ANNEX 29 DRAWINGS - JICA
Transcript of ANNEX 29 DRAWINGS - JICA
Final Report The Study on Vientiane Water Supply Development Project
ANNEX 29
DRAWINGS
Final Report The Study on Vientiane Water Supply Development Project
Annex 29 - 1
LIST OF DRAWINGS FOR
TREATMENT AND PUMPING FACILITIES
Final Report The Study on Vientiane Water Supply Development Project
Annex 29 - 2
REHABILITATION OF KAOLIEO WTP
Dwg. No. Name of Drawing Scale
R-1 General Plan None
R-2 Intake Facilities (Plan and Section) 1:200
R-3 Mixing Chamber (Plan and Section) 1:50
R-4 Plan of Flocculation and Sedimentation Basin None
R-5 Section of Flocculation and Sedimentation Basin None
R-6 Filtration Facilities (Plan and Section) None
R-7 Clear Water Reservoir (Plan and Section) 1:200
R-8 Distribution Pump Station (Plan and Section) 1:100
EXPANSION OF KAOLIEO WTP
Dwg. No. Name of Drawing Scale
E-1 General Plan None
E-2 Hydraulic Diagram None
E-3 Intake Facilities (Plan and Section) None
E-4 Plan of Treatment Facilities None
E-5 Section of Receiving Well, Mixing well, Flocculation and Sedimentation Basin None
E-6 Section of Flocculation and Sedimentation Basin (1/2) 1:200
E-7 Section of Flocculation and Sedimentation Basin (2/2) 1:200
E-8 Section of Filtration Basin and Filtered Water Measurement & Chlorine Mixing
Chamber 1:200
E-9 Plan of Clear Water Reservoir, Pumping Station and Administration Building None
E-10 Section of Clear Water Reservoir, Pumping Station and Administration Building 1:200
IMPROVEMENT OF CHINAIMO WTP
Dwg. No. Name of Drawing Scale
I-1 General Plan 1:1,000
I-2 Hydraulic Diagram None
I-3 Plan of New Clear Water Reservoir and Distribution Pumping Station None
I-4 Section of New Clear Water Reservoir and Distribution Pumping Station None
IMPROVEMENT OF Km 6 BOOSTER PUMP STATION
Dwg. No. Name of Drawing Scale
I-5 General Plan 1:200
I-6 Plan of Distribution and Transmission Pump Station 1:100
Final Report The Study on Vientiane Water Supply Development Project
Annex 29 - 3
REHABILITATION OF
KAOLIEO WATER TREATMENT PLANT
Rive
r Bed
Pro
tect
ion
Riv
er B
ank
Prot
ectio
n
Rive
r Ban
k Pr
otec
tion
Administration Building(Office, Chemical &
Laboratory)Pumping Station
Clear Water Reservoir
Existing Distribution PipeCIP D450 mm
Exi
stin
g B
ackw
ashi
ng P
ipe
CIP
D45
0 m
m
CIP D450 mm
Exist. Flow Meter
Flow
Met
er
Raw
Wat
er T
rans
mis
sion
Pip
eD
IP D
700m
m
Intake
Mek
ong
Riv
er
Filtration Basin
Filtered Water Measurement &Chlorine Mixing Chamber
Sedimentation Basin
Flocculation Basin
Receiving Well &Mixing Well
Filtered Water Pipe DIP D700mm
Distribution Pipe DIP D700mm
Flow Meter
Rive
r Bed
Pro
tect
ion
Rive
r Bed
Pro
tect
ion
Filtered Water Connecting PipeDIP D600mm
Back
was
hing
Pip
e D
IP D
500m
mA
ir S
cour
ing
Pipe
D25
0mm
By-P
ass P
ipe
DIP
D45
0mm
Surface Washing Pipe DIP D200mm
Exist
ing
Filte
red
Wat
er P
ipe
SP D
500
mm
Existing Surface Washing PipeCIP D450 mm
Exi
stin
g W
ater
Sup
ply
Pipe
CIP
D25
0 m
m
EmergencyGenerator
BillCollecting
Office(Relocation)
AlumProduction
Factory(Relocation)
Exist. Clear Water Reservoir
Exist
. Pum
ping
Sta
tion
Exist. Suction Pipefor Backwash Pump
Future Space for
TransmissionPump
Exist. Chlorination Room
Exist. ElectricRoom
Exist. Power Sub-Station(Abandon)
