ANNEX R – PASSPORT TEMPLATE › uploads › media › 160704-passport-2012-bundle.pdfWu Yangqing...

30
ANNEX R – PASSPORT TEMPLATE CONTENTS A. Project title B. Project description C. Proof of project eligibility D. Unique Project Identification E. Outcome stakeholder consultation process F. Outcome sustainability assessment G. Sustainability monitoring plan H. Additionality and conservativeness deviations Annex 1 ODA declarations

Transcript of ANNEX R – PASSPORT TEMPLATE › uploads › media › 160704-passport-2012-bundle.pdfWu Yangqing...

  • ANNEXR–PASSPORTTEMPLATE

    CONTENTS

    A. Projecttitle

    B. Projectdescription

    C. Proofofprojecteligibility

    D. UniqueProjectIdentification

    E. Outcomestakeholderconsultationprocess

    F. Outcomesustainabilityassessment

    G. Sustainabilitymonitoringplan

    H. Additionalityandconservativenessdeviations

    Annex1ODAdeclarations

  • SECTIONA. ProjectTitle

    [SeeToolkit1.6]

    Title:InfraVestTaiwanWindFarmsBundledProject2012

    Date:21/06/2016

    Versionno.:4.0

    SECTIONB. Projectdescription

    [SeeToolkit1.6]

    InfraVest
Taiwan
Wind
Farms
Bundled
Project
2012
is constructed and operated by InfraVest Wind

    Group. The project in total comprises 34 wind turbines, each having a capacity up to 2.3 MW. The total

    installed capacity of the proposed project is 78.2 MW. At full capacity, the output of the project is totally

    expected to be 187,680 MWh per year derived from the FSRs of each sub-project. The annual

    emission reductions are estimated as about 126,120 tCO2e/year.

    The project start date is 13/12/20121. InfraVest
Taiwan
Wind
Farms
Bundled
Project
2012 is a

    bundle project:

    1. Chubei Wind Farm Project: a 11.5 MW onshore wind farm in Chubei township, Hsinchu County,

    which comprises 5 wind turbines. The annual electricity generated is 27,600 MWh with emission

    reductions of 18,547 t CO2e/year.

    2. Zhaowei Wind Farm Project: a 13.8 MW onshore wind farm in Tongxiao Township, Miaoli

    County,which comprises 6 wind turbines. The annual electricity generated is 33,120 MWh with

    emission reductions of 22,257 t CO2e/year.

    3. Tongyuan Wind Farm Project: a 52.9 MW onshore wind farm located in Tongxiao & Yuanli

    Township, Miaoli County, comprised 23 wind turbines.

    Among the 23 wind turbines of Tongyuan Wind Farm, 11 wind turbines change the locations. And the

    11 wind turbines in the new locations belong to 3 wind farm project as followed. Thus, the annual

    electricity generated of Tongyuan Wind Farm is 66,240 MWh with emission reductions of 44,513 t

    CO2e/year.

    1. Taichung III Wind Farm Project: 5 wind turbines with total capacity of 11.5 MW in Da-an Township

    and Da-jia Township, Taichung city. The annual electricity generated is 27,600 MWh with emission

    1 The construction starting date of Tongyuan wind farm

  • reductions of 18,547 t CO2e/year.

    2. Taichung Chingfeng Wind Farm Project: 1 wind turbine of 2.3 MW in Chingshui Township, Taichung

    city. The annual electricity generated is 5,520 MWh with emission reductions of 3,709 t CO2e/year.

    3. Taichung Anwei Wind Farm Project: 5 wind turbines with total capacity of 11.5 MW in Da’an

    Township, Dajia Township, and Chingshui Township, Taichung city. The annual electricity generated

    is 27,600 MWh with emission reductions of 18,547 t CO2e/year.

    Contribution to sustainable development

    The project contributes significantly to the region‘s sustainable development. The specific goals for the

    project are to:

    1. reduce the greenhouse gas emissions in Taiwan by replacing fossil fuel based power

    generation;

    2. produce clean, renewable energy that contributes to alleviate the global warming;

    3. contribute to the development of the wind energy sector in Taiwan;

    4. create local employment both during the construction and operational phase;

    SECTIONC. Proofofprojecteligibility

    C.1. ScaleoftheProject

    [SeeToolkit1.2.1]

    Pleasetickwhereapplicable:

    ProjectType Large Small

  • C.2. HostCountry

    [SeeToolkit1.2.2]

    Taiwan

    C.3. ProjectType

    [SeeToolkit1.2.3andAnnexC]

    Pleasetickwhereapplicable:

    Projecttype Yes No

    DoesyourprojectactivityclassifyasaRenewableEnergyproject?

    DoesyourprojectactivityclassifyasanEnd-useEnergyEfficiencyImprovementproject?

    Doesyourprojectactivityclassifyaswastehandlinganddisposalproject?

