Anastasia Pappas 304426
-
Upload
anastasia-pappas -
Category
Documents
-
view
234 -
download
0
description
Transcript of Anastasia Pappas 304426
anastasia pappas
architectureportfolio
302246
2
Architecture represents art, an artwork publicized through form. Architecture is the “art you walk through” that signifies the painting one looks at; claims Dan Rice. Imagery develops from memory of visual experiences and the recollection of senses, such as music, textures, visuals, literature and smells which results in visual mayhem. I do not believe that design derives its imagery from order as Louis Kahn says but from chaos. Design is chaotic imagery put into an expression of order through factors where I mainly focus on site, history, nature, sustainability and lastly humanity.
I feel as an architect you should “dig the hole before you are thirsty”; responding to the site and solving the problem before it is recognized by the user, it is always better to think ahead for the benefit of our future. Design is a result of social revolution and influences the way we live determined by people. Mother Nature responds to architecture and so should architecture - “mother art” - respond to nature.
i n d
e x 4 university
. 2nd year
. 3rd year
22 internship. stauch vorster international architects
. parallax architecture
46 Travel. europe
. india
54 documentation. CV
. references
4
2nd year
RESEARCHYeoville - RENTING (RESEARCH)
FURNITUREBLACK + WHITE CHAIR (REINVENTION)
URBAN DESIGNmistreet (INTERACTIVE NETWORK)
un
ive
rsity (w
its)
6
8
10
5
3rd year
RESEARCHYeoville - RENTING (RESEARCH)
FURNITUREBLACK + WHITE CHAIR (REINVENTION)
URBAN DESIGNmistreet (INTERACTIVE NETWORK)
URBAN DESIGNmanifesto
ARCHITECTURE DESIGN &+ CONSTRUCTIONJuta street (mixed use student housing)
ARCHITECTURE DESIGNVictoria clinic (germiston educational clinic)
12
14
18
Type - Group AnalysisLocation - Yeoville, Jhb
Description - A research project based on Yeoville as a site analysis. Our
group was chosen to research the subject of “renting”. We analysed how
the renting process works in Yeoville, for e.g.. the adverts posted, what is the state of living, what is advertised etc.
This information was gathered and compiled in a graphic mapping
presentation.
6
2y
eov
ille
rent
N
7
interview
RESEARCH
rented space Accommodation ANALYSIS
renting processavailability ANALYSIS
1. Lives with 1 person2. It’s dangerous + poor. Sufficient electricity + water for now (conditions)3. R800 per person p/m4. ---5. 8 people (Space accommodates?)6. Likes yeoville’s inhabitants (Reason for living in Yeoville)7. 9 years (South African residency)8. For a long time (present accommodation length of stay)9. Verbal agreement. Small deposit must be paid on agreement (contracts)10. Drinking + smoking permitted; no noise, cleaning timetable (expectations)11. 3 times (times you have moved)
BLACK AND WHITE CHAIR
MODEL
1
2
GERIT REITVELD
BLUE AND RED CHAIR REVISION
BLACK AND WHITE CHAIR
MODEL
1
2
GERIT REITVELD
BLUE AND RED CHAIR REVISION
BLACK AND WHITE CHAIR
MODEL
1
2
GERIT REITVELD
BLUE AND RED CHAIR REVISION
BLACK AND WHITE CHAIR
MODEL
1
2
GERIT REITVELD
BLUE AND RED CHAIR REVISION
BLACK AND WHITE CHAIR
REVISION
GERIT REITVELD
BLUE AND RED CHAIR
Type - Timber ChairDescription - This project entails
re-inventing a well known furniture piece. I chose the Gerit Reitveld (Red and Blue Chair). My “Black + White chair represented a more
simple design steering towards a square geometry made out of plywood(white washed) coated in nylon strapping with a striking
grayscale appeal.
8
bla
ck +
w
hite
ch
air
23d
building progress
BLACK AND WHITE CHAIR
GERIT REITVELD
BLUE AND RED CHAIR REVISION
BLACK AND WHITE CHAIR
GERIT REITVELD
BLUE AND RED CHAIR REVISION 10/10/15
BLACK AND WHITE CHAIR
GERIT REITVELD
BLUE AND RED CHAIR REVISION
BLACK AND WHITE CHAIR
GERIT REITVELD
BLUE AND RED CHAIR REVISION
0 500250mm
750
9
side elevation
details
plan
front elevation ge
rit r
eitv
eld
ch
air
WEATHER
MI FOUNTAIN BENCHYELLOW: STIMULATES MENTAL PROCESS STIMULATES MEMORY POSITIVITY/ENERGY ENCOURAGES COMMUNICATION
MATERIALITY: CONCRETE/YELLOW
FUNCTIONS:FUNCTIONS: BENCH
FOUNTAIN
TAP
SKATEBOARDING
EVENTS
MIWATER
MITREE
MIADVERT
GAMES
MIBENCH
BIRTHDAYS
EVENTS
3DMIWALL - MIWATER
SCALE 1:203D ELEVATION
3D ELEVATION
DETAILS SECTION
PROFILE
MICOMMENTS?
LOGGED IN
MISTOP
APPLICATIONS
ULTIMATE AROBICSWEDNESDAY 17:00
48 CJOHANNESBURG
BEDFORDVIEW
SHREK TUESDAY 14:00
JOHN GREEN
DEVELOPERS.PRIVACY.TERMS.HELP.
HOMEPROFILE
MIFOLLIE MIWALL
ELEVATIONS PLAN
MIGARDEN
WEATHER
ROTATIONAL VEGETABLE GARDEN
YELLOW: STIMULATES MENTAL PROCESS STIMULATES MEMORY POSITIVITY/ENERGY ENCOURAGES COMMUNICATION
MATERIALITY: CONCRETE/YELLOW PERSPEX
FUNCTIONSFUNCTIONS: MOVABLE STAIRWAY
DETAILS: IT WORKS OFF A WATER SYSTEM BASED ON A TIMER. IT WATERS THE PLANTS THROUGH CONNECTING PIPES RUNNING IN THROUGH EACH BOX WITH A FILTERING SYSTEM
TECHNOLOGY: IT IS AN APPLICATION CONNECTED TO THE MISTREET PAGE. IT PROVIDES TO THE MISTREET PAGE. IT PROVIDES THE NECESSARY INFO. ON WHAT TO PLANT, THE RIGHT SEASON, THE WATERING SYSTEM
EVENTS
MIWATER
MITREE
MIADVERT
GAMES
MIBENCH
BIRTHDAYS
EVENTS
3DMIWALL - MIGARDEN
SCALE 1:203D ELEVATION
3D ELEVATION
DETAILS SECTION
PROFILE
MICOMMENTS?
LOGGED IN
MISTOP
APPLICATIONS
ULTIMATE AROBICSWEDNESDAY 17:00
48 CJOHANNESBURG
BEDFORDVIEW
SHREK TUESDAY 14:00
JOHN GREEN
DEVELOPERS.PRIVACY.TERMS.HELP.
HOMEPROFILE
MIFOLLIE MIWALL
ELEVATIONS PLAN
MIGARDEN
WEATHER
EVENTS
MIWATER
MITREE
MIADVERT
mi water outlet
mi inner pipe pumping up
water
Ground
Top[ of pipe
mi watering vein system
GAMES
MIBENCH
BIRTHDAYS
EVENTS
MIWALL - MIGARDEN
mi yellow perspex
mi watering pipes
mi vegetable box
holes
mi concreteblock
mi concrete grass box
mi rotation
SCALE 1:5DETAILS DETAIL 1
DETAIL 3DETAIL 2
DETAILS
mi water pipes
mi filter system
pumping up water
mi pipe fills up
with water
mi outer water
pipe
SECTION3D
MISTOP
APPLICATIONS
ULTIMATE AROBICSWEDNESDAY 17:00
48 CJOHANNESBURG
BEDFORDVIEW
SHREK TUESDAY 14:00
JOHN GREEN
DEVELOPERS.PRIVACY.TERMS.HELP.
