1773 1513 1733

20 Cyanide(as CN)

0.05 NoRelaxation

mg/l BDLDL=0.2)

BDL(DL=0.02)

BDL(DL=0.02)

BDL(DL=0.02

)

BDL(DL=0.0

2)

BDL(DL=0.0

2)

BDL(DL=0.02

)

BDL(DL=0.02)

21 Lead (asPb)

0.01 NoRelaxation

mg/l BDL(DL=0.00

8)

BDL(DL=0.008

)

BDL(DL=0.008)

BDL(DL=0.00

8)

BDL(DL=0.0

08)

BDL(DL=0.0

08)

BDL(DL=0.00

8)

BDL(DL=0.008

)

11

22 TotalCromium(asCr)

0.05 1.5 mg/l BDL(DL=0.0

4)

BDL(DL=0.04)

BD(DL=0.04)

BDL(DL=0.04

)

BDL(DL=0.0

4)

BDL(DL=0.0

4)

BDL(DL=0.04

)

BDL(DL=0.04)

23 Cadmium(asCd)

0.003 NoRelaxation

mg/l BDL(DL=0.003)

BDL(DL=0.003

)

BDL(DL=0.003)

BDL(DL=0.00

3)

BDL(DL=0.0

03)

BDL(DL=0.003

)

BDL(DL=0.003)

BDL(DL=0.003)

24 TotalArsenic(as As)

0.05 NoRelaxation

mg/l BDL(DL=0.009)

BDL(DL=0.009

)

BDL(DL=0.009)

BDL(DL=0.00

9)

BDL(DL=0.0

09)

BDL(DL=0.009

)

BDL(DL=0.009)

BDL(DL=0.009)

25 Boron(as B)

0.5 1 mg/l BDL(DL=0.02)

BDL(DL=0.02)

BDL(DL=0.02)

BDL(DL=0.02

)

BDL(DL=0.0

2)

BDL(DL=0.02)

BDL(DL=0.02)

BDL(DL=0.02)

26 Manganese (asMn)

0.1 0.3 mg/l BDL(DL=0.09)

BDL(DL=0.09)

BDL(DL=0.09)

BDL(DL=0.09

)

BDL(DL=0.0

9)

BDL(DL=0.09)

BDL(DL=0.09)

BDL(DL=0.09)

27 Mercury (asHg)

0,001 NoRelaxation

mg/l BDL(DL=0.001

)

BDL(DL=0.001

)

BDL(DL=0.001)

BDL(DL=0.00

1)

BDL(DL=0.0

01)

BDL(DL=0.001

)

BDL(DL=0.001)

BDL(DL=0.001)

Microbiological Parameter

1 Coliform

10 - MPN/100ml

7.8 9 4.5 17 11 5.6 4 4

2 E.coli Shouldnot be

Detectable in any100mlsample

- - Absent

Absent Absent Present

Absent

Absent

Absent

Present

Criteria Pollutants: - (pH, TSS, TDS, Total Hardness, Chlorides, Fluoride, Heavy Metals,

other parameters specific to the sector)- Unit :- (mg/l, NA)

g. No. of Surface Water MonitoringLocations

2 Locations

h. Details of Ground Water Monitoring (Multiple Entries Allowed)

Sl. No. Parameters Unit SW1 SW2

1 pH - 7.73 7.4

2 Total Solid mg/l 1720 1620

3 Total Suspended Solid mg/l 1 1

4 TDS 1719 1619

5 Dissolved Oxygen mg/l 2.4 2.3

6 COD mg/l 26.96 26.96

7 BOD mg/l 5.48 5.55

8 Oil and Grease mg/L 2 2

9 Calcium mg/L 20 18

10 Magnesium mg/L 1 7

11 Chloride as Cl mg/l 487.89 499.91

12

12 Sulphate as SO4 mg/l 147.3 145.23

13 Nitrate(NO3) mg/l 1.22 1.39

14 Fluoride (aF) mg/l 0.69 0.63

15 Copper as Cu mg/l BDL(DL=0.02) BDL(DL=0.02)

16 Zinc as Zn mg/l BDL(DL=0.02) BDL(DL=0.02)

17 Cyanide as CN mg/L BDL(DL=0.2) BDL(DL=0.02)

18 Lead as Pb mg/l BDL(DL=0.008) BDL(DL=0.008)

19 Nickel as Ni mg/l BDL(DL=0.01) BDL(DL=0.01)

20 Manganese(as Mn) mg/l BDL(DL=0.09) BDL(DL=0.09)

21 Total Arsenic as As mg/l BDL(DL=0.009) BDL(DL=0.009)

22 Total Chromium as Cr mg/l BDL(DL=0.04) BDL(DL=0.04)

23 Mercury as Hg mg/l BDL(DL=0.001) BDL(DL=0.001)

24 Boron as B mg/l BDL(DL=0.2) BDL(DL=0.2)

25 Phenolic Compounds mg/l BDL(DL=0.001) BDL(DL=0.001)

26 Cadmium (as Cd) mg/L BDL(DL=0.003) BDL(DL=0.003)

27 Iron (as Fe) mg/L BDL(DL=0.02) BDL(DL=0.02)

28 Total Coliform(MPN/100ml)

MPN/100ml

33 27

29 Faecal Coliform(MPN/100ml)

MPN/100ml

23 21

- Parameter :- (pH, DO, BOD, COD, Others parameters specific to the sector)- Unit :- (mg/l, NA)

i. No. of Ambient Noise MonitoringLocations

8 Locations

j. Details of Noise Monitoring (Multiple Entries Allowed)

