    NEWCASTLE MUNICIPALITY

    DRAFT TURNAROUND STRATEGY 2010

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010

    Target for

    December2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    1 BASICSERVICEDELIVER

    Y

    Access to Water Funding Lack of funding(Limitedallocation fromfunders& internalfund)

    Report onfundingoptions foreradication ofbacklogs frominternal fundsanddevelopmentof WCDM

    Develop &implement WaterConservation andDemandManagement Plan

    COGTA(MIG) &DWA to considerincreasingallocation perbus. Planssubmitted

    SEDsTechnical and

    Finance

    2 BASICSERVICE

    DELIVERY

    Access to Water Eradication ofbacklog

    26% Backlogs 11%eradication of

    backlogs

    Installation ofstandpipes within

    200m from eachhousehold

    DWA & MIG toprovide/allocate

    more fundingper bus. Planssubmitted

    Mr Ncube R0.6m R300m

    3 BASICSERVICEDELIVERY

    Access to Water Water loss No WCDM andwater balance

    Final WCDMPlan

    Develop &implement WaterConservation andDemandManagement Plan

    DWA toconsider fundingsupport

    R3m R15m

    4 BASICSERVICEDELIVERY

    Access to Water Service levelagreement(SLA) not inplace for WSP,

    NM & SemeMunicipality

    Outdated SLA withWSP & NO SLA forSeme Municipality.

    Completereview for allSLA

    Review all SLA COGTA tofinalise sect.78processes

    Mr Ncube/MNkosi

    5 BASICSERVICEDELIVERY

    Access to

    Sanitation

    Verification ofbaselineinformation

    Draft CIP Verification of

    Baseline

    information in

    Draft CIP

    Conduct aComprehensiveBacklog Study forall basic services

    Cogta andStatsa toconsider fundingBacklog Study

    SED:Planning R3m

    6 BASICSERVICEDELIVERY

    Access to

    Sanitation

    Eradication ofbacklog

    27,3% backlogs 10%

    eradication of

    Installation of VIPsin rural areas

    DWA to considerprovide/allocatemore fundingper bus. Planssubmitted

    R1,5m R45m

    NNTAS 2010 (DRAFT) Page 1

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    2/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    backlogs throughRegional BulkServices Grant

    7 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    Management

    Information

    System(water

    management

    systems) for

    WSP

    Service Level

    Agreement

    outdated for WSP

    Task Team to

    submit

    recommendati

    ons on the

    review of the

    SLA with WSP

    Review

    arrangements with

    regards to water

    service provision

    Mr Ncube/M

    Nkosi

    8 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    Lack of

    strategic

    alignment

    between WSA

    and WSP

    Business Plan

    from WSP

    (SP2030)outdated/

    not in place

    Business Plan

    reviewed

    100%

    Implement

    Business Plan

    MEC to finalise

    recommendation

    s regarding

    intervention at

    Uthukela Water

    9 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    Non

    compliance

    with reporting

    requirements

    by Entity

    Ad hoc reporting

    by Entity

    Final PMS for

    WSP by July

    2010

    Develop and

    Implement PMS for

    Entity

    10 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    Outdated

    WSDP (Last

    reviewed in

    2006)

    Draft WSDP Finalise WSDP Finalise and

    Implement WSDP

    (to include

    rehabilitation of

    infrastructure)

    MIG to

    increasing

    funding for new

    projects

    Mr Ncube

    DWA /Cogta to

    assist with

    Technical and

    Financial

    Support

    R215

    000

    R45m

    11 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    Insufficient

    provision in

    Budget for

    Operating and

    Deteriorating

    condition of main

    bulk line

    Investigate

    options

    regarding Bulk

    supply line

    from

    Install new bulk

    supply line from

    Ntshingwayo Dam

    DWA to consider

    funding of

    project on

    submission of a

    R30m

    NNTAS 2010 (DRAFT) Page 2

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    3/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    sanitation Maintenance Ntshingwayo business plan

    12 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    No

    maintenance

    program in

    place

    Ad hoc

    maintenance plans

    by WSP

    Maintenance

    Program

    (Planned and

    Preventative

    Plan/Framewor

    k)

    To develop and

    implement a

    Maintenance

    Program( Planned

    and Preventative

    Framework)

    Cogta to assist

    to technical

    support

    WSA Manager

    : N Ncube

    13 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    High Water

    loss

    High Water loss Final WCDM Implement WCDM Mr Ncube R3m R15m

    14 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    Insufficient

    capacity of

    infrastructure

    Ingress of

    stormwater into

    sewer

    Research and

    analysis of

    results and

    costing

    Upgrade

    infrastructure

    15 BASIC

    SERVICE

    DELIVERY

    Management

    and

    maintenance of

    water and

    sanitation

    Lack of policy

    and and

    bylaws for

    infrastructure

    development

    Ad hoc upgrade of

    infrastructure

    based on

    development

    demands

    Develop

    Infrastructure

    Development

    Policies/Bylaw

    s

    Develop

    Infrastructure

    Development

    Policies/Bylaws

    M Nkosi

    Legal Services

    16 BASIC

    SERVICE

    DELIVERY

    Access toelectricity

    Accuracy of

    household

    data

    No Market

    survey

    Out of Munics

    5560 Households

    (100%) backlogs

    (areas include

    Ingogo 600,

    Rooipoint 800,

    Charlestown 1500,

    Bosworth 500),

    500 (9%)

    yr2010

    2000 (36%)

    yr2011

    DOE funding

    applications need

    to be submitted

    DOE and Eskom

    technical

    support

    S Dube R7.358m R70m

    NNTAS 2010 (DRAFT) Page 3

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    4/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    license area

    demand

    High Eskom

    Budget. Of

    R13000 a

    connection

    Siyahlalala 1000,

    Soul City Mad Sec

    3 60, Dry Cut 500,

    Ingqayizivele 600)