MIFOLLIE MIWALL
ELEVATIONS PLAN
mi yellow perspexbox
MIGARDEN
WEATHER
ROTATIONAL ADVERT DOORWAY
YELLOW: STIMULATES MENTAL PROCESS STIMULATES MEMORY POSITIVITY/ENERGY ENCOURAGES COMMUNICATION
MATERIALITY: CONCRETE/YELLOW PERSPEX
FUNCTIONS:FUNCTIONS: DOORWAY ADVERTISING SPACE EXHIBITION SPACE
DETAILS: ROTATIONAL DOORWAY AROUND A CENTRAL POLE WHICH CONSTANTLY MOVES AT A SLOW PACE
TECHNOLOGY: POSTERS ARE ADVERTISED THROUGH A PROJECTOR ON A SREEN, WHICH PROJECTOR ON A SREEN, WHICH CONSTANLY CHANGES WHILE SPINNING AROUND THE CENTRAL POLE
EVENTS
MIWATER
MITREE
MIADVERT
GAMES
MIBENCH
BIRTHDAYS
EVENTS
3DMIWALL - MIADVERT
SCALE 1:203D ELEVATION
3D ELEVATION
DETAILS SECTION
PROFILE
MICOMMENTS?
LOGGED IN
MISTOP
APPLICATIONS
ULTIMATE AROBICSWEDNESDAY 17:00
48 CJOHANNESBURG
BEDFORDVIEW
SHREK TUESDAY 14:00
JOHN GREEN
DEVELOPERS.PRIVACY.TERMS.HELP.
HOMEPROFILE
MIFOLLIE MIWALL
ELEVATIONS PLAN
MIGARDEN
10
mis
tre
et
2Type - Multi-Functional Street Furniture
Description - Mistreet acts as a live network (i.e. Facebook)for the social
interaction between the neighbourhood, creating a community space + safe zone.
Each intervention is designed to serve multiple purposes to benefit the
community. The structures are designed using sustainable and green principles, solar panels, turbines etc. as well as a
community farm. These allow people to work together, to share ideas
encouraging them to interact and communicate creating a more
cohesive society.
MI BENCH
MI GARDEN
MI ADVERT
MI TREE
MI WATER
MI STOP
MI FOLLIE
mi fountain
mi street
mi skateride
mi bench
mi doorway
mi vegetables
mi playground
mi gym
mi playground
mi junglegym
DE W
ET ST
REET
PHYSICAL INTERACTIONENABLES COMMUNICATION
TAKING A WALKSCHOOL ROAD
bench
mi skateboarding
ramp
De wet street
mi solar panelled lights
mi vegetables
mi garden mi advert
mi doorway
mi bench
DEVELOPERS.PRIVACY.TERMS.HELP.
HOMEPROFILE
MIFOLLIE
WEATHER
EVENTS
MIWATER
MITREE
MIADVERT
GAMES
MIBENCH
BIRTHDAYS
EVENTS
3DMIWALL - MIBENCH
SCALE 1:203D TRANSFROMATION
DETAILS SECTION
PROFILE
MICOMMENTS?
LOGGED IN
MISTOP
APPLICATIONS
ULTIMATE AROBICSWEDNESDAY 17:00
48 CJOHANNESBURG
BEDFORDVIEW
SHREK TUESDAY 14:00
JOHN GREEN
DEVELOPERS.PRIVACY.TERMS.HELP.
HOMEPROFILE
MIFOLLIE MIWALL
ELEVATIONS
mi radio
mi playground
PLAN
MIGARDEN
WEATHER
EVENTS
MIWATER
MITREE
MIADVERT
GAMES
MIBENCH
BIRTHDAYS
EVENTS
3DMIWALL - MIBENCH
SCALE 1:203D TRANSFROMATION
DETAILS SECTION
PROFILE
MICOMMENTS?
LOGGED IN
MISTOP
APPLICATIONS
ULTIMATE AROBICSWEDNESDAY 17:00
48 CJOHANNESBURG
BEDFORDVIEW
SHREK TUESDAY 14:00
JOHN GREEN
DEVELOPERS.PRIVACY.TERMS.HELP.
HOMEPROFILE
MIFOLLIE MIWALL
ELEVATIONS
mi radio
mi playground
PLAN
MIGARDEN
DE W
ET ST
REET
NO PHYSICAL INTERACTIONUNSOCIABLE BEHAVIOUR
TAKING A DRIVESCHOOL ROAD
N
0 2000 4000mm
11
plan
3d tree
3d benchsocial street network
CONCEPT ARTOWN
ANASTAS PAPPAS 304426 11/03/14ARCHITECTURAL MANIFESTO ARPL 3005 - ARCHITECTURAL DESIGN AND THEORY 3
ROOTS
ORGANIC
NATURE ONE WITH BEINGS
PIERNEEF
GEOMETRIC
NATURE
LANDSCAPES
BLACKHEART GANG
SOUTH AFRICAN ARTISTS - REPRESENT THEME OF WSOA
ROOTS - IVY GROWING OVER WSOA BUILDING
CONCEPT ARTOWN
ANASTAS PAPPAS 304426 11/03/14ARCHITECTURAL MANIFESTO ARPL 3005 - ARCHITECTURAL DESIGN AND THEORY 3
ROOTS
ORGANIC
NATURE ONE WITH BEINGS
PIERNEEF
GEOMETRIC
NATURE
LANDSCAPES
BLACKHEART GANG
SOUTH AFRICAN ARTISTS - REPRESENT THEME OF WSOA
ROOTS - IVY GROWING OVER WSOA BUILDING
0 500 15001000mm
12
ma
nife
sto
3wits theatre
Type - Urban DesignDescription - This project’s
intention was to interpret what we stand for by improving an space
urban space. I chose WITS theatre which I feel has disappeared. My
intention was to create a grandeur entrance by opening up the space creating a more user friendly and public interface which provides
shading, seating, lighting and greenery to encourage
people.
elevations
elevation
0 1000 2000
elevation
13
planting detail
bench detail
shading plan elevation sections
0 3000 6000mm
14
3section d-d
tetr
isju
ta st
reet
Type - Multi-FunctionalLocation - Juta Str., BraamfonteinDescription - Tetris is a multi-func-
tional student housing set in Johannesburg CBD near WITS
University based on green living. It is a project designed for a modern lifestyle for students convenience where necessities are provided
within the same building from hous-ing to gym, shops, offices.
15
mm0 1000 3000
student housing
details4 bedroom unit 2 bedroom units
function & tectonics analysis
0 30 9060mm
N 4000 120000mm
16
3te
tris
juta
st
reet
sun shading analysis
ground floor plan
3rd floor plan
17
30000 9000mm
30000 9000mm
north elevation
south elevation
construction section
sewer system wind patterns
mixed use
30000 9000mm
18
3h
ea
lth
clin
ic section d-d
Type - Educational ClinicLocation - Victoria Str., GermistonDescription - Victoria Health Clinic
is a 24 hour operating clinic and pharmacy with residency for staff
members. It consists of a rehabilitation centre with
educational facilities which intend to help the underprivileged and teach them about local health
issues.