Sl. No. Location Unit Results

Day Time Night Time

1 Average Noise LevelAround Project Boundary-Ps

db(A) 54 42.8

2 N1 Village Padhar db(A) 54.2 43.2

3 N1 Village Lakhond db(A) 51.5 40.2

4 N1 Village Kukma db(A) 53.4 41.6

5 N1 Village Reldi Molti db(A) 52.4 40.7

6 N1 Village Ler db(A) 50.2 40.8

7 N1 Village Bhujondi db(A) 52.2 41.9

8 N1 Village Vadvara db(A) 52.9 41.5

13

- Parameter:- (Leq(Day), Leq(Night))- Unit :- (A-weighted decibels(dB(A))

k. No. of Soil Monitoring Locations (MultipleEntries Allowed)

7 Locations

S.No Parameter Unit SS-01 SS-02 SS-03 SS-04 SS-05 SS-06 SS-07 SS-08 MethodReference

Project Site

Village

Padhar

VillageLakhond

Village

Kukma

VillageReldiMoti

VillageLer

VillageBhujodi

VillageVadvara

1 SoilTexture

__ SandyClay

SandyClay

SandyClay

SandyClay

SandyClay

SandyClay

SandyClay

SandyClay

Manual ofSoil Testing,Ministry ofAgriculture

GoI2 Bulk

Densityg/cc 1.47 1.41 1.44 1.38 1.41 1.35 1.39 1.45 Manual of

Soil Testing,Ministry ofAgriculture

GoI3 Porosity % 22 25 27 29 24 32 28 28 Manual of

Soil Testing,Ministry ofAgriculture

Gol4 Permeabili

tycm/hour

0.82 0.88 1.2 1.5 0.94 0.95 0.92 0.85 Manual ofSoil Testing,Ministry ofAgriculture

Gol5 pH

(1:2.5 at25°C)

-- 7.6 7.27 8.62 6.92 8.1 7.27 6.98 8.27 Manual ofSoil Testing,Ministry ofAgriculture

Gol6 Conducti

vity(1:2.5 at

25°C)

mS/cm 3.89 3.57 3.33 2.69 2.83 3.17 2.83 3.47 is: 2720(Part26)1987R2011

7 OrganicCarbon

% 1.06 1.02 1.12 0.96 1.18 0.93 0.93 1.13 IS 14767-2000

8 Organicmatter

% 1.82 1.76 1.93 1.66 2.03 1.59 1.61 1.95 IS: 2720 P-221972 R 2010

9 CEC meq/100 g

90.00 96.00 94.00 90.00 88.00 90.00 94.00 88.00 IS: 2720 P-221972 R 2010

10 Available N

% 0.08 0.10 0.15 0.28 0.06 0.14 0.22 0.06 Manual ofSoil Testing ,Ministry ofAgriculture

Gol

14

11 Available

Phosphorus

mg/100 gm

0.01 0.0057 0.0099 BDL 0.007 BDL 0.005 0.03 Manual ofSoil Testing ,

MinistryofAgriculture

Gol12 Availabl

ePotassium

mg/kg 149 163 116 162 231 137 189 169 Manual ofSoil Testing ,

MinistryofAgriculture

Gol13 Availabl

e Znug/gm 11.1 12.46 15.24 17.5 13.1 15.84 14.3 15.14 Manual of

Soil Testing,Ministry ofAgriculture

GoI14 Availabl

e Cuug/gm 8.5 8.5 5.7 4.84 5.5 6.5 7.54 5.96 Manual of

Soil Testing ,MinistryofAgriculture

Gol15 Availabl

e Feug/gm 15.2 16.8 18.2 18.4 16.6 16.6 16.6 18.6 Manual of

Soil Testing ,MinistryofAgriculture

Gol16 Availabl

e Crmg/kg 1.44 0.52 BDL

(DL=0.2)BDL

(DL=0.2)BDL

(DL=0.2)BDI(DI

=0.2)

BDL(DL=0.2

)

BDL(DL=0.2)

Manual ofSoil Testing ,

MinistryofAgriculture

Gol17 Availabl

e Pbmg/kg 0.54 0.37 BDL

(DL=0.2)BDL

(DL=0.2)BDL

(DL=0.2)BDL

(DI=0.2)

