    Improvement Proposal of Culverts for Chandrapura-Gomia Road   Annexure 8.3

    Sl

    No.

    Survey

    Chainage

    (in Km)

    Design

    Chainage (in

    Km)    I   n   v   e   n   t   o   r   y

       C    h

       a   i   n   a   g   e    (   i   n   K   m    )

       T   y   p   e   o    f

       S   t   r

       u   c   t   u   r   e   E   x   i   s   t   i   n   g

       S   p   a   n    /    d   i   a   e   x   i   s   t   i   n   g

       i   n    (   m    )

       D   i   r   e   c   t   i   o   n   o    f    f    l   o   w

       C   a   r   r   i   a   g   e   w   a   y

       W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       e   x   i   s   t   i   n   g

       i   n    (   m    )

       S   o    f    f   i   t   o    f   c   u    l   v   e   r   t

       E   x   i   s   t   i   n   g   R   o   a    d   T   o   p

       I   n   v   e   r   t   o    f   e   x   i   s   t   i   n   g

       c   u    l   v   e   r   t   s

    LBL

    Pipe/

    Slab/

    Box/ Arch

    Head

    Wall

    Wing

    Wall

    Return

    Wall

    Parapet /

    Handrail  Condition

      Improvement

    Proposal

    Improvement

    Proposal after

    finalisation of 

    vertical Profile

    Proposed

    Finished

    Level

    Type of 

    Structure

       S   p   a   n   a   r   r   a   n   g   e   m   e   n   t

       o    f   S   t   r   u   c   t   u   r   e

       C   a   r

       r   i   a   g   e   w   a   y   W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       i   n    (   m    )

    1 0.181 0.181 0.180 Slab 1X1.0 R->L 11.700 12.800 204.147 204.613 202.956 202.474 F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 204.675 - - 11.700 12.800

    2 0.420 0.420 0.425 Slab 1X0.9 R->L 11.600 12.700 204.067 204.670 202.825 202.079 F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 204.926 - - 11.600 12.700

    3 0.523 0.522 0.527 Slab 1X0.9 R->L 11.700 12.600 204.805 205.194 202.167 202.677 P - F - PCulvert: Poor, Wing Wall/ Return

    Wall: Fair, Parapet: PoorReconstruction

    New Culvert

    Proposed2 05 .4 64 Box Culvert

    2m x 3m x

    1cell10. 900 12.000

    4 0.740 0.739 0.747 Slab 1X0.9 R->L 11.800 12.700 204.833 205.211 203.751 203.559 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 205.362 - - 11.800 12.700

    5 0.870 0.869 0.880 Slab 1X0.9 R->L 11.800 12.400 203.727 204.149 202.235 201.636 F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 204.252 - - 11.800 12.400

    6 1.090 1.088 1.103 Slab 1X0.9 R->L 11.600 12.500 203.049 203.459 201.297 201.297 P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed2 03 .7 32 Box Culvert

    2m x 3m x

    1cell10. 900 12.000

    7 1.193 1.191 1.207 Slab 1X1.1 R->L 12.300 12.600 202.595 202.833 200.538 200.393 F P NIL

    Culvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: NIL

    May be Retained with

    Repairing Retained 202.918 - - 12.300 12.600

    As Per Field investigation New Proposal

    :

    : :

    8 2.602 2.599 2.633 Slab 1X0.9 R->L 11.600 12.600 185.882 186.353 184.873 185.734 P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed1 86 .5 62 Box Culvert

    2m x 2m x

    1cell10. 900 12.000

    9 2.803 2.797 2.839 Slab 1X1.7 R->L 11.200 11.800 - 175.445 171.346 - P - F - PCulvert: Poor, Wing Wall/ Return

    Wall: Fair, Parapet: PoorReconstruction

    New Culvert

    Proposed1 75 .9 97 Box Culvert

    2m x 2m x

    1cell 3m EC10. 900 12.000

    10 2.891 2.884 2.928 Slab 1X1.8 R->L 12.400 12.400 176.225 176.639 174.611 174.471 P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed1 76 .7 78 Box Culvert

    2m x 3m x

    1cell10. 900 12.000

    11 3.227 3.220 3.270 Slab 1X2.9 R->L 11.200 12.100 185.907 186.156 180.485 185.469 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 186.140 - - 11.200 12.100