N
mm
19
street view
transportation infrastructure
victoria str
130000 39000
N30000 9000
mm
20
3h
ea
lth
clin
ic
ground floor plan
west elevation
5th floor plan N
30000 9000
30000 9000mm
21
section a-a
rehabilitation
mm
22
inte
rnsh
ip
4th year
DESIGN + GRAPHICS. brochure
. greensprings (mixed use)
CONCEPT DESIGN. port harcourt housing. douala casino (proposal). Fourways (mixed use proposal). lekki retail (mall)
LAYOUT DESIGN + COSTING. rosebank apartments
RENDERS. Willowbridge offices. matlosana mall
CONSTRUCTION. 8 Melvill (Offices)
26
30
stauch vorster architects
28
34
36
23
6th year
CONSTRUCTION + GRAPHICS. the edge estate (row housing)
HOUSING. ditibane house. main residence house
CONSTRUCTION + DESIGN. Caravotas House
40
42
44
parallax architects
24
stauch vorster architects
inte
rnsh
ip. Commercial/Retail/Residential
. year - 2012
. length of stay - 12 months
. Programs - Revit - Autocad - CorelDraw - Photoshop
25
26
de
sig
n +
g
rap
hic
s
4 brochure
I designed the brochure to advertise the financial centre and rendered all the drawings included in the brochure.
Brochure : learnt about presentation layout, graphic design and how to show off a
building.
Greensprings: this was an urban design project which taught me the use and manipulation of space and
levels through the needs and activity of people.
N
27
green springs mixed use development
circulation plan
site analysis plan
zoning plan
site plan
Greensprings is a mixed use development con-taining a shopping centre, offices, residency and a hotel. I was involved in designing the water theme park within the mall, helping with the facade design, researching and rendering.
N
28
4 port harcourt housing
1st floor plan 2nd floor plan
Participated in the design of different types of housing in the Port Harcourt Estate as well as rendering for presentation.
con
cept
de
sig
n Port Harcourt: learnt about spatial relationships in relation to
suburban necessities.
Douala Casino: this was more retail related where I learnt about the psychologies of architecture,
casinos and how one can manipu-late people to do certain activities
through design.
30000 9000mm
N
29
do
ua
la c
asi
no
mix
ed
use
concept 1
site analysis
concept layout
circulation analysis
Worked on a concept design for a mixed use casino in Douala, Cameroon
130000 39000
entrance perspective
entertainment perspective
mm
30
con
cept
de
sig
n
4fourways proposal
mixed use
Worked on the concept design of a new office block proposal and mixed use residency.
Fourways: this mixed use development taught me about
the relationship between heights of each building relating to the
sun and light making way for good circulation.
Lekki Retail: This mall focused on structure which was the important element in this project especially framing entrances. The ability to expose trusses and beams to be
aesthetically pleasing to the eye.
31le
kki r
eta
ilParticipated in the design of a new shopping centre proposal, designing he entrance and circulation layout of Lekki Retail Centre.
32
lay
ou
t
4 3 bedroom unit 3 bedroom area plan
2 bedroom unit bachelor studio unit
rosebank apartments
Rosebank Apartments: I learnt about spatial relationships
respective to limited space (square metres) and budget costing which restricts the design as well as trying to earn the client the most profit. I also learnt about the layout and requirements for SDP drawings.
30000 9000mm
50000 15000
50000 15000
33
north elevation
south elevation west elevation
east elevation
I helped design 3 types of apartment layouts which I ren-dered and summarised the statistics of costing, space & layout for a Rosebank Apartment Block.
mm
mm
34
100000 30000
ren
de
rs
4 willowbridge offices
ground floor plan -1 basement plan
-2 basement planfirst floor plan
site plan
N
Willowbridge Offices: parking spaces aligned with
your grid make it easier to determine the shape of your
structure.
Matlosana Mall: this taught me how important natural lighting, the volume and height of ceilings are
in a shopping centre.
mm
60000 18000mm
35
matlosana mall
mm
36
20000 6000
con
stru
ctio
n
48 melvill offices
ground floor plan - ceiling plan
N
8 Melvill: I was involved mainly on site which taught me mostly about construction and
the priorities and important stages of building. Communica-tion with all parties is a must for no unnecessary mishaps. I also learnt about green systems and for office buildings one needs
to accommodate mechanical systems within their design.
37
ground floor plan - floor finishes ceiling details
ceiling details
8 Melvill were Stauch Vorster’s new offices. I was involved in many aspects from drawings - floor, electrical, floor finishes etc. - to site visits, furniture layouts and site management.
N
mm20000 6000
mm500 150100
38
6parallax architects
. Residential
. year - 2014
. length of stay - 7 months - current
. Programs - Revit - Autocad - Artlantis(3d Render) - Photoshop
39
code project weeks
2127
2047
2118
2114
2120
----
Highway Gardens
The Egde Estate
Main Residence House
Ditibane House
Caravotas House
New Proposal
4
10
4
4
6
current
2d/3
d r
ender
counci
l subm
issi
on
SDP s
ubm
issi
on
est
ate
subm
issi
on
site
measu
re b
uild
ing
desi
gn p
art
icip
atio
n
Pre
sent
atio
n
2d
2d/3d
dra
w u
p m
odels
pro
posa
l dra
win
gs
N
40
con
stru
ctio
n +
gra
ph
ics
6the edge estate
I have been involved on The Edge Estate since it commenced. I have worked on the design proposal process,working with the client, builders and engineers submitting SDP submissions as well as council working drawings. Presentation renders and posters were completed for proposals and advertising.
ground floor plan
sketches
The Edge Estate: This complex taught me how
space costs and how you manipulate and use spaces
wisely to create multi-functional areas maximising each unit. Being on site confronted me
with different building methods. I also experimented with fa-
cades which can make or break a building. I also learnt to use 3D
render programs.
10000 3000mm
41
section 1
section 2
south elevation
north elevation
west elevation
10000 3000
mm
10000 3000mm
42
N
mm
ho
use
s
6Ditibane House
1st floor plan
ground floor plan
I participated in the design of this luxurious house producing design proposal drawings and model in a presentation for the client.
20000 6000
Ditibane House: learnt about spatial relationships parallel
to necessity ways of living especially privacy, natural light and
ventilation.Main Residence: renovation costs more than building from scratch. It is hard due to different building methods, eras and junctions be-
tween the add-ons and the original house. This teaches you to adapt
and be inventive with detailing.
735
900
STUDY
7
BEDROOM 2
8
NEW MAINBEDROOM
12
NEWBEDROOM 1
10ON SUITEBATHR'M 1
11
GUESTBATHR'M 1
6
NEWKITCHEN
3
NEWSCULLERY
2
GARAGE
1
MAIDS ROOM
15
LOUNGE
5
ENTRANCE &DINING AREA
4
OUTSIDE WC
16
REF
OV
WM TDDW
WB BATH SHWCWB
WB
WC
MAINBATHR'M
14
WALK INDRESSER
13
WB
BATH
SHWC
WB
BIC
BIC
BIC
BIC
BIC
BIC
BIC
BIC
W01 W01
W07W06
W03
W02
W01
W12
W08
W09
W10
D13
1500mm BUILDING LINE
1500mm BUILDING LINE
1500mm
BUILD
ING
LINE
6000mm
BUILD
ING
LINE
7395
250
3950
345
2600
250
345
3950
1835
1646
915915
850
FP
W06
W03
W14
W01
D01
D01
D01
D01
D01
D04
D02D01
D01
D03
D01
2720
250
980
135
2810
1030
460
4580
1890
1900
3530
3640
4965
4505
84537
50
54052995
3595 1560
D01
-
---
BIC
1500
1500
1500
6000
BIC
BIC
59808670
569520345
460
1236
0
250 4111 2583 1897 46105695
2127 135 920 841 1422 250
BIC
BIC
BIC
1600
0
1616
1372
652
250
606
1804
620
250
1613
3723
1480
1372
7751 6774
977
SINK
BIC
4540
1064
6
847
2441 3289
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 50
4/23
/201
4 10
:41:
16 A
M
Unnamed0001
Project NameOwner
Issue Date
Author
Checker
A101
No. Description Date
1 : 50
A101 - Ground Floor Plan(N.G.L.)1
43
20000 6000mm
N Ma
in R
esi
de
nce
ground floor plan
I was introduced to this project on site by measuring the house for renovation. I was involved in the design process and set up proposal presentation drawings.
