ANNEX R – PASSPORT TEMPLATE › uploads › media › 160704-passport-2012-bundle.pdfWu Yangqing...
Transcript of ANNEX R – PASSPORT TEMPLATE › uploads › media › 160704-passport-2012-bundle.pdfWu Yangqing...
-
ANNEXR–PASSPORTTEMPLATE
CONTENTS
A. Projecttitle
B. Projectdescription
C. Proofofprojecteligibility
D. UniqueProjectIdentification
E. Outcomestakeholderconsultationprocess
F. Outcomesustainabilityassessment
G. Sustainabilitymonitoringplan
H. Additionalityandconservativenessdeviations
Annex1ODAdeclarations
-
SECTIONA. ProjectTitle
[SeeToolkit1.6]
Title:InfraVestTaiwanWindFarmsBundledProject2012
Date:21/06/2016
Versionno.:4.0
SECTIONB. Projectdescription
[SeeToolkit1.6]
InfraVest Taiwan Wind Farms Bundled Project 2012 is constructed and operated by InfraVest Wind
Group. The project in total comprises 34 wind turbines, each having a capacity up to 2.3 MW. The total
installed capacity of the proposed project is 78.2 MW. At full capacity, the output of the project is totally
expected to be 187,680 MWh per year derived from the FSRs of each sub-project. The annual
emission reductions are estimated as about 126,120 tCO2e/year.
The project start date is 13/12/20121. InfraVest Taiwan Wind Farms Bundled Project 2012 is a
bundle project:
1. Chubei Wind Farm Project: a 11.5 MW onshore wind farm in Chubei township, Hsinchu County,
which comprises 5 wind turbines. The annual electricity generated is 27,600 MWh with emission
reductions of 18,547 t CO2e/year.
2. Zhaowei Wind Farm Project: a 13.8 MW onshore wind farm in Tongxiao Township, Miaoli
County,which comprises 6 wind turbines. The annual electricity generated is 33,120 MWh with
emission reductions of 22,257 t CO2e/year.
3. Tongyuan Wind Farm Project: a 52.9 MW onshore wind farm located in Tongxiao & Yuanli
Township, Miaoli County, comprised 23 wind turbines.
Among the 23 wind turbines of Tongyuan Wind Farm, 11 wind turbines change the locations. And the
11 wind turbines in the new locations belong to 3 wind farm project as followed. Thus, the annual
electricity generated of Tongyuan Wind Farm is 66,240 MWh with emission reductions of 44,513 t
CO2e/year.
1. Taichung III Wind Farm Project: 5 wind turbines with total capacity of 11.5 MW in Da-an Township
and Da-jia Township, Taichung city. The annual electricity generated is 27,600 MWh with emission
1 The construction starting date of Tongyuan wind farm
-
reductions of 18,547 t CO2e/year.
2. Taichung Chingfeng Wind Farm Project: 1 wind turbine of 2.3 MW in Chingshui Township, Taichung
city. The annual electricity generated is 5,520 MWh with emission reductions of 3,709 t CO2e/year.
3. Taichung Anwei Wind Farm Project: 5 wind turbines with total capacity of 11.5 MW in Da’an
Township, Dajia Township, and Chingshui Township, Taichung city. The annual electricity generated
is 27,600 MWh with emission reductions of 18,547 t CO2e/year.
Contribution to sustainable development
The project contributes significantly to the region‘s sustainable development. The specific goals for the
project are to:
1. reduce the greenhouse gas emissions in Taiwan by replacing fossil fuel based power
generation;
2. produce clean, renewable energy that contributes to alleviate the global warming;
3. contribute to the development of the wind energy sector in Taiwan;
4. create local employment both during the construction and operational phase;
SECTIONC. Proofofprojecteligibility
C.1. ScaleoftheProject
[SeeToolkit1.2.1]
Pleasetickwhereapplicable:
ProjectType Large Small
-
C.2. HostCountry
[SeeToolkit1.2.2]
Taiwan
C.3. ProjectType
[SeeToolkit1.2.3andAnnexC]
Pleasetickwhereapplicable:
Projecttype Yes No
DoesyourprojectactivityclassifyasaRenewableEnergyproject?
DoesyourprojectactivityclassifyasanEnd-useEnergyEfficiencyImprovementproject?
Doesyourprojectactivityclassifyaswastehandlinganddisposalproject?
-
Pleasejustifytheeligibilityofyourprojectactivity:
AccordingtothecurrentGoldStandardrules(version2.2),theproposedprojectisconsideredeligibleifallofthefollowingconditionsaresatisfied:
- Theprojectisalarge-scaleGSprojectwithcapacity>15MWforeachyearofthecreditingperiod;
- TheprojectislocatedinTaiwan,whichisaNon-Annex1Countryunderthe“KyotoProtocol”;- Theprojectgenerateselectricityusingwindenergy.Theelectricitygeneratedisdeliveredto
thenationalgrid.Theprojectclassifiesasrenewableenergyproject;- Theemissionreductionofgreenhousegases(GHG)intendedtobeachievedbytheproject
includescarbondioxide(CO2),whichiseligibleunderGoldStandard;- NoOfficialDevelopmentAssistance(ODA)isusedforprojectimplementation;- Itwasneverpreviouslyannouncedthattheprojectwouldproceedwithoutrevenuesfrom
carboncredits;- TheprojectisseekingforregularprojectcycleregistrationunderGoldStandard;- TheprojectonlysubmittedforregistrationtotheGoldStandardVERstream.Other
CertificationSchemesisnotinvolved.NodoublecountingwouldoccurfromtheissuanceofGoldStandardcarboncreditsoriginatingfromthisproject.