    12 3.597 3.589 3.647 Slab 1X0.9 R->L 11.900 12.800 186.027 186.827 184.576 184.589 F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 186.919 - - 11.900 12.800

    13 3.790 3.782 3.843 Slab 1X1.0 R->L 11.900 12.800 186.579 187.399 185.026 185.221 F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 187.490 - - 11.900 12.800

    14 3.983 3.975 4.040 Slab 1X1.5 R->L 11.800 12.700 184.008 184.569 182.349 182.327 P P PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 184.780 - - 11.800 12.700

    15 4.150 4.141 4.210 Slab 1X0.9 R->L 11.800 12.700 184.726 185.217 183.522 183.443 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 185.380 - - 11.800 12.700

    16 4.662 4.654 4.735 Slab 1X1.5 R->L 11.900 12.500 191.450 1 93.072 188.914 - F - F - PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: PoorReconstruction

    New Culvert

    Proposed1 93 .7 00 Box Culvert

    2m x 2m x

    1cell 3m EC10. 900 12.000

    Page - 662

  • 8/16/2019 Annex 8.3_Culvert Proposal

    2/6

    Sl

    No.

    Survey

    Chainage

    (in Km)

    Design

    Chainage (in

    Km)   I   n   v   e   n   t   o   r   y

       C    h   a   i   n   a   g   e    (   i   n   K   m    )

       T   y   p   e   o    f

       S   t   r   u   c   t   u   r   e   E   x   i   s   t   i   n   g

       S   p   a   n    /    d   i   a   e   x   i   s   t   i   n   g

       i   n    (   m    )

       D   i   r   e   c   t   i   o   n   o    f    f    l   o   w

       C   a   r   r   i   a   g   e   w   a   y

       W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       e   x   i   s   t   i   n   g

       i   n    (   m    )

       S   o    f    f   i   t   o    f   c   u    l   v   e   r   t

       E   x   i   s   t   i   n   g   R   o   a    d   T   o   p

       I   n   v   e   r   t   o    f   e   x   i   s   t   i   n   g

       c   u    l   v   e   r   t   s

    LBL

    Pipe/

    Slab/

    Box/ Arch

    Head

    Wall

    Wing

    Wall

    Return

    Wall

    Parapet /

    Handrail  Condition

      Improvement

    Proposal

    Improvement

    Proposal after

    finalisation of 

    vertical Profile

    Proposed

    Finished

    Level

    Type of 

    Structure

       S   p   a   n   a   r   r   a   n   g   e   m   e   n   t

       o    f   S   t   r   u   c   t   u   r   e

       C   a   r   r   i   a   g   e   w   a   y   W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       i   n    (   m    )

    As Per Field investigation New Proposal

    17 5.031 5.023 5.111 Slab 1X1.4 R->L 11.400 12.000 200.534 2 01.572 196.400 - F F P Culvert: Fair, Wing Wall/ ReturnWall: Fair, Parapet: Poor

    May be Retained withRepairing

    Retained 201.762 - - 11.400 12.000

    18 5.177 5.168 5.257 Slab 1X1.5 R->L 11.200 11.800 200.927 2 01.659 197.172 - F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 201.807 - - 11.200 11.800

    19 5.340 5.331 5.422 Slab 1X1.5 R->L 11.600 12.200 200.269 201.686 195.559 195.965 F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 201.828 - - 11.600 12.200

    20 5.460 5.450 5.543 Slab 1X1.3 R->L 12.000 12.300 199.535 201.259 196.632 196.589 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 201.526 - - 12.000 12.300

    21 5.497 5.489 5.581 Slab 1X1.4 R->L 11.600 12.200 199.965 2 01.205 196.165 - F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 201.338 - - 11.600 12.200

    22 5.697 5.688 5.782 Slab 1X1.4 R->L 11.600 11.800 198.802 199.634 194.167 194.595 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 199.831 - - 11.600 11.800

    23 5.830 5.821 5.916 Slab 1X0.9 R->L 11.400 12.000 198.742 1 99.325 196.982 - F F NILCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: NIL

    May be Retained with

    RepairingRetained 199.522 - - 11.400 12.000

    24 5.941 5.932 6.028 Slab 1X1.2 R->L 11.200 12.100 196.392 1 97.036 195.032 - F F PCulvert: Fair, Wing Wall/ Return

    : :

    May be Retained withRetained 197.255 - - 11.200 12.100. . . . . . . . .

