Plant Name & Location
Product information
Customer information
No of Kaizens generated in the plant(Month wise break up)
Month Apr-09
May-09
Jun-08
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar -10
No of Kaizens
Total Employees
Kaizens/ Employee/month
Kaizen Target: One kaizen/Employee/Month
Then start with Kaizen Theme
Continue
Problem statement / Present status
Why Why analysis
Root cause & Kaizen idea
Countermeasure
Kaizen Results & Benefits
Kaizen sustenance
Horizontal Deployment
TPM Circle No.: Activity KK JH QM PM SHE OT DM E&T
COMPANY LOGO / NAME TPM Circle Name: Loss no./Step
Result Area P C D S M
Cell No.: Cell Name: Operation :
Kaizen Theme: Idea:
Bench Mark Problem / Present status: Target
KAIZEN StartKAIZEN FinishTeam Members:
Benefits:
Why Why Analysis : Results: What to do :
TargetDate
Registration no. & Date : Registered by :Manager's Sign :
Model
(Implementating this kaizen at all possible cases in existing product.
(Check & confirm repurcations of changes being suggested before implementating)
Responsibility StatusSr no
(Indicating "Howt to check / audit to ensure that
Scope & Plan for Horizontal Deployment
Dept: Kaizen No.:
COUNTERMEASURE :
(E.g. Poka Yoke, More friction, Fully, More bolts, More coolant, Big, Short, Can detect, Easy)
Machine :
(Correct observation. Use of 5W 1H)(When = Trend / Time / Period: Contienous / Discontineous / Rare, Start up / Seasons / Set up),(Who =Men:Day shift / Night shift / New employee / Temporary help), (What =Materials: Lots / Type), (Where = Locations: Part / Range / Process / Equipment), (Which = Trend: Direction e.g. possitive, Negative, Rear, Left, Right etc / Increase / Reduction), (How -How much/How many) = Status: Equipment / Jig / Tools / Accuracy / Machining conditions etc)
(Always starting with "Providing / Changing)
Q - Def. A / B / C
Process / Stage :
How to do :
KAIZEN SUSTAINANCE :
E.g. Increase production, Reduce time / cost etc
(Always opposite to root cause)
(E.g. Reduce time, Reduce frequency, Eliminate, Increase life etc.)
(E.g. Poka, Less friction, Partly, Less bolts, No coolant, Small, Long, Can not detect, Difficult)
Always start with To prevent /To Reduce / To Increase ( Prevent for failure / rejection / accident etc. To Reduce for time parameters like set up & cost, To increase for productivity)
the kaizen will be effective in long run"
the kaizen will be effective in long run"
Root Cause :
(Indicating "What to check / audit to ensure that
Please insert graph indicating appearance of the defect on which action is taken. Monitoring for few months is necessary to check effectiveness.(Rejection for the specific problem)
Why Why analysis in brief: Analysis showing as how the REAL root cause was identified.
(Implementating this kaizen at all the possible case in the existing / similar products to arrest possibilities of this defect in similar current products.