    1860 (33%)

    yr2012

    1200(22%)yr

    2013

    17 BASIC

    SERVICE

    DELIVERY

    Access toElectricity

    RiversideCapacity to bedoubled

    Insufficient

    capacity in the

    industrial area

    100% Capacity To maintain

    100% capacity

    To increase to

    200% Capacity by

    installing a

    20MVA

    transformer and

    substation

    Municipal

    Manager and

    CFO to fast track

    approval of Bid

    P Haripersad R12 m

    18 BASIC

    SERVICE

    DELIVERY

    Access toElectricity

    Formosa

    Capacity to be

    increased

    Insufficient

    capacity for

    expansion

    100% 128% To increase

    capacity at

    Formosa

    None P Haripersad R1.2 m R4 m

    19 BASIC

    SERVICE

    DELIVERY

    Access tolighting

    High Mast Lights

    Capacity -Unlit

    areas

    Eskom license

    area

    150 High Masts 18 at year end To insta ll High

    Mast Lights in line

    with allocated

    budget

    To improve turn

    around time for

    installation of High

    Mast Lights

    None P Haripersad R3,2m R10m

    NNTAS 2010 (DRAFT) Page 4

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    5/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    BASIC

    SERVICE

    Access to FBE Roll out of Free BasicElectricity inESKOMLicence Area

    Communities not

    benfitting from

    FBE Subsidy

    through ESKOM

    Initiated

    engagements with

    ESKOM to resolve

    the matter

    Formalise a

    data base of

    beneficiaries

    in ESKOM

    License area ,

    aligned to

    Indigent

    Register of

    Newcastle

    municipality

    Finalise roll out of

    FBE through

    ESKOM

    DOE and ESKOM

    to render

    technical and

    financial support

    P Haripersad

    Access toElectricity(Infills)

    Infills in

    ESKOM

    License area

    require

    electrification

    Infill beneficiaries

    in ESKOM Licence

    area not electrifies

    Formalise

    database of all

    existing Infills

    for

    electrification

    Engage ESKOM

    for roll-out of

    electrification for

    Infills

    Review of ESDP to

    include Infills

    DOE and ESKOM

    to consider

    Business Plan for

    Infrastructure

    Upgrade

    P Haripersad

    20 BASIC

    SERVICE

    DELIVERY

    ManagementandMaintenance ofelectricityinfrastructure

    Staff shortage

    Cable faults &

    theft are

    variables

    Old municipal

    fleet

    30% of budget 50%

    90%-100%

    end finance

    year

    To fill critical posts

    in line with revised

    structure

    To eliminate

    uncertainty by

    enforcing security

    measures

    MM and CFO to

    fast track

    prioritization of

    critical posts

    To engage

    Community

    Services

    (Security

    Section)

    P Haripersad To be

    confirme

    d and

    allocate

    d

    through

    prioritisa

    tion on

    2010/11

    provisio

    NNTAS 2010 (DRAFT) Page 5

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    6/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    n

    21 BASIC

    SERVICE

    DELIVERY

    Access to roads(new)

    Funding Lack of funding

    (Ltd allocation

    from funders &

    internal fund

    Annually Submit

    additional

    business plans to

    relevant funding

    authorities

    Cogta (MIG) to

    consider

    increasing

    allocations

    based on

    backlogs

    Mr V Khumalo R 62 m Total of

    all

    Infrastru

    ctural

    projects

    22 BASIC

    SERVICE

    DELIVERY

    Access to roads(new)

    Backlogs

    eradication

    735 km backlog 15 k m to be

    eradicated

    Submit BP for

    approval to MIG

    CoGTA-Mig for

    increasing

    allocation

    Mr V Khumalo R 32 m R 1,728

    b

    23 BASIC

    SERVICE

    DELIVERY

    Management

    and

    Maintenance of

    roads

    Funding Lack of funding

    (ltd allocation

    Municipality)

    An increase

    internal

    funding

    Increase allocation

    through collecting

    of rates &taxes

    DOT to upgrade

    their Gravel

    District Road

    Mr S Dube

    24 BASIC

    SERVICE

    DELIVERY

    Management

    and

    Maintenance of

    roads

    Roadsmaintenance

    1 297 km existinggravel & tarred

    649 km graveland tarredroads to bemaintained

    To purchase newgrader for gravelroadsmaintenance

    DOT- possiblehandover ofnewlyconstructedgravel roadsthem

    Mr J Thulasee R 19m R 180 m

    Installation of

    Speed Humps

    High Accidents

    rates due tospeeding

    Budget allocation

    of R600k to installspeed humps

    60 Speed

    Humps to beinstalled

    All future new

    roadsinfrastructure toinclude speedhumps inspecifications anddesigns

    Roll out ofprogram forinstallation ofspeed humps inpotential accidentzones

    Director :