BDL(DL=0.2

)

BDL(DL=0.2)

Manual ofSoil Testing,Ministry ofAgriculture

Gol

- Parameter :- (pH, N(Nitrogen), P(Phosphorus), K(Potassium), Electric Conductivity)- Unit :- (Millisiemens per Centimeter, Milligram per Litre, Percent, Centimeter per

Second, Milliequivalents per 100 Gram, Milligram per Kilogram, Parts per Million,

Kilogram per hectare, Others)l Ground Water Table: The water table is observed to be in the range of 10-30m at Bhuj

Talukai Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)):

From :1.20

To :53.64

ii Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)):

From :0.65

To :98.80

iii Whether Ground Water Intersection will bethere (Yes / No)?

No

15

If Yes,

(i) Upload Copy of Central Ground WaterAuthority Letter (Upload pdf only)

Receipt of Application submitted forGroundwater Abstraction to CGWB,Ahmedabad has been attached asAnnexure V in the EIA report

(ii) Letter No. 2017-2618-26

(iii) Date of issue 9.08.17

15 Details of Water Requirement (During Operation)(Multiple Entries Allowed)

a. Details

Category KLD(A)Domestic 0.2(B) Gardening --(C) Industrial

Process --Washing --

Boiler --Cooling --

Others 0.3Total 0.5

Source of water: Borewell(Proposed)

- Source: Surface /Ground Water /Sea /Others: GIDC

- Mode of Transportation: Pipeline /Canal /Others

- Method of water withdrawal: Barrage / Weir / Intake well / Jack well / Tube well / Openwell / Others

b. Upload Copy of Permission from Competent Authority -

c. Letter No. -

d. Date of issue -

e. Permitted quantity -

f. Whether Desalination is proposed (Yes/No)

-

If Yes, -

(i) Desalination capacity (KLD) -

(ii) Quality of Brine (KLD) -

(iii) Mode of Disposal of brine -

16 Waste Water Management (During Operation)

Category Waste water KLD

(A) Domestic 0.2

(B) Industrial

Process --

Washing --

Boiler --

16

Cooling --

Others --

Total Industrial waste 0.2

a. Total Waste Water Generation 0.2 KLD

b. Total Discharged Water

c. Total Reused Water The treated waste water proposed to bestored in overhead tank shall be sent tomember units through pipeline for itsreuse for washing purpose. Excesstreated waste water shall be used fordevelopment and maintenance of Greenbelt.

17 Solid Waste Generation Management(Multiple Entries Allowed)

Item Quantityper Annum

Unit Distancefrom Site

Mode ofTransport

Mode ofDisposal

ChemicalSludge

37.5 kg/day Kg TSDF site

Used oil Dependingupon usage

- - - Registered recycler

- Item:- (Industrial waste, Municipal Solid waste, Fly ash, Bottom Ash, Hazardous Waste(as per Hazardous and Other Waste Management Rules 2016), E Waste, Bio-Medical waste,

Construction & Demolition waste, Plastic Waste, Others)- Unit:- (Tons, Kiloliter)- Mode of Disposal:- (Treatment, Storage and Disposal Facility(TSDF), Authorized Re-

cyclers, Landfills, Sanitary Landfills, Others)

18 Air Quality Impact Prediction (Multiple Entries Allowed): NA

Parameter:- (PM10, PM, SO2, NOx, Others parameters specific to the sector)- Unit :- (Microgram per Meter Cube, NA)

19 Power Requirement

a. Quantity (Kilo Volt Amps (KVA)) 40 KW

b. Source Paschim Gujarat Vij Company Ltd.

c. Upload Copy of Agreement (Upload pdfonly)

d. Standby Arrangement (Details of DG Sets) 1 D.G. sets(10 KVA capacity)

e. Stack Height (in m)

20 Land Ownership Pattern (Prior to the project proposal) in Ha

a. Forest land NA

b. Private Land 0.46 Ha

c. Government Land

d. Revenue Land -

e. Other Land

Total land 0.46 Ha

17

21 Present Land Use breakup in Ha

a. Agriculture Area 9307.00

b. Waste/Barren Area -

c. Grazing/ Community Area -

d. Surface Water bodies -

e. Settlements -

f. Industrial -

g. Forest -

h. Mangroves -

i. Marine area -

j. Others (Specify)Fallow landBuilt up AreaWaterbodiesMining areaForest Area/Hill/Scrub

11596.001436.00223.00466.008387.50

Total 31415.5 Hect.

22 Land requirement for various activities(Multiple entries allowed) in Ha

:

Sr. Title Particulars1. Area for CETP 1102.5 Sq.m.2. Green Area 277 Sq.m.3. D.G Set Area 2.4 Sq.m.4. Road Area 325 Sq.m.5. Office Area 20 Sq.m.