    :

    Wall: Fair, Parapet: Poor

     

    Repairing. . .

    25 6.019 6.010 6.107 Slab 1X2.9 R->L 11.300 12.300 195.386 1 96.224 193.086 - F - F - PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained,

    replacing the deck

    and Repairing

    New Culvert

    Proposed1 96 .5 60 Box Culvert

    3m x 4m x

    1cell10. 900 12.000

    26 6.184 6.174 6.272 Slab 1X1.0 R->L 11.400 12.300 196.723 1 97.212 196.231 - P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed1 97 .3 82 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    27 6.666 6.657 6.761 Slab 1X1.0 R->L 10.500 11.100 201.618 2 02.260 201.550 - P - P - P

    Culvert: Poor, chocked, Wing

    Wall/ Return Wall: Poor, Parapet:

    Poor

    ReconstructionNew Culvert

    Proposed2 02 .3 70 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    28 6.837 6.828 6.933 Slab 1x0.6 R->L 10.200 11.100 197.582 1 98.284 197.392 - P - P - P

    Culvert: Poor, Chocked, Wing

    Wall/ Return Wall: Poor, Parapet:

    Poor

    ReconstructionNew Culvert

    Proposed1 98 .4 72 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    29 6.989 6.980 7.090 Slab 1X1.0 R->L 11.000 11.900 196.814 197.219 194.489 193.461 G G GCulvert: Good, Wing Wall/ Return

    Wall: Good, Parapet: Good

    May be Retained with

    RepairingRetained 197.313 - - 11.000 11.900

    30 7.168 7.158 7.267 Slab 1X4.2 R->L 10.700 11.600 193.882 1 94.555 191.110 - F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 194.731 - - 10.700 11.600

    31 7.295 7.282 7.384 Slab 1X2.1 R->L 11.100 12.000 196.079 196.523 194.099 193.818 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 196.691 - - 11.100 12.000

    32 7.750 7.733 7.842 Slab 1X0.9 R->L 11.300 12.100 200.812 201.379 198.701 199.027 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 201.446 - - 11.300 12.100

    33 7.825 7.808 7.916 Slab 1x0.7 R->L 11.200 12.600 200.415 201.156 198.702 198.845 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 201.325 - - 11.200 12.600

    34 7.945 7.928 8.037 Slab 1X1.9 R->L 11.800 12.700 201.185 201.577 195.645 195.569 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 201.738 - - 11.800 12.700

    Page - 663

  • 8/16/2019 Annex 8.3_Culvert Proposal

    3/6

    Sl

    No.

    Survey

    Chainage

    (in Km)

    Design

    Chainage (in

    Km)   I   n   v   e   n   t   o   r   y

       C    h   a   i   n   a   g   e    (   i   n   K   m    )

       T   y   p   e   o    f

       S   t   r   u   c   t   u   r   e   E   x   i   s   t   i   n   g

       S   p   a   n    /    d   i   a   e   x   i   s   t   i   n   g

       i   n    (   m    )

       D   i   r   e   c   t   i   o   n   o    f    f    l   o   w

       C   a   r   r   i   a   g   e   w   a   y

       W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       e   x   i   s   t   i   n   g

       i   n    (   m    )

       S   o    f    f   i   t   o    f   c   u    l   v   e   r   t

       E   x   i   s   t   i   n   g   R   o   a    d   T   o   p

       I   n   v   e   r   t   o    f   e   x   i   s   t   i   n   g

       c   u    l   v   e   r   t   s

    LBL

    Pipe/

    Slab/

    Box/ Arch

    Head

    Wall

    Wing

    Wall

    Return

    Wall

    Parapet /

    Handrail  Condition

      Improvement

    Proposal

    Improvement

    Proposal after

    finalisation of 

    vertical Profile

    Proposed

    Finished

    Level

    Type of 

    Structure

       S   p   a   n   a   r   r   a   n   g   e   m   e   n   t

       o    f   S   t   r   u   c   t   u   r   e

       C   a   r   r   i   a   g   e   w   a   y   W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       i   n    (   m    )

    As Per Field investigation New Proposal

    35 8.351 8.334 8.446 Slab 1X1.2 R->L 11.400 12.300 197.960 198.555 194.749 194.502 F F P Culvert: Fair, Wing Wall/ ReturnWall: Fair, Parapet: Poor

