DILLER SCOFIDIO + RENFRO, 02/2012 - 03/2015

WATERFRONT RESIDENTIAL DEVELOPMENT, Boston [Concept]Project architect for a 110 unit, residential development

COOPER HEWITT SMITHSONIAN DESIGN MUSEUM, New York, 2013 - 2015 [Completed]Project architect for master plan, new exhibitions, shop design and exterior intervention

KOC CONTEMPORARY MUSEUM, Istanbul, Turkey [Invited Competition]

MERCEDES BENZ MUSEUM OF THE FUTURE, Stuttgart, Germany [Invited Competition]

TOWER D HUDSON YARDS, New York [Under Construction]800 ft residential tower concept and schematic design

RMJM, 2008 - 2012

SONGDO D24, Seoul, Korea [Proposal]3 towers with over 500 residential units within the new Songdo development: concept master planning and exterior design

COMPETITION TIMUR APA OFFICE BUILDING, Istanbul [Competition]14,000 SM Class A office building in the Levant development

OZYEGIN UNIVERSITY, Istanbul, Turkey [Completed]master plan for 115K SM of a new engineering and business university in IstanbulPhase 2 schematic design for the student center

HUAWEI R&D CAMPUS, Wuhan, China [Competition]competition for a 150K SM R&D campus

ZLITEN UNIVERSITY, Libya (AIA NJ Chapter Award 2010) [Masterplan]senior designer for the master plan and building design for a 130,000 SM university campus, housing and sports facilities

PEDDIE SCHOOL ATHLETIC CENTER, New Jersey [Completed] design for the revised building exterior and lobby of a 30,000 SF natatorium

MD-1LAB BUILDING EXTERIOR NATIONAL UNIVERSITY, Singaporeexterior conceptual and schematic development for a new 130K SM lab and teaching building on the NUS campus

TIMUR HALIC RESIDENTIAL MASTER PLAN, Istanbul [Proposal]60,000 SM of high-end residences and townhouses with private and public gardens

KASCT, Riyadh, Saudi Arabia [Proposal]master plan for a new science city in Riyadh

RABDAN POLICE ACADEMY, UAE, Abu Dhabi [Proposal]master plan for a new police academy in Abu Dhabi: training facilities, teaching and administration, housing, mosque (220K SM total area)

KOHN PEDERSEN FOX, 1998 - 2008

CANARY WHARF, London [Completed]senior designer for Lobby fit-out, DS3 West (400,000SF)senior designer for exterior and Lobby fit-out, DS3 East (300, 000 SF)

ROYAL BANK OF CANADA, Toronto [Completed]designer for a 30 story LEED Silver office tower in Toronto

NEW YORK PRESBYTERIAN HOSPITAL, New Yorksenior designer for a new ambulatory building (300,000 SF) within the existing campussenior designer for the renovation of 30,000 SF entrance lobby and new skylights

PARK CENTRAL MULTI-USE PROJECT, Las Vegassenior designer for a 10M SF development on Las Vegas Boulevard

Andreas Buettner P 917. 756. 7569abuettnernyc@gmail.

Page 3: Andreas Buettner

NEW YORK UNIVERSITY SCHOOL OF LAW, New York [Completed]designer for exterior design; SD, DD, CD and CA for a 170,000 SF academic building

MET LIFE BUILDING, New York [Completed]designer for 40,000 SF lobby renovation at 200 Park Avenue

MASTER PLAN USPS, Boston 5 million SF office, housing and retail complex on the Boston waterfront

HPP, 1996-1998

MINISTRY OF FINANCES, Berlin, Germany [Completed]renovation of the former “Reichsluftfahrtministerium”, design development, construction de-sign and construction

Education

ARE (to be completed 06/2015)

LEED AP, 2009 BEUTH UNIVERSITY, Berlin, 3/95-1/98 School of Architecture Dipl.-Ing. UNIVERSITY OF APPLIED SCIENCES, Kaiserslautern, 10/93-3/95School of Architecture (Dipl.-Ing. professional degree)

Skills

Rhino 3D, 3DS Max, AutoCad, Revit (project experience), Adobe Suite

P 917. 756. 7569abuettnernyc@gmail.

Andreas Buettner

Page 4: Andreas Buettner

COOPER HEWITT SMITHSONIAN DESIGN MUSEUM [WITH DS+R]

In close collaboration with the museum Diller Scofidio and Renfro devised a program for the museum’s master plan as well as for the first and second floor exhibits.

The public face of the mansion will be revitalized with the illumination of its historical piers on 5th Avenue, and for the first time visitors will be able to enter into the mansion gardens under a new entrance canopy on 90th Street. The former Carnegie art gallery is appropriated for the new museum shop, and the new admissions desk in the Great Hall is emblematic of the museum’s unique position to juxtapose contemporary design objects against the Mansion’s architectural fabric. With the third-floor gallery expansion, an opportunity was created to use the first- and second-floor galleries to showcase Cooper Hewitt’s vast and diverse permanent collection. After extensive, back and forth discussions with the curators and conservators about how the collections should be shown, we utilized new technologies and designed a variety of adaptable, modular display systems with a kit-of-parts infrastructure to highlight the collection within the challenging confines of its historic context.