    Civils

    R600k R600k

    pa

    25 BASIC % MIG Non- 51 % spent 70 % targeted Appointment of Engagement V Khumalo R 62m Total

    NNTAS 2010 (DRAFT) Page 6

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    7/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    SERVICEDELIVERY

    expenditure performanceof appointedcontractors

    expenditureon MIGallocation

    competentconsultants and/orOfficials

    Improving contractmanagement andcashflowmanagement

    Ensure 100% ofMIG expenditureannually

    with Cogta (MIG)and DWAregarding reviewof policies on theappointment ofconsultants forprojects

    requiredfrom MIG

    R 1,7b

    26 BASICSERVICEDELIVERY

    IncompleteConsolidatedInfrastructurePlan

    IncompleteinfrastructurePlan

    Finalise CIPthrough DBSAdeployee throughSiyenza Manje

    Siyenza Manjehas deployedGert to assistwith all DBSAreports

    Infrastructuredevelopment Planand high prioritysector plans

    DBSA toconsider fundingof CIP

    SED :TechnicalServices

    27 BASIC

    SERVICE

    DELIVERY

    Under-

    capacitated PMUStrengthening

    of the PMU

    90% positionfilled byDecember2010

    Identify fundingthrough grants toincrease capacityand engageNational MIG onproposed businessplan

    28 BASIC

    SERVICE

    DELIVERY

    Counter funding

    for MIG Projects

    Limited

    internal funds

    to address

    demands/back

    log

    To investigateVAT Claimedto top up toprojects

    Source Additionalfunding tosupplement MIGAllocations

    Cogta to assistand advise

    SED :Technical /BTO

    To investigatethe 14%contributionfor consultantsto be injectedinto projectwhere internalcapacity isavailable

    29 BASIC

    SERVICE

    Fleet Old fleet

    (Average 20

    Low turn around

    time for repairs to

    Report on

    Fleet

    Implementing

    Fleet Management

    PraveshHaripersad

    R2.5m

    NNTAS 2010 (DRAFT) Page 7

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    8/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    DELIVERY Managementyear life for

    vehicles)

    vehicles,

    replacement of

    vehicles to slow

    Management

    OptionsSystem

    30 BASIC

    SERVICE

    DELIVERY

    Skills

    developmentScarcity of

    artisans &

    apprenticeship

    and scarce

    skills

    Capacity

    constraints iro of

    artisans &

    apprentices

    Recommendat

    ions on

    training

    options to

    EXCO

    Investigate option

    of Practical

    Experential

    Training in

    consultation with

    FET

    DoE to rendersupport

    T Mjilo/AllSEDs

    31 BASIC

    SERVICE

    DELIVERY

    Skills

    development

    Assessments

    in terms of

    RPL (Phased

    approach)

    Finalise RPL

    process

    32 BASIC

    SERVICE

    DELIVERY

    Transfer of

    electricity to

    REDS

    REDS -

    revenue loss

    and impact on

    Financial

    viability

    Ring fencing

    process Finalised

    Quarterly Reports

    on Status of Reds

    to EXCO

    NERSA to adviseon roll out ofREDS

    P Haripersad

    33 BASIC

    SERVICE

    DELIVERY

    Stormwater

    No Storm

    Water MasterPlan

    Provision on

    budget for2010/11

    Finalise Storm

    Water Master

    Plan for

    Newcastle and

    Madadeni

    areas

    Finalise and

    implement

    Stormwater

    Master Plan for

    entire municipal

    area

    DBSA andCogta(MIG) to

    considerBusiness Plan

    R100000.00

    R50m

    34 BASIC

    SERVICE

    DELIVERY

    Infrastructure

    development for

    new

    developments

    No Bulk water

    contributions

    for new

    developments

    Bulk water

    contributions

    for new

    developments

    Investigate best

    practice for

    implementation

    M Nkosi Legal/ WSA

    Manager

    NNTAS 2010 (DRAFT) Page 8

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    9/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    35 BASIC

    SERVICE

    DELIVERY

    Fire hydrant

    maintenance

    and installation

    in previously

    unserviced areas

    Fire hydrants -

    Poorly

    maintained /

    non-existent /

    un-serviced

    areas

    Draft Plan for

    Fire Hydrants

    To develop an

    maintenance and

    provision plan for

    Fire Hydrants

    WSA Manager In house

    36 BASIC

    SERVICE

    DELIVERY

    Refuse removaland solid wastedisposal

    Serious

    Challenges

    Currently 55

    thousand

    households-

    inclusive of

    businesses

    55 000

    households

    (inclusive of

    business)

    Procurement of

    additional fleet

    and recruitment of

    additional staff

    None N Swanepoel :