- Activity / Facility / Plant / Others include: Main Plant, Township, Greenbelt, Ash pond,Quarry area, OB dump Area, Safety zone, Tailing pond, Landfill, Water reservoir, De-salination plant, Area for solid waste management, Built-up area, others

23 Ecological and Environmental Sensitivity (Within 10 Km):-WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas;ESZs- Eco Sensitive Zones)a. Details of Ecological Sensitivity

Details of EcologicalSensitivity

Name Distance fromthe Project (Km)

Remarks

NA NA NA NA

- Details of Ecological Sensitivity: - (Critically Polluted Area, WLS, NPA, ESAs,ESZs, Corridors, Wildlife Corridors)

b. Whether NBWL recommendation isrequired (Yes/No)?

NO

If yes -

Upload NBWL recommendation in PDF -

c. Details of Environmental Sensitivity -

18

Details ofEnvironmental Sensitivity

Name Distance from theProject (Km)

Remarks

- - - -

- Details of Environmental Sensitivity: - (Forest, Archaeological Sites, DefenseInstallations, Others)

d. Whether NoC / Permission from thecompetent authority is required (Yes/No)?

NA

If yes -

Upload NoC / Permission from thecompetent authority in PDF

-

24 Forest Land

1 Whether any Forest Landinvolved(Yes/No)?

No

If Yes

a. Forests Clearance Status (In-Principle(Stage-I) Approval Obtained /Final (Stage-II) Approval Obtained /Forest Clearance Under Process(Stage-I) /Forest Clearance Under Process(Stage-II) /Application for Forest Clearance yet to beSubmitted)

-

If In-Principle (Stage-I) ApprovalObtained,

-

(i) MoEFCC file number -

(ii) Date of InPrinciple (Stage-I) approval -

(iii) Area diverted -

(iv) Upload FC Letter (Upload pdf onlyand attach it as Annexure-FC letter)

-

If Final (Stage-II) Approval Obtained, -

(i) MoEFCC file number -

(ii) Date of Final Approval -

(iii) Date of In-Principle Approval -

(iv) Area diverted -

(v) Upload FC Letter(Upload pdf only andattach it as Annexure-FC letter)

-

If Forest Clearance under process (Stage-I),(i) MoEFCC file number -

(ii) Area applied -

19

If Forest Clearance under process (Stage-II),

-

(i) MoEFCC file number -

(ii) Area applied -

b. Legal Status of Forest Land (Reserved,Protected, Private, Village, Others)

-

If Others, -

Please Specify Others -

25 Tree Cutting, if any

a. No. of Trees Cut for the Project (ifForestland not involved)

b. Details of Tree Cutting and Planting ofTrees (Upload pdf Only)

NA

26 Land Acquisition Status

a. Acquired Land NA

b. Land yet to be acquired -

c. Status of Land acquisition if not acquired -

27 Rehabilitation and Resettlement (R&R)

a. No. of Villages NA

b. No. of Households -

c. No. of PDFs (Project Displaced Families) -

d. No. of PAFs (Project Affected Families) -

e. Funds Allocated for R&R -

f. Status of R&R (Completed / In-progress /Yet to start)

-

28 Whether there is Presence of Schedule-ISpecies (Yes/No)?

Yes

If yes,

a. Details of Schedule-I Species Pavo cristatus (Indian Peafowl)

b. Whether conservation plan for Schedule-ISpecies has been prepared (Yes/ No)?

Yes

If Yes,

(i) Upload conservation plan(Upload only PDF)

Applied & attached as Annexure IX inthe EIA Report

(ii) Fund Provision made Capital cost: 9.00 lacs & AnnualRecurring cost: 4.8 lacs

(iii) Period of Implementation

c. Whether conservation plan for Schedule-ISpecies has been approved by competentauthority (Yes/ No)?

Applied

20

(i) Upload copy of approval (UploadPDF Only)

(ii) Letter No.

(iii) Date of issue

(iv) Recommendations if any -

29 Whether there is Presence of Water Bodies inCore Area(Yes/No)?

NO

If yes, -

a. Details of Water Bodies in Core Area -

b. Whether there is Diversion required(Yes/No)?

-

If yes, -

c. Details of diversion required -

d. Details of study conducted -

e. Whether permission has been obtainedfrom competent authority (Yes/No)?

-

(i) Upload copy of permission(Upload PDF Only)

-

(ii) Letter No. -

(iii) Date of issue -

(iv) Recommendations if any -

30 Whether there is Presence of Water Bodies inBuffer Area (Yes/No)?

Yes

If Yes

a. Details of Water Bodies in Buffer Area Pond near village KukmaPond near village Padhar

b. Direction of Water Bodies in Buffer Area(North / South / East / West / North East

/ North West / South East / South West)

Pond near village Kukma in SWdirectionPond near village Padhar in ENEdirection.

c. Distance of Water Bodies in Buffer Area(kilo meters)

At a distance of 2.15 Km 3.39 Km

31 Manpower Requirement

a. Permanent employment duringconstruction

-

b. Permanent employment during operation -

c. Temporary employment duringconstruction

6

d. Temporary employment during operation 4

e. No. of working days

f. Total manpower 10

21

32 Green Belt in Ha

a. In case of new projects -

i. Total Area of Green Belt 277 sq.mtr (0.0277 Ha)

ii. Percentage of Total Project Area 6%

iii. No. of Plants to be Planted 45

iv. Funds Allocated for Plantation Recurring cost/per year Rs 50,000

v Upload Green Belt Plan (Upload PDFOnly)

Green belt plan given in pt.3.15,pg.no.81 in EIA report

b. In case of expansion / modernization /change in product mix etc.