01 - T.O.C. Ground Floor Plan 10
02 - T.O.C. First Floor Plan 13230
F.G.L.-170
U/S Slab2975
U/S Ceiling Slab5865
00 - Site Plan (1-50)6715
03 - T.O.C. Roof Plan6035
03 - Parapet Height6290
47.88 m²
DOUBLEGARAGE
31.24 m²PLANTED ROOF
14.40 m²PLANTED ROOF
28.98 m²PASSAGE
14.27 m²BEDROOM 3
104.33 m²
CONCRETEROOF
1.92 m²
BALCONY3
57.54 m²PLANTED ROOF
44.55 m²
COVEREDPATIO
40.82 m²KITCHEN
5.07 m²
WINECELLAR
TIMBER CLADDINGACCESS PANEL
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
CONC. MONOPITCHED ROOF @ 5°
CONC. OFFSHUTTER FINISH TO SPEC.
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
TIMBER GARAGEDOOR
170mm STEP DOWN
WINERACK
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
SLIDING TIMBERSCREENS
ALUMINIUM FRAMED FOLDING WINDOWGLAZING TO SRDC APPROVAL
TIMBER CLADDING
TIMBERSLIDING DOOR
BAY WINDOW SEATS
TIMBER SCREENEDSLIDING GATE
CONC. SLAB DETAIL DERBIGUM WATERPROOFING -ROOF GARDEN FINISHED TO SPEC.
TIMBER CLADED BULKHEAD SLIDING TIMBERSCREENS
CONC. BEAM PERGOLASYSTEM TO SPEC.
CONC. SLAB DETAIL DERBIGUM WATERPROOFING -ROOF GARDEN FINISHED TO SPEC.
CONC. SLAB DETAIL DERBIGUMWATERPROOFING - ROOF GARDEN
FINISHED TO SPEC.
2890
BRAAIPIZZA OVEN
LEDGE LEDGE
TIMBER DECKING
M.S. TENSIONCABLEDRAILING
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
EXTERNAL WALLS TOBE PLASTERED &
PAINTED TO SPEC.
SITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
3.0m 45
° HEIG
HT IN R
ELATIO
NTO BOUNDARY
RULE AS TO ESTATE G
UIDELIN
ES
3.0m 45° HEIGHT IN RELATIONTO BOUNDARY
RULE AS TO ESTATE GUIDELINES
9.0m DOUBLE STOREY HEIGHT RESTRICTION
1955
170
1275
425
170
2465
162
N.G.L.
425
255
170
2975
6715
2465
255
ALUMINIUM FRAMEDSLIDING DOOR GLAZING
TO SRDC APPROVAL
700OVERHANG
EXTERNAL WALLS TOBE PLASTERED &
PAINTED TO SPEC.
170
7258
GLAZING TO SPEC.
POLISHED CONC. FLOOR FINISHED TO SPEC.DRIVEWAY
TIMBER DOOR
T.O.C. GROUND FLOOR< 500mm TO N.G.L.
N.G.L.
T.O.C. GROUND FLOOR< 500mm TO N.G.L.
244
541
N.G.L.
N.G.L.
2635
255
340
TIMBER GARAGEDOOR
01 - T.O.C. Ground Floor Plan 10
02 - T.O.C. First Floor Plan 13230
F.G.L.-170
U/S Slab2975
U/S Ceiling Slab5865
03 - T.O.C. Roof Plan6035
03 - Parapet Height6290
50.64 m²POOL
22.67 m²LOUNGE
30.71 m²PASSAGE
13.04 m²
ENTRANCEHALL
13.82 m²
WATERFEATURE POND
23.58 m²D/V
28.98 m²PASSAGE
13.96 m²D/V
104.33 m²
CONCRETEROOFCONC. OFFSHUTTER FINISH TO SPEC.
TIMBER CLADDINGFACADE
FLOATINGCONC.SEAT
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
NATURAL DRYPACKSTONE PLANTER WALL
>5% BUT <40%
FIXED M.S LOUVRES TOLATER DETAIL
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
GLASSBALUSTRADE
WITH M.S. RAILING
M.S. PERGOLA SYSTEM
TIMBER SCREEN
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
NATURAL DRYPACKSTONE PLANTER WALL
>5% BUT <40%
CONC. MONOPITCH ROOF @ 5°
SOLAR PANELS
M.S. SCREEN TO CONCEALSATELLITE DISH
EXTERNAL WALLS TOBE PLASTERED &
PAINTED TO SPEC.
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
TIMBER TREADS
M.S. STRINGER
FIREPLACE
170mm STEP UP LANDING
M.S. PERGOLA SYSTEM
PLANTER
1530
WATERPROOFING BY SPECIALIST
WATERPROOFING BY SPECIALIST
425
STONE WALKWAY
EXTERNAL WALLS TOBE PLASTERED &
PAINTED TO SPEC.
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
TIMBER CLADDINGFACADE
SITE
BO
UN
DAR
Y
3.0m 45° HEIGHT IN RELATION TO BOUNDARY
RULE AS TO ESTATE GUIDELINES3.0
m 45° H
EIGHT IN
RELA
TION TO BOUNDARY
RULE AS TO ESTATE G
UIDELIN
ES
SITE
BO
UN
DAR
Y
9.0m DOUBLE STOREY HEIGHT RESTRICTION
N.G.L.WATERPROOFING BY SPECIALIST
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
255
170
2635
255
2975
170
6460
255
171
250
2045
170
510
680
850
5865
TIMBER DECKRIM FLOW
p a r a l l a x
NOTES
ENGINEER
COPYRIGHTThis drawing is the property of
PARALLAX ARCHITECTURE cc.
Copyright is reserved by them and the drawing is issuedon the condition that it is not copied, reproduced,
retained or disclosed to any unauthorised person, eitherwholly or in part without the written consent of
PARALLAX ARCHITECTURE cc.
GENERAL NOTES
1. All works to be done in accordance with the National BuildingRegulations and the SABS specifications.
2. All dimensions and levels to be checked before any work is putin hand.
3. All dimensions are in mm unless otherwise stated.
4. Use figure dimensions only - do not scale.
5. Any discrepancies are to be reported to the Architect.
6. These drawings are to be read in conjunction with structuralengineer's, civil engineer's, mechanical engineer's or plumbingconsultant's drawings where specified.
7. All materials and workmanship are to comply with the relevantSABS codes.
8. The Contractor must obtain the Architect's written confirmation ofany instructions which involve a variation to the contract beforeputting the work in hand.
9. All mechanical and electrical work is to be done in accordance withthe National Building Regulations.
10. Walls :
- Provide brickforce every fifth course.
11. Drainage :
- System used is a one-pipe system.- Access eyes to all bends and junctions and changes in gradient to
waste and soil pipes.- All rodding eyes to have marked covers at ground level.- All waste pipes to be fully accessible.- Waste fittings to have 75mm deep seal traps.- Gradients to waste branches to be between 1.25 and 5.- Gradients to soil branches to be between 2.5 and 5.- Gradients to drains to be between 2.5 and 4.5.- All soil pipes under buildings to be encased in minimum 300mm
concrete.
CLIENT
PROJECT
DRAWING PAGE
PROJECT NO.