    May be Retained withRepairing

    Retained 198.738 - - 11.400 12.300

    36 8.838 8.821 8.936 Chocked, Fully covered with 14.200 200.553 - 199.497 Chocked, Fully covered with soil, only head wall present ReconstructionNew Culvert

    Proposed2 00 .5 94 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    37 9.480 9.463 9.587 Slab 1x1.0 R->L 11.500 12.100 194.069 1 96.568 191.972 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 196.703 - - 11.500 12.100

    38 9.792 9.775 9.906 Slab 1x1 R->L 9.200 10.100 198.970 199.882 197.974 198.239 P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed2 00 .0 55 Box Culvert

    2m x 2m x

    1cell10. 900 12.000

    39 10.034 10.017 10.143 Slab 1x4.5 R->L 11.000 11.900 198.819 199.255 194.053 195.216 F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 199.445 - - 11.000 11.900

    40 10.350 10.333 10.460 Slab 1x2.4 R->L 10.900 11.500 199.405 200.433 193.026 192.678 P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed2 00 .5 00 Box Culvert

    3m x 3m x

    1cell 5m EC10. 900 12.000

    41 10.904 10.885 11.019 Slab 1x1.0 R->L 11.100 12.000 201.855 202.486 200.191 - P - P - NILCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: NILReconstruction

    New Culvert

    Proposed2 02 .5 42 Box Culvert

    2m x 3m x

    1cell10. 900 12.000

    Pipe

     

    No No:

    : :42 11.104 11.085 11.220

    en

    ed by

    Slab

    1x1.2 11.600 12.200 survey

    data

    2 01 .9 71 survey

    data

    - F NIL Fuvert: ar, ng a / eturn

    Wall: NIL, Parapet: Fair

    ay e et ane w t

    RepairingRetained 202.094 - - 11.600 12.200

    43 11.178 11.159 11.295 Slab 1x0.9 R->L 11.500 12.400 201.483 2 02.314 200.832 - P - P - PCulvert: Poor, Wing Wall/ Return

    Wall: Poor, Parapet: PoorReconstruction

    New Culvert

    Proposed2 02 .4 62 Box Culvert

    2m x 2m x

    1cell10. 900 12.000

    44 11.336 11.317 11.457 Slab 1x1.1 R->L 11.200 12.100

    No

    survey

    data

    202.758

    No

    survey

    data

    - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 202.860 - - 11.200 12.100

    45 11.812 11.792 11.935 Slab 1x1.0 R->L 11.100 12.000 205.623 2 06.581 204.072 - F NIL PCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: Poor

    May be Retained with

    RepairingRetained 206.690 - - 11.100 12.000

    46 12.824 12.800 12.962 SlabChocke

    d- 11.200 12.100 211.864 212.366 210.994 - P F NIL F NIL

    Culvert: Poor, Wing Wall/ Return

    Wall: NIL, Parapet: NILReconstruction

    New Culvert

    Proposed2 12 .4 88 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    47 13.345 13.303 13.465 Slab Chocked

    - 7.300 7.300 218.456 216.638 216.618 P - NIL - NIL Culvert: Poor, Wing Wall/ ReturnWall: NIL, Parapet: NIL

    Reconstruction New CulvertProposed

    2 18 .6 44 Box Culvert 2m x 2m x1cell

    10. 900 12.000

    48 13.741 13.695 13.875 Slab 1x1.4 R->L 10.300 10.900 217.621 2 18.491 216.638 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 220.595 - - 10.300 10.900

    49 13.832 13.782 13.969 Pipe 1x0.6 R->L 12.500 12.500 219.762 220.471 217.751 - F - NIL - NILCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NILReconstruction

    New Culvert

    Proposed2 19 .7 50 Box Culvert

    2m x 2m x

    1cell20. 900 22.000

    Page - 664

  • 8/16/2019 Annex 8.3_Culvert Proposal

    4/6

    Sl

    No.