Toconclude,theprojectmeetsalleligiblecategoriesundertheGoldStandardeligibilityAssessment,itshouldapplyfortheregistryofGoldStandardRenewableEnergySupplyProject.
PreAnnouncement Yes No
Wasyourprojectpreviouslyannounced?
Explainyourstatementonpreannouncement
Nosuchpreviousannouncementhasbeenmade.
C.4. Greenhousegas
[SeeToolkit1.2.d]
GreenhouseGas
Carbondioxide
-
Methane
Nitrousoxide
C.5. ProjectRegistrationType
[SeeToolkit1.2.f]
ProjectRegistrationType
Regular
Retroactiveprojects
(T.2.5.1)
Preliminaryevaluation(eg:LargeHydroorpalmoil-relatedproject)
(T.2.5.2)
RejectedbyUNFCCC
(T2.5.3)
Pre-feasibilityassessment
IfRetroactive,pleaseindicateStartDateofprojectactivitydd/mm/yyyy:_________________
SECTIOND. Uniqueprojectidentification
D.1. GPS-coordinatesofprojectlocation
[SeeToolkit1.6]
Wind Farm Name Coordinates for center of farm
Chubei Wind Farm Project 24°51'47"N, 120°56'23"E
Zhaowei Wind Farm Project 24°29'57’’N, 120°40'28"E
Tongyuan Wind Farm Project 24°25'37"N, 120°36'57"E
Taichung III Wind Farm Project 24°22'32’’N, 120°34'49"E
Taichung Chingfeng Wind Farm Project 24°18'21"N, 120°32'55"E
-
Taichung Anwei Wind Farm Project 24°24'14"N, 120°36'40"E
Explaingivencoordinates
Theprojectcontainedsixwindfarm:ChubeiWindFarm,ZhaoweiWindFarm,TongyuanWindFarm,TaichungIIIWindFarm,TaichungChingfengWindFarm,TaichungAnweiWindFarm.
D.2. Map
[SeeToolkit1.6]
SECTIONE. Outcomestakeholderconsultationprocess
Taichung III Wind Farm
Taichung Chingshui Wind Farm
Taichung Anwei Wind Farm
Tongyuan Wind Farm
Zhaowei Wind Farm Project
Chubei Wind Farm Project
-
E.1. Assessmentofstakeholdercomments
Twolocalstakeholderconsultationmeetingswereheldfortheproposedprojectin2012andonelocalstakeholderconsultationmeetingwasheldin2015.ThequestionnairesampleisattachedinAnnex2.The local communitieswere involved in the consultation process of the proposed project throughinviting the local residents and the community representatives to the stakeholder consultationmeeting.Invitationsweresentouttoallvillagesandcountriesthatmightbeimpactedbytheprojectbundle,includingareasofthesixwindfarms.Mostoftheinvitationsweredeliveredinpersontothevillageheadsandcommunityrepresentatives;thisisaimedtoencouragethemtogathertheresidents(menandwomen)intheircommunitytojointhemeeting.Thisapproachisconsideredmoreeffectiveto invitethe localpeopleascomparedtoputtingannouncementsthroughmediaorat localoffices.59stakeholders,fromdifferentvillagesandcountieswherethesixwindfarmslocated,includinglocalresidents, community representatives, village heads, county/township officers attended thestakeholderconsultationmeeting,amongwhich15werewomen.
AllGSNGOsupportersandlocalGSexpertlocatedatthenearestregiontotheprojectareinvitedtothemeetingthroughemailinvitations.ThelocalNGOinvitedatthestakeholderconsultationisNEATTaiwan (New Energy Association of Taiwan), which is an independent local NGO focusing on theclimatesustainability,andthedevelopmentoftheclean,efficientenergytechnologiesintheregion.ThisNGOhasatouch-baseexperienceintherenewableenergiescultivationthanotherNGOsintheregion. Given the organization’s background, it was expected to present an objective perspectiveregardingtheproposedprojectdevelopment.