  • Pleasejustifytheeligibilityofyourprojectactivity:

    AccordingtothecurrentGoldStandardrules(version2.2),theproposedprojectisconsideredeligibleifallofthefollowingconditionsaresatisfied:

    - Theprojectisalarge-scaleGSprojectwithcapacity>15MWforeachyearofthecreditingperiod;

    - TheprojectislocatedinTaiwan,whichisaNon-Annex1Countryunderthe“KyotoProtocol”;- Theprojectgenerateselectricityusingwindenergy.Theelectricitygeneratedisdeliveredto

    thenationalgrid.Theprojectclassifiesasrenewableenergyproject;- Theemissionreductionofgreenhousegases(GHG)intendedtobeachievedbytheproject

    includescarbondioxide(CO2),whichiseligibleunderGoldStandard;- NoOfficialDevelopmentAssistance(ODA)isusedforprojectimplementation;- Itwasneverpreviouslyannouncedthattheprojectwouldproceedwithoutrevenuesfrom

    carboncredits;- TheprojectisseekingforregularprojectcycleregistrationunderGoldStandard;- TheprojectonlysubmittedforregistrationtotheGoldStandardVERstream.Other

    CertificationSchemesisnotinvolved.NodoublecountingwouldoccurfromtheissuanceofGoldStandardcarboncreditsoriginatingfromthisproject.

    Toconclude,theprojectmeetsalleligiblecategoriesundertheGoldStandardeligibilityAssessment,itshouldapplyfortheregistryofGoldStandardRenewableEnergySupplyProject.

    PreAnnouncement Yes No

    Wasyourprojectpreviouslyannounced?

    Explainyourstatementonpreannouncement

    Nosuchpreviousannouncementhasbeenmade.

    C.4. Greenhousegas

    [SeeToolkit1.2.d]

    GreenhouseGas

    Carbondioxide

  • Methane

    Nitrousoxide

    C.5. ProjectRegistrationType

    [SeeToolkit1.2.f]

    ProjectRegistrationType

    Regular

    Retroactiveprojects

    (T.2.5.1)

    Preliminaryevaluation(eg:LargeHydroorpalmoil-relatedproject)

    (T.2.5.2)

    RejectedbyUNFCCC

    (T2.5.3)

    Pre-feasibilityassessment

    IfRetroactive,pleaseindicateStartDateofprojectactivitydd/mm/yyyy:_________________

    SECTIOND. Uniqueprojectidentification

    D.1. GPS-coordinatesofprojectlocation

    [SeeToolkit1.6]

    Wind Farm Name Coordinates for center of farm

    Chubei Wind Farm Project 24°51'47"N, 120°56'23"E

    Zhaowei Wind Farm Project 24°29'57’’N, 120°40'28"E

    Tongyuan Wind Farm Project 24°25'37"N, 120°36'57"E

    Taichung III Wind Farm Project 24°22'32’’N, 120°34'49"E

    Taichung Chingfeng Wind Farm Project 24°18'21"N, 120°32'55"E

  • Taichung Anwei Wind Farm Project 24°24'14"N, 120°36'40"E

    Explaingivencoordinates

    Theprojectcontainedsixwindfarm:ChubeiWindFarm,ZhaoweiWindFarm,TongyuanWindFarm,TaichungIIIWindFarm,TaichungChingfengWindFarm,TaichungAnweiWindFarm.

    D.2. Map

    [SeeToolkit1.6]

    SECTIONE. Outcomestakeholderconsultationprocess

    Taichung III Wind Farm

    Taichung Chingshui Wind Farm

    Taichung Anwei Wind Farm

    Tongyuan Wind Farm

    Zhaowei Wind Farm Project

    Chubei Wind Farm Project

  • E.1. Assessmentofstakeholdercomments

    Twolocalstakeholderconsultationmeetingswereheldfortheproposedprojectin2012andonelocalstakeholderconsultationmeetingwasheldin2015.ThequestionnairesampleisattachedinAnnex2.The local communitieswere involved in the consultation process of the proposed project throughinviting the local residents and the community representatives to the stakeholder consultationmeeting.Invitationsweresentouttoallvillagesandcountriesthatmightbeimpactedbytheprojectbundle,includingareasofthesixwindfarms.Mostoftheinvitationsweredeliveredinpersontothevillageheadsandcommunityrepresentatives;thisisaimedtoencouragethemtogathertheresidents(menandwomen)intheircommunitytojointhemeeting.Thisapproachisconsideredmoreeffectiveto invitethe localpeopleascomparedtoputtingannouncementsthroughmediaorat localoffices.59stakeholders,fromdifferentvillagesandcountieswherethesixwindfarmslocated,includinglocalresidents, community representatives, village heads, county/township officers attended thestakeholderconsultationmeeting,amongwhich15werewomen.

    AllGSNGOsupportersandlocalGSexpertlocatedatthenearestregiontotheprojectareinvitedtothemeetingthroughemailinvitations.ThelocalNGOinvitedatthestakeholderconsultationisNEATTaiwan (New Energy Association of Taiwan), which is an independent local NGO focusing on theclimatesustainability,andthedevelopmentoftheclean,efficientenergytechnologiesintheregion.ThisNGOhasatouch-baseexperienceintherenewableenergiescultivationthanotherNGOsintheregion. Given the organization’s background, it was expected to present an objective perspectiveregardingtheproposedprojectdevelopment.