    Superintendan

    t Waste

    Removal

    ????? R60

    million

    37 BASIC

    SERVICE

    DELIVERY

    Maintenance

    of current

    service

    Site is

    reaching

    design life

    Alternative

    Technology for

    Waste

    reduction

    Closure of existing

    site and

    Identification and

    permitting of a

    new landfill site

    None T.Kelly

    :Superintenda

    nt Waste

    Removal

    R15

    million

    38 BASIC

    SERVICE

    DELIVERYParking Meter

    Revenue

    Loss of

    parking meter

    revenue

    Service Provider

    abandoned site

    Parking meters not

    functioning

    Re-instate

    parking meter

    service

    Investigate options

    for re-instating

    parking meter

    service

    H Zungu Chief

    : Traffic

    39 BASIC

    SERVICE

    DELIVERY

    Unfunded

    mandates

    S 84 functions

    Transfer of

    functions to

    the District

    Negotiations

    through Provincial

    Task

    Team(Environmen

    tal Health)

    Finalise Share

    Service

    Agreements

    with the ADM

    Finalise Share

    Service

    Agreements with

    the ADM

    SALGA(KZN) to

    submit

    directives

    regarding

    transfer of

    health functions

    MEC (Health) to

    Municipal

    Manager and

    COO

    NNTAS 2010 (DRAFT) Page 9

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    10/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    fast track

    response on

    transfer of

    Health

    Provincial Cogta

    to respond to

    request made in

    2009

    Cemeteries

    Cemetery

    space

    becoming

    exhausted

    To develop a

    comprehensive

    cemetery plan

    Amajuba District

    Municipality to

    consider funding

    / transferring

    function

    R500 00

    40 SPATIAL

    AND

    ENVIRONM

    ENT

    Access to waterand sanitation,electricity,refuse removaland roads

    Non Alignmentof basicservicesprovision tohousingdevelopment

    SDF not covering

    the entire

    Municipal area.

    (Housing backlog

    estimated at 30

    000 units)

    Approved

    Local Area

    Development

    Plan for

    Kilbarchan

    Ingagane

    Balangeich

    Identify

    another Local

    Area for

    Spatial

    Development

    Framework

    planning

    Undertake SDF

    review.

    SDF to be

    implemented

    incrementally

    Annual review.

    Facilitate

    approvals by

    Province

    Appoint project

    and programme

    managers for

    implementing

    approved projects.

    Implement

    approved projects.

    Annual review of

    Department ofHumanSettlements tospeed upapproval ofhousing projects

    InternalDepartments toinclude service

    provision indepartmentalplans and co-ordinationthrough Co-ordinationCommittee

    E.Nyathikazi/SED Technicall

    Services

    Funded

    by

    Provinci

    al

    Departm

    ent of

    Human

    Settleme

    nts

    Operatio

    nal

    budget

    to be

    confirme

    d

    NNTAS 2010 (DRAFT) Page 10

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    11/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    Implementatio

    n of funded

    housing

    projects.

    Review of

    Housing

    Sector Plan

    the Housing Sector

    41 Formalization of informalsettlements(What isrequired i.r.o.township

    formalization,basic servicesand housing)

    No info Planning and

    settlements design

    stages with

    respect to

    Siyahlala la, JBC,

    H39, Khathide

    Rural project.

    Settlements

    Establishment

    Applications

    submission

    Detailed layout

    planning

    Identify areas for

    infill and

    Greenfield

    development

    Approval of PLS

    applications by

    Human

    Settlements

    Department:

    Provincial

    M.O. Shozi R500k In-house

    42 LED Alignment ofLED Strategy toLocal, Provincialand NationalPrograms

    Alignment withotherinitiatives, e.g.URP, andimplementation of LEDproposals.

    There is astrategy in place

    Reviewed LEDStrategy

    Annual Review ofLED strategy toaddress alignmentwith URP andother provincialand nationalstrategies

    N/A F. Alberts R400k

    43 LED LED Plan alignedto the PGDS and

    adopted byCouncil

    Alignmentneeds to be

    ascertained.

    LED Strategyaligned to PGDS

    and Adopted byCouncil

    Reviewed LEDStrategy

    Annual Review ofLED strategy to

    address alignmentwith URP andother provincialand nationalstrategies

    N/A F. Alberts

    44 LED LED Directorateneeds to be re-engineered andcapacitated

    Lack ofcapacity toaddress alllocal economicdevelopmentchallenges

    Finalizing UnitStructure

    Appointmentof LEDManager(critical posts)

    Appointment MM and CFO toprioritize criticalposts

    E. Nyathikazi R540k

    NNTAS 2010 (DRAFT) Page 11

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    12/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    45 LED Increase focuson tourism as

    one of the keypotential localeconomicdevelopmentdrivers

    Tourismfunction done

    externally

    Report submittedfor the

    incorporation ofthe Tourism unit tothe Municipality

    Incorporatethe Tourism

    unit into theMunicipality

    Incorporate theTourism unit into

    the Municipality

    MM to consideruntilization of

    funds for criticalposts

    E Nyathikazi/TMjilo

    R500k

    46 BASIC

    SERVICE

    DELIVERY

    Housing Delivery Housing need

    and associated

    backlogs

    growing

    rapidly and

    not being

    addressed

    effectively

    Busy packagingprojects involving21760 households;i.e. Siyahlala la(1200),Emawozeni (150),H39 (2000),Osizweni E PhaseII (1240), OsizweniIII (670), Khathiderural housing(1500) and JBC(15 000)

    Identifying and/oracquiring moreland for housingdevelopment

    Servicing suitablemunicipal ownedland for middleincome housingand releasing it

    Implementatio

    n of funded

    housing

    projects

    Re-

    engineering

    of housingdelivery

    processes.