Page 5: Andreas Buettner

TOWER D HUDSON YARDS [WITH DS+R]

The 70-story residential tower, comprising half rental and half condominium units, anchors the southeast corner of Hudson Yards East at 30th Street and 11th Avenue. While the characteristic feature of many tall buildings is an iconic top, D Tower is defined by its distinctive middle. A network of crisscrossing straps cinches the tower at its mid-section, squeezing the rectilinear lower half of the building into a curvaceous upper half. tThe tower is designed to LEED gold standards.

Page 6: Andreas Buettner

MERCEDES BENZ MUSEUM OF THE FUTURE [COMPETITION WITH DS+R]

In April 2012 Mercedes Benz invited DS+R amongst 8 high profile international design firms to participate in a competition for a new future brand complex. The client’s program included the need for interactive presentations, experiential spaces and an art collection open to the public. The new program also needs to be in dialogue with the Mercedes Benz Museum (UN Studio) and the Mercedes Benz Center. The visitor experiences an elevated conscience for distance travelled, speed reached, time passed and energy used. The theme of the parti addresses urban order

and infrastructure, landscape and architecture, sustainability and individual mobility.A new campus piazza forms the center between the four parts of the campus. The existing museum and the Future Center make a pair at the campus entrance. The identity of the Future Center develops from three elements: the public piazza connected to the amphitheatre and the top of the building, spaces for education and learning, and the future center with a coreographed procession from the near future to the far future.

Page 7: Andreas Buettner

BOSTON WATERFRONT DEVELOPMENT [WITH DS+R]

DS+R engaged with a premier developer in the concept design of a 10 5 unit residential development on the Boston Harbor waterfront. Expansive views and the adjacency to the Institute for Contemporary Art made this project attractive to the DS+R studio. The team developed 2 schemes addressing the pro-forma of the developer whilst seizing the site opportunities.

AMENITIES + URBAN CORRIDOR

N

S

4BR3,385 SF

2BR2,185 SF

2BR1,839 SF

2BR2,083 SF

2BR2,190 SF

2BR2,167 SF

2BR1,957 SF

2BR1,804 SF

2BR2,015 SF

2BR2,139 SF

1 BEDROOM (775 SF - 910 SF)

2 BEDROOM (1,200 SF - 2,150 SF)

3 BEDROOM (2,350 SF - 2,800 SF)

4 BEDROOM (3,200 SF, 4,000 SF)

BALCONY

SK

YLIG

HT A

BO

VE

SK

YLIG

HT B

ELO

W

8TH FL PLAN

Page 8: Andreas Buettner

ZLITEN UNIVERSITY, Libya [WITH RMJM]Located approximately 7 kilometers south of the coastal city of Zliten, the campus will serve as a living / learning environment focused on the study of Islamic religion and law. The 82-hectare cam-pus will be designed for an initial student enroll-ment of 2,800 that can grow to more than 4,000 with housing for 3,500 students and faculty.

While the site is bound on the east and west by roads, the campus is oriented along the Qibla line - towards Mecca. Core academic functions are organized in 4 quad-rants within a 220-meter square with a perimeter wall that contains faculty offices and academic support functions.

Page 9: Andreas Buettner

OZYEGIN UNIVERSITY, Istanbul, Tur-key [WITH RMJM]

Design for a new campus on 3 parcels in Istan-bul: the largest of the three parcels provides the location for the core campus functions: Student Services and Campus Life, the Library / Learning Center and Technology Hub, and core Adminis-trative functions. The design team developed a series of concepts for the three parcels that now form the core for the 5,000 student campus: a distinct organizing theme and response to the site, context, visual character and micro-climate were evaluated.

Page 10: Andreas Buettner

Three residential towers with 550 units; located at the South-east corner of Park Central in Inchon, Korea. Prescriptive placement of the towers re-lated to set backs and orientation. The client re-inforced his desire to plan for shallow units which would allow for cross ventilation.

SONGDO D24, Inchon, Korea [WITH RMJM]

Page 11: Andreas Buettner

MD-1 LAB BUILDING NUS, Singapore [WITH RMJM]

This new building for the National University of Singapore combines lab spaces and research-ers offices with large and small group instruction spaces on 130,000 SM over 25 floors.The next step after MD-6 in a multiphase devel-opment of the 40-year-old National University of Singapore campus, the project’s central scheme is a vertical atrium which provides natural ventila-tion and offers opportunities for a collaborative environment. The building will be connected on various floor to the adjacent Vivarium, to the Yoon Long Lin Medi-cal school building and to future developments. A spacious multi level lobby continues the lush landscaping into the heart of the building.The exterior of the lab tower required special attention to achieve a high quality brand image as well as to satisfy strict environmental perfor-mance parameters.

Page 12: Andreas Buettner

TIMUR APA OFFICE, Istanbul, Turkey [WITH RMJM]

APA OFFICE TOWER Concept Design Proposal for Timur Real Estate Development Building Investments, Inc.