    Date/Time:Sep3rdand4th2012

    Attendance:33

    Location:TongxiaoCounty,ChubeiTownship

    Nameofparticipant,job/position

    inthecommunity

    Male/Female

    Organisation(ifrelevant)

    Contactdetails

    ZhengGuoxiong,Representativeof People’scongress ofTongxiaoCounty

    Male N/A 932665403

    ZhangYouji Male Localresident ofTongxiaoCounty

    912754125

  • ZhangA’jia Male Localresident ofTongxiCounty

    933861985

    LaiCilang Male Resident ofWubeiVillage

    933754998

    LuoPingshi Male Resident ofTongxiaoCounty

    958052689

    ZhuangZhaoyang

    Male Resident ofWubeiVillage

    916211513

    QiuYonghe Male Resident ofTongxiVillage

    930888562

    LuoMubiao Male President ofTongxiCoummunity

    935275752

    WuYangqing Male Generalwhip ofTongxiCommunity

    919905756

    GanQiunan Male The head ofWubeivillage

    933409025

    ZhengA’jin Male Villager ofTongwanVillage

    910517629

    XuLinsheng Male Villager ofTongwanVillage

    910115659

    LaiJinlong Male President ofWunanCommunity

    919827664

    LiA’xin Male Villager ofTongwanVillage

    No.105,TongwanVillage

    WangXuanrong

    Male The head ofYuangangvillage

    925968689

    ZhangChunji Male President ofHaigangvalligecommunity

    935734659

  • ZengShihong Male President ofHai’anvillagecommunity

    919855030

    LaiYuzhong Male Resident ofXipingvillage

    952752088

    LiZhizhong Male Resident ofXipingVillage

    915942588

    ChenJiding Male Resident ofHai’anVillage

    932863406

    JiangShufen Female GeneralWhip ofWunanVillage

    989205892

    ZhangChuanfa Male The head ofTongxiVillage

    916836135

    LiuShoufu Male Resident ofTongxiVillage

    916751533

    ChenChunchang

    Male Resident ofTongxiVillage

    916753038

    TuDingqi Male Resident ofWunanVillage

    983803636

    HuangRongcong

    Male Thechairman ofPeople’sCongress

    927788886

    ZengGuoqing Male Resident ofChubeiCounty

    988613638

    ZengZhong’an Male Resident ofChubeiCounty

    989200925

    ZengWenqi Male Resident ofChubeiCounty

    981178231

    LinQiurong Male The head ofChongyiVillage

    937121390

  • HuangGuojia Male Resident ofChubeiCounty

    916737947

    GuoGongbao Male Reisident ofChubeiCounty

    910295205

    ChenZhihui Female Resident ofChubeiCounty

    939420888

    Dateandtime:November27th2015

    Attendance:26

    Location:TaiChuangCounty,DajiaTownship

    Nameofparticipant,job/position

    inthecommunity

    Male/Female

    Organisation(ifrelevant)

    Contactdetails

    LinMingda Male LocalResidentsinDajiaTownship

    932677192

    XuShuwen Female LocalResidentsinDa’anTownship

    426816186

    HuangBixia Female LocalResidentsinDa’anTownship

    426713224

    XiaoWeiYu Female LocalResidentsinDa’anTownship

    426710082

    LinQiulan Female LocalResidentsinDa’anTownship

    988080305

    ZhangBizhu Male LocalResidentsinDa’anTownship

    426713611

  • WuWencan Male LocalResidentsinDa’anTownship

    912323476

    Sumeizhu Female LocalResidentsinDa’anTownship

    963341434

    Chenpanquan

    Male DirectorofGuikeli

    932569534

    Baiyintang Male DirectorofGaobei

    935039730

    XuWenyi Female LocalResidentsinGaobei

    980217199

    LinWenqin Female LocalResidentsinGaobei

    933433428

    LinShiguang Male LocalResidentsinGaobei

    933232222

    ZhenChunjia Male LocalResidentsinGaobei

    426111358

    ZhenQili Male LocalResidentsinGaobei

    921782206

    ZhuangYunhe

    Female LocalResidentsinGaobei

    426113377

    ChenZizhang Female LocalResidentsinXiqi

    932605929

    Panhaishen Male LocalResidentsinXiqi

    426813920

    Lizhuanghuang

    Female LocalResidentsinXiqi

    426813920

    ZhenLixiuqing

    Female LocalResidentsinXiqi

    426815186

    Libixia Female LocalResidentsinXiqi

    426813895

  • Chenjianquan

    Male LocalResidentsinXiqi

    910245635

    ZenQingli Female LocalResidentsinXiqi

    426812961

    Wangrongnan

    Female LocalResidentsinXiqi

    Wanga’e Female LocalResidentsinXiqi

    426816610

    ChenMirong Female LocalResidentsinXiqi

    426812638

    Duringthelocalstakeholderconsultation,thefollowingconcernswereraisedbythestakeholders.Thefollowingtablesummarizestheconcernsandtheresponsemadebytheprojectowner:

    Stakeholdercomment Wascommenttakenintoaccount(Yes/No)?

    Explanation(Why?How?)

    Noiseproblemmightoccurforsomeoftheresidentsfromawindturbine.Isthereanyapproachplannedtoovercomethisproblem?

    Yes Monitoringofnoisewillbemonitoredwhoisaffectedbytheprojectparticipantsifneeded.

    Trafficconditionsandsoilcondition

    Yes Theprojectparticipantspromisedthatagoodmaintenancewouldbedonefortheroadifitisimpactedbytheconstructionsoftheprojectactivity.AndreplantationscouldbeconsideredaccordingtoEIAreportifthereareany.