Exist. MixingChamber
Exist. Flocculation &Sedimentation Basin
Exist. Filtration Basin
PowerSub-Station
FGL +172.00
FGL +172.00
FGL
+17
2.00
FGL +172.00
Dra
in P
ipe
(Underground:Top EL.+171.20)
FGL +172.00
PDrain Pump (Used in WetSeason only)
N
SCALE:10m5m 0 30m20m
4DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
REHABILITATION OF KAOLIEO WTPGENERAL PLAN
Exist. Intake Tower
FGL +172.00
R - 1
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
5Ton Chain Block
Inspection Bridge
HWL+171.50
SECTION A-A S=1:200
PLAN S=1:200
FLEXIBLE JOINT
FLEXIBLE JOINT
INSPECTION BRIDGEMEKONGRIVER
TRANSMISSION MAIN PIPERAW WATER
(Repair)
(Repair)
ORIFFICE PLATE(Remove)
ORIFFICE PLATE(Remove)
(Replace)INTAKE PUMP SUPPORT
GATELWL+159.500
MEKONGRIVER
+158.15
Flow MeterInstallation of Ultrasnic
(Repair)
Note: REPLACEMENT
(Replace)
(Replace)
(Replace)
(Replace)(Replace)
(Replace)
(Replace)
(Replace)
SCALE: 1:2003m1.5m 0 9m6m
5DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
REHABILITATION OF KAOLIEO WTPINTAKE FACILITIES
A A
R - 2
AIR VALVE 75φ
250φCHECK VALVE
250φGATE VALVE
500φBUTTERFLY VALVE
250φGATE VALVE
SLUICE GATE 700φ
250φ INTAKE PUMP WITH MOTOR ANDASSOCIATED PIPES AND VALVES, 3 UNITS
(Replace)
HATCH WAY COVER
FROM
PLAN S=1:50
A
CH P
DRAIN PIPE
ALUM FEEDING PIPE(FROM ALUM FEEDING ROOM)
INTAKE PUMPA
DRAIN PIPE
TO FLOCCULATION BASIN
SECTION A-A S= 1:50
BOLT4SELSANCHOR
+GL+172,000
ALUM
PIPEFEEDING
+GL+173,500
+GL+171,500
FLASH MIXER
+176,200
BAFFLED PLATE
+176,000
FLASHMIXER
Note: REPLACEMENT
L
SCALE: 1:501m0 3m2m
6DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
REHABILITATION OF KAOLIEO WTPMIXING CHAMBER
R - 3
900 1,000 1,600
800800
150 150 150 150 200
2007,3002501,200 14,700 300 250150
300150
400 300150 150 150
450 450
3,350 3,350
8,300
31,300
12,900
5,175
250 300
300
150450
1,300 150
300
150300 250
7575
6.075
250
300
300 150
5,175
6.075
550
2,750
2,825
500
250
550
2,825
2,750
500
250 300
100
100
100
100
100
100
100
100
250
300
1,150
1,100
1,100
1,100
1,225
1,225
1,150
1,100
1,100
1,100
250
12,900
6.075
6.075
1,0001,0001,000
900 1,000 1,600
800800
150 150 150 150 200
2007,3002501,200 250150
450
31,300
12,900
5,175
250
300
300 150
450
1,300
150
300
150
300
250
7575
6.075
250 300
300
150
5,175
6.075
550
2,750
2,825
500
250
550
2,825
2,750
500
250
300
100
100
100
100
100
100
100
100
250 300
1,1501,100
1,100
1,100
1,225
1,225
1,150
1,100
1,100
1,100
250
12,900
6.075
6.075
1,0001,0001,000 300150120120
2,460
10,500
300 300300300120120 120120120120
30 2,460 2,460 780
12,800
1,5003,000 3,0003,000
Rehabilitation
Existing
SCALE:2m1.0m 0 6m4m
7DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
REHABILITATION OF KAOLIEO WTP
PLAN OF FLOCCULATION & SEDIMENTATION BASIN
R - 4
176.00
175.40
176.00 176.00175.80 175.60
175.25174.95
300
400
1,50
0
3,70
020
015
01,
350
5,25
0
350
6,05
015
0
6,40
0
5,85
0
4,30
0
1,50
0
400
150
800
400
200
30070
020
0
700
200
400
400
1,600 1,000 1,450 1,450 1,000 1,700
150250
300150
400150150
300150
3,350
200
3,350
3002501,200
2,200
7,300 14,700 8,300
31,300
1,000500
900 1,000 1,000 1,000 1,000 1,600
800 800
14,700
300150
400150150
300150
3,350 3,350
8,300 500 1,0007,300 200
200
100
100100100
31,800
200
400
500
800
800
175.80175.60
