S.No Description Qty Unit Specification Remarks
1Ventilation Air and Exhaust
Flue Gas System
Air Intake Filter Housing 3 Nos Paint Coated Supply & Installation
Air Intake Filter sets 3 Nos Filtration Class G3 Supply & Installation
Air Intake Ducting 3 NosAs Per GEJ
Recommendation Supply & Installation
Exhaust Silencer Structure 3 Lot MS Structure Supply & Installation
Exhaust Silencer CondensatePiping 3 Lot Supply & Installation
Engine Exhaust Piping 3 Lot Supply & Installation
Exhaust piping insulation withGI cladding 3 Lot Supply & Installation
2 Cooling Water System
Cooling tower 2 Nos 225 USRt
Cooling water header 3 LotSeamless
ASTM A106, Sch 40 Supply & Installation
Piping for genset's LT circuit 3 LotSeamless
ASTM A106, Sch 40 Supply & Installation
Piping for genset's HT circuit 3 LotSeamless
ASTM A106, Sch 40 Supply & Installation
Expansion tanks piping 3 LotGI piping with
fitting Supply & Installation
Water charging pump 1 Nos Supply & Installation
A-OES Scope of Supply
Power generation system
S.No Description Qty Unit Specification Remarks
3 Lube Oil System Nos
Lube oil filling and overflowlines 3 Lot
Seamless Sch 40,A106 Supply & Installation
Dirty oil drain line 3 LotSeamless Sch 40,
A106 Supply & Installation
Lube oil filling line to genset 3 NoSeamless Sch 40,
A106 / A53 Supply & Installation
4 Fuel System
Gas supply line up to gasstreet 3 Lot
with in powerhouse Supply & Installation
Paint work on piping 3 Jobwith in power
house
Valves & Fittings 3 Lotwith in power
house Supply & Installation
Piping Supports 3 Lotwith in power
house Supply & Installation
5 Electrical
LV Incoming power panel 3 Nos Supply & Installation
MCC Panel 1 NoFor auxiliaries of
genset Supply & Installation
Body Earth, Auxiliary andControl cables 3 Lot
Within OES BatteryLimit
Earth point with Material &cable will be provided by SSD
Electrical installation material 3 Lot Cable trays Supply & Installation
S.No Description Qty Unit Specification Remarks
6 Documentation
General arrangement layout 1 Job As per scope
Cable trench and cablerouting drawings Job Nos As per scope
Operation Philosophy Job Nos As per scope
P &ID 1 Job As per scope
Complete Project Schedule 1 Job As per scope
Project Schedule Job Nos As per scope
Project Submittals 1 Job As per scope
Wiring diagrams Job Nos As per scope
7 Shipping and Transportation
Transportation of localauxiliary items to site withtransportation insurance
1 Job As per scope
Lifting, unloading, rigging andplacement at designated
place1 Job As per scope
Flushing, Hydrotesting andRecharging 1 Job
With in 01 meter ofOES battery limits As per scope
NOTE:1. Protection setting & other signals will be identified by OES