    Initiate green

    field

    development.

    Identify land

    for infill

    development

    and release of

    municipal

    owned land for

    middle income

    development.

    Have in place

    a fully

    functional and

    updated

    housing data-

    Appoint project

    and programme

    managers for

    implementing

    approved projects.

    Identify andrelease land for

    various incomegroup and varioushousing forms

    Finalise LandDisposal Policy(Investigateoptions for therelease of landbelow marketvalue to cater forvarying incomecategories)

    Set-up andmaintain housingdata base

    MM S. Mkhize

    NNTAS 2010 (DRAFT) Page 12

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    13/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    base

    47 BASIC

    SERVICE

    DELIVERY

    Tenure upgrade

    Process of

    transferring

    state

    provided

    houses to

    beneficiaries

    too slow

    Significant numberof Beneficiaries ofgovernmenthousing schemesstill do not havefull title overproperties theyoccupy

    Finalize EEDBS

    implementatio

    n

    Assign morepeople in EEDBSand estate section

    AccelerateImplementation ofEEDBS

    MM K. kubheka

    48 LED

    SMME

    Development

    SMME

    Development

    should be part

    and parcels of

    the economic

    development

    strategy.

    SMMEdevelopmentcurrentlyundertaken on anad hoc basis

    Development

    of an SMME

    Framework

    MainstreamingSMMEdevelopmentwithin theorganization

    N/A F Alberts

    49 LED Implement

    "Sebenzel

    iKhaya"

    program

    Implement"Sebenzel iKhaya"program as acomponent ofSMMEdevelopment

    N/A EJ Nyathikaziand S Dube

    R100k

    50 GoodGovernance andPublicParticipation

    Functionality ofWardCommittees

    Wards

    established

    insufficient

    human and

    financial

    support for

    functionality.

    No mechanism

    to participate

    in municipal

    matters,

    All 31 wards are

    now functional.

    Currently only one

    municipal official

    is responsible to

    service 31 wards.

    Public

    Participation

    Unit needs

    additional

    staff.

    Quarterly

    Reports on

    Ward

    Committees to

    be tabled to

    Council and

    Ward Committee

    reports to be

    Ensure that the

    full functionality,

    effectiveness is

    sustained.

    Continuous

    training about

    COGTAs

    Intervention

    Mthi Mduna

    NNTAS 2010 (DRAFT) Page 13

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    14/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    (reporting to

    council and

    feed back to

    communities)

    There still has no

    mechanism to

    participate in

    Municipal matters.

    Currently the ward

    committee reports

    go as far as the

    COO but not to

    Council.

    feedback.

    Improve the

    relationship

    between Ward

    Commitees

    and Ward

    Councillors.

    roles and

    responsibilities

    51 Broader publicparticipationpolicies andplans

    (Implementedframework)

    No framework Draft Framework. Review andAdopted.

    Implementatio

    nCommences

    Reviewimplementation

    Engage otherStakeholderse.g. NGO andCBOs.

    Mthi Mduna

    52 PublicCommunicationsystems

    No info Media (Press

    releases).

    Ward Committee

    Ward public

    meetings

    IDP Forums

    Investigate the

    financial

    implication of

    extending

    communication via

    the national radio

    Not applicable.

    Improve

    feedback

    Revisit/Reprior

    itise the draft

    budget by May

    2010

    Improve feedback

    mechanism.

    Strengthen the

    relationship with

    the media.

    Provide feedback

    mechanism

    processes.

    Review the

    organogram of the

    Public Relations

    Unit.

    None Siza

    53 Complaintsmanagementsystems

    No customersatisfactionsurvey

    Not available Set up a callcentre

    Customersatisfactionsurvey, every twoyears.

    COGTA,

    Office of the

    Siza Ntombela

    NNTAS 2010 (DRAFT) Page 14

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    15/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    Review theeffectiveness of

    the call centre.

    Premier.

    54 Front DeskInterface

    Customercomplaints

    Through enquiriesdesk. Continuousstaff training onBatho Peleprinciples.

    DraftingGenericCustomer CarePolicy

    Monitor Feedbackfrom Communitiesthrough customersurvey reports.

    Internal Process Siza Ntombela

    55 Appointment of CDWs vs.number of wards

    Not all wardshave CDWsand no formallinks.

    Councilopinion CDWs

    notaccountable tothem as theyare part ofProvince butshould betransferred tomunicipalityaccountable toManager forPublicparticipation.

    There are only 4CDW for 31 Wardswhich are sharedwith other sectorDepts.

    No control over

    CDWs.

    Investigate theCadre systemfor Newcastle

    Engage othersectors for sharedresources.

    Sharedresources withother sectors.

    ExamplePremiersflagship

    programmes

    Mthi Mduna

    56 Good

    Governanc

    e andPublic

    Participati

    on

    Stability ofCouncil

    Relationshipbetweenparties is poordue to powerstruggle,resulting indistrust andwalk outs.

    Does notfunction as acooperativestructurerather withindividualissues.