Site Building Analysis SustainabilityThe new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

MLEVENT

ALI KAYA SK

HARMAN SK

BÜYÜKDERE CD

TALATPAȘA CD

KANYON MALL

+122.84+128.06

ALI KAYA SOKAGI

LOBBY

SECURITY

DROP-OFF

PARKING ENTRANCESERVICE ENTRANCE

DN

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

?

4+1

4+1

4+1

4+1

3+1

4

1

CENTER CORE:INEFFICIENT WITH SMALLFLOOR PLATE

END CORE:LONG DISTANCE FROM ELEVATORLOCATION OF 2ND EGRESS

LONG SIDE CORE AT SOUTH:PRIME VIEWS TOWARDS BOSPORUSARE BLOCKED

LONG SIDE CORE AT NORTH:PRIME VIEWS TOWARDS BOSPORUSSUFFICIENT WIDTH OF RENTABLEFLOOR PLATE

REDUCED COMPACT CORE:3 ELEVATORSACCEPTABLE WIDTH OF RENTABLE FLOOR PLATEPRIME VIEWS TOWARDS BOSPORUS

433 SM (INCL. GARDEN)

425 SM (INCL. GARDEN)

478 SM (INCL. GARDEN)

72%EFFICENCY

65%EFFICENCY

66%EFFICENCY

233 SM (INCL. CIRCULATION)

180 SM (INCL. CIRCULATION)

225 SM (INCL. CIRCULATION)

1

2 3

4

1

1

2

2

3

3

4

S

S

F

F

F

M

M

M

KIT

KIT

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

MEET

MEET

MEETCOMPACT CORE:CORE AND CIRCULATION AT 50% OF WIDTH OF FLOOR PLATE ALI KAYA SOKAGI

5M

5M

*SET BACK LINES PER DWG: “vaziyet planı.dwg”

5M 658 SM35M

35M

20M

20M 7M

1. KAT

2.KAT

3.KAT

4.KAT

5.KAT

6.KAT

7.KAT

8.KAT

9.KAT

10.KAT

11.KAT

12.KAT

13.KAT

14.KAT

15.KAT

16.KAT

17.KAT

18.KAT

19.KAT

20.KAT

1.ÇK

2.ÇK

3.ÇK

MECH

LOBBY

B1

LOBBY MEZZANINE

B2

B3

B4

B5

B6

B7

Floor Elev. Area

TOB. 92.00 658.003.ÇK 85.00 658.002.ÇK 81.00 658.001.ÇK 77.00 658.00

20.Kat 73.50 658.0019.Kat 70.00 658.0018.Kat 66.50 658.0017.Kat 63.00 658.0016.Kat 59.50 658.0015.Kat 56.00 658.0014.Kat 52.50 658.0013.Kat 49.00 658.0012.Kat 45.50 658.0011.Kat 42.00 658.0010.Kat 38.50 658.009.Kat 35.00 658.008.Kat 31.50 658.007.Kat 28.00 658.006.Kat 24.50 658.005.Kat 21.00 658.004.Kat 17.50 658.003.Kat 14.00 658.002.Kat 10.50 658.001.Kat 7.00 658.00

Lobby M 3.50 329.00Ground/ Lobby 0.00 658.00

1B -4.00 719.002B -8.00 719.003B -12.00 1,280.004B -16.00 1,280.005B -20.00 1,280.006B -24.00 1,280.007B -28.00 1,280.00

# of Floors above Ground 26Sub Total 16,779.0Total w/o 15% 14,262.2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

OPTION A:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

ELEVATOR LOBBY

ELEVATOR LOBBYOFFICE

MEZZANINE

OFFICESUITE

PARTITION WITH OVERHEAD LIGHT

LIGHT WEIGHT STEEL STRUCTUREHUNG MEZZANINE FLOOR

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

3000

3000

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

F

E C

MKIT

FLOOR GARDEN

MEETINGROOM

OFFICE

OFFICE OFFICE OFFICE OFFICE

9M

UP

UP UP UP

OPTION C :

FULL BUILD-OUT SCHEME

2 ELEVATORS + 1 SWING ELEVATOR (SERVICE / PASSENGER)

FAN COIL SET-UP

CHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICESUITE

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

BLIND FOR GLARECONTROL

3000

3000

2 3S+1

FM

KIT

FLOOR GARDEN

FLOOR GARDEN MEETING

ROOM

BLIND FOR GLARECONTROL

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

OPTION B:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

TYPICAL OFFICE FLOOR

MEZZANINE OFFICE FLOOR

togglemeeting and �oor gardenevery 4th �oor1

2

MECHANICAL SPACE AT MEZZANINE LEVEL

MEP

3 (PH)

4

S

SF

F

M

M

KIT

KIT

FLOOR GARDEN

MEETINGROOM

MEETINGROOM

9M

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICEOFFICE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICE OFFICEUP

DN

DN DN DN

UP

UP UP

2800

2800

VAV BOX

VAV BOX

7M

FROM CENTRAL CHILLER

FRESH AIR

EXHAUST

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

APA OFFICE TOWER Concept Design Proposal for Timur Real Estate Development Building Investments, Inc.