174.95
176.00
175.40
176.00 176.00
400
1,50
0
3,70
020
015
01,
350
5,25
0
350
6,05
015
0
6,40
0
5,85
0
4,30
0
1,50
0
400
150
800
400
200
30070
020
0
400
400
150250
300150120120
200
2,460
2501,200
2,200
7,300 12,800 10,500
31,300
1,000500
900 1,000 1,000 1,000 1,000 1,600
800 800
12,800
1,5003,000 3,000
10,500 500 1,0007,300 200
200100 100100100
31,800
400
500
3,000
300200
300 300300300120120 120120120120
30 2,460 2,460 780
700
150
450
300
150
Perforated BaffleWall
Weir
Launder
Rehabilitation
Existing
FGL 172.00 FGL 172.00
SCALE:
8DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
2m1.0m 0 6m4m
REHABILITATION OF KAOLIEO WTP
PLAN OF FLOCCULATION & SEDIMENTATION BASIN
DWG NO.:R - 5
FLOOR FINISED BY TILE
CONTROL CENTER
GATE VALVE
PIPING FORLOSS HEAD METER( TYPICAL )
WASHING DAIN
ALUM FEEDING ROOM
LOSS HEAD METERLOSS HEAD METER
TO CLEAR WATER RESERVOIR
A
LOSS HEAD METER
GATE VALVE
B
LOSS HEAD METER
FROM BACK WASH PUMP
BACK WASH MAIN
SURFACE WASH PIPE
GATE VALVE GATE VALVE
FILTER WATER
SURFACE WASH PIPE
GATE VALVE DAIN
OVERFLOWB EXISTING OUTLET
GATE VALVE
TROUGH
WASH WATERA
PLAN S= 1:150
GATE VALVE GATE VALVE
+171
.000
FROM BACK WASH PUMP
+171
.500
+174
.880
+174
.750
PIPI
NG
FOR
LOSS
HEA
DM
ETER
+171
.500
UP-
AN
DD
OWN
BEL
LMO
UTH
POSI
TIO
N
HW
L+17
4.70
0+1
74.5
00 SEC
TION
A-A
S=1:
150
SECTION B-B S=1:150UNDERDRAIN
(ABADON)
WOODER DOORWITH LOUVER
750 x 2000w h
STAIRCASECONCRETE
LAODER-5nos
SURFACE WASHING
PLAN OF PIPE GALLERY S= 1:150
INSPECTION PASSAGE
VALVE
WOODEN DOORWITH LOUVER1200 x 2000
up
w h
up
MOTA R PLASTER
+172.000+172.700
HAT CH COVERPL32t EPOXY PA INTIN G
BRICK MASONRY
INSPECTIO NPASSAGESEE DETAIL
SECTION C-C S= 1:150
+171.000
C
C
NOTE: REPLACEMENT OF FILTER MEDIA, UNDERDRAIN,MOTORIZED OPERATING VALVES & PIPES WITH
& CONTROL ROOM
ALL ASSOCIATED EQUIPMENT.
SCALE:2m1.0m 0 6m4m
9DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
REHABILITATION OF KAOLIEO WTPFILTRATION FACILITIES
R - 6
BELL
MO
UTH
DIS
TRIB
UTI
ON
PUM
P
SEC
TION
A-A
S=1:
200
GL+1
71.5
0
BELL
MOU
TH
+165
.00
BACK
WA
SHPU
MP
HWL+
170.
60
HWL+
166.
60
GUIDE PIPE FOR WATER LEVEL
BY-PASS FORGATE VALVE
OVER FLOW
DISTRIBUTION
DRAINAGE PUMP
PLAN S=1:200
A
BLINDFLANGE
VENTILATOR
CLEAR WATER RESERVOIR
CHLORINATION ROOM
A
SUCTION PIPING
OVER FLOW
BACKWASH PUMP
GATE VALVE
GUIDE PIPE FOR WATER LEVEL
INCLUDING STRUCTUREREPAIRING and VALVEREPLACEMENT IF NECESSARY.
Note:
SCALE: 1:2003m1.5m 0 9m6m
10DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
REHABILITATION OF KAOLIEO WTPCLEAR WATER RESERVOIR
R - 7
SECTION A-A S=1:100
DISTRITION PUMP
171.500 171.500
SECTION B-B S=1:100
DISTRITION PUMP
PLAN S=1:100
A
A
PUMPDISTRIBUTION
FLEXIBLE JOINT PUMP
GATE VALVE
DISTRIBUTION
CHECK VALVE
B
GATE VALVE
BACKWASH
CHECK VALVE
PUMP
PUMPBACKWASH
PUMPDISTRIBUTION
PUMPDISTRIBUTION
B
VACUUM PUMPWATER TANK
PUMPBACKWASH
Note: REPLACEMENT
SCALE: 1:1001m0.5m 0 3m2m
11DWG NO.:DATE:
APPROVED BY:DRAWN BY:
CHECKED BY:DESIGNED BY:
DRAWING TITLE:
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)NIHON SUIDO CONSULTANTS CO., LTD.
THE STUDY ONVIENTIANE WATER SUPPLY DEVELOPMENT
PROJECT INLAO PEOPLE’S DEMOCRATIC REPUBLIC
REHABILITATION OF KAOLIEO WTPDISTRIBUTION PUMP STATION
SPACE FOR FUTURETRANSMISSION PUMPS
R - 8