DATE
DRAWN
[email protected] - 083 44 77 111TEL - 0861 PARALLAX
FAX - 086 528 7972
A R C H I T E C T U R Ed e s i g n f o r d i s c e r n i n g c l i e n t s
CRAIG R CANTER - Pr.S.Arch.TPROFESSIONAL NUMBER : ST 1156
DRAWING No.
REVISION
ISSUED FOR
ENERGY EFFICIENCY NOTES
HOT WATER SUPPLY:A MININUM OF 50% BY VOLUME OF THE ANNUALAVERAGE HOT WATER HEATING REQUIREMENT SHALL BEPROVIDED BY MEANS OTHER THAN ELECTRICALRESISTANCE HEATING.
ALL EXPOSED HOT WATER PIPES & GEYSERS MUST BEINSULATED WITH R VALUE OF 1. ACCORDING TO SANS10400-XA
ROOF ASSEMBLY:ALL ROOF ASSEMBLIES TO ACHIEVE A MINMUMINSULATION R VALUE OF 3.7 FOR CLIMATIC ZONE 1 ASPER 10400-XA CLAUSE 4.4.5
FLOORS:IF A UNDER FLOOR HEATING SYSTEM IS PROVIDED THEHEATING SYSTEM MUST BE INSULATED UNDERNEATHTHE SLAB WITH INSULATION THAT HAS A MINIMUMR-VALUE OF NOT LESS THAN 1 AS PER SANS 10400-XACLAUSE 4.4.2
EXTERNAL WALLS:230mm DOUBLE SKIN MASONARY WALLS WITH PLASTERFINISH TO INTERIOR AND EXTERIOR AS PER SANS 10400-XA CLAUSE 4.4.3.2
FENESTRATION:FENESTRATION ABOVE 15% OF NETT FLOOR AREA SHALLCOMPLY WITH REQUIREMENTS FOR FENESTRATION INACCORDANCE WITH SANS 204SEE FENESTRATION CALCULATIONS FOR SANS 204COMPLIANCE
AIR LEAKAGES SHALL NOT EXCEED:-FENESTRATION MAX 2/S/m²-FIXED GLAZING MAX 0.306L/S/m²-REVOLVING AND SWING DOORS MAX 5L/S/m²
1 : 50A109
Section 21
1 : 50A109
Section 32
NOTE: NATURAL DRYPACKED STONE = 6,4% OF EXTERNALENVELOPE
NOTE: NO REFLECTIVE GLAZING TO BE USED
2120
08/08/2014
A.P.
SK - 2120 - 07
A
APPROVAL
ERF 489WITFONTEIN EXT. 30
(SERENGETI GOLF AND WILDLIFEESTATE)
SECTIONS 2+3
MR. C. CARAVOTAS
8 of 10
NOTE: N.G.L. TO T.O.C. GROUND LEVEL TO BE < 500mm ATTHE CLOSEST N.G.L. LEVEL OF THE BUILDING ENVELOPE15000 4500
mm
44
ho
use
s
6 section 3
sketches
Caravotas House: By building up the model of this
house on revit, I learnt about how the house is constructed paying
attention to the intricate detailing. Learnt about the restrictions of
building in estates.
I drew up the house in revit working on the estate submission drawings. I worked a little with the engineer involved in the project.
UP
2
1
SHELVING
WC
SIN
K
BIC TO SPECIALIST
FIXED M.S LOUVRES TO LATER DETAIL
WATER TANK
MO
UN
TED
TV
MO
UN
TED
TV
STOVE
PREP
LINENBIC
TD WM
WHB
WC
SHW
WASHING LINE
SHEL
VIN
GWC
WC
SHELVING
BIC
GOLF EQUIPMENT STORAGE
WHB
SHW
DROP ZONE
PERGOLA ABOVE
PERGOLA ABOVE
SLAB ABOVE
PREP
LIN
E O
F BU
LKH
EAD
ABO
VE
SLAB ABOVE
DROP ZONE
BIC
- UTI
LITY
STO
RAG
EC
ON
CEA
LED
WO
RK
BEN
CH
SLID
ER D
OO
RS
VER
TIC
AL B
ICYC
LE R
ACK
SHELVING ABOVEBIC TOSPECIALIST
BROOMBIC
LINENBIC
BIC ABOVE
HANGER RAIL
LAUNDRYBASKETBELOW
LINE OF LINTELS ABOVELINE OF BRICKWORK UNDER
200mm FLOATINGSTEP UP
CLERESTOREY WINDOW ABOVE M.S BEAM
120 x 120mm MILD STEEL BEAMABOVE BY ENGINEER
SLAB ABOVE
SLAB ABOVE
SLAB ABOVE
FOLDING STACKING DOORS
PERGOLA ABOVE
BAR
SER
VER
RIM
FLO
W T
RO
UG
H
REF
USE
BIN
S
WHBFEATURE WALL
SHW
BAY WINDOW SEAT
DW
STAC
KIN
G W
IND
OW
S
CAVITY SLIDING DOORS CAVITY SLIDING DOORS
BUILT IN GASCOMBO BRAAI BY'Megamaster'CODE: MEGA0008
WOOD STORAGE
DOLCE VITA WOODBURNING PIZZA OVEN BY'Forno d'Venezia INSTALLEDIN ACCORDANCE WITHMANUFACTURERSINSTRUCTION.
WASHING LINE
HIGH LEVEL WINDOW
PREP
BAR
FR
IDG
E BE
LOW
SLIDING SCREENS
LINE OF BULKHEADLINE OF SLAB
LINE OF BULKHEAD
LINE OF SLAB
LINE OF SLAB
POO
L PU
MP
HEAT PUMP
DUCTDUCT
SLAB
ABO
VE
SLA
B A
BOV
E
SLAB ABOVE
SEAT
SEAT
STEP
STEPARTWORK
CLERESTOREY WINDOW ABOVE M.S BEAM
SLAB ABOVESLAB ABOVE SLAB ABOVE
M.S POST
PERGOLA ABOVE
FLOATING SEAT
FIXE
D T
IMBE
R S
CR
EEN
FANLIGHTWINDOWABOVE
UN
DER
CO
UN
TER
STO
RAG
E
W.T
WATER FEATURE SPOUT TO LATER DETAIL
BENCH
CAT
LAD
DER
LED
GE
LED
GE
FR M.WELO ELO
ROCK CLADDING
ROCK CLADDING
ROCK CLADDING
TIM
BER
TR
EAD
SMILD STEEL STRINGER
FIXE
D F
RAM
ELES
SG
LASS
HIGH LEVEL CUPBOARDS ABOVE
TIM
BER
CLA
DD
ING
SLID
ING
DO
OR
SEAT
MO
UN
TED
TV
LED
BAC
K LI
GH
TIN
G
LANDING
GAS FIREPLACE
TOP
HU
NG
SLI
DIN
G L
ADD
ER
CONCRETE COPING
GEYSER 2 TO SUPPLY:• MASTER BATHROOM (FF)• GUEST WC• GUEST SUITE
OVE
R H
EAD
BIC
OVE
R H
EAD
BIC
WOOD BURNINGFIREPLACE BELOW
MCZ FORMA 95
MO
UN
TED
TV
FOLDING STACKING DOORS
MO
UN
TED
TV
PREP
STO
VE
PLAN
TER
GOLF CART
HER
B PL
ANTE
R
LIN
E O
F BU
LKH
EAD
ABO
VE
FIREPIT
WHB
DU
CT
SLAB ABOVE
DU
CT
WATER TANK
CONCRETE COPING
PLANTER
S
E
W
N
SUN RISE
SUN SET
SUN RISE
SUN SET
STRONG
SUMM
ER
WINDS
WINTER W
INDS
WINTER32'38"
SUMMER79'30"
10.51 m²
GUESTBEDROOM
T.O.C. +0.00
12.10 m²PLAYROOM
T.O.C. +0.00
3.15 m²STORE/ LINEN
T.O.C. +0.00
2.58 m²GUEST WC
T.O.C. +0.00
17.40 m²
STUDIOBEDROOM
T.O.C. +0.00
24.06 m²
STUDIOLOUNGE &
KITCHENETTE
T.O.C. +0.00
5.02 m²