Site Building Analysis SustainabilityThe new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

MLEVENT

ALI KAYA SK

HARMAN SK

BÜYÜKDERE CD

TALATPAȘA CD

KANYON MALL

+122.84+128.06

ALI KAYA SOKAGI

LOBBY

SECURITY

DROP-OFF

PARKING ENTRANCESERVICE ENTRANCE

DN

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

?

4+1

4+1

4+1

4+1

3+1

4

1

CENTER CORE:INEFFICIENT WITH SMALLFLOOR PLATE

END CORE:LONG DISTANCE FROM ELEVATORLOCATION OF 2ND EGRESS

LONG SIDE CORE AT SOUTH:PRIME VIEWS TOWARDS BOSPORUSARE BLOCKED

LONG SIDE CORE AT NORTH:PRIME VIEWS TOWARDS BOSPORUSSUFFICIENT WIDTH OF RENTABLEFLOOR PLATE

REDUCED COMPACT CORE:3 ELEVATORSACCEPTABLE WIDTH OF RENTABLE FLOOR PLATEPRIME VIEWS TOWARDS BOSPORUS

433 SM (INCL. GARDEN)

425 SM (INCL. GARDEN)

478 SM (INCL. GARDEN)

72%EFFICENCY

65%EFFICENCY

66%EFFICENCY

233 SM (INCL. CIRCULATION)

180 SM (INCL. CIRCULATION)

225 SM (INCL. CIRCULATION)

1

2 3

4

1

1

2

2

3

3

4

S

S

F

F

F

M

M

M

KIT

KIT

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

MEET

MEET

MEETCOMPACT CORE:CORE AND CIRCULATION AT 50% OF WIDTH OF FLOOR PLATE ALI KAYA SOKAGI

5M

5M

*SET BACK LINES PER DWG: “vaziyet planı.dwg”

5M 658 SM35M

35M

20M

20M 7M

1. KAT

2.KAT

3.KAT

4.KAT

5.KAT

6.KAT

7.KAT

8.KAT

9.KAT

10.KAT

11.KAT

12.KAT

13.KAT

14.KAT

15.KAT

16.KAT

17.KAT

18.KAT

19.KAT

20.KAT

1.ÇK

2.ÇK

3.ÇK

MECH

LOBBY

B1

LOBBY MEZZANINE

B2

B3

B4

B5

B6

B7

Floor Elev. Area

TOB. 92.00 658.003.ÇK 85.00 658.002.ÇK 81.00 658.001.ÇK 77.00 658.00

20.Kat 73.50 658.0019.Kat 70.00 658.0018.Kat 66.50 658.0017.Kat 63.00 658.0016.Kat 59.50 658.0015.Kat 56.00 658.0014.Kat 52.50 658.0013.Kat 49.00 658.0012.Kat 45.50 658.0011.Kat 42.00 658.0010.Kat 38.50 658.009.Kat 35.00 658.008.Kat 31.50 658.007.Kat 28.00 658.006.Kat 24.50 658.005.Kat 21.00 658.004.Kat 17.50 658.003.Kat 14.00 658.002.Kat 10.50 658.001.Kat 7.00 658.00

Lobby M 3.50 329.00Ground/ Lobby 0.00 658.00

1B -4.00 719.002B -8.00 719.003B -12.00 1,280.004B -16.00 1,280.005B -20.00 1,280.006B -24.00 1,280.007B -28.00 1,280.00

# of Floors above Ground 26Sub Total 16,779.0Total w/o 15% 14,262.2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

OPTION A:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

ELEVATOR LOBBY

ELEVATOR LOBBYOFFICE

MEZZANINE

OFFICESUITE

PARTITION WITH OVERHEAD LIGHT

LIGHT WEIGHT STEEL STRUCTUREHUNG MEZZANINE FLOOR

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

3000

3000

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

F

E C

MKIT

FLOOR GARDEN

MEETINGROOM

OFFICE

OFFICE OFFICE OFFICE OFFICE

9M

UP

UP UP UP

OPTION C :

FULL BUILD-OUT SCHEME

2 ELEVATORS + 1 SWING ELEVATOR (SERVICE / PASSENGER)

FAN COIL SET-UP

CHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICESUITE

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

BLIND FOR GLARECONTROL

3000

3000

2 3S+1

FM

KIT

FLOOR GARDEN

FLOOR GARDEN MEETING

ROOM

BLIND FOR GLARECONTROL

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

OPTION B:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

TYPICAL OFFICE FLOOR

MEZZANINE OFFICE FLOOR

togglemeeting and �oor gardenevery 4th �oor1

2

MECHANICAL SPACE AT MEZZANINE LEVEL

MEP

3 (PH)

4

S

SF

F

M

M

KIT

KIT

FLOOR GARDEN

MEETINGROOM

MEETINGROOM

9M

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICEOFFICE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICE OFFICEUP

DN

DN DN DN

UP

UP UP

2800

2800

VAV BOX

VAV BOX

7M

FROM CENTRAL CHILLER

FRESH AIR

EXHAUST

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

APA OFFICE TOWER Concept Design Proposal for Timur Real Estate Development Building Investments, Inc.