    Survey

    Chainage

    (in Km)

    Design

    Chainage (in

    Km)   I   n   v   e   n   t   o   r   y

       C    h   a   i   n   a   g   e    (   i   n   K   m    )

       T   y   p   e   o    f

       S   t   r   u   c   t   u   r   e   E   x   i   s   t   i   n   g

       S   p   a   n    /    d   i   a   e   x   i   s   t   i   n   g

       i   n    (   m    )

       D   i   r   e   c   t   i   o   n   o    f    f    l   o   w

       C   a   r   r   i   a   g   e   w   a   y

       W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       e   x   i   s   t   i   n   g

       i   n    (   m    )

       S   o    f    f   i   t   o    f   c   u    l   v   e   r   t

       E   x   i   s   t   i   n   g   R   o   a    d   T   o   p

       I   n   v   e   r   t   o    f   e   x   i   s   t   i   n   g

       c   u    l   v   e   r   t   s

    LBL

    Pipe/

    Slab/

    Box/ Arch

    Head

    Wall

    Wing

    Wall

    Return

    Wall

    Parapet /

    Handrail  Condition

      Improvement

    Proposal

    Improvement

    Proposal after

    finalisation of 

    vertical Profile

    Proposed

    Finished

    Level

    Type of 

    Structure

       S   p   a   n   a   r   r   a   n   g   e   m   e   n   t

       o    f   S   t   r   u   c   t   u   r   e

       C   a   r   r   i   a   g   e   w   a   y   W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       i   n    (   m    )

    As Per Field investigation New Proposal

    50 14.095 14.040 14.241 Slab 1x1.0 R->L 11.500 12.100 226.889 228.603 225.827 - F NIL NILCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NIL

    May be Retained with

    RepairingRetained 229.015 - - 11.500 12.100

    51 14.536 14.481 14.695 Pipe 1x1.0 - 15.000 15.000 231.974 232.383 228.972 - F - NIL - NILCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NILReconstruction

    New Culvert

    Proposed2 33 .4 97 Box Culvert

    2m x 2m x

    1cell 3m EC10. 900 12.000

    52 14.803 14.741 14.954 Slab 1x1.5 R->L 10.100 11.000 - 232.868 - 231.960 F F F

    Culvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: One side

    brocken

    May be Retained with

    RepairingRetained 232.500 - - 10.100 11.000

    53 15.271 15.208 15.425 Slab 1 x 2.1 L->R 11.600 12.900 236.997 237.644 236.252 - F F NILCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: NIL

    May be Retained with

    RepairingRetained 237.754 - - 11.600 12.900

    54 15.494 15.431 15.654 Slab 1x1.1 L->R 11.300 12.200 240.354 240.877 239.817 239.932 F NIL NIL

    Culvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: One side

    brocken

    May be Retained with

    RepairingRetained 243.257 - - 11.300 12.200

    55 15.920 15.857 16.080 Slab 1x2.0 L->R 11.100 12.000 240.354 2 40.914 239.817 - P - F - PCulvert: Poor, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    ReconstructionNew Culvert

    Proposed

    2 41 .0 07 Box Culvert1.5m x 1.5m

    x 1cell

    10. 900 12.000:

    : :

    56 16.658 16.588 16.827 Slab 1x1.3 L->R 11.200 11.800 241.786 2 42.248 241.125 - F NIL FCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: Fair

    May be Retained with

    RepairingRetained 242.431 - - 11.200 11.800

    57 17.077 17.006 17.250 Slab 1x0.9 L->R 11.500 12.100 235.440 235.837 234.940 - P P NIL - PCulvert: Poor, Wing Wall/ Return

    Wall: NIL, Parapet: PoorReconstruction

    New Culvert

    Proposed2 35 .9 55 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    58 17.093 17.022 17.269 Slab 1x2.0 - 10.200 10.200 235.440 235.837 235.104 235.449 F ully chocked - - - Culvert: Fully chocked ReconstructionNew Culvert

    Proposed2 35 .9 50 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    17.397 17.326 17.574 Slab 1x1.0 L ->R 10.600 11.200 228.491 229.697 227.882 - F NIL NILCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NIL

    Existing Culvert

    Dismantled, A New

    culvert Proposed at

    Chainage 17.380

    Dismantled 229.827 - - - -

    17.452 17.380 - - - - - - - 228.928 - 228.610 - - - - - - New culvert requiredfor pipe line

    New CulvertProposed

    2 29 .0 91 Box Culvert 1.5m x 1.5mx 1cell

    10. 900 12.000

    60 18.034 17.962 18.211 Slab 1X1.1 L->R 9.100 9.100 221.565 222.451 220.905 - F - NIL - NIL

    Culvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NIL, Bridge

    width is less

    ReconstructionNew Culvert

    Proposed2 22 .6 71 Box Culvert

    2m x 2m x

    1cell10. 900 12.000

    61 18.858 18.785 19.042 Slab 1X1.1 R->L 10.900 11.800 217.100 2 17.255 215.300 - F P FCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Fair

    May be Retained with

    RepairingRetained 217.428 - - 10.900 11.800

    62 19.210 19.133 19.398 Slab 1x1.0 R->L 11.100 12.200 216.780 217.341 215.700 - F NIL NILCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NIL

    May be Retained with

    RepairingRetained 217.455 - - 11.100 12.200

    59

    Page - 665

  • 8/16/2019 Annex 8.3_Culvert Proposal

    5/6

    Sl

    No.

    Survey

    Chainage

    (in Km)

    Design

    Chainage (in

    Km)   I   n   v   e   n   t   o   r   y

       C    h   a   i   n   a   g   e    (   i   n   K   m    )

       T   y   p   e   o    f

       S   t   r   u   c   t   u   r   e   E   x   i   s   t   i   n   g

       S   p   a   n    /    d   i   a   e   x   i   s   t   i   n   g

       i   n    (   m    )

       D   i   r   e   c   t   i   o   n   o    f    f    l   o   w

       C   a   r   r   i   a   g   e   w   a   y

       W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       e   x   i   s   t   i   n   g

       i   n    (   m    )

       S   o    f    f   i   t   o    f   c   u    l   v   e   r   t

       E   x   i   s   t   i   n   g   R   o   a    d   T   o   p

       I   n   v   e   r   t   o    f   e   x   i   s   t   i   n   g

       c   u    l   v   e   r   t   s

    LBL

    Pipe/

    Slab/

    Box/ Arch

    Head

    Wall

    Wing

    Wall

    Return

    Wall

    Parapet /

    Handrail  Condition

      Improvement

    Proposal

    Improvement

    Proposal after

    finalisation of 

    vertical Profile

    Proposed

    Finished

    Level

    Type of 

    Structure

       S   p   a   n   a   r   r   a   n   g   e   m   e   n   t

       o    f   S   t   r   u   c   t   u   r   e

       C   a   r   r   i   a   g   e   w   a   y   W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       i   n    (   m    )

    As Per Field investigation New Proposal

    63 19.247 19.170 19.435 Slab 1x0.9 R->L 11.200 11.800 216.892 2 17.401 215.412 - F P PCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Poor

    May be Retained with

    RepairingRetained 217.574 - - 11.200 11.800

    64 20.436 20.358 20.627 Pipe 1x1.0 R->L 9.200 10.000 230.278 2 30.823 229.256 - G - G - GCulvert: Good, Wing Wall/ Return

    Wall: Good, Parapet: GoodReconstruction

    New Culvert

    Proposed2 30 .9 60 Box Culvert

    2m x 2m x

    1cell10. 900 12.000

    6 5 2 0.68 7 2 0.60 9 2 0.88 1 Pipe 1 X0 .7 5 R->L Const ruct ion of t hi s culvert g oi ng on, const ruct ion ha lf compl et ed, this i s due to a dra in crosses t he roadThis hume pipe is being newly

    constructed.Reconstruction

    New Culvert

    Proposed2 35 .1 44 Box Culvert

    2m x 2m x

    1cell 4m EC10. 900 12.000

    66 21.153 21.075 21.347 Pipe 2x1 9.900 12.100 206.923 2 13.980 205.697 - G Nil G GCulvert: Good, Wing Wall/ Return

    Wall: NIL, Parapet: GoodRetained Retained 214.120 - - 9.900 12.100

    67 22.044 21.927 22.233 Slab 1x2.1 R->L 10.900 11.800 221.728 2 21.994 219.551 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 222.106 - - 10.900 11.800

    68 22.719 22.585 22.914 Box 1x2.8 R->L 6.800 7.900 209.884 211.138 207.622 207.774 F - F - PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: PoorWidening

    New Culvert

    Proposed2 11 .2 50 Box Culvert

    3m x 4m x

    1cell10. 900 12.000

    69 24.015 23.874 24.222 Slab 1x1 R->L 11.200 11.800 233.436 2 33.595 231.676 - P - F - PCulvert: Poor, Wing Wall/ Return

    : :Reconstruction

    New Culvert2 32 .0 87 Box Culvert

    1.5m x 1.5m

     10. 900 12.000. . . . . . . .