    Publicsafety No AstheprojectactivitywillbeconstructedandoperatedstrictlyaccordingtothedesignandEIAassessment,thereforenopublicsafetyissueswouldbeinvolved.Andthishasbeenexplainedtothestakeholdersduringthemeeting,andaconsensushasbeenmadethat.

  • meeting,andaconsensushasbeenmadethat.

    According to this stakeholder consultation process, it is clear that the stakeholders are verysupportivetowardsthedevelopmentoftheproposedproject.

    E.2. StakeholderFeedbackRound

    Pleasedescribereporthowthefeedbackroundwasorganized,whattheoutcomeswereandhowyoufolloweduponthefeedback.

    During the consultation meeting, the stakeholders were informed that they are invited for thefeedbackround.

    Sincenosignificant issuehasbeen identified intheconsultationmeeting, thestakeholder feedbackroundwasnotconductedasaphysicalmeeting,instead,therelevantdocumentsincludingPDD,LSCreport, passport, IEEwhich includes the information collected from the first round LSCweremadepublicavailablebytheprojectowner.

    Hardcopiesofthestakeholderconsultationreport,PDDandPassportweresenttothestakeholdersthroughtheleaderofthevillagecommunitysinceJune,2016.Besides,therelevantdocumentswerealsopublishedatwebsiteofVERbuyerandGSsinceJune2016toinvitefurthercommentsformlocalandglobalstakeholders.

    TheresultsoftheStakeholderFeedbackRoundwillbeaddedaftertheSFRwascompleted.

    E.3. Discussiononcontinuousinput/grievancemechanism

    MethodChosen(includeallknowndetailse.g.locationofbook,phone,number,identityofmediator)

    Justification

    ContinuousInput/GrievanceExpressionProcessBook

    ZhaoweiWindFarmandTongyuanWindFarm:GrievanceexpressionbookkeptbyLaisongcun,the

    ZhaoweiWindFarmandTongyuanWindFarm:

    TheHeadofWubeiVillage,

  • headofWubeiVillage,TongxiaoTownship,MiaoliCounty.Thetelephonenumberis00886-037-753737.

    ChubeiWindFarm:GrievanceexpressionbookkeptbyLinQiurong,theheadofChongyiVillage,ChubeiCity.Thetelephonenumberis00886-03-5561016.

    TaichungIIIWindFarm,ChingfengWindFarmandAnweiWindFarm:GrievanceexpressionbookkeptbyHongZhengyi,theheadofGuikeVillage,Da’anTownship,TaichungCounty.Thetelephonenumberis00886-04-26713641.

    TongxiaoTownship,MiaoliCounty.

    ChubeiWindFarm:

    TheHeadofChongyiVillage,ChubeiCity.

    TaichungIIIWindFarm,ChingfengWindFarmandAnweiWindFarm:

    TheheadofGuikeVillage,Da’anTownship,TaichungCounty.

    Telephoneaccess +886-2-2395-4886

    +41(0)227887080

    Projectmanager

    GScontactor

    Internet/emailaccess [email protected]

    [email protected]

    [email protected]

    Projectmanager

    GScontactor

    AllissuesidentifiedduringthecreditingperiodthroughanyoftheMethodsshallhaveamitigationmeasureinplace.TheidentifiedissueshouldbediscussedintherevisedPassportandthecorrespondingmitigationmeasureshouldbeaddedtosustainabilitymonitoringplaninsectionG.

    SECTIONF. OutcomeSustainabilityassessment

    F.1. ‘Donoharm’Assessment

    [SeeToolkit2.4.1andAnnexH]

    Safeguardingprinciples Descriptionofrelevancetomyproject Assessmentofmy

    projectrisks

    breachingit(low/

    Mitigation

    measure

  • medium/high)

    HumanRights

    1. Theprojectrespectsinternationallyproclaimedhumanrightsincluding

    dignity,culturalproperty,and

    uniquenessofindigenouspeople.

    Theprojectisnotcomplicityin

    HumanRightsabuses.

    The project respects internationally proclaimed human

    rights.Taiwanhasitsownlegislationinplaceprohibiting

    the violation of human rights principle and it actively

    enforces the compliance of such principle. Taiwan

    ratifiedtwoUNhumanrightstreaties—theInternational

    Covenant on Civil and Political Rights and the

    InternationalCovenantonEconomic,Social,andCultural

    Rights—and passed the implementing law to bring

    relevant regulations and practice into line with the

    treaties. The widely recognized democracy, political

    freedom, and human rights watchdog organization,

    FreedomHouse ratesTaiwanasamongthemost"Free"

    nations in Asia (labelled as green), with a 2 in Political

    Rightsanda1inCivilLiberties(scaleof1-7,with1being

    thehighest)

    2015report:

    https://freedomhouse.org/report/freedom-

    world/freedom-world-2015#.VjnMbWQrKL0

    Low N/A

    2. Theprojectdoesnotinvolveandisnotcomplicitininvoluntary

    resettlement.

    The proposed project is constructed distanced toresidential area. Therefore, resettlement is not at allnecessary. The land use permission is offered and it isconfirmed that the project does not involve theresettlement.

    Low N/A

    3. Theprojectdoesnotinvolveandisnotcomplicityinthealteration,

    damage,orremovalofanycritical

    culturalheritage.