Date/Time:Sep3rdand4th2012
Attendance:33
Location:TongxiaoCounty,ChubeiTownship
Nameofparticipant,job/position
inthecommunity
Male/Female
Organisation(ifrelevant)
Contactdetails
ZhengGuoxiong,Representativeof People’scongress ofTongxiaoCounty
Male N/A 932665403
ZhangYouji Male Localresident ofTongxiaoCounty
912754125
-
ZhangA’jia Male Localresident ofTongxiCounty
933861985
LaiCilang Male Resident ofWubeiVillage
933754998
LuoPingshi Male Resident ofTongxiaoCounty
958052689
ZhuangZhaoyang
Male Resident ofWubeiVillage
916211513
QiuYonghe Male Resident ofTongxiVillage
930888562
LuoMubiao Male President ofTongxiCoummunity
935275752
WuYangqing Male Generalwhip ofTongxiCommunity
919905756
GanQiunan Male The head ofWubeivillage
933409025
ZhengA’jin Male Villager ofTongwanVillage
910517629
XuLinsheng Male Villager ofTongwanVillage
910115659
LaiJinlong Male President ofWunanCommunity
919827664
LiA’xin Male Villager ofTongwanVillage
No.105,TongwanVillage
WangXuanrong
Male The head ofYuangangvillage
925968689
ZhangChunji Male President ofHaigangvalligecommunity
935734659
-
ZengShihong Male President ofHai’anvillagecommunity
919855030
LaiYuzhong Male Resident ofXipingvillage
952752088
LiZhizhong Male Resident ofXipingVillage
915942588
ChenJiding Male Resident ofHai’anVillage
932863406
JiangShufen Female GeneralWhip ofWunanVillage
989205892
ZhangChuanfa Male The head ofTongxiVillage
916836135
LiuShoufu Male Resident ofTongxiVillage
916751533
ChenChunchang
Male Resident ofTongxiVillage
916753038
TuDingqi Male Resident ofWunanVillage
983803636
HuangRongcong
Male Thechairman ofPeople’sCongress
927788886
ZengGuoqing Male Resident ofChubeiCounty
988613638
ZengZhong’an Male Resident ofChubeiCounty
989200925
ZengWenqi Male Resident ofChubeiCounty
981178231
LinQiurong Male The head ofChongyiVillage
937121390
-
HuangGuojia Male Resident ofChubeiCounty
916737947
GuoGongbao Male Reisident ofChubeiCounty
910295205
ChenZhihui Female Resident ofChubeiCounty
939420888
Dateandtime:November27th2015
Attendance:26
Location:TaiChuangCounty,DajiaTownship
Nameofparticipant,job/position
inthecommunity
Male/Female
Organisation(ifrelevant)
Contactdetails
LinMingda Male LocalResidentsinDajiaTownship
932677192
XuShuwen Female LocalResidentsinDa’anTownship
426816186
HuangBixia Female LocalResidentsinDa’anTownship
426713224
XiaoWeiYu Female LocalResidentsinDa’anTownship
426710082
LinQiulan Female LocalResidentsinDa’anTownship
988080305
ZhangBizhu Male LocalResidentsinDa’anTownship
426713611
-
WuWencan Male LocalResidentsinDa’anTownship
912323476
Sumeizhu Female LocalResidentsinDa’anTownship
963341434
Chenpanquan
Male DirectorofGuikeli
932569534
Baiyintang Male DirectorofGaobei
935039730
XuWenyi Female LocalResidentsinGaobei
980217199
LinWenqin Female LocalResidentsinGaobei
933433428
LinShiguang Male LocalResidentsinGaobei
933232222
ZhenChunjia Male LocalResidentsinGaobei
426111358
ZhenQili Male LocalResidentsinGaobei
921782206
ZhuangYunhe
Female LocalResidentsinGaobei
426113377
ChenZizhang Female LocalResidentsinXiqi
932605929
Panhaishen Male LocalResidentsinXiqi
426813920
Lizhuanghuang
Female LocalResidentsinXiqi
426813920
ZhenLixiuqing
Female LocalResidentsinXiqi
426815186
Libixia Female LocalResidentsinXiqi
426813895
-
Chenjianquan
Male LocalResidentsinXiqi
910245635
ZenQingli Female LocalResidentsinXiqi
426812961
Wangrongnan
Female LocalResidentsinXiqi
Wanga’e Female LocalResidentsinXiqi
426816610
ChenMirong Female LocalResidentsinXiqi
426812638
Duringthelocalstakeholderconsultation,thefollowingconcernswereraisedbythestakeholders.Thefollowingtablesummarizestheconcernsandtheresponsemadebytheprojectowner:
Stakeholdercomment Wascommenttakenintoaccount(Yes/No)?
Explanation(Why?How?)
Noiseproblemmightoccurforsomeoftheresidentsfromawindturbine.Isthereanyapproachplannedtoovercomethisproblem?
Yes Monitoringofnoisewillbemonitoredwhoisaffectedbytheprojectparticipantsifneeded.
Trafficconditionsandsoilcondition
Yes Theprojectparticipantspromisedthatagoodmaintenancewouldbedonefortheroadifitisimpactedbytheconstructionsoftheprojectactivity.AndreplantationscouldbeconsideredaccordingtoEIAreportifthereareany.
Publicsafety No AstheprojectactivitywillbeconstructedandoperatedstrictlyaccordingtothedesignandEIAassessment,thereforenopublicsafetyissueswouldbeinvolved.Andthishasbeenexplainedtothestakeholdersduringthemeeting,andaconsensushasbeenmadethat.
-
meeting,andaconsensushasbeenmadethat.