-

i. Description Existing Proposed TotalTotal Area of Green Belt - 277 m2

Percentage of TotalProject Area

- 6% -

No. of Plants - 45

Funds Allocated - 50,000 as recurring

cost per annum

-

ii. Upload Green Belt Plan (Upload PDFOnly)

Green belt plan given in pt.3.15,pg.no.81 in EIA report

33 Project Benefit (Multiple entry allowed)

Type of Project Benefits Details of Project BenefitEmployments Generation Project will also provide employment to local

people that will help in increasing socio-economic status of the people.

Provide raw materials .(Project benefits shall include environmental, social and others)

34 Whether the Project / Activity attracts theprovisions of CRZ (Yes/No)?

NO

If yes, -

1 Project Details -

a. CRZ Classification: (CRZ I (A),

CRZ I(B), CRZ II, CRZ III, CRZ IV

(A), CRZ IV(B))

-

b. Location type: (Non-Eroding Coast,

Low and Medium Eroding Coast,

High Eroding Coast)

-

c. Details of Mangroves Land

Involved, if Any

-

d. Area of Mangroves Land (hectare) -

22

e. EIA (Terrestrial) Studies: (Carried

Out, Not Carried Out)

-

If Carried Out, -

1) Summary Details of EIA

(Terrestrial) Studies

-

2) Upload Recommendation made

in EIAs (Upload pdf only)

-

3) Period of Study from (EIA

Terrestrial)

-

4) Period of Study to (EIA

Terrestrial)

-

If Not Carried out -

Give Reason -

f. EIA (Marine) Studies: (Carried Out,Not Carried Out)

-

If carried out -

1) Summary Details of EIA

(Marine) Studies

-

2) Upload Recommendation

made in EIAs

-

3) Period of Study from (EIA

Marine)

-

4) Period of Study to (EIA

Marine)

-

If Not Carried out, -

Give Reason -

g. Disaster Management Plan/National

Oil Spill Disaster Contingency Plan

(if Applicable)

-

2. Description of the Project Under

Consideration

a. Type of Project:

(Resort/Buildings/civic amenities,

Coastal Roads/Roads on Stilt,

Pipelines from Thermal power Blow

Down, Marine Disposal of Treated

Effluent, Facility for Storage of

Goods/Chemicals, Offshore

structures, Desalination Plant,

Others

23

Mining of Rare Earth/Atomic

Minerals, Sewage Treatment Plants,

Lighthouse, Wind Mills, Others)

If Resort/Buildings/civic amenities, NA

1) Agency Name for Preparing

CRZ Maps

-

2) Total Area/Built-up Area

(hectare)