Site Building Analysis SustainabilityThe new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

MLEVENT

ALI KAYA SK

HARMAN SK

BÜYÜKDERE CD

TALATPAȘA CD

KANYON MALL

+122.84+128.06

ALI KAYA SOKAGI

LOBBY

SECURITY

DROP-OFF

PARKING ENTRANCESERVICE ENTRANCE

DN

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

?

4+1

4+1

4+1

4+1

3+1

4

1

CENTER CORE:INEFFICIENT WITH SMALLFLOOR PLATE

END CORE:LONG DISTANCE FROM ELEVATORLOCATION OF 2ND EGRESS

LONG SIDE CORE AT SOUTH:PRIME VIEWS TOWARDS BOSPORUSARE BLOCKED

LONG SIDE CORE AT NORTH:PRIME VIEWS TOWARDS BOSPORUSSUFFICIENT WIDTH OF RENTABLEFLOOR PLATE

REDUCED COMPACT CORE:3 ELEVATORSACCEPTABLE WIDTH OF RENTABLE FLOOR PLATEPRIME VIEWS TOWARDS BOSPORUS

433 SM (INCL. GARDEN)

425 SM (INCL. GARDEN)

478 SM (INCL. GARDEN)

72%EFFICENCY

65%EFFICENCY

66%EFFICENCY

233 SM (INCL. CIRCULATION)

180 SM (INCL. CIRCULATION)

225 SM (INCL. CIRCULATION)

1

2 3

4

1

1

2

2

3

3

4

S

S

F

F

F

M

M

M

KIT

KIT

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

MEET

MEET

MEETCOMPACT CORE:CORE AND CIRCULATION AT 50% OF WIDTH OF FLOOR PLATE ALI KAYA SOKAGI

5M

5M

*SET BACK LINES PER DWG: “vaziyet planı.dwg”

5M 658 SM35M

35M

20M

20M 7M

1. KAT

2.KAT

3.KAT

4.KAT

5.KAT

6.KAT

7.KAT

8.KAT

9.KAT

10.KAT

11.KAT

12.KAT

13.KAT

14.KAT

15.KAT

16.KAT

17.KAT

18.KAT

19.KAT

20.KAT

1.ÇK

2.ÇK

3.ÇK

MECH

LOBBY

B1

LOBBY MEZZANINE

B2

B3

B4

B5

B6

B7

Floor Elev. Area

TOB. 92.00 658.003.ÇK 85.00 658.002.ÇK 81.00 658.001.ÇK 77.00 658.00

20.Kat 73.50 658.0019.Kat 70.00 658.0018.Kat 66.50 658.0017.Kat 63.00 658.0016.Kat 59.50 658.0015.Kat 56.00 658.0014.Kat 52.50 658.0013.Kat 49.00 658.0012.Kat 45.50 658.0011.Kat 42.00 658.0010.Kat 38.50 658.009.Kat 35.00 658.008.Kat 31.50 658.007.Kat 28.00 658.006.Kat 24.50 658.005.Kat 21.00 658.004.Kat 17.50 658.003.Kat 14.00 658.002.Kat 10.50 658.001.Kat 7.00 658.00

Lobby M 3.50 329.00Ground/ Lobby 0.00 658.00

1B -4.00 719.002B -8.00 719.003B -12.00 1,280.004B -16.00 1,280.005B -20.00 1,280.006B -24.00 1,280.007B -28.00 1,280.00

# of Floors above Ground 26Sub Total 16,779.0Total w/o 15% 14,262.2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

OPTION A:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

ELEVATOR LOBBY

ELEVATOR LOBBYOFFICE

MEZZANINE

OFFICESUITE

PARTITION WITH OVERHEAD LIGHT

LIGHT WEIGHT STEEL STRUCTUREHUNG MEZZANINE FLOOR

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

3000

3000

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

F

E C

MKIT

FLOOR GARDEN

MEETINGROOM

OFFICE

OFFICE OFFICE OFFICE OFFICE

9M

UP

UP UP UP

OPTION C :

FULL BUILD-OUT SCHEME

2 ELEVATORS + 1 SWING ELEVATOR (SERVICE / PASSENGER)

FAN COIL SET-UP

CHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICESUITE

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

BLIND FOR GLARECONTROL

3000

3000

2 3S+1

FM

KIT

FLOOR GARDEN

FLOOR GARDEN MEETING

ROOM

BLIND FOR GLARECONTROL

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

OPTION B:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

TYPICAL OFFICE FLOOR

MEZZANINE OFFICE FLOOR

togglemeeting and �oor gardenevery 4th �oor1

2

MECHANICAL SPACE AT MEZZANINE LEVEL

MEP

3 (PH)

4

S

SF

F

M

M

KIT

KIT

FLOOR GARDEN

MEETINGROOM

MEETINGROOM

9M

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICEOFFICE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICE OFFICEUP

DN

DN DN DN

UP

UP UP

2800

2800

VAV BOX

VAV BOX

7M

FROM CENTRAL CHILLER

FRESH AIR

EXHAUST

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

APA OFFICE TOWER Concept Design Proposal for Timur Real Estate Development Building Investments, Inc.