According to this stakeholder consultation process, it is clear that the stakeholders are verysupportivetowardsthedevelopmentoftheproposedproject.
E.2. StakeholderFeedbackRound
Pleasedescribereporthowthefeedbackroundwasorganized,whattheoutcomeswereandhowyoufolloweduponthefeedback.
During the consultation meeting, the stakeholders were informed that they are invited for thefeedbackround.
Sincenosignificant issuehasbeen identified intheconsultationmeeting, thestakeholder feedbackroundwasnotconductedasaphysicalmeeting,instead,therelevantdocumentsincludingPDD,LSCreport, passport, IEEwhich includes the information collected from the first round LSCweremadepublicavailablebytheprojectowner.
Hardcopiesofthestakeholderconsultationreport,PDDandPassportweresenttothestakeholdersthroughtheleaderofthevillagecommunitysinceJune,2016.Besides,therelevantdocumentswerealsopublishedatwebsiteofVERbuyerandGSsinceJune2016toinvitefurthercommentsformlocalandglobalstakeholders.
TheresultsoftheStakeholderFeedbackRoundwillbeaddedaftertheSFRwascompleted.
E.3. Discussiononcontinuousinput/grievancemechanism
MethodChosen(includeallknowndetailse.g.locationofbook,phone,number,identityofmediator)
Justification
ContinuousInput/GrievanceExpressionProcessBook
ZhaoweiWindFarmandTongyuanWindFarm:GrievanceexpressionbookkeptbyLaisongcun,the
ZhaoweiWindFarmandTongyuanWindFarm:
TheHeadofWubeiVillage,
-
headofWubeiVillage,TongxiaoTownship,MiaoliCounty.Thetelephonenumberis00886-037-753737.
ChubeiWindFarm:GrievanceexpressionbookkeptbyLinQiurong,theheadofChongyiVillage,ChubeiCity.Thetelephonenumberis00886-03-5561016.
TaichungIIIWindFarm,ChingfengWindFarmandAnweiWindFarm:GrievanceexpressionbookkeptbyHongZhengyi,theheadofGuikeVillage,Da’anTownship,TaichungCounty.Thetelephonenumberis00886-04-26713641.
TongxiaoTownship,MiaoliCounty.
ChubeiWindFarm:
TheHeadofChongyiVillage,ChubeiCity.
TaichungIIIWindFarm,ChingfengWindFarmandAnweiWindFarm:
TheheadofGuikeVillage,Da’anTownship,TaichungCounty.
Telephoneaccess +886-2-2395-4886
+41(0)227887080
Projectmanager
GScontactor
Internet/emailaccess [email protected]
Projectmanager
GScontactor
AllissuesidentifiedduringthecreditingperiodthroughanyoftheMethodsshallhaveamitigationmeasureinplace.TheidentifiedissueshouldbediscussedintherevisedPassportandthecorrespondingmitigationmeasureshouldbeaddedtosustainabilitymonitoringplaninsectionG.
SECTIONF. OutcomeSustainabilityassessment
F.1. ‘Donoharm’Assessment
[SeeToolkit2.4.1andAnnexH]
Safeguardingprinciples Descriptionofrelevancetomyproject Assessmentofmy
projectrisks
breachingit(low/
Mitigation
measure
-
medium/high)
HumanRights
1. Theprojectrespectsinternationallyproclaimedhumanrightsincluding
dignity,culturalproperty,and
uniquenessofindigenouspeople.
Theprojectisnotcomplicityin
HumanRightsabuses.
The project respects internationally proclaimed human
rights.Taiwanhasitsownlegislationinplaceprohibiting
the violation of human rights principle and it actively
enforces the compliance of such principle. Taiwan
ratifiedtwoUNhumanrightstreaties—theInternational
Covenant on Civil and Political Rights and the
InternationalCovenantonEconomic,Social,andCultural
Rights—and passed the implementing law to bring
relevant regulations and practice into line with the
treaties. The widely recognized democracy, political
freedom, and human rights watchdog organization,
FreedomHouse ratesTaiwanasamongthemost"Free"
nations in Asia (labelled as green), with a 2 in Political
Rightsanda1inCivilLiberties(scaleof1-7,with1being
thehighest)
2015report:
https://freedomhouse.org/report/freedom-
world/freedom-world-2015#.VjnMbWQrKL0
Low N/A
2. Theprojectdoesnotinvolveandisnotcomplicitininvoluntary
resettlement.
The proposed project is constructed distanced toresidential area. Therefore, resettlement is not at allnecessary. The land use permission is offered and it isconfirmed that the project does not involve theresettlement.
Low N/A
3. Theprojectdoesnotinvolveandisnotcomplicityinthealteration,
damage,orremovalofanycritical
culturalheritage.
According to theEIA report, theproject isevidenced tobeconstructedfarfromanyculturalheritage.