    :

    Wall: Fair, Parapet: Poor

     

    Proposed.

    x 1cell. .

    70 26.429 26.259 26.660 Slab 1x2.2 R->L 11.200 11.800 233.436 2 33.557 231.751 - F Nil PCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: Poor

    May be Retained with

    RepairingRetained 233.748 - - 11.200 11.800

    71 26.508 26.337 26.737 Slab 1x1.0 R->L 10.700 11.300 234.280 234.780 233.129 233.129 P - Nil - PCulvert: Poor, Wing Wall/ Return

    Wall: NIL, Parapet: PoorReconstruction

    New Culvert

    Proposed2 34 .7 87 Box Culvert

    1.5m x 1.5m

    x 1cell19. 900 21.000

    72 27.062 26.891 27.297 Slab 1x1.0 L->R 11.400 11.400 240.205 240.937 240.373 239.870 P - F - PCulvert: Poor, Wing Wall/ Return

    Wall: Fair, Parapet: PoorReconstruction

    New Culvert

    Proposed2 41 .0 60 Box Culvert

    1.5m x 1.5m

    x 1cell10. 900 12.000

    73 27.276 27.103 27.511 Slab 1x1.0 L->R 11.500 11.800 241.598 242.116 240.373 240.310 F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 242.246 - - 11.500 11.800

    74 27.436 27.263 27.671 Slab 1x1.0 L->R 11.100 11.700 241.246 2 41.593 240.411 - F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 241.795 - - 11.100 11.700

    75 29.022 28.850 - - - - - - - 245.510 - 245.287 - - - - - -New culvert required

    for pipe line

    New Culvert

    Proposed2 46 .1 19 Box Culvert

    1.5m x 1.5m

    x 1cell16. 900 18.000

    76 29.355 29.180 - - - - - - - 236.260 - 235.722 - - - - - - New culvert requiredfor pipe line New CulvertProposed 2 36 .6 20 Box Culvert 2m x 2m x1cell 10. 900 12.000

    77 29.603 29.428 29.857 Slab 1x2.85 L->R 11.100 12.000 229.050 2 29.719 227.240 - G G GCulvert: Good, Wing Wall/ Return

    Wall: Good, Parapet: Good

    May be Retained with

    RepairingRetained 229.845 - - 11.100 12.000

    78 29.846 29.671 30.101 Slab 2x1 L->R 10.400 11.000 227.519 2 28.315 225.030 - F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 228.506 - - 10.400 11.000

    79 30.067 29.892 30.326 Slab 1x0.9 L->R 11.000 11.600 224.918 225.411 223.742 223.661 F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 225.547 - - 11.000 11.600

    80 30.586 30.411 30.847 Pipe 3x1.2 L->R 11.800 12.400 222.434 223.382 221.071 221.564 F - F - FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: FairReconstruction

    New Culvert

    Proposed2 29 .5 91 Box Culvert

    3m x 3m x

    1cell 5m EC10. 900 12.000

    81 30.842 30.681 31.106 Pipe 2x1.2 R->L 11.800 12.400 223.029 2 23.882 221.779 - F - F - FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: FairReconstruction

    New Culvert

    Proposed2 29 .5 07 Box Culvert

    3m x 3m x

    1cell 5m EC10. 900 12.000

    Page - 666

  • 8/16/2019 Annex 8.3_Culvert Proposal

    6/6

    Sl

    No.

    Survey

    Chainage

    (in Km)

    Design

    Chainage (in

    Km)   I   n   v   e   n   t   o   r   y

       C    h   a   i   n   a   g   e    (   i   n   K   m    )

       T   y   p   e   o    f

       S   t   r   u   c   t   u   r   e   E   x   i   s   t   i   n   g

       S   p   a   n    /    d   i   a   e   x   i   s   t   i   n   g

       i   n    (   m    )

       D   i   r   e   c   t   i   o   n   o    f    f    l   o   w

       C   a   r   r   i   a   g   e   w   a   y

       W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       e   x   i   s   t   i   n   g

       i   n    (   m    )