Site Building Analysis SustainabilityThe new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The new Timur office development is planned in the north-eastern section of Istanbul on the European side of the Bosporus. The site is located in east of the Buyukdere Caddesi adjacent to the Levent and Ortabayir development. This district consists of high-end residential, retail (most notably the Kanyon mall) and class-A office buildings.

The district and the site are easily accessible by car from Buyukdere Caddesi and by public transportation via the Levent Metro stop.

The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb according to the information provided by Timur.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

The Timur competition brief asks for a double height lobby with a mezzanine. Above the lobby 10 floors with mezzanines and 4-5 penthouses are planned. RMJM recommends to evaluate together with the client the commercial value of the mezzanine floors versus regular floors.

As the site slopes by 6M from East to West, the first 2 basement floors can make use of natural light and become additional office spaces and meeting rooms. Below that there will be 4 levels of parking, accessed by a ramp on the north side of the property.

The RMJM design team envisions this new office building as a development which fulfills the highest standards in regard to efficiency, sustainability and architectural quality.

Design features such as raised floor system, exposed concrete ceilings, smart light controls, high performance envelopes etc. should be considered.

The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building. The penthouse floors should be accessed by a dedicated elevator.

Two egress stairs with sufficient distance towards each other will be required. An option with a scissor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.

The core will provide the necessary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms. As the typical floor-to-floor height

is 7m the mezzanine floor should be a light weight, steel frame structure hung from the structural members of the floor above. This will reduce the overall weight of the structure and allows for column free spaces.

From the information given RMJM understands that the current FAR (Emsal) for the site is 2.5 and that the area for the ground floor is not to exceed 50% of the overall site area.

The following design proposals use the information given in the Timur design brief and most likely will require a variance.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

RMJM is committed to being a leader in Sustainable Design. We welcome the challenge of designing buildings that meet our modern needs for shelter and services, nourish our cultural and spiritual desires, and preserve to the greatest degree possible the finite resources of our planet.

Energy efficiency, passive solar design, environmental quality initiatives, and attention to materials selection are evident throughout the RMJM portfolio. Our focus on sustainable design issues and high-performance design strategies demonstrates our commitment to building better, building smarter and building more responsibly.

RMJM uses the LEEDT methodology and rating system. RMJM has forty four (44) LEEDT accredited professionals on staff and we are currently actively working on 12 projects that are registered and seeking LEED certification.

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

MLEVENT

ALI KAYA SK

HARMAN SK

BÜYÜKDERE CD

TALATPAȘA CD

KANYON MALL

+122.84+128.06

ALI KAYA SOKAGI

LOBBY

SECURITY

DROP-OFF

PARKING ENTRANCESERVICE ENTRANCE

DN

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

TYPICAL OFFICE FLOOR WITH MEZZANINE

LOBBY ENTRY

PARKING ENTRY

LIGHT MOAT FOR 2 BASEMENT FLOORS

ACCESS TO LOWER FLOORS FROM LOBBY BY OPEN STAIR CASE

FLOOR PACKETS W/MEZZANINE

PENTHOUSE FLOORS

MECHANICAL PENTHOUSE

DOUBLE HEIGHT LOBBY

CORE: 4 OR 3+1 PASSENGER ELEVATORS1 SERVICE ELEVATOR2 EGRESS STAIRCASESMEP SPACESBATHROOM MALE/FEMALEKITCHENETTESMALL MEETING ROOM

HIGH PERFORMANCEENVELOPE WITH SHADING DEVICES OR CERAMIC FRIT

RAISED FLOOR SYSTEM WITHUNDERFLOOR AIR SUPPLY

USE LOWER CEILINGS IN CORRIDOR FOR HVAC SUPPLY AND RETURNROUTE

MEZZANINE FLOOR TYPICAL FLOOR

COMMUNICATIONSTAIR

EXPOSED CONCRETE SLABS WITH FLY-ASH MIX

HUNG LIGHT-WEIGHT STEELMEZZANINE

SEMI-TRANSPARENTPARTITIONS

?