    According to theEIA report, theproject isevidenced tobeconstructedfarfromanyculturalheritage.

    Low N/A

    LabourStandards

    4. Theprojectrespectstheemployees’freedomofassociation

    andtheirrighttocollective

    bargainingandisnotcomplicitin

    restrictionsofthesefreedomand

    rights

    Labourrightsareprotected intheLabourStandardsAct

    (http://law.moj.gov.tw/eng/LawClass/LawAll.aspx?PCod

    e=N0030001).The right tounionize,bargaincollectively

    are highly protected by Labor Union Law:

    http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=

    FL014918. The project fully respects the employees’

    freedomandrightsandallrelatedlawsendorsedwithin

    TaiwanR.O.C.Lawcomplianceissubjecttogovernment’s

    ruling.

    Ref:Company'sarticles.Employeeemploymentcontract

    Low N/A

    5. Theprojectdoesnotinvolveandisnotcomplicitinanyformofforced

    orcompulsorylabour.

    Forcedor compulsory labour is regulated in the Labour

    Standards Act

    (http://law.moj.gov.tw/eng/LawClass/LawAll.aspx?PCod

    e=N0030001).Theproject fully respects theemployees’

    rights in accordance with all labour related laws

    endorsedwithinTaiwanR.O.C.Lawcomplianceissubject

    to government’s inspection and ruling. In case of any

    termsofviolation,duepenaltywouldbeenforcedas in

    accordancetotheregulations.

    Ref: Employee employment contract, Employee

    Qualificationcertification,Company'sarticles

    Low N/A

    6. Theprojectdoesnotemployandis In Taiwan, there is a comprehensive definition of child Low N/A

  • notcomplicitinanyformofchild

    labour.

    labour in terms of age limitation, working hours, etc.

    Such employment regulations are described in Labour

    Standard Act Chapter 5:

    http://law.moj.gov.tw/eng/LawClass/LawAll.aspx?PCode

    =N0030001

    The proposed project requires a limited number of

    skilledemployeestooperate,maintain,andmanagethe

    wind farm, as opposed to manufacturing industries,

    which may require abundant low-skilled labour.

    Therefore, the project does not employ and is not

    complicit in any form of child labour. According to the

    Employee employment contract, it could be confirmed

    thattheprojectdoesnotemployanychildlabour.

    7. Theprojectdoesnotinvolveandisnotcomplicitinanyformof

    discriminationbasedongender,

    race,religion,sexualorientationor

    anyotherbasis.

    Specifically regarding the gender equality, detailed

    enforcement rules are regulated in ‘Gender Equality in

    Employment Act’

    (http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=

    FL015149

    http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=

    FL015150), and in case of lawsuit occurrence, legal aid

    could be provided as in accordance to ‘Regulations for

    Providing Legal Aid in Lawsuits Concerning Gender

    Equality in Employment Act’

    (http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=

    FL015152)

    According to the interviewwith the project owner, the

    projectabidestherulesofequalityaccordinglyanddoes

    not involve and is not complicit in any form of

    discrimination.

    Low N/A

    8. Theprojectprovidesworkerswithasafeandhealthyworkenvironment

    andisnotcomplicitinexposing

    workerstounsafeorunhealthy

    workenvironments.

    Proposed project applies an automated wind power

    generating facility, equipped with a remote controlling

    system. Therefore, most of the employees work in

    indoorenvironment (at theoffice), insteadofhaving to

    standby at the wind farm site. In case of on-site

    monitoringanddevicemaintenance-sincewindturbine

    doesnotgenerateanytypeofpollutants,employeesare

    not exposed to unsafe or unhealthy environment. The

    project owner’s office space complieswith the detailed

    principles of working environment as described in

    ‘Enforcement Rules of Labour Safety and Health at

    Workplace, Taiwan R.O.C.’:

    http://law.moj.gov.tw/LawClass/LawAllIf.aspx?PCode=N

    0060001

    Low N/A

    EnvironmentalProtection

    9. The project takes a precautionaryapproach in regard to

    environmentalchallengesandisnot

    complicity in practices contrary to

    theprecautionaryprinciple.

    Theprojectactivityisonlyawindpowerprojectwhichis

    not includes any pollutions or similar activities. The

    project activity dose not threaten human health or the

    environment. The project will be constructed and

    operated in an environmental friendly way. All the

    release (i.e. waste water, solid waste during the

    Low N/A

  • construction phase) will be handled according to the

    national legislation.EIAisconductedincompliancewith

    lawsandregulations.AndtheEIAapprovalpublishedby

    theEnvironmental ProtectionAgencyof ExecutiveYuan

    isavailable.

    10. Theprojectdoesnot involveand isnot complicit in significant

    conversionordegradationofcritical

    natural habitats, including those

    that are (a) legally protected, (b)

    officially proposed for protection,

    (c) identified by authoritative

    sources for their high conservation

    valueor(d)recognizedasprotected

    bytraditionallocalcommunity

    The project does not involve and is not complicit in

    significant conversion or degradation of critical natural

    habitats.AccordingtotheEIA,theprojectislocatedinan

    isolated area and there are no critical natural habitats

    locatedator close to theproject site.Asawindpower

    project, the project dose not lead to invasive species

    introductionoractivitydisplacement.