Low N/A
LabourStandards
4. Theprojectrespectstheemployees’freedomofassociation
andtheirrighttocollective
bargainingandisnotcomplicitin
restrictionsofthesefreedomand
rights
Labourrightsareprotected intheLabourStandardsAct
(http://law.moj.gov.tw/eng/LawClass/LawAll.aspx?PCod
e=N0030001).The right tounionize,bargaincollectively
are highly protected by Labor Union Law:
http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=
FL014918. The project fully respects the employees’
freedomandrightsandallrelatedlawsendorsedwithin
TaiwanR.O.C.Lawcomplianceissubjecttogovernment’s
ruling.
Ref:Company'sarticles.Employeeemploymentcontract
Low N/A
5. Theprojectdoesnotinvolveandisnotcomplicitinanyformofforced
orcompulsorylabour.
Forcedor compulsory labour is regulated in the Labour
Standards Act
(http://law.moj.gov.tw/eng/LawClass/LawAll.aspx?PCod
e=N0030001).Theproject fully respects theemployees’
rights in accordance with all labour related laws
endorsedwithinTaiwanR.O.C.Lawcomplianceissubject
to government’s inspection and ruling. In case of any
termsofviolation,duepenaltywouldbeenforcedas in
accordancetotheregulations.
Ref: Employee employment contract, Employee
Qualificationcertification,Company'sarticles
Low N/A
6. Theprojectdoesnotemployandis In Taiwan, there is a comprehensive definition of child Low N/A
-
notcomplicitinanyformofchild
labour.
labour in terms of age limitation, working hours, etc.
Such employment regulations are described in Labour
Standard Act Chapter 5:
http://law.moj.gov.tw/eng/LawClass/LawAll.aspx?PCode
=N0030001
The proposed project requires a limited number of
skilledemployeestooperate,maintain,andmanagethe
wind farm, as opposed to manufacturing industries,
which may require abundant low-skilled labour.
Therefore, the project does not employ and is not
complicit in any form of child labour. According to the
Employee employment contract, it could be confirmed
thattheprojectdoesnotemployanychildlabour.
7. Theprojectdoesnotinvolveandisnotcomplicitinanyformof
discriminationbasedongender,
race,religion,sexualorientationor
anyotherbasis.
Specifically regarding the gender equality, detailed
enforcement rules are regulated in ‘Gender Equality in
Employment Act’
(http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=
FL015149
http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=
FL015150), and in case of lawsuit occurrence, legal aid
could be provided as in accordance to ‘Regulations for
Providing Legal Aid in Lawsuits Concerning Gender
Equality in Employment Act’
(http://laws.cla.gov.tw/Eng/FLAW/FLAWDAT01.asp?lsid=
FL015152)
According to the interviewwith the project owner, the
projectabidestherulesofequalityaccordinglyanddoes
not involve and is not complicit in any form of
discrimination.
Low N/A
8. Theprojectprovidesworkerswithasafeandhealthyworkenvironment
andisnotcomplicitinexposing
workerstounsafeorunhealthy
workenvironments.
Proposed project applies an automated wind power
generating facility, equipped with a remote controlling
system. Therefore, most of the employees work in
indoorenvironment (at theoffice), insteadofhaving to
standby at the wind farm site. In case of on-site
monitoringanddevicemaintenance-sincewindturbine
doesnotgenerateanytypeofpollutants,employeesare
not exposed to unsafe or unhealthy environment. The
project owner’s office space complieswith the detailed
principles of working environment as described in
‘Enforcement Rules of Labour Safety and Health at
Workplace, Taiwan R.O.C.’:
http://law.moj.gov.tw/LawClass/LawAllIf.aspx?PCode=N
0060001
Low N/A
EnvironmentalProtection
9. The project takes a precautionaryapproach in regard to
environmentalchallengesandisnot
complicity in practices contrary to
theprecautionaryprinciple.
Theprojectactivityisonlyawindpowerprojectwhichis
not includes any pollutions or similar activities. The
project activity dose not threaten human health or the
environment. The project will be constructed and
operated in an environmental friendly way. All the
release (i.e. waste water, solid waste during the
Low N/A
-
construction phase) will be handled according to the
national legislation.EIAisconductedincompliancewith
lawsandregulations.AndtheEIAapprovalpublishedby
theEnvironmental ProtectionAgencyof ExecutiveYuan
isavailable.
10. Theprojectdoesnot involveand isnot complicit in significant
conversionordegradationofcritical
natural habitats, including those
that are (a) legally protected, (b)
officially proposed for protection,
(c) identified by authoritative
sources for their high conservation
valueor(d)recognizedasprotected
bytraditionallocalcommunity
The project does not involve and is not complicit in
significant conversion or degradation of critical natural
habitats.AccordingtotheEIA,theprojectislocatedinan
isolated area and there are no critical natural habitats
locatedator close to theproject site.Asawindpower
project, the project dose not lead to invasive species
introductionoractivitydisplacement.
Low N/A
Anti-Corruption
11. Theprojectdoesnot involveand isnotcomplicitincorruption
Theproject is ownedby aprivateequity company, and
there is no governmental subsidy disbursed to the
project. Therefore, the project does not involve and is
notcomplicitincorruptionandisnotpronetoentrusted
powerabusenorcorruption.
