AND SPECIAL PROVISIONS - · PDF file2-1.03 DVBE GOAL FOR THIS PROJECT ..... 9 2-1.04...

127
__________________________________________________________ __________________________________________________________ __________________________________________________________ ** WARNING ** WARNING ** WARNING ** WARNING ** This document is intended for informational purposes only. Users are cautioned that Caltrans does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders and non-bidder packages, write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone and fax number, P.O. Box and street address so that you can receive addenda. Note: Addenda information is NOT included with the electronic documents available via electronic file transfer. Only bidder or non-bidder package holders listed with the Caltrans Plans and Bid Documents section as described above will receive addenda information. etric Caltrans STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS AND SPECIAL PROVISIONS FOR CONSTRUCTION ON STATE HIGHWAY IN ALAMEDA COUNTY IN HAYWARD FROM 1.7 km EAST OF THE SAN MATEO-HAYWARD BRIDGE TOLL PLAZA TO 0.3 km WEST OF CLAWITER ROAD OVERCROSSING DISTRICT 04, ROUTE 92 For Use in Connection with Standard Specifications Dated JULY 1999, Standard Plans Dated JULY 1999, and Labor Surcharge and Equipment Rental Rates. CONTRACT NO. 04-045044 04-Ala-92-5.9 / 6.9

Transcript of AND SPECIAL PROVISIONS - · PDF file2-1.03 DVBE GOAL FOR THIS PROJECT ..... 9 2-1.04...

  • __________________________________________________________

    __________________________________________________________

    __________________________________________________________

    ** WARNING ** WARNING ** WARNING ** WARNING ** This document is intended for informational purposes only.

    Users are cautioned that Caltrans does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders and non-bidder packages, write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone and fax number, P.O. Box and street address so that you can receive addenda.

    Note: Addenda information is NOT included with the electronic documents available via electronic file transfer. Only bidder or non-bidder package holders listed with the Caltrans Plans and Bid Documents section as described above will receive addenda information.

    etric

    Caltrans

    STATE OF CALIFORNIA

    DEPARTMENT OF TRANSPORTATION

    NOTICE TO CONTRACTORS AND

    SPECIAL PROVISIONS FOR CONSTRUCTION ON STATE HIGHWAY IN

    ALAMEDA COUNTY IN HAYWARD FROM 1.7 km EAST OF THE SAN MATEO-HAYWARD BRIDGE TOLL PLAZA TO 0.3 km WEST OF CLAWITER ROAD OVERCROSSING

    DISTRICT 04, ROUTE 92

    For Use in Connection with Standard Specifications Dated JULY 1999, Standard Plans Dated JULY 1999, and Labor Surcharge and Equipment Rental Rates.

    CONTRACT NO. 04-045044

    04-Ala-92-5.9 / 6.9

  • Bids Open: October 10, 2001 Dated: September 10, 2001 OSD

  • *************************************************************************************************

    IMPORTANT SPECIAL NOTICES

    *************************************************************************************************

    Payment Bonds Attention is directed to Section 5 of the Special Provisions, regarding contract bonds. The payment bond shall be in a sum not less than one hundred percent of the total amount payable by the terms of the contract.

    Attention is directed to Section 11-2, "Portland Cement Concrete," of these Special Provisions which contains Section 90, "Portland Cement Concrete," of the Standard Specifications.

    Attention is directed to "Miscellaneous Metal," in Section 8-1, "Miscellaneous," of these Special Provisions for new requirements for miscellaneous metal.

  • TABLE OF CONTENTS

    NOTICE TO CONTRACTORS ............................................................................................................................................ 1 COPY OF ENGINEER'S ESTIMATE.................................................................................................................................. 3 SPECIAL PROVISIONS....................................................................................................................................................... 8 SECTION 1. SPECIFICATIONS AND PLANS ................................................................................................................. 8 SECTION 2. PROPOSAL REQUIREMENTS AND CONDITIONS ................................................................................. 8

    2-1.01 GENERAL ......................................................................................................................................................... 8 2-1.02 DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) ......................................................................... 8 2-1.03 DVBE GOAL FOR THIS PROJECT ................................................................................................................ 9 2-1.04 SUBMISSION OF DVBE INFORMATION................................................................................................... 10 2-1.05 SMALL BUSINESS PREFERENCE .............................................................................................................. 10 2-1.06 CALIFORNIA COMPANY PREFERENCE................................................................................................... 11

    SECTION 3. AWARD AND EXECUTION OF CONTRACT ......................................................................................... 11 SECTION 4. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES ........................ 12 SECTION 5. GENERAL.................................................................................................................................................... 13 SECTION 5-1. MISCELLANEOUS.................................................................................................................................. 13

    5-1.01 PLANS AND WORKING DRAWINGS......................................................................................................... 13 5-1.011 EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK....................... 13 5-1.012 DIFFERING SITE CONDITIONS ................................................................................................................ 13 5-1.015 LABORATORY............................................................................................................................................. 13 5-1.017 CONTRACT BONDS.................................................................................................................................... 13 5-1.018 EXCAVATION SAFETY PLANS................................................................................................................ 14 5-1.019 COST REDUCTION INCENTIVE ............................................................................................................... 14 5-1.02 LABOR NONDISCRIMINATION ................................................................................................................. 14 5-1.03 INTEREST ON PAYMENTS.......................................................................................................................... 15 5-1.031 FINAL PAYMENT AND CLAIMS .............................................................................................................. 15 5-1.04 PUBLIC SAFETY............................................................................................................................................ 15 5-1.05 SURFACE MINING AND RECLAMATION ACT ....................................................................................... 16 5-1.06 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES ............................................................. 17 5-1.07 YEAR 2000 COMPLIANCE ........................................................................................................................... 17 5-1.08 SUBCONTRACTOR AND DVBE RECORDS .............................................................................................. 17 5-1.086 PERFORMANCE OF DVBE SUBCONTRACTORS AND SUPPLIERS................................................... 17 5-1.09 SUBCONTRACTING...................................................................................................................................... 18 5-1.10 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS.................................................................... 18 5-1.11 PARTNERING................................................................................................................................................. 18 5-1.11 AREAS FOR CONTRACTOR'S USE ............................................................................................................ 18 5-1.12 PAYMENTS .................................................................................................................................................... 19 5-1.13 SOUND CONTROL REQUIREMENTS ........................................................................................................ 19

    SECTION 6. (BLANK) ...................................................................................................................................................... 20 SECTION 7. (BLANK) ...................................................................................................................................................... 20 SECTION 8. MATERIALS................................................................................................................................................ 20 SECTION 8-1. MISCELLANEOUS.................................................................................................................................. 20

    8-1.01 SUBSTITUTION OF NON-METRIC MATERIALS AND PRODUCTS...................................................... 20 8-1.02 PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS..................................... 26 8-1.03 MISCELLANEOUS METAL.......................................................................................................................... 32 8-1.04 ENGINEERING FABRICS ............................................................................................................................. 33

    SECTION 8-2. CONCRETE .............................................................................................................................................. 34 8-2.01 PORTLAND CEMENT CONCRETE ............................................................................................................. 34 8-2.02 CORROSION CONTROL FOR PORTLAND CEMENT CONCRETE ........................................................ 35

    SECTION 8-3. WELDING................................................................................................