    Low N/A

    Anti-Corruption

    11. Theprojectdoesnot involveand isnotcomplicitincorruption

    Theproject is ownedby aprivateequity company, and

    there is no governmental subsidy disbursed to the

    project. Therefore, the project does not involve and is

    notcomplicitincorruptionandisnotpronetoentrusted

    powerabusenorcorruption.

    Moreover, Taiwan was ranked 35 out of 180 countries

    surveyed in Transparency International’s Worldwide

    Corruption Perceptions Index

    http://en.wikipedia.org/wiki/Corruption_Perceptions_In

    dex.

    Low N/A

    Additionalrelevantcriticalissuesformy

    projecttype

    Descriptionofrelevancetomyproject Assessmentof

    relevancetomy

    project

    (low/medium/high)

    Mitigation

    measure

    1

    2

    Etc.

    F.2. SustainableDevelopmentmatrix

    [SeeToolkit2.4.2andAnnexI]

    InserttableasinsectionD3fromyourStakeholderConsultationreport(SustainableDevelopmentmatrix).

    Indicator MitigationmeasureRelevancetoachievingMDG

    Chosenparameterandexplanation

    Preliminaryscore

    GoldStandardindicatorsofsustainabledevelopment

    Ifrelevant,copymitigationmeasurefrom‘DoNoHarm’assessment,andincludemitigationmeasureusedtoneutraliseascoreof‘-’

    Checkwww.undp.org/mdgandwww.mdgmonitor.org

    Describehowyourindicatorisrelatedto

    Definedbyprojectdeveloper

    Negativeimpact:score‘-’incasenegativeimpactisnotfullymitigated,score‘0’incaseimpactisplannedtobefullymitigated

  • localMDGgoals

    Nochangeinimpact:score‘0’

    Positiveimpact:score‘+’

    Airquality

    MDGTarget7.A:Integratetheprinciplesofsustainabledevelopmentintocountrypoliciesandprogrammesandreversethelossofenvironmentalresources

    Chosen parameter:NOx, SOx emissionreductionsExplanation: Sincethe fuel combustionin baseline powergeneration producesairpollutantsbesidesGHG, such as NOxandSOx,theprojectconsiderablyfacilitates air qualityimprovement byproducing cleanelectricity to thenational grid.According to thelatest statistic data(2015 data)2, 310 kgofSOxand302kgofNOx were generatedper GWh powergeneration. Thus,this sustainableindicator scores a“+”.

    +

    Waterqualityandquantity

    Toreduce/avoidthenoiseimpacts,followingmeasures:-

    MDGTarget7.C:Halve,by2015,theproportionofpeoplewithoutsustainableaccesstosafedrinkingwaterandbasicsanitation

    During the projectconstruction period,domesticwastewateris and will beproduced. Theproject ownerapplies treatment todischargedwastewater to makesure it is compliedwith the localregulation. Theproject does notgenerate and wastewater during itsoperation, thereforeit has no impact onthe water quality.Thus,itscores‘0’.

    0

    Soilcondition

    MDGTarget7.A:Integratetheprinciplesofsustainabledevelopmentinto

    According to the EIAreport, the projectactivity does notcause any kind ofland occupation and

    0

    2http://www.taipower.com.tw/content/govern/govern01.aspx?MType=5&MSType=14

  • countrypoliciesandprogrammesandreversethelossofenvironmentalresources

    no deforestation/plantation removalwas necessary sincethe wind farmconstruction was inerection-point basis.Theproposedprojecthasnoimpactonsoilcondition. Thereforeitscores“0”.

    Otherpollutants

    To reduce/avoid thenoise impacts,followingmeasureswillbetaken:1.Restrict workinghours, Making nooperation of noisymachinery during therest time of localresidents2. The cars should beequipped with noisecontrol devises such asmufflers.

    MDG Target 7.A:Integrate theprinciples ofsustainabledevelopment intocountry policies andprogrammes andreverse the loss ofenvironmentalresources

    As the mainconstructionsitesarenot adjacent to thelocal communities,theimpactofnoiseislimited. And theprojects site is farawayfromthevillageand mitigationmeasuresimplemented duringconstructionwork.

    AccordingtotheEIA,thenoiselevelduringtheoperationtimeiscomplied with therelevantrequirements.

    This indicator scores“0”

    0

    Biodiversity

    Precaution measure:the locations of windtowers are carefullyselected; thesurroundings of windtowersaregreened.

    MDG Target 7.B:Reduce biodiversityloss, achieving, asignificantreductionintherateofloss

    Chosenparameter:Re-plantationrecordsThewindprojectstakeveryfewland(only42.25m2foreachwindtower),andallareasinwindfarmsisreplantedtonativegrassspeciesofplantsinordertoattractsometerrestrialanimalstoinhabit;Therefore,thisscores“0”.

    0

    Qualityofemployment

    MDGTarget1.B:Achievefullandproductiveemploymentanddecentworkforall,includingwomenandyoungpeople

    Theprojectdevelopmentcreatesrecruitmentopportunitieswithqualificationstandardfortechniciansduringbothconstructionandoperationphase.

    0

  • ThestaffsweretrainedbyInfraVest,andthetrainingincludestechnical,operationalandmaintenanceinstructions.TheprojectownerprovidesLaborinsuranceforthestaffsasrequiredbythenationalregulations.However,sincethetrainingprogrammeswereheldeveryyear,andthelaborinsuranceisincompliancewiththelaw,thusinaconservativestandpoint,thisindicatorscoresa“0”.