Moreover, Taiwan was ranked 35 out of 180 countries
surveyed in Transparency International’s Worldwide
Corruption Perceptions Index
http://en.wikipedia.org/wiki/Corruption_Perceptions_In
dex.
Low N/A
Additionalrelevantcriticalissuesformy
projecttype
Descriptionofrelevancetomyproject Assessmentof
relevancetomy
project
(low/medium/high)
Mitigation
measure
1
2
Etc.
F.2. SustainableDevelopmentmatrix
[SeeToolkit2.4.2andAnnexI]
InserttableasinsectionD3fromyourStakeholderConsultationreport(SustainableDevelopmentmatrix).
Indicator MitigationmeasureRelevancetoachievingMDG
Chosenparameterandexplanation
Preliminaryscore
GoldStandardindicatorsofsustainabledevelopment
Ifrelevant,copymitigationmeasurefrom‘DoNoHarm’assessment,andincludemitigationmeasureusedtoneutraliseascoreof‘-’
Checkwww.undp.org/mdgandwww.mdgmonitor.org
Describehowyourindicatorisrelatedto
Definedbyprojectdeveloper
Negativeimpact:score‘-’incasenegativeimpactisnotfullymitigated,score‘0’incaseimpactisplannedtobefullymitigated
-
localMDGgoals
Nochangeinimpact:score‘0’
Positiveimpact:score‘+’
Airquality
MDGTarget7.A:Integratetheprinciplesofsustainabledevelopmentintocountrypoliciesandprogrammesandreversethelossofenvironmentalresources
Chosen parameter:NOx, SOx emissionreductionsExplanation: Sincethe fuel combustionin baseline powergeneration producesairpollutantsbesidesGHG, such as NOxandSOx,theprojectconsiderablyfacilitates air qualityimprovement byproducing cleanelectricity to thenational grid.According to thelatest statistic data(2015 data)2, 310 kgofSOxand302kgofNOx were generatedper GWh powergeneration. Thus,this sustainableindicator scores a“+”.
+
Waterqualityandquantity
Toreduce/avoidthenoiseimpacts,followingmeasures:-
MDGTarget7.C:Halve,by2015,theproportionofpeoplewithoutsustainableaccesstosafedrinkingwaterandbasicsanitation
During the projectconstruction period,domesticwastewateris and will beproduced. Theproject ownerapplies treatment todischargedwastewater to makesure it is compliedwith the localregulation. Theproject does notgenerate and wastewater during itsoperation, thereforeit has no impact onthe water quality.Thus,itscores‘0’.
0
Soilcondition
MDGTarget7.A:Integratetheprinciplesofsustainabledevelopmentinto
According to the EIAreport, the projectactivity does notcause any kind ofland occupation and
0
2http://www.taipower.com.tw/content/govern/govern01.aspx?MType=5&MSType=14
-
countrypoliciesandprogrammesandreversethelossofenvironmentalresources
no deforestation/plantation removalwas necessary sincethe wind farmconstruction was inerection-point basis.Theproposedprojecthasnoimpactonsoilcondition. Thereforeitscores“0”.
Otherpollutants
To reduce/avoid thenoise impacts,followingmeasureswillbetaken:1.Restrict workinghours, Making nooperation of noisymachinery during therest time of localresidents2. The cars should beequipped with noisecontrol devises such asmufflers.
MDG Target 7.A:Integrate theprinciples ofsustainabledevelopment intocountry policies andprogrammes andreverse the loss ofenvironmentalresources
As the mainconstructionsitesarenot adjacent to thelocal communities,theimpactofnoiseislimited. And theprojects site is farawayfromthevillageand mitigationmeasuresimplemented duringconstructionwork.
AccordingtotheEIA,thenoiselevelduringtheoperationtimeiscomplied with therelevantrequirements.
This indicator scores“0”
0
Biodiversity
Precaution measure:the locations of windtowers are carefullyselected; thesurroundings of windtowersaregreened.
MDG Target 7.B:Reduce biodiversityloss, achieving, asignificantreductionintherateofloss
Chosenparameter:Re-plantationrecordsThewindprojectstakeveryfewland(only42.25m2foreachwindtower),andallareasinwindfarmsisreplantedtonativegrassspeciesofplantsinordertoattractsometerrestrialanimalstoinhabit;Therefore,thisscores“0”.
0
Qualityofemployment
MDGTarget1.B:Achievefullandproductiveemploymentanddecentworkforall,includingwomenandyoungpeople
Theprojectdevelopmentcreatesrecruitmentopportunitieswithqualificationstandardfortechniciansduringbothconstructionandoperationphase.
0
-
ThestaffsweretrainedbyInfraVest,andthetrainingincludestechnical,operationalandmaintenanceinstructions.TheprojectownerprovidesLaborinsuranceforthestaffsasrequiredbythenationalregulations.However,sincethetrainingprogrammeswereheldeveryyear,andthelaborinsuranceisincompliancewiththelaw,thusinaconservativestandpoint,thisindicatorscoresa“0”.