4+1

4+1

4+1

4+1

3+1

4

1

CENTER CORE:INEFFICIENT WITH SMALLFLOOR PLATE

END CORE:LONG DISTANCE FROM ELEVATORLOCATION OF 2ND EGRESS

LONG SIDE CORE AT SOUTH:PRIME VIEWS TOWARDS BOSPORUSARE BLOCKED

LONG SIDE CORE AT NORTH:PRIME VIEWS TOWARDS BOSPORUSSUFFICIENT WIDTH OF RENTABLEFLOOR PLATE

REDUCED COMPACT CORE:3 ELEVATORSACCEPTABLE WIDTH OF RENTABLE FLOOR PLATEPRIME VIEWS TOWARDS BOSPORUS

433 SM (INCL. GARDEN)

425 SM (INCL. GARDEN)

478 SM (INCL. GARDEN)

72%EFFICENCY

65%EFFICENCY

66%EFFICENCY

233 SM (INCL. CIRCULATION)

180 SM (INCL. CIRCULATION)

225 SM (INCL. CIRCULATION)

1

2 3

4

1

1

2

2

3

3

4

S

S

F

F

F

M

M

M

KIT

KIT

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

FLOOR GARDEN

MEET

MEET

MEETCOMPACT CORE:CORE AND CIRCULATION AT 50% OF WIDTH OF FLOOR PLATE ALI KAYA SO

KAGI

5M

5M

*SET BACK LINES PER DWG: “vaziyet planı.dwg”

5M 658 SM35M

35M

20M

20M 7M

1. KAT

2.KAT

3.KAT

4.KAT

5.KAT

6.KAT

7.KAT

8.KAT

9.KAT

10.KAT

11.KAT

12.KAT

13.KAT

14.KAT

15.KAT

16.KAT

17.KAT

18.KAT

19.KAT

20.KAT

1.ÇK

2.ÇK

3.ÇK

MECH

LOBBY

B1

LOBBY MEZZANINE

B2

B3

B4

B5

B6

B7

Floor Elev. Area

TOB. 92.00 658.003.ÇK 85.00 658.002.ÇK 81.00 658.001.ÇK 77.00 658.00

20.Kat 73.50 658.0019.Kat 70.00 658.0018.Kat 66.50 658.0017.Kat 63.00 658.0016.Kat 59.50 658.0015.Kat 56.00 658.0014.Kat 52.50 658.0013.Kat 49.00 658.0012.Kat 45.50 658.0011.Kat 42.00 658.0010.Kat 38.50 658.009.Kat 35.00 658.008.Kat 31.50 658.007.Kat 28.00 658.006.Kat 24.50 658.005.Kat 21.00 658.004.Kat 17.50 658.003.Kat 14.00 658.002.Kat 10.50 658.001.Kat 7.00 658.00

Lobby M 3.50 329.00Ground/ Lobby 0.00 658.00

1B -4.00 719.002B -8.00 719.003B -12.00 1,280.004B -16.00 1,280.005B -20.00 1,280.006B -24.00 1,280.007B -28.00 1,280.00

# of Floors above Ground 26Sub Total 16,779.0Total w/o 15% 14,262.2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

penthouses at 4m �oor to �oorhow many tbd re: FAR and max height allowable

10 o�ce �oors at 7m (�oor-to �oor?) + mezzanine

lobby at 10m + mezzanine

2 �oors below ground + 3 parkingprovide natural light for the 2 basement �oors

Timur APA o�ce | progress | Oct. 25, 2010 \ 1 0f 2

OPTION A:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

ELEVATOR LOBBY

ELEVATOR LOBBYOFFICE

MEZZANINE

OFFICESUITE

PARTITION WITH OVERHEAD LIGHT

LIGHT WEIGHT STEEL STRUCTUREHUNG MEZZANINE FLOOR

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

3000

3000

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

F

E C

MKIT

FLOOR GARDEN

MEETINGROOM

OFFICE

OFFICE OFFICE OFFICE OFFICE

9M

UP

UP UP UP

OPTION C :

FULL BUILD-OUT SCHEME

2 ELEVATORS + 1 SWING ELEVATOR (SERVICE / PASSENGER)

FAN COIL SET-UP

CHILLING PLANT ON ROOF

COOLING TOWER

ABSORPTION CHILLER

CENTRIFUGAL CHILLERS

HIGH PERFORMANCEVENTILATION UNIT

TYPICAL FLOOR WITHMAIN SUPPLY LINE AND FAN COIL UNITS INCORRIDOR

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICESUITE

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

DOUBLE HEIGHT FLOORW/ ELECTRICAL AND DATA OUTLETS

BLIND FOR GLARECONTROL

3000

3000

2 3S+1

FM

KIT

FLOOR GARDEN

FLOOR GARDEN MEETING

ROOM

BLIND FOR GLARECONTROL

FAN COIL UNIT

FAN COIL UNIT

7M

FROM CENTRAL CHILLER

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

OPTION B:

MEZZANINE FLOOR SCHEME4 ELEVATORS + 1 SERVICE ELEVATORFAN COIL SET-UPCHILLING PLANT ON ROOF

TYPICAL OFFICE FLOOR

MEZZANINE OFFICE FLOOR

togglemeeting and �oor gardenevery 4th �oor1

2

MECHANICAL SPACE AT MEZZANINE LEVEL

MEP

3 (PH)