    The politicalclimate hasstabilised.

    To get input fromCouncil.

    Get MEC s Officeto intervene,through IGRmeetings.

    NNTAS 2010 (DRAFT) Page 15

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    16/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    NoRelationship

    with District

    57 Delegation of functionsbetween politicalandadministration

    No delegations

    There is aperceptionthat politicshas filtereddown to theadministration

    Draft delegation

    Council

    Approved byCouncil

    Finalise thedelegation policyandimplementationwith annualreview.

    COGTA andProvincial

    Treasury

    Manager LegalService M.

    Nkosi

    58 Training of Councillors

    Council toidentifytraining needs

    Need forcouncillors tounderstandtheadministration.

    Planning theworkshop on Rolesand Responsibility

    Roles andresponsibilitywork shop in

    Feb 2010

    Continuous annualworkshop on roles,responsibility and

    protocol

    COGTA andWhips

    MrHauptfleisch

    59 CouncillorOversightFramework(functioningscopa)

    Does not havea oversightframework.Cllrs not awareof oversightrole, andindicate theyreceive no

    monthlyreports.Reports fromExco toCouncil aresubmitted, butno feedbackon resolutionstaken.

    Council notaware ofsystems andprocedures inplace in the

    No OversightFramework

    No follow up on

    implementation ofresolutions.

    Develop anoversightFramework.

    WorkshopCouncillors on

    oversightroles.

    Reintroducethe executionof resoultionreports.

    Implementationand review ofFramework

    SED to submitand/or present

    reports onexecution ofresolutionsmonthly toPortfolioCommittees

    None MUNICIPALMANAGER/SED

    s

    NNTAS 2010 (DRAFT) Page 16

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    17/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    municipality.

    60 Feedback tocommunities(Ward councillorto wardcommittee andvice versa)

    Perceptioncouncil doesnot takecommunityview intoconsideration.

    Communicatio

    n takes place

    on ad hoc

    basis.

    Perceptioncouncil does

    not takecommunityview intoconsideration

    Publicparticipationframework willaddress theissue.

    Steamlining ofcommunicationthrough ward publimeetings.

    Mthi

    61 Oversight

    Committee/

    Municipal

    SCOPA

    composition

    Dysfunctional

    Oversight

    COmmittee

    Establish a

    SCOPA by

    June 2010

    Establish andensure afunctionalMunicipal SCOPA

    Cogta to rendertechnicalsupport

    Speaker/ COO

    62 Finalise

    strategies for

    developmentof high Priority

    Sector Plans

    Departments todraft sector plansin house

    63 Evaluate

    effectiveness

    of

    Organisational

    Structure

    Finalise the

    Micro

    Structure

    MM

    NNTAS 2010 (DRAFT) Page 17

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    18/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    aligned to IDP

    64 Institution

    al

    developme

    nt and

    transforma

    tion

    HR Policiesavailability,adoption andimplementation

    Council notaware ofsystems andprocedures inplace in themunicipality.

    All HR policies andprocedures inplace howeversubject to reviewand workshop asand when required

    Workshoptargetedstakeholderson all currentHR policiesandprocedures

    Annually to reviewat least 3 policies asand when required

    To develop andapprove HR Plan by2011

    SALGA toprovide genericpolicies andassistance

    T Mjilo Nil R1m for2010/11required

    forconsulta

    nts toassist

    65 Vacancies (S57)

    Status of fillingof vacantpositions

    MM & 1 S57offical is onsuspensionbut would

    appear thatthe process isnot inaccordancewith theregulations

    In progress to befinalized byCouncil in May2010

    All section 57positions to befilled

    Fill all Section 57positions

    T Mjilo Includedin

    2010/11Budget

    66 % Vacancies inother levels

    Status of fillingof critical vacantpositions

    Approx 50%vacancy rate

    30 Criticalvacancies to befilled

    All criticalpositions asidentified andfunded andapproved byMM to be filledprior toDecember2010

    Critical positionsto be filled as andwhen vacanciesoccur

    Workstudy to beinvolved inidentifying criticalvacancies and

    advise MM on theurgent fillingthereof

    LLF and MM T Mjilo

    67 S57 appointed

    with signed

    Performance

    Agreements

    MM and SEDCorporateServicessuspended,vacancy forSEDCommunityServices

    All section 57agreementsfinalized. Tofinaliseagreements forActing posts

    All Section 57agreementsfinalized andimplemented.Monthlyevaluationsandmonitoring inline with PA

    All Section 57Agreements to befinalized within 1month of approvalof budget

    None MM/N Ticka-Ragunanan

    IDP/PM &Mayor

    NNTAS 2010 (DRAFT) Page 18

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    19/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    68 PerformanceEvaluations

    processes notfinalised

    2007/08 and 08/09evaluations

    outstanding

    Performanceevaluations

    finalized upto2009/10

    69 Has a SkillsAudit beenconducted for allemployees

    No info andas well there isa gapidentifiedregarding theimplementation of WSP

    In progress withSkills Audit for allemployees

    Skills Auditreport will bepresented byDecember2010

    Will have SkillsAudit Report by2011.