-

3) Height of Structure -

4) FSI Ratio -

5) The governing Town Planning

Rules/Regulations

-

6) Details of Provision of Car

Parking Area

-

If Coastal Roads/Roads on stilt, NA

1) Agency Name for Preparing

CRZ Maps

-

2) Area of Land Reclamation -

3) Estimated Quantity of

Muck/Earth for Reclamation

-

4) Carrying Capacity of Traffic -

If Pipelines from Thermal PowerBlow Down,

NA

1) Agency Name for Preparing

CRZ Maps

-

2) Length of Pipeline -

3) Length Traversing CRZ Area -

4) Depth of Excavation -

5) Width of Excavation -

6) Length of Pipeline from

Seashore to Deep Sea

-

7) Depth of Outfall Point from

Surface of Sea Water

-

8) Temperature of effluent above

Ambient at Disposal Point

-

If Marine Disposal of TreatedEffluent,

NA

1) Agency Name for Preparing

CRZ Maps

-

24

2) Location of Intake/Outfall -

3) Depth of Outfall Point -

4) Length of Pipeline -

5) Length Traversing CRZ Area -

6) Depth of Excavation -

7) Width of Excavation -

8) Length of Pipeline from

Seashore to Deep Sea/Creek

-

9) Depth of Outfall Point from

Surface of Sea Water

-

10) Depth of Water at Disposal

Point

-

11) Type of Disposal -

If Facility for Storage ofGoods/Chemicals,

NA

1) Agency Name for Preparing

CRZ Maps

-

2) Name and Type of Chemical -

3) End use of the Chemical -

4) No. of Tanks for Storage -

5) Capacity of tanks -

If offshore structures, NA

1) Agency Name for Preparing

CRZ Maps

-

2) Exploration or Development -

3) Depth of Sea Bed -

4) No. of Rigs/Platform -

5) Details of Group Gathering

Stations

-

If Desalination Plant, -

1) Agency Name for Preparing

CRZ Maps

-

2) Capacity of Desalination -

3) Total Brine Generation -

4) Temperature of Effluent above

Ambient at Disposal Point

-

5) Ambient Salinity -

6) Disposal Point -

25

If Mining of Rare Earth/AtomicMinerals,

NA

1) Agency Name for Preparing

CRZ Maps

-

2) Capacity of Mining -

3) Volume/Area to be mined -

4) Type of Mineral to be

Extracted

-

5) End use of the Mineral -

If Sewage Treatment Plants, NA

1) Agency Name for Preparing

CRZ Maps

-

2) Capacity -

3) Total Area of Construction -

4) Compliance of effluent

parameters as laid down by

CPCB/SPCB/other authorized

agency

-

5) Whether discharge is in sea

water/creek?

If yes,

-

Distance of Marine Outfall

Point from Shore/from the tidal

river bank

-

Depth of Outfall Point from

Sea Water Surface

-

Depth of Sea at Outfall Point -

If Lighthouse,

1) Agency Name for Preparing

CRZ Maps

NA

2) Total Area of Construction -

3) Height of the Structure -

If Wind Mills, NA

1) Agency Name for Preparing

CRZ Maps

-

2) Capacity (MW) -

3) Transmission Lines:

(Overhead, Underground)

-

4) Diameter of Windmill -

26

5) Length of Blade -

6) Speed of Rotation -

7) Height of the Structure -

If Others,

1) Agency Name for Preparing

CRZ Maps

-

2) Please Specify with salient

features

-

3) Upload relevant Document

(Upload pdf only)

-

3. Distance of Project (In Meters) from

LTL/HTL to be Stated

NA

a. Clause of CRZ Notification Under

which the Project is a

Permissible/Regulated Activity

-

b. Whether CRZ Map Indicating HTL,

LTL Demarcation in 1:4000 Scales

Prepared? (Yes/No)

-

If Yes, -

1) Distance of Project (in meters)

from HTL to be Stated

-

2) Upload Maps(kml File) -

3) Distance of Project(in meters)

from LTL to be Stated

-

4) Upload Maps (kml File) -

c. Whether Project Layout

Superimposed on CRZ Map 1:4000

Scales?: (Yes/No)

-

If Yes, -

1) Upload Maps (kml File) -

d. Whether CRZ Map 1:25000

Covering 7 km Radius Around

Project Site Prepared? (Yes/No)

-

If Yes, -

1) Upload Maps (kml File) -

e. Whether CRZ Map Indicating CRZ-

I,II,III and IV Including Other

Notified ESAs Prepared?: (Yes/No)

-

If Yes, -

27

1) Upload Maps (kml File) -

f. NOC from State Pollution Control

Boards Obtained: (Yes/No)

-

If Yes -

1) Upload Copy of NOC (Uploadpdf only)

-

g. Details of Rain Water Harvesting

System

-

4. Recommendation of State Coastal Zone

Management Authority

-

a. Upload Copy of CZMA (Upload pdfOnly)

-

b. State the Conditions Imposed -

c. Social and Environmental Issues andMitigations Measures SuggestedIncluding but not Limited to R&R,Water, Air, Hazardous Wastes,Ecological aspects, etc. (Brief Detailsto be Provided)

-

35 Sector Specific Details

I Whether the proposal is mining of minerals(coal / non-coal) project (Yes/No)?

No

If yes,

1 No. of Mineral to be Mined (MultipleEntries Allowed)

:

2 Mine Capacity in ROM (Run of Mine)

3 Upload 500 meters Cluster Certificate fromState Mines and Geology in case of minorminerals (Upload pdf Only)

4 Mining Plan

a. Approval Letter No.

b. Date of Approval

c. Upload Approved Letter (Uploadpdf only)

d. Approved by State Mines &Geology Department / IndianBureau of Mines / Ministry of Coal/Ministry of Mines /StateGovernment /Atomic MineralDirectorate / Others)

28

e. If Others, -

Please specify -

f. Approved Mining Lease Area

g. Approved Capacity

5 Technical Details

a. Total Geological Reserves (MillionTon)

b. Mineable Reserves (Million Ton)

c. Extractable Reserves(Million Ton)

d. Percent of Extraction (%)

e. Grade of Coal /Ore /Mineral

f. Stripping Ratio

g. Category of Gaseousness (Only forCoal Mining, Others may write Notapplicable)

h. Average Gradient(Degree)

i. Maximum Thickness ofSeams(meters) (Only for CoalMining, Others may write Notapplicable)

j. Mining Method (Opencast /Underground /Mixed(Opencast +Underground) /Adit

k. Life of Mine (Years)

6 Details of beneficiation (includingcrushing / screening/others)a. Whether it is proposed to install

crusher within the mining leasearea (Yes/No)?If yes, -

b. No. of crushers -

c. Details of crusher (Multiple entriesallowed)

-

Crusher ID Capacity (in TPH) Remarks- - -- - -- - -

d. Whether it is proposed to installbeneficiation plant / Coal washerywithin the mining lease area(Yes/No)?