4

S

SF

F

M

M

KIT

KIT

FLOOR GARDEN

MEETINGROOM

MEETINGROOM

9M

HIGH EFFICIENCY FAN COIL UNITS WITHMECHANICAL VENTILATION

ENTHALPY WHEEL HEAT RECOVERYON VENTILATION SYTEM

HIGH-EFFICIENCY AIR-COOLED CHILLERS

OFFICESUITE

OFFICEOFFICE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICEMEZZANINE

OFFICE OFFICEUP

DN

DN DN DN

UP

UP UP

2800

2800

VAV BOX

VAV BOX

7M

FROM CENTRAL CHILLER

FRESH AIR

EXHAUST

OVERHEADAIR

OVERHEADAIR

EXHAUST

EXHAUST

PERIMETERRADIATION

The new Timur office development is planned in the north-eastern section of Istanbul on the Euro-pean side of the Bosporus. The diamond shaped site has 30m street frontage along Ali Kaya Street and is approximately 50m deep adjacent to another site. Setback lines are approximately 5M to adjacent sites and 10M to the street curb.Design features such as raised floor system, ex-posed concrete ceilings, smart light controls and a high performance envelope should be consid-ered.The team evaluated different core options and recommends an elongated side core with 4+1 or 2+1 elevators on the north side of the building.

The penthouse floors can be accessed by a dedi-cated elevator.Two egress stairs with sufficient distance towards each other will be required. An option with a scis-sor stair is also shown; the Istanbul code should be reviewed to ensure whether a scissor stair is permissible or not.The core will provide the nec-essary shear walls and will also accommodate bathrooms, kitchenettes and conference rooms.

Page 13: Andreas Buettner

TIMUR HALIC RESIDENTIAL DEVELOPMENT, Istanbul, Turkey [WITH RMJM]The design of the Haliç project, a complex urban site in Istanbul, requires a special set of skills and a deep understanding of how cities function. The site is situated in a manufacturing zone to the West of the old Eyup neighborhood. In the fu-ture, this neighborhood will transform to a new, dynamic, young district. The new development will be the first high-rise residential development in this industrial area. The design explores to use some of the available FAR for low-rise townhous-es by creating a garden atmosphere providing an opportunity for a courtyard for future residents.This study of the Haliç site was conducted in 2

parts: the analysis of the singular lot (#72) and the combined lots (#71 + #72) has led to 3+2 site and massing configurations. Each design approach has the potential to engage the specific site con-ditions and the development goals including easy site access, creation of public and private ameni-ties, achieving an iconographic design, financial viability, planning flexibility and sustainability.

Page 14: Andreas Buettner

HUAWEI R&D CAMPUS, Wuhan, China [WITH RMJM]

The design of the new Huawei R&D campus in Wuhan draws upon a unique sense of place by echoing the notion of a cultivated landscape and gathering it’s own community along a central landscaped valley form. A strong focus has been placed upon the sensi-tive integration of buildings within a landscaped campus environment. Echoing traditional Chi-nese building typologies, the blurring of inside and outside spaces through a series of court-yards and partially enclosed gardens will en-sure a harmony between architectural and land-scaped environments.The planning of the R&D facility at both a site

and building level has put the highest priority on operational issues. . The typical linear typology developed will allow research teams to adapt to the changing demands of the technology market and will ensure that the buildings adapt to the future. Efficiency has been core to the develop-ment of the architecture also, both in terms of reducing energy consumption through careful sustainable design and reducing cost through an understanding of simple, robust and practical building designs

Page 15: Andreas Buettner

VARIOUS PROJECTS [WITH RMJM]

MBC, Seoul, Korea, 2011

mbc

| sc

hem

e 1A

| vie

ws +

land

scap

e

11-0

9-20

11

view eye level into court view aerial

KASCT, Riyadh, Saudi Arabia, 2010

KHALIFA UNIVERSITY, Abu Dhabi, UAE, 2009

PEDDIE SCHOOL NATATORIUM, New Jersey, completed 2009

Page 16: Andreas Buettner

Lobby design and coordination for a 45,000 SM office building for KPMG.Core and shell design for a 35,000 SM office building for Fitch Ratings.

DS3 EAST & WEST, Canary Wharf, London, 2006-08 [WITH KPF]

Page 17: Andreas Buettner

Exterior design of podium and RBC branding, LEED Silver class A office building in downtown Toronto

ROYAL BANK OF CANADA OFFICE TOWER, Toronto, 2008 [WITH RMJM]

Page 18: Andreas Buettner

Massing and exterior design of a new 170,000 sf aca-demic building for NYU.From conceptual massing design through construction administration.Detailing of exterior brick wall, curtain wall elements and metal clad roof, shop drawing review and site supervision

NYU Law School, New York, 2000-2002 [WITH KPF]

Page 19: Andreas Buettner

New master plan for 68th street campusSchematic design for renovation of 68th street entrance with 2 new overglazed courtyards, New reception desk and re-programming of adjacent spacesDesign for an ambulatory care buildingDevelopment of strategies to integrate new ambulatory care building into the existing hospital structure

NEW YORK PRESBYTERIAN HOSPITAL, New York, 2003-2005 [WITH KPF]

Page 20: Andreas Buettner

Renovation of 100,000 sqm office building for the Ministry of Finances

MINISTRY OF FINANCE, Berlin, 1996-98 [WITH HPP]