       S   o    f    f   i   t   o    f   c   u    l   v   e   r   t

       E   x   i   s   t   i   n   g   R   o   a    d   T   o   p

       I   n   v   e   r   t   o    f   e   x   i   s   t   i   n   g

       c   u    l   v   e   r   t   s

    LBL

    Pipe/

    Slab/

    Box/ Arch

    Head

    Wall

    Wing

    Wall

    Return

    Wall

    Parapet /

    Handrail  Condition

      Improvement

    Proposal

    Improvement

    Proposal after

    finalisation of 

    vertical Profile

    Proposed

    Finished

    Level

    Type of 

    Structure

       S   p   a   n   a   r   r   a   n   g   e   m   e   n   t

       o    f   S   t   r   u   c   t   u   r   e

       C   a   r   r   i   a   g   e   w   a   y   W   i    d   t    h

     

        (   m    )

       T   o   t   a    l   w   i    d   t    h

       i   n    (   m    )

    As Per Field investigation New Proposal

    82 31.075 30.914 31.340 Slab 1x1.8 R->L 11.400 12.300 222.197 222.637 221.008 221.233 F F F Culvert: Fair, Wing Wall/ ReturnWall: Fair, Parapet: Fair

    May be Retained withRepairing

    New CulvertProposed

    2 28 .2 74 Box Culvert 3m x 3m x1cell 5m EC

    10. 900 12.000

    83 31.198 31.037 31.463 Slab 1x0.9 R->L 10.200 10.600 222.564 2 23.215 220.719 - F F NILCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: NIL

    May be Retained with

    Repairing

    New Culvert

    Proposed2 27 .6 22 Box Culvert

    3m x 3m x

    1cell 5m EC10. 900 12.000

    84 31.858 31.697 32.126 Slab 1X1.0 L->R 11.200 12.100 234.566 2 35.541 233.078 - F F PCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Poor

    May be Retained with

    RepairingRetained 235.628 - - 11.200 12.100

    85 32.536 32.375 32.807 Slab 1x0.9 L->R 11.500 12.100 239.396 2 40.640 238.331 - F F NILCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: NIL

    May be Retained with

    RepairingRetained 240.877 - - 11.500 12.100

    86 32.699 32.536 32.970 Slab 1X1.0 L->R 11.100 11.700 240.896 2 41.617 239.286 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 241.857 - - 11.100 11.700

    87 33.009 32.846 33.281 Slab 1X1.0 L->R 11.200 12.100 243.319 2 43.605 241.260 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 243.818 - - 11.200 12.100

    88 33.360 33.198 33.638 Slab 1X1.0 L->R 10.300 11.200 247.625 2 48.213 246.868 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 248.405 - - 10.300 11.200

    89 33.768 33.604 34.050 Slab 1X0.9 R->L 11.400 12.300 256.980 257.547 255.694 255.529 F F FCulvert: Fair, Wing Wall/ Return

    : :

    May be Retained withRetained 257.689 - - 11.400 12.300. . . . . . . . .

    .:

    Wall: Fair, Parapet: Fair

     

    Repairing. . .

    90 33.893 33.730 34.176 Slab 1X1.0 R->L 11.300 11.900 258.546 2 59.005 257.449 - F P NILCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: NIL

    May be Retained with

    RepairingRetained 259.159 - - 11.300 11.900

    91 34.443 34.259 34.730 Slab 1X1.0 R->L 11.200 12.100 265.819 2 66.190 264.759 - F P FCulvert: Fair, Wing Wall/ Return

    Wall: Poor, Parapet: Fair

    May be Retained with

    RepairingRetained 266.308 - - 11.200 12.100

    92 34.593 34.429 34.882 Slab 1X1.0 R->L 11.000 11.900 267.507 2 67.320 265.064 - F F FCulvert: Fair, Wing Wall/ Return

    Wall: Fair, Parapet: Fair

    May be Retained with

    RepairingRetained 267.596 - - 11.000 11.900

    93 35.059 34.885 35.350 Slab 1X1.8 R->L 11.200 12.100 272.181 272.500 271.171 - F NIL FCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: Fair

    May be Retained with

    RepairingRetained 272.582 - - 11.200 12.100

    94 35.823 35.660 36.506 Slab 1X1.1 L->R 11.600 11.900 272.699 273.865 271.995 - F NIL NILCulvert: Fair, Wing Wall/ Return

    Wall: NIL, Parapet: NIL

    May be Retained with

    RepairingRetained 274.086 - - 11.600 11.900

    Page - 667