-

If yes, -

29

e. Beneficiation / washingTechnology

-

f. Capacity -

7 Details of Seams if applicable

a. No. of seams -

b. Thickness of seams to be workedon

-

c. Maximum Thickness ofSeams(meters) (if notApplicable, may Write NA)

-

8 Details of Mining Lease

a. Details of Mining Lease

b. Upload Letter of Intent (Uploadpdf only)

c. Date of Execution of Mining Leasewith Reference Number

d. Validity of Mining Lease

e. Upload Copy of Executed Leasedeed valid as on Date (Upload pdfonly)

f. Earlier Renewals (Multiple EntriesAllowed)

9 OB (Over Burden) Management (Onlyif Mining Method: Opencast)

-

a. Details of External Dumps -

i) No. of OB Dumps -

ii) Total Area (in Hectare) -

iii) Height (in meter) -

iv) Quantity (in Million Cubicmeter)

-

v) No. of year back fill up -

b. Details of Internal Dump

i) No. of Internal Dumps

ii) Total Area (in Hectare)

iii) Height (in meter)

iv) Quantity (in Million Cubicmeter)

10 Details of Topsoil Management

30

a. Quantity of Topsoil excavatedduring the entire life of the mine (inMillion Cubic meter)

--

b. Quantity of Topsoil proposed forutilization for reclamation duringthe entire life of the mine (inMillion Cubic meter)

--

c. Quantity of Topsoil proposed forutilization for other activitiesduring the entire life of the mine (inMillion Cubic meter)

--

11 Detail of Final Mine Void(Only ifMining Method: Opencast)a. Area (in Hectare)

b. Depth (in meter)

c. Volume (in Million Cubic meter)

12 Details of Quarry(Only if MiningMethod: Opencast)a. Final Void of (hectare)

b. At a Depth of (meter which isproposed to be converted into aWater Body.)

c. Total Quarry Area (ha)

13 Details of Transportation

a. In Pit/Underground to Surface -

b. Surface to Siding/Loading -

c. Transportation / Conveyor Details

14 Details of Land Usage (Pre-Mining)

Land Use Within MLArea

(Hectare)

Outside MLArea

(Hectare)

Total

Agriculture Land -Forest Land -Waste Land

Grazing Land -Surface Water Bodies -

Settlements -Others(Specify) -

15 Details of Transportation

a. In Pit/Underground to Surface -

b. Surface to Siding/Loading -

c. Transportation / Conveyor Details

31

16 Details of Land Usage (Pre-Mining)

Land Use Within ML Area(Hectare)

Outside MLArea (Hectare)

Total

Agriculture Land -Forest Land -Waste Land

Grazing Land -Surface Water

Bodies-

Settlements -Others(Specify) -

Others -17 Details of Land Usage (Post-Mining)

Land Use Plantation Water Body Public Use OthersExcavation / quarry - -

Top Soil Storage - - -External OB dumps - - -Internal OB dumps - - -

Roads - - -Built Up Area

(Colony/Office)- - -

Green Belt -- - -Virgin Area - - -

Other - - -Total

18 Details of Reclamation (Only if MiningMethod: Opencast) Total AfforestationPlan shall be Implemented Covering ofMining. This will include:a. External OB Dump (in hectare) -

b. Internal Dump (in hectare)

c. Quarry (in hectare)

d. Safety Zone (in hectare)

e. Final Void of (hectare)

f. At a Depth of (meter which isproposed to be converted into aWater Body.)

g. Density of Tree Plantation per ha(in no.)

h. Others in ha (such as ExcavationArea along ML Boundary, alongRoads and Infrastructure,Embankment Area and in

32

Township Located outside theLease etc.)

i. Total afforestation plant (inhectare)

19 Status of Progressive Mining ClosurePlan (For Expansion Projects only)

-

a. Implementation of VariousActivities as per ApprovedProgressive Mine Closure Plan(inBar Chart) (pdf) (Upload pdf only)

-

b. Any Deviation from the ApprovedProgressive Mine Closure Plan

-

c. Total Area Excavated(in hectare) -

d. Total Area Backfilled afterExcavation(in hectare)

-

e. Total Area Reclaimed (in hectare) -

20 Actual Coal/Ore Production vis-à-vissanctioned capacity Since inception(Multiple Entries Allowed)

-

FinancialYear

SanctionedCapacity as

per EC(MTPA)

Sanctioned

capacityas perCTO

Sanctionedcapacity as

perapproved

Mining Plan

ActualProduction

Excess Production Beyond theEC / CTO / Mining PlanSanctioned Capacity (MTPA)

- - - - - -- - - - - -

36 Details of Court Cases if any

a. Whether there is any Court Cases pendingagainst the project and/or land in which theproject is proposed to be set up (Yes/No)?