STUDIOBATHROOM
T.O.C. +0.00
16.27 m²DRYING YARD
T.O.C. -170.00
3.20 m²STAFF WC
T.O.C. +0.00
7.70 m²LAUNDRY
T.O.C. +0.00
2.12 m²PANTRY
T.O.C. +0.00
5.07 m²
WINECELLAR
T.O.C. +0.00
47.88 m²
DOUBLEGARAGE
T.O.C. -0.170
7.71 m²STUDY
T.O.C. +0.00
1.12 m²
GEYSERSTORE
T.O.C. +0.00
40.82 m²KITCHEN
T.O.C. +0.00
12.49 m²DINING ROOM
T.O.C. +0.00
22.67 m²LOUNGE
T.O.C. +0.00
50.64 m²POOL
1.31 m²
GASSTORE
44.55 m²
COVEREDPATIO
F.F.L. -0.170
T.O.C. -0.340
PERGOLA &SKYLIGHT ABOVE
RIMFLOW TROUGH
OPEN AIR TERRACED DECK
TERRACED DECK
TERRACED LAWN
TERRACED LAWN
2M SERVITUDE
2.5M DOUBLE STOREY BUILDING LINE
2M SERVITUDE
2.5M DOUBLE STOREY BUILDING LINE
NEW BOUNDARY W
ALL @ 2.1m HIGH
2M S
ING
LE S
TOR
EY B
UIL
DIN
G L
INE
2.5M
DO
UBL
E ST
OR
EY B
UIL
DIN
G L
INE
2M S
ING
LE S
TOR
EY B
UIL
DIN
G L
INE
2.5M
DO
UBL
E ST
OR
EY B
UIL
DIN
G L
INE
STONE WALKWAY
STO
NE
WAL
KWAY
EXIS
TIN
G B
OU
ND
ARY
WAL
L
6M GARAGE BUILDING LINE
5M BUILDING LINE
6M GARAGE BUILDING LINE
5M BUILDING LINE
1.16 m²
GARDENSTORE
T.O.C. +0.00
6.60 m²
STUDIOENTRANCE
T.O.C. -0.170
13.04 m²
ENTRANCEHALL
T.O.C. +0.170
30.71 m²PASSAGE
T.O.C. +0.00
D/V
COVEREDWALKWAY
COVEREDENTRANCE
13.82 m²
WATERFEATURE POND
6.67 m²JACUZZI
COVERED PATIO
M.H.
COVERED TERRACED DECK
11.20 m²SCULLERY
T.O.C. +0.00
BATT
ERY
STO
RE
DUCT
OPENABOVE
TIMBER CLADDING FACADE
TIM
BER
GAT
E
GLASS BALUSTRADE
DUCT
6000
5000
1000
0
STO
NE
WAL
KWAY
7.80 m²
GUESTBATHROOM
T.O.C. +0.00
M.S POST
4420
5800
3910 3450
1265
3795
5060
3910
2530
1265
2530
2530
2990
6785
5980
9545
2760
2760
3680 3105 2415
3220
3450
1150
26454255
184012
65
14951955
1A108
1A108
1A109
1A109
5060
1725
1265
3795
3105
4370
1299
5
3910 4830 2415 9890 2473 5348 14835 800
44500
9545 4370 4715 402522655
1230511
615
1725
2060 1150
1840
3115
1485
4945
8050 2875 1150 13570 5520 3335 4025 5975
2185
3450
1265 5290 9265
4140
115
1265
TIM
BER
CLA
DD
ING
TIMBER CLADDING
3220
3450
1610
3972
1265
OVE
RH
ANG
ABO
VE
1.79 m²COURTYARD
LANDSCAPED GARDEN
LANDSCAPED GARDEN
INDIGENOUS LANDSCAPE
44505
6555
1380
1978
0
SEWER CONNECTION POINT
ERF 489WITFONTEIN EXT. 30
SERENGETI GOLF AND WILDLIFE ESTATE(2021 SQM)
POOL TO COMPLY TO SANS/NBR
SITE BOUNDARY LINE = 67, 47m
SITE BOUNDARY LINE = 40,80m
SITE BOUNDARY LINE = 46,1m
SITE
BO
UN
DAR
Y LI
NE
= 37
,20m
VISUALLY PERMEABLE FENCE SUBJECT TO ESTATE GUIDELINES
HAR
D S
IDE
BOU
ND
ARY
MIN
. 5m
FR
OM
OPE
N S
IDE
BOU
ND
ARY
HARD SIDE BOUNDARY MIN. 6m
FROM STREETFRONT HAR
D S
IDE
BOU
ND
ARY
MIN
.6m
FR
OM
STR
EETF
RO
NT
DRIVEWAY &GUEST PARKING
ACCESS
LIN
E O
F SL
AB
LIN
E O
F BU
LKH
EAD
LIN
E O
F SL
AB
SLAB ABOVE
SLAB
ABO
VE
SLAB
ABO
VE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
UP
STONE PAVERS
STONE WALKWAY
D/V
T.O.C. -0.170
LINE OF BULKHEAD ABOVE
SELF LOCKING,SELF CLOSING
GATE
SELF LOCKING,SELF CLOSING
GATE
2M SINGLE STOREY BUILDING LINE
6000
6000
5M BUILDING LINE, NATURE ESTATE BOUNDARY & HARD SCREEN WALL SETBACK
2M POOL & POOL ENCLOSURE BUILDING LINE
4m 45° LINE
RESTRICTION
SELF LOCKING,SELF CLOSING
GATE5M BUILDING LINE, NATURE ESTATE BOUNDARY & HARD SCREEN WALL SETBACK
2M POOL & POOL ENCLOSURE BUILDING LINE
5030
1495
2415
1495
575
1955
2185
6000
NATURALDRYPACK STONEPLANTER WALL>5% BUT <40%
NATURALDRYPACK STONEPLANTER WALL>5% BUT <40%
20355
2415
7639
4345
2A109
2A109
1A112
1A112
2A112
2A112
2A108
2A108
0.60 m²
AVROOM
1A113
1A113
2A113
2A113
p a r a l l a x
NOTES
ENGINEER
COPYRIGHTThis drawing is the property of
PARALLAX ARCHITECTURE cc.
Copyright is reserved by them and the drawing is issuedon the condition that it is not copied, reproduced,
retained or disclosed to any unauthorised person, eitherwholly or in part without the written consent of
PARALLAX ARCHITECTURE cc.
GENERAL NOTES
1. All works to be done in accordance with the National BuildingRegulations and the SABS specifications.
2. All dimensions and levels to be checked before any work is putin hand.
3. All dimensions are in mm unless otherwise stated.
4. Use figure dimensions only - do not scale.
5. Any discrepancies are to be reported to the Architect.
6. These drawings are to be read in conjunction with structuralengineer's, civil engineer's, mechanical engineer's or plumbingconsultant's drawings where specified.
7. All materials and workmanship are to comply with the relevantSABS codes.
8. The Contractor must obtain the Architect's written confirmation ofany instructions which involve a variation to the contract beforeputting the work in hand.
9. All mechanical and electrical work is to be done in accordance withthe National Building Regulations.
10. Walls :
- Provide brickforce every fifth course.