    Quarterly reportsto be submitted toLLF and Manco ontheimplementation ofthe WSP

    CoGTA to rendertechnicalsupport on Skillsaudit

    D Jansen N/A

    70 Does themunicipality

    have aWorkplace Skillsplan

    No info- noncompliance

    with minimumcompetencylevels andneed for thedevelopmentof strategies

    2009/10 WSP inplace with

    compliancecertificate and inprogress with2010/11 WSP

    WSP willapproved and

    submitted toLGSETA by 30

    June 2010 andincorporatethe MinimumCompetencylevels in WSP

    Annually reviewWSP and

    implement

    SALGA, LGSETA,LOGOLA to roll-

    out training

    T Mjilo

    D Jansen

    71 Establishcommittee toundertakeminimumcompetencyassessmentsand submitrecommendations to comply

    withRegulations

    Comply withMinimumCompetencyLevels for seniormanagers

    LGSETA andKwanaloga tooffer technical

    support/funding

    D Jansen /TMjilo

    ????? No accreditedtraining planfor Councillors

    Develop aCouncillor

    Training Policy

    Skills Auditand PDPs forall Councillorsfinalised andAccredited

    Training Planincorporated

    Develop andimplement anAccredited

    Training Plan forall Councillors

    Cogta andKwanaloga tooffer fundingand on-going

    training support

    SED :CorporateServices/

    Directors HRand

    Administration

    NNTAS 2010 (DRAFT) Page 19

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    20/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    into WPSP

    72 Functionality of LLF

    Relationshipbetweenmanagementand unions ispoor.

    No regularmeetings.

    LLF meetings takeplace andworkshop hasbeen conductedby Kwanaloga toenhance the goodrelationshipbetween theunions andmanagement-

    Employer sideshould berepresented(allSEDs to attend)

    MM and allSEDs to attendLLFs

    To review thecomposition ofmanagement ,EXCO andPortfolioCommitteemembers in theLLF.

    All SEDs to attendand have LLFmeetings at leastonce a month tocomply with theagreements but ifno items there will

    be no meeting

    T Mjilo

    73 Employmentequity plan

    No Info Draft EEP in theprocess ofconsultation

    To beapproved byDecember2010

    Will have the planin place byDecember 2010

    Quarterly reportsto the PortfolioCommittee onimplementation ofEEP

    LLF, Manco,Porfolio, Excoand Council

    T Mjilo

    74

    Office

    Accommodation

    Decentralized

    office

    accommodatio

    n

    Appointment of

    Consortium for

    Office

    accommodation

    proposals

    30% of

    Planning

    Phase 1

    complete

    Appointment

    of Contractor

    Finalise extensionplans for CivicBuilding forcentralization ofoffice

    accommodation

    Implement Phase1 by 2010/11

    E Hauptf le isch R10mCapital

    75 Finalise office

    rental

    arrangements

    as an interim

    measure (if

    To consider officerental as aninterim measures

    Manco

    NNTAS 2010 (DRAFT) Page 20

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    21/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    approved by

    Manco)

    76

    ICT - Upgrade

    infrastructureNo IT Section

    Recruitment

    Process for ICT

    Manager

    Draft ICT

    policies

    Establish ITSection anddevelop IT policies

    IT Manager

    NKadiramwando

    77 Proposed ICT

    Section

    Structure

    78 Health and

    safety issues not

    managed in

    terms of

    Occupational

    Health and

    Safety Act

    Designation of

    official as a

    Chief Safety

    Officer

    To comply withOHSA legislation

    T Mjilo

    Director

    HR/MM

    In-House

    79 HR Plan does not

    include

    induction of new

    employees

    No induction

    process

    Incorporation

    into the HR

    Plan

    Inductionprogramme for allemployees

    T Mjilo

    80 Training for

    senior

    managers for

    conducting

    induction

    departmentall

    y for new

    employees

    81 Labour matters

    Collective

    Supervisors

    not being held

    All disciplinary

    matters referred

    Training on

    Disciplinary

    To identify andtrain supervisorsto conduct

    Kwanaloga tosupport

    M Nkosi MMs office/ V

    In-house

    NNTAS 2010 (DRAFT) Page 21

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    22/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    agreements and

    procedures

    non compliance

    accountable/re

    sponsible fordiscipline of

    subordinates

    to HR

    Procedures for

    all levels of

    management

    disciplinaryprocesses

    Nzuza

    82 Financial

    Viability

    Revenueenhancementstrategiesincomplete

    RevenueEnhancementStrategy hasbeendeveloped.

    RES has beensubmitted to Excoand was referredto the FSPC.

    Implement theRES.

    Employ Staff, co-ordinatedepartmentswithin theMunicipality andpublicparticipation.

    SED: BTO

    R2 000 000

    R2 500000

    83 Debtorsmanagement

    A creditcontrol,Customer Care

    and DebtManagementPolicy is inplace.

    OutstandingDebtors of R500m

    Reduce debtby at least20%

    Implementincentivesscheme torecoveroutstandingdebt.

    Install flowregulators(phased Approachannually)

    Verification ofIndigents (10%per ward)

    Review TOR forappointment of anew service

    provider.

    90% of verificationprocessed to be

    phased

    Intervention byProvincial

    Treasury to

    assist in therecovery ofGovernmentDebt.