Livelihoodofthepoor
MDGGoal1:EradicateextremehungerandpovertyMDGGoal4:ReducechildmortalityrateMDGGoal5:Improvematernalhealth
Thereisnosignificantimpactonthisaspectresultingfromtheprojectdevelopment.
0
Accesstoaffordableandcleanenergyservices
MDGTarget7.A:Integratetheprinciplesofsustainabledevelopmentintocountrypoliciesandprogrammesandreversethelossofenvironmentalresources
Theprojectfacilitatesaccesstocleanelectricityintermsofreplacingfueluseforthesameamountofelectricitygeneratedgiventhebaselinescenario.WindfarmdevelopmentinTaiwanisalsoparticularlyimportantinitseffortstoreducedependencyonimportedfuel.However,theimpactofthisindicatoronalocallevelisratherdifficulttoquantifyandmonitor.Thusthisindicatorscoresa“0”.
0
Humanandinstitutionalcapacity
MDGTarget3.A:Eliminategenderdisparityinprimaryandsecondaryeducation,preferablyby2005,andinall
Thereisnosignificantimpactonthisaspectresultingfromtheprojectdevelopment.
0
-
levelsofeducationnolaterthat2015MDGTarget8.F:Incooperationwiththeprivatesector,makeavailablebenefitsofnewtechnologies,especiallyinformationandcommunications
Quantitativeemploymentandincomegeneration
MDGTarget1.B:Achievefullandproductiveemploymentanddecentworkforall,includingwomenandyoungpeople
Chosenparameter:NumberofjobsandsalarylevelduringtheoperationalphasesExplanation:Theprojectactivitygeneratesemploymentopportunitiesduringtheprojectoperationperiod.
+
Balanceofpaymentsandinvestment
MDGTarget8.D:Dealcomprehensivelywiththedebtproblemsofdevelopingcountries
WindfarmdevelopmentwillhelpreducefossilfuelimportsinTaiwan.Yet,itrequirescomplexquantificationandmonitoring,thereforethisscores‘0’
0
Technologytransferandtechnologicalself-reliance
MDGTarget8.F:Incooperationwiththeprivatesector,makeavailablebenefitsofnewtechnologies,especiallyinformationandcommunications
ThewindenergyiswelldevelopedinTaiwan.ThoughtheequipmentsareimportedfromGermany,theprojectownerhadorganizedcapacitybuildingforthelocalstaffs,sothatitisnolongernecessarytoimporttheskilledforeignworkers.Though,therehasnotbeenpublicseminarsorworkshopheldaccordingtotheproject.Therefore,itscores‘0’.
0
Justificationchoices,datasourceandprovisionofreferences
Airquality Since the fuel combustion in baseline power generation produces airpollutants besides GHG, such as NOx and SOx, the project considerably
-
facilitates air quality improvement by producing clean electricity to thenationalgrid.Accordingtothelateststatisticdata(2015data),310kgofSOxand 302 kg of NOx were generated per GWh power generation. Thus, thissustainableindicatorscoresa“+”.Ref: http://www.taipower.com.tw/content/govern/govern01.aspx?MType=5&MSType=14
Waterqualityandquantity According to theEIA report, theproject doesnot generate andwastewaterduringitsoperation,thereforeithasnoimpactonthewaterquality.
Reference:EIAreport
Soilcondition AccordingtotheEIAreport,theprojecthasnoimpactonsoilcondition.
Reference:EIAreport
Otherpollutants Parameter chosen inassessmentofotherpollutants impact is levelofnoise.Survey result of this aspect is reported in the EIA report, it shows that theeffectisveryminimum.However,forresidentswholiveveryclosetothewindturbine(<200m)andfeelaffectedbythewindnoise,theprojectownerofferstoinstallairtightwindowstosignificantlyreducenoiseintheirhouses.
Reference:EIAreport
Biodiversity AccordingtotheEIAreport,themeasurementisbasedonnumberofaffectedplants.Sincetheconstructionprocessiskeptsmall-scaledatatime,theimpacttowards biodiversity is very limited. Furthermore, the re-plantation will beconducted.
Reference:EIAreport
Qualityofemployment Taiwan Government requires a highly skilled chief engineer (with certaincertification) toperformsuchpowergenerationprojects, responsible for theconstructionplanning,operationalandmaintenanceofthesystem.
Reference:EIAreport
EnforcementRulesofLabourSafetyandHealthatWorkplace,TaiwanR.O.C.:http://law.moj.gov.tw/LawClass/LawAllIf.aspx?PCode=N0060001
Livelihoodofthepoor In terms of livelihood of the poor: poverty alleviation, access to health careservices and sanitation, there were no significant issues derived from theproposedproject.
Accesstoaffordableandcleanenergyservices
Theprojectfacilitatesaccesstocleanelectricityintermsofreplacingfueluseforthesameamountofelectricitygeneratedgiventhebaselinescenario.Windfarmdevelopment in Taiwan is also particularly important in its efforts to reducedependencyonimportedfuel.
Humanandinstitutionalcapacity There were no significant impacts deriving from the proposed projectdevelopmentinanyofthepossibleparameters.