11. Drainage :
- System used is a one-pipe system.- Access eyes to all bends and junctions and changes in gradient to
waste and soil pipes.- All rodding eyes to have marked covers at ground level.- All waste pipes to be fully accessible.- Waste fittings to have 75mm deep seal traps.- Gradients to waste branches to be between 1.25 and 5.- Gradients to soil branches to be between 2.5 and 5.- Gradients to drains to be between 2.5 and 4.5.- All soil pipes under buildings to be encased in minimum 300mm
concrete.
CLIENT
PROJECT
DRAWING PAGE
PROJECT NO.
DATE
DRAWN
[email protected] - 083 44 77 111TEL - 0861 PARALLAX
FAX - 086 528 7972
A R C H I T E C T U R Ed e s i g n f o r d i s c e r n i n g c l i e n t s
CRAIG R CANTER - Pr.S.Arch.TPROFESSIONAL NUMBER : ST 1156
DRAWING No.
REVISION
ISSUED FOR
ENERGY EFFICIENCY NOTES
HOT WATER SUPPLY:A MININUM OF 50% BY VOLUME OF THE ANNUALAVERAGE HOT WATER HEATING REQUIREMENT SHALL BEPROVIDED BY MEANS OTHER THAN ELECTRICALRESISTANCE HEATING.
ALL EXPOSED HOT WATER PIPES & GEYSERS MUST BEINSULATED WITH R VALUE OF 1. ACCORDING TO SANS10400-XA
ROOF ASSEMBLY:ALL ROOF ASSEMBLIES TO ACHIEVE A MINMUMINSULATION R VALUE OF 3.7 FOR CLIMATIC ZONE 1 ASPER 10400-XA CLAUSE 4.4.5
FLOORS:IF A UNDER FLOOR HEATING SYSTEM IS PROVIDED THEHEATING SYSTEM MUST BE INSULATED UNDERNEATHTHE SLAB WITH INSULATION THAT HAS A MINIMUMR-VALUE OF NOT LESS THAN 1 AS PER SANS 10400-XACLAUSE 4.4.2
EXTERNAL WALLS:230mm DOUBLE SKIN MASONARY WALLS WITH PLASTERFINISH TO INTERIOR AND EXTERIOR AS PER SANS 10400-XA CLAUSE 4.4.3.2
FENESTRATION:FENESTRATION ABOVE 15% OF NETT FLOOR AREA SHALLCOMPLY WITH REQUIREMENTS FOR FENESTRATION INACCORDANCE WITH SANS 204SEE FENESTRATION CALCULATIONS FOR SANS 204COMPLIANCE
AIR LEAKAGES SHALL NOT EXCEED:-FENESTRATION MAX 2/S/m²-FIXED GLAZING MAX 0.306L/S/m²-REVOLVING AND SWING DOORS MAX 5L/S/m²
1 : 50A103
01 - T.O.C. Ground Floor Plan1
2120
08/08/2014
A.P.
A
APPROVAL
ERF 489WITFONTEIN EXT. 30
(SERENGETI GOLF AND WILDLIFEESTATE)
GROUND FLOOR PLAN
MR. C. CARAVOTAS
2 of 6
SK - 2120 - 01
01 - T.O.C. Ground Floor Plan 10
02 - T.O.C. First Floor Plan 13230
F.G.L.-170
U/S Slab2975
U/S Ceiling Slab5865
00 - Site Plan (1-50)6715
TIMBERSCREENING
CONC.OFFSHUTTERFINISH TO SPEC.
TIMBER CLADDINGFACADE
CORRUGATEDWATER TANK
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
EXTERNAL WALLSTO BE PLASTERED &PAINTED TO SPEC.
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
CONC. MONOPITCHED ROOF @ 5°
M.S SCREEN TO CONCEALSATELLITE DISH
ALUMINIUMLOUVRED
DUCT COVER
ALUMINIUMLOUVRED
DUCT COVER
TIMBER CLADDINGFACADE
FLOATINGCONC.SEAT
TIMBER SCREEN
NATURAL DRYPACKSTONE PLANTER WALL
>5% BUT <40%
TIMBER SCREENEDSLIDING GATE
GAS BRAAI PIZZAOVEN
TIMBERCLADDINGFACADE
TIMBERCLADDINGFACADE
EXTERNAL WALLS TOBE PLASTERED &
PAINTED TO SPEC.
M.S CLADDING
EXTERNAL WALLS TOBE PLASTERED &
PAINTED TO SPEC.
TIMBER CLADDINGFACADE
CONC. FLAT ROOF GARDENFINISHED TO SPEC.
CONC. OFFSHUTTER TO SPEC.
MOVABLE TIMBERSCREENS
CONC. BEAM PERGOLASYSTEM TO SPEC.
CONC. FLAT ROOF GARDEN FINISHED TO SPEC.
TIMBER CLADDED BULKHEAD TO SPEC.
TIMBER CLADDINGFACADE
FIXED M.S. LOUVRESCREEN TO LATER DETAIL
BRAAI & OVEN VENTS
SITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
3.0m 45
° HEIG
HT IN R
ELATIO
N TO BOUNDARY
RULE AS TO ESTATE G
UIDELIN
ES
3.0m 45° HEIGHT IN RELATION TO BOUNDARY
RULE AS TO ESTATE GUIDELINES
9.0m DOUBLE STOREY HEIGHT RESTRICTION
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
ALUMINIUM FRAMED GLAZINGTO SRDC APPROVAL
TIMBERCLADDEDGEYSER
STORE DOOR
03 - T.O.C. Roof Plan6035
1275
3060
340
935
255
2635
170
340
425
255
170
2635
255
2975
170
OUTSIDE PATIO 170mm STEP DOWNPOOL AREA
2720
03 - Parapet Height6290
6715
363
690
2975
340
2890
850
425
5.00°
1955
170
2125
N.G.L.
N.G.L.
N.G.L.
T.O.C. GROUND FLOOR< 500mm TO N.G.L.
T.O.C. GROUND FLOOR< 500mm TO N.G.L.
M.S.POST
LEDGE LEDGE
700OVERHANG
01 - T.O.C. Ground Floor Plan 10
02 - T.O.C. First Floor Plan 13230
F.G.L.-170
U/S Slab2975
U/S Ceiling Slab5865
00 - Site Plan (1-50)6715
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
CONC.MONOPITCHEDROOF @ 5°
M.S.POST
TIMBER CLADDINGFACADE
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
EXTERNAL WALLS TO BEPLASTERED & PAINTED
TO SPEC.
CORRUGATEDWATER TANK
M.S. SCREEN TOCONCEALING
SATELLITE DISH
EXTERNAL WALLS TO BE PLASTERED& PAINTED TO SPEC.
EXTERNAL WALLS TO BE PLASTERED& PAINTED TO SPEC.
EXSITINGBOUNDARY
WALL
CONC. BEAM PERGOLASYSTEM TO SPEC.
M.S BEAM PERGOLA SYSTEM TO SPEC.
TIMBER CLADDING FACADE
ALUMINIUMFRAMED
GLAZING TOSRDC APPROVAL
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
CONC. MONOPITCHED ROOF @ 5°
CONC. OFFSHUTTER FINISH TO SPEC.
CONC. OFFSHUTTER FINISH TO SPEC.
03 - T.O.C. Roof Plan6035
03 - Parapet Height6290
SITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
3.0m 45° HEIGHT IN RELATION TO BOUNDARY
RULE AS TO ESTATE GUIDELINES3.0
m 45° H
EIGHT IN
RELA
TION TO BOUNDARY
RULE AS TO ESTATE G
UIDELIN
ES
9.0m DOUBLE STOREY HEIGHT RESTRICTION
1955
170
340
935
255
2635
170
255
1275
3060
TIMBER SCREENEDSLIDING GATE
TIMBER SLIDING GOLFGARAGE DOOR
NATURAL DRYPACKSTONE PLANTER WALL>5% BUT <40%
CONC. FLAT ROOF GARDENFINISHED TO SPEC.