    Livelihoodofthepoor

    MDGGoal1:EradicateextremehungerandpovertyMDGGoal4:ReducechildmortalityrateMDGGoal5:Improvematernalhealth

    Thereisnosignificantimpactonthisaspectresultingfromtheprojectdevelopment.

    0

    Accesstoaffordableandcleanenergyservices

    MDGTarget7.A:Integratetheprinciplesofsustainabledevelopmentintocountrypoliciesandprogrammesandreversethelossofenvironmentalresources

    Theprojectfacilitatesaccesstocleanelectricityintermsofreplacingfueluseforthesameamountofelectricitygeneratedgiventhebaselinescenario.WindfarmdevelopmentinTaiwanisalsoparticularlyimportantinitseffortstoreducedependencyonimportedfuel.However,theimpactofthisindicatoronalocallevelisratherdifficulttoquantifyandmonitor.Thusthisindicatorscoresa“0”.

    0

    Humanandinstitutionalcapacity

    MDGTarget3.A:Eliminategenderdisparityinprimaryandsecondaryeducation,preferablyby2005,andinall

    Thereisnosignificantimpactonthisaspectresultingfromtheprojectdevelopment.

    0

  • levelsofeducationnolaterthat2015MDGTarget8.F:Incooperationwiththeprivatesector,makeavailablebenefitsofnewtechnologies,especiallyinformationandcommunications

    Quantitativeemploymentandincomegeneration

    MDGTarget1.B:Achievefullandproductiveemploymentanddecentworkforall,includingwomenandyoungpeople

    Chosenparameter:NumberofjobsandsalarylevelduringtheoperationalphasesExplanation:Theprojectactivitygeneratesemploymentopportunitiesduringtheprojectoperationperiod.

    +

    Balanceofpaymentsandinvestment

    MDGTarget8.D:Dealcomprehensivelywiththedebtproblemsofdevelopingcountries

    WindfarmdevelopmentwillhelpreducefossilfuelimportsinTaiwan.Yet,itrequirescomplexquantificationandmonitoring,thereforethisscores‘0’

    0

    Technologytransferandtechnologicalself-reliance

    MDGTarget8.F:Incooperationwiththeprivatesector,makeavailablebenefitsofnewtechnologies,especiallyinformationandcommunications

    ThewindenergyiswelldevelopedinTaiwan.ThoughtheequipmentsareimportedfromGermany,theprojectownerhadorganizedcapacitybuildingforthelocalstaffs,sothatitisnolongernecessarytoimporttheskilledforeignworkers.Though,therehasnotbeenpublicseminarsorworkshopheldaccordingtotheproject.Therefore,itscores‘0’.

    0

    Justificationchoices,datasourceandprovisionofreferences

    Airquality Since the fuel combustion in baseline power generation produces airpollutants besides GHG, such as NOx and SOx, the project considerably

  • facilitates air quality improvement by producing clean electricity to thenationalgrid.Accordingtothelateststatisticdata(2015data),310kgofSOxand 302 kg of NOx were generated per GWh power generation. Thus, thissustainableindicatorscoresa“+”.Ref: http://www.taipower.com.tw/content/govern/govern01.aspx?MType=5&MSType=14

    Waterqualityandquantity According to theEIA report, theproject doesnot generate andwastewaterduringitsoperation,thereforeithasnoimpactonthewaterquality.

    Reference:EIAreport

    Soilcondition AccordingtotheEIAreport,theprojecthasnoimpactonsoilcondition.

    Reference:EIAreport

    Otherpollutants Parameter chosen inassessmentofotherpollutants impact is levelofnoise.Survey result of this aspect is reported in the EIA report, it shows that theeffectisveryminimum.However,forresidentswholiveveryclosetothewindturbine(<200m)andfeelaffectedbythewindnoise,theprojectownerofferstoinstallairtightwindowstosignificantlyreducenoiseintheirhouses.

    Reference:EIAreport

    Biodiversity AccordingtotheEIAreport,themeasurementisbasedonnumberofaffectedplants.Sincetheconstructionprocessiskeptsmall-scaledatatime,theimpacttowards biodiversity is very limited. Furthermore, the re-plantation will beconducted.

    Reference:EIAreport

    Qualityofemployment Taiwan Government requires a highly skilled chief engineer (with certaincertification) toperformsuchpowergenerationprojects, responsible for theconstructionplanning,operationalandmaintenanceofthesystem.

    Reference:EIAreport

    EnforcementRulesofLabourSafetyandHealthatWorkplace,TaiwanR.O.C.:http://law.moj.gov.tw/LawClass/LawAllIf.aspx?PCode=N0060001

    Livelihoodofthepoor In terms of livelihood of the poor: poverty alleviation, access to health careservices and sanitation, there were no significant issues derived from theproposedproject.

    Accesstoaffordableandcleanenergyservices

    Theprojectfacilitatesaccesstocleanelectricityintermsofreplacingfueluseforthesameamountofelectricitygeneratedgiventhebaselinescenario.Windfarmdevelopment in Taiwan is also particularly important in its efforts to reducedependencyonimportedfuel.

    Humanandinstitutionalcapacity There were no significant impacts deriving from the proposed projectdevelopmentinanyofthepossibleparameters.