    Manager :Income

    J Muir

    SED :Technical andBTO

    SED : BTO

    R3m

    ????

    ????

    84 Cash flowmanagement

    A cash andinvestmentpolicy as wellcredit controland debtcollectionpolicy is inplace.

    Low paymentfactor (75%),however municipalcommitments arehonored.

    Increasepaymentfactor by atleast 20%

    Implement theRevenueEnhancementStrategy.

    Manager:BudgetImplementation

    85 Repairs andmaintenanceprovision

    Provision isnoteadequately

    Investigate costallocation modelfor repairs and

    SED : BTO

    NNTAS 2010 (DRAFT) Page 22

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    23/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    made on thebudget.

    As the capitalbudgetprovisionincrease, thisprovision mustalso increaseproportionally.

    maintenance ofassets

    86 Capitalexpenditure

    Slow spending 24% spent 50%

    Monthlyreporting ofturnaroundtimes for SCMand Creditors

    CommunicateSCM normsand standardsto all internalrole-players by

    July 2010

    Employ and trainstaff in the SCMUnit. (CriticalPosts)

    SCM processes tokick in May 2010.

    Manager:SCMU/ALLSEDs

    ?????

    87 Clean Audit Unqualifiedaudit2007/2008.

    Qualified Audit2008/2009.

    Budget notaligned to IDPof local ordistrict.

    Assets notclassified

    according to GRAP17.

    Consolidated AFShas not beenachieved due tonon submissionfrom UthukelaWater.

    Budget aligned toIDP locally

    Favourableaudit opinionfor 09/10

    Complete theassetclassificationito GRAP 17.

    Consolidatethe AFS .

    Clean audit for10/11 andonwards

    Consult withUthukela Waterand the AG due tothe backlog offinancialstatements.

    Engage AuditorGeneral/ MEC

    CoGTA

    MM to intervenewhen necessary

    SED : BTO

    NNTAS 2010 (DRAFT) Page 23

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    24/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    88 Submission of Annual Financial

    Statements

    Submitted ontime.

    ConsolidatedAFS has notbeen achieveddue to nonsubmissionfrom UthukelaWater.

    Consolidated AFShas not been

    achieved due tonon submissionfrom UthukelaWater.

    SubmitConsolidated

    AFS.

    Consult withUthukela Water

    and the AG due tothe backlog offinancialstatements.

    MM/AG/MECCoGTA

    SED : BTO

    89 To internallyprepare financialstatements forFinancial Year10/11 by August2010

    90 Assetmanagement

    Current AssetRegister is notGRAPcompliant.

    A service providerwas appointed toverify and tagassets.

    To have aGRAPcompliantasset register.

    Implementrecommendationof the ServiceProvider itobusinessprocesses andassetmanagementpolicy.

    Manager:BudgetImplementation

    R2 000000

    91 Develop andimplement anAssetManagement Plan

    ???

    92 Credibility, and

    transparency ofSupply ChainManagement

    Council aware

    they are notinvolved inSCM system,but unawareof oversightrole.

    Concernsregarding theeffectiveness

    Reports on the

    implementation ofthe Supply ChainManagementPolicy andDeviations aresubmittedquarterly since

    July 2009

    Workshop on

    roles andresponsibilitieson SCMmatters forCouncillorsand officials

    A report onthe differentranges ofprocurementwill be

    Implement the

    new FMS.

    New Service

    Provider

    Manager :

    SCMU

    R4,5m

    NNTAS 2010 (DRAFT) Page 24

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    25/26

    No.

    NationalKPA

    Priority TurnAround Focal

    Area

    CapacityAssessment

    Findings January 2010Target forDecember

    2010

    Municipal

    Action

    UnblockingAction Needed

    from otherSpheres and

    Agencies

    Responsible

    Official

    Budget

    Allocated

    Projected

    of SCMsystems and

    possibility ofmaladministration.

    submitted withthe

    implementation of the newFMS quarterly

    Appointmentof additionalstaff withrequiredcompetencystandards

    Review of thecomposition ofBid

    CommitteesBy June 2010

    Workshop/TrainedCommitteeson SCMrelatedmatters andcase law

    Appoint staff(Critical Posts)

    93 and

    Anti Fraud and

    Corruption

    Approval of

    Anti Fraud and

    Corruption

    Policy by July

    2010

    Risk Manager

    NEWCASTLE MUNICIPALITY TOP 10 TURN AROUND PRIORITIES

    1. Service Delivery (Maintenance existing levels , Rehabilitation of infrastructure and backlogs)

    NNTAS 2010 (DRAFT) Page 25

  • 8/3/2019 Annex J3 Newcastle Turnaround Strategies (NNTAS)

    26/26

    2. Fast Track Sustainable Human Settlements through Housing and Rural Development Program

    3. Finalise Consolidated Infrastructure Plan and Capital program implementation

    4. Debt Management increase payment factor

    5. Finalisation of Micro Structure, Filling of critical posts & Compliance Minimum Competency levels and training of

    Councillors by 2012

    6. Clean Audit 2014

    7. Effective functioning of municipal SCOPA

    8. Effective and functioning ward committees

    9. Anti- Corruption and Fraud Prevention program

    10. Halving poverty and unemployment by 2014