NO

If Yes,

b. Name of the Court (Districts Court / HighCourt / NGT / Tribunals / Supreme Courtof India)

-

If name of Court: (Districts Court, HighCourt, NGT, Tribunals)

-

c. Name of the Sub-court -

d. Case No. -

e. Orders/Directions of the court,if any and itsrelevance with the proposed project

-

f. Case Details -

g. Upload Court Order if any (Upload pdfOnly)

-

33

37 Details of direction issued under Environment (Protection) Act / Air (Prevention & Controlof Pollution)) Act / Water (Prevention & Control of Pollution) Acta. Whether any direction issued under

Environment (Protection) Act/Air(Prevention & Control of Pollution))Act/Water (Prevention & Control ofPollution) Act(Yes/No)?

No

If yes, -

b. Details of directions issued underEnvironment (Protection) Act/Air(Prevention & Control of Pollution))Act/Water (Prevention & Control ofPollution) Act

NA

c. Upload copy of directions issued underEnvironment (Protection) Act/Air(Prevention & Control of Pollution))Act/Water (Prevention & Control ofPollution) Act

NA

d. Compliance status of the directions NA

38 Details of EIA Consultant

a. Have you hired Consultant for preparingdocument(Yes/No)?

Yes

If No,

(i) Reason for not engaging the Consultant -

If Yes, -

(i) Accreditation No. List of Accredited ConsultantOrganizations S.No. 133, Rev 67 July09, 2018

(ii) Name of the EIA Consultant M/s Shivalik Solid Waste ManagementLimited

(iii) Address 1st floor, SCO 20-21, near Hotel

Dolphin Baltana, Zirakpur, Punjab

140604

(iv) Mobile No. 8288079365

(v) Landline No. 01762-509496

(vi) E-mail Id [email protected]

(vii) Category of Accreditation (Eligiblefor Category A / Eligible for Category B)

Category A

(viii) Sector of Accreditation 7(h)

(ix) Validity of Accreditation 16.02.2019

34

(x) Upload Certificate of Accreditationcertified by QCI/NABET (Upload pdfOnly)

Attached in EIA report at pg. no. ix.

39 Documents to be attached

I If Project Type is New / Expansion / Modernization / one-time capacity expansion for coalmining: NAa. Upload Copy of EIA/EMP Report

b. Upload Copy of Risk Assessment Report

c. Upload Copy of Feasibility Report/Detailed Project Report(DPR) /DetailedEngineering Report /Detailed ConceptualPlan / Approved Mining Plan (in case ofMining proposals) (Upload pdf only)

d. Upload Copy of Final Layout Plan (Uploadpdf only)

e. Upload Cover Letter(Upload pdf only andattach it as Annexure-document of Coverletter)

f. Upload a copy of documents in support ofthe competence/authority of the personmaking this application to makeapplication on behalf of the UserAgency (Upload pdf only and attach it asAnnexure-authorization)

g. Upload copy of District Survey Report (formining of minor minerals only)Upload copy of Replenishment StudyReport & Baseline Survey data (for riversand mining proposals only)

g. Upload Additional File, if any (Upload pdfonly)

II If Project Type is other than New / Expansion /Modernization / one-time capacity expansionfor coal mining: -

NA

a. Upload Copy of Feasibility Report/Detailed Project Report(DPR) /DetailedEngineering Report /Detailed ConceptualPlan (Upload pdf only)

-

b. Upload Copy of Final Layout Plan (Uploadpdf only)

-

c. Upload Cover Letter(Upload pdf only andattach it as Annexure-document of Coverletter)

-

d. Upload a copy of documents in support ofthe competence/authority of the person

-

35

making this application to makeapplication on behalf of the UserAgency(Upload pdf only and attach it asAnnexure-authorization)

e. Upload Additional File, if any(Upload pdfonly)

-

f. Upload Updated Form1(Upload pdf only) -

40 Undertaking

a. I hereby give undertaking that the data and information given in the application andenclosures are true to be best of my knowledge and belief and I am aware that if any part ofthe data and information found to be false or misleading at any stage, the project will berejected and clearance given,if any to the project will be revoked at our risk and cost. Inaddition to above,I hereby give undertaking that no activity / construction / expansion hassince been taken up

b. Name Dr. Ismail Mohmed Khatri

c. Designation President

d. Company Ajrakhpur Hastkala Vikas Sangathan.Ajrakhpur- Paddhar, Post: Kukma,370105, Tal. Bhuj Kutch, Gujarat,India.

e. Address Common Plot No 1 of Survey No. 694of Paddhar- Ajrakhpur Village