    Quantitativeemploymentandincomegeneration

    In terms of quantitative employment and income generation, the projectactivity generate project employment opportunities during the projectoperationperiod.Thus,thissustainableindicatorscoresa“+”.Reference:HRrecordsandemploymentcontract

    Balanceofpaymentsandinvestment

    Wind farm development in Taiwanwill help reduce its dependency in fossilfuelimports.Yet,itrequirescomplexquantificationandmonitoring

    Technologytransferandtechnologicalself-reliance

    In terms of technology transfer, the staffs responsible for operation andmaintenancewillbetrained inregardsoftechnical issues.Theturbineoftheproject is produced by German Company. However, there is no publicseminars or workshop held. The technology was already in the country, notechnologytransfer.

  • SECTIONG. SustainabilityMonitoringPlan

    No 1

    Indicator AirQuality

    Mitigationmeasure N/A

    Repeatforeachparameter

    Chosenparameter NOx,SOx

    Currentsituationofparameter According to Taipower’s latest announcement3, an average of310kgof SOxand302kgofNOxemissionsaregenerated forproducing1000MWhofelectricityproducedin2015.Basedonsuch estimation, the proposed project is expected to abateapproximatelyadditional58,180tSOxand56,679tNOxannually

    Estimationofbaselinesituationofparameter

    SOx, NOx emissions deriving from the electricity generated inthegrid-connectedfossilfuelfiredpowerplants.

    Futuretargetforparameter Continuousmonitoring of howmuch SOx, NOx are abated bytheproposedproject.

    How Calculated,basedon theannouncedSOx,NOxEmissions/kwhannouncedbythegridcompany.

    When Data will be compiled and monitored annually. All relatedrecordswillbeprovidedandverifiedbytheDOE.

    Wayofmonitoring

    Bywho Theprojectowner.ThecalculationofSOx,NOxabatementwillbepresentedinthemonitoringreportduringverification.

    No 2

    Indicator Quantitativeemploymentandincomegeneration

    Mitigationmeasure N/A

    Repeatforeachparameter

    Chosenparameter Numberofjobs,salarylevel

    3http://www.taipower.com.tw/content/govern/govern01.aspx?MType=5&MSType=14

  • Currentsituationofparameter Theemployeesgetthejobopportunitiesandallemployeesarefairlycompensated.

    Estimationofbaselinesituationofparameter

    Employment opportunity did not exist before the projectwasdeveloped.

    Futuretargetforparameter Theproposedprojectprovidesemploymenttopermanentstaffsfor wind farms operation and all staff will be fairlycompensated.Theprojectownerprovideshealthinsuranceandlabor insurance for the employee. Working hours and staff’ssalaryisincompliancewithapplicableregulations.

    How CopyofemploymentcontractandthelabourinsurancelistfromLabour Insurance Bureau will be used to specify number ofpermanentemployeesoftheprojectownerandtoindicatethesalarylevels.

    When Data will be compiled and monitored annually. All relatedrecordswillbeprovidedandverifiedbytheDOE.

    Wayofmonitoring

    Bywho Theprojectownerwillkeepallemploymentrecords.

    No 3

    Indicator Biodiversity

    Mitigationmeasure The locations of wind towers are carefully selected and thesurroundingsofwindtowersaregreened.

    Repeatforeachparameter Plantsre-plantation

    Chosenparameter Re-plantationrecords

    Currentsituationofparameter Theprojectownerhasalreadycompletedreplantationforthecommissionproject.

    Estimationofbaselinesituationofparameter

    Nosuchrecordexists

    Futuretargetforparameter Windturbineitselfoccupiesverylittlelandaftercompletionofconstruction, with the foundation part of only 6.5 × 6.5 m(42.25m2)exposedsurfacearea;andtheremainingareaofonewholewindfarmisalsocoveredbyearth.Alltheseareaswillbereplanted to native grass species of plants, in order to attractsome terrestrial animals to inhabit, and the reduced habitatareas due to turbines setting will be reduced to a minimumrange.

    How Keepreplantationrecordsandphotos.

    Wayofmonitoring

    When Recordsandphotoswillbecompiledandcheckedannually.All

  • relatedrecordswillbeprovidedandverifiedbytheDOE.

    Bywho Theprojectownerwillkeepallrecordsandphotos.

    Additionalremarksmonitoring

    N/A

    SECTIONH. Additionalityandconservativeness

    Thissectionisonlyapplicableifthesectiononadditionalityand/oryourchoiceofbaselinedoesnotfollowGoldStandardguidance

    H.1. Additionality

  • [SeeToolkit2.3]

    TheAdditionalityAnalysisisassessedinthePDD.

    H.2. Conservativeness

  • [SeeToolkit2.2]

    ThissectionisnotapplicableasthisisaGSVERproject.

    ANNEX1 ODAdeclaration

    [SeeToolkitAnnexD]

    AsconfirmedwiththeGSVERprojectinTaiwanhavebeenexemptedfromODAdeclaration.TaiwanisnotanOECDmember,anditisnotincludedintheDAClistofODArecipients.ProjectsinTaiwanaretherefore not eligible for receiving ODA funding. And Taiwan does not have a cap on the GHGemissions.

  • ANNEX2 StakeholderConsultationMeetingQuestionnaireSample