Quantitativeemploymentandincomegeneration
In terms of quantitative employment and income generation, the projectactivity generate project employment opportunities during the projectoperationperiod.Thus,thissustainableindicatorscoresa“+”.Reference:HRrecordsandemploymentcontract
Balanceofpaymentsandinvestment
Wind farm development in Taiwanwill help reduce its dependency in fossilfuelimports.Yet,itrequirescomplexquantificationandmonitoring
Technologytransferandtechnologicalself-reliance
In terms of technology transfer, the staffs responsible for operation andmaintenancewillbetrained inregardsoftechnical issues.Theturbineoftheproject is produced by German Company. However, there is no publicseminars or workshop held. The technology was already in the country, notechnologytransfer.
-
SECTIONG. SustainabilityMonitoringPlan
No 1
Indicator AirQuality
Mitigationmeasure N/A
Repeatforeachparameter
Chosenparameter NOx,SOx
Currentsituationofparameter According to Taipower’s latest announcement3, an average of310kgof SOxand302kgofNOxemissionsaregenerated forproducing1000MWhofelectricityproducedin2015.Basedonsuch estimation, the proposed project is expected to abateapproximatelyadditional58,180tSOxand56,679tNOxannually
Estimationofbaselinesituationofparameter
SOx, NOx emissions deriving from the electricity generated inthegrid-connectedfossilfuelfiredpowerplants.
Futuretargetforparameter Continuousmonitoring of howmuch SOx, NOx are abated bytheproposedproject.
How Calculated,basedon theannouncedSOx,NOxEmissions/kwhannouncedbythegridcompany.
When Data will be compiled and monitored annually. All relatedrecordswillbeprovidedandverifiedbytheDOE.
Wayofmonitoring
Bywho Theprojectowner.ThecalculationofSOx,NOxabatementwillbepresentedinthemonitoringreportduringverification.
No 2
Indicator Quantitativeemploymentandincomegeneration
Mitigationmeasure N/A
Repeatforeachparameter
Chosenparameter Numberofjobs,salarylevel
3http://www.taipower.com.tw/content/govern/govern01.aspx?MType=5&MSType=14
-
Currentsituationofparameter Theemployeesgetthejobopportunitiesandallemployeesarefairlycompensated.
Estimationofbaselinesituationofparameter
Employment opportunity did not exist before the projectwasdeveloped.
Futuretargetforparameter Theproposedprojectprovidesemploymenttopermanentstaffsfor wind farms operation and all staff will be fairlycompensated.Theprojectownerprovideshealthinsuranceandlabor insurance for the employee. Working hours and staff’ssalaryisincompliancewithapplicableregulations.
How CopyofemploymentcontractandthelabourinsurancelistfromLabour Insurance Bureau will be used to specify number ofpermanentemployeesoftheprojectownerandtoindicatethesalarylevels.
When Data will be compiled and monitored annually. All relatedrecordswillbeprovidedandverifiedbytheDOE.
Wayofmonitoring
Bywho Theprojectownerwillkeepallemploymentrecords.
No 3
Indicator Biodiversity
Mitigationmeasure The locations of wind towers are carefully selected and thesurroundingsofwindtowersaregreened.
Repeatforeachparameter Plantsre-plantation
Chosenparameter Re-plantationrecords
Currentsituationofparameter Theprojectownerhasalreadycompletedreplantationforthecommissionproject.
Estimationofbaselinesituationofparameter
Nosuchrecordexists
Futuretargetforparameter Windturbineitselfoccupiesverylittlelandaftercompletionofconstruction, with the foundation part of only 6.5 × 6.5 m(42.25m2)exposedsurfacearea;andtheremainingareaofonewholewindfarmisalsocoveredbyearth.Alltheseareaswillbereplanted to native grass species of plants, in order to attractsome terrestrial animals to inhabit, and the reduced habitatareas due to turbines setting will be reduced to a minimumrange.
How Keepreplantationrecordsandphotos.
Wayofmonitoring
When Recordsandphotoswillbecompiledandcheckedannually.All
-
relatedrecordswillbeprovidedandverifiedbytheDOE.
Bywho Theprojectownerwillkeepallrecordsandphotos.
Additionalremarksmonitoring
N/A
SECTIONH. Additionalityandconservativeness
Thissectionisonlyapplicableifthesectiononadditionalityand/oryourchoiceofbaselinedoesnotfollowGoldStandardguidance
H.1. Additionality
-
[SeeToolkit2.3]
TheAdditionalityAnalysisisassessedinthePDD.
H.2. Conservativeness
-
[SeeToolkit2.2]
ThissectionisnotapplicableasthisisaGSVERproject.
ANNEX1 ODAdeclaration
[SeeToolkitAnnexD]
AsconfirmedwiththeGSVERprojectinTaiwanhavebeenexemptedfromODAdeclaration.TaiwanisnotanOECDmember,anditisnotincludedintheDAClistofODArecipients.ProjectsinTaiwanaretherefore not eligible for receiving ODA funding. And Taiwan does not have a cap on the GHGemissions.
-
ANNEX2 StakeholderConsultationMeetingQuestionnaireSample