EXTERNAL WALLS TO BEPLASTERED & PAINTED TO SPEC.
EXSITINGBOUNDARY
WALL
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
M.S. TENSIONCABLED RAILING
ALUMINIUM FRAMEDGLAZING TO SRDC
APPROVAL
CONC. FLAT ROOFFINISHED TO SPEC.
425
255
170
2635
255
2975
170
6885
170
595
2975
510
1020
3655
340 340mm THICK
CONC. SLAB
700OVERHANG
1955
170
2125
N.G.L.
N.G.L.
T.O.C. GROUND FLOOR< 500mm TO N.G.L.
359
T.O.C. GROUND FLOOR< 500mm TO N.G.L.
N.G.L.
NATURAL DRYPACKSTONE PLANTER WALL>5% BUT <40%
p a r a l l a x
NOTES
ENGINEER
COPYRIGHTThis drawing is the property of
PARALLAX ARCHITECTURE cc.
Copyright is reserved by them and the drawing is issuedon the condition that it is not copied, reproduced,
retained or disclosed to any unauthorised person, eitherwholly or in part without the written consent of
PARALLAX ARCHITECTURE cc.
GENERAL NOTES
1. All works to be done in accordance with the National BuildingRegulations and the SABS specifications.
2. All dimensions and levels to be checked before any work is putin hand.
3. All dimensions are in mm unless otherwise stated.
4. Use figure dimensions only - do not scale.
5. Any discrepancies are to be reported to the Architect.
6. These drawings are to be read in conjunction with structuralengineer's, civil engineer's, mechanical engineer's or plumbingconsultant's drawings where specified.
7. All materials and workmanship are to comply with the relevantSABS codes.
8. The Contractor must obtain the Architect's written confirmation ofany instructions which involve a variation to the contract beforeputting the work in hand.
9. All mechanical and electrical work is to be done in accordance withthe National Building Regulations.
10. Walls :
- Provide brickforce every fifth course.
11. Drainage :
- System used is a one-pipe system.- Access eyes to all bends and junctions and changes in gradient to
waste and soil pipes.- All rodding eyes to have marked covers at ground level.- All waste pipes to be fully accessible.- Waste fittings to have 75mm deep seal traps.- Gradients to waste branches to be between 1.25 and 5.- Gradients to soil branches to be between 2.5 and 5.- Gradients to drains to be between 2.5 and 4.5.- All soil pipes under buildings to be encased in minimum 300mm
concrete.
CLIENT
PROJECT
DRAWING PAGE
PROJECT NO.
DATE
DRAWN
[email protected] - 083 44 77 111TEL - 0861 PARALLAX
FAX - 086 528 7972
A R C H I T E C T U R Ed e s i g n f o r d i s c e r n i n g c l i e n t s
CRAIG R CANTER - Pr.S.Arch.TPROFESSIONAL NUMBER : ST 1156
DRAWING No.
REVISION
ISSUED FOR
ENERGY EFFICIENCY NOTES
HOT WATER SUPPLY:A MININUM OF 50% BY VOLUME OF THE ANNUALAVERAGE HOT WATER HEATING REQUIREMENT SHALL BEPROVIDED BY MEANS OTHER THAN ELECTRICALRESISTANCE HEATING.
ALL EXPOSED HOT WATER PIPES & GEYSERS MUST BEINSULATED WITH R VALUE OF 1. ACCORDING TO SANS10400-XA
ROOF ASSEMBLY:ALL ROOF ASSEMBLIES TO ACHIEVE A MINMUMINSULATION R VALUE OF 3.7 FOR CLIMATIC ZONE 1 ASPER 10400-XA CLAUSE 4.4.5
FLOORS:IF A UNDER FLOOR HEATING SYSTEM IS PROVIDED THEHEATING SYSTEM MUST BE INSULATED UNDERNEATHTHE SLAB WITH INSULATION THAT HAS A MINIMUMR-VALUE OF NOT LESS THAN 1 AS PER SANS 10400-XACLAUSE 4.4.2
EXTERNAL WALLS:230mm DOUBLE SKIN MASONARY WALLS WITH PLASTERFINISH TO INTERIOR AND EXTERIOR AS PER SANS 10400-XA CLAUSE 4.4.3.2
FENESTRATION:FENESTRATION ABOVE 15% OF NETT FLOOR AREA SHALLCOMPLY WITH REQUIREMENTS FOR FENESTRATION INACCORDANCE WITH SANS 204SEE FENESTRATION CALCULATIONS FOR SANS 204COMPLIANCE
AIR LEAKAGES SHALL NOT EXCEED:-FENESTRATION MAX 2/S/m²-FIXED GLAZING MAX 0.306L/S/m²-REVOLVING AND SWING DOORS MAX 5L/S/m²
1 : 50A105
East Elevation1
1 : 50A105
West Elevation2
2120
08/08/2014
A.P.
SK - 2120 - 03
A
APPROVAL
ERF 489WITFONTEIN EXT. 30
(SERENGETI GOLF AND WILDLIFEESTATE)
EAST & WESTELEVATIONS
MR. C. CARAVOTAS
4 of 6
NOTE: NATURAL DRYPACKED STONE = 6,4% OFEXTERNAL ENVELOPE
NOTE: NO REFLECTIVE GLAZING TO BE USED
NOTE: N.G.L. TO T.O.C. GROUND LEVEL TO BE < 500mm ATTHE CLOSEST N.G.L. LEVEL OF THE BUILDING ENVELOPE
N
15000 4500
15000 4500 mm
mm
mm
45
20000 6000
ground floor plan
east elevation
north elevation
caravotas House
46
tra
vel
5th year
ARCHITECTURE. woofing. Richard Rogers. grand designs. nice, france. zadar, croatia. serpentine pavilion
INDIA. state of living
EUROPE. analysis 2 buildings. facade. sketches
48
52
50
dehli, india
N
47
ARCHITECTURE. woofing. Richard Rogers. grand designs. nice, france. zadar, croatia. serpentine pavilion
INDIA. state of living
EUROPE. analysis 2 buildings. facade. sketches
16 countries11 months64 rooms1 bag
spa
ce is
lux
ury
dubai, UaE
2013
mapping
WOOFING(World of Organic Farming)
I worked on 2 farms in the coun-tryside of Somerset, near Bath,
England. We learnt about organic farming, built structures, fences and
lived a sustainable green lifestyle (compost toilets, boilers etc.)
48
centre pompidou, Paris
Arc
hite
ctu
reserpentine pavilion
richard rogersI visited a Richard Rogers exhibition in London. I respect him as an architect as he was a master of different trades; architect, urban designer, sustainable designer... for his time. He had a different approach towards structure.... “an improvisation plays a part - permanence + transformation.” “Architecture mirrors society, its civility and its barbarism” . Through models, sketches, sayings and presentation you learn the reason behind his industrial dominant architecture which provokes emotion whether good or bad. I visited a few of his buildings throughout my travels which all told a different story and certainly stood out in the crowd.
Sou Fujimoto designed the intricate Serpentine Pavilion in London 2013. This structure created by thousands of white steel posts joined through geometric cubes resembled a light and delicate form that faded into the distance becoming part of natures element. This pavilion was used as a restaurant in Hyde Park which was playful among people. One could climb, sit, use it as a jungle gym, suitable for all ages. The 3 dimensional floating cubes overwhelmed me with the intense amount of posts used which contrasted with the calming effect it conveyed.
49
nice, france
zadar, croatia
row
ho
usi
ng
urban spacesNice, France. The new constructed urban development which brought the city to life through a simplicity of vast water features replacing the once upon a time river. The reflective space brought people together in a playful manner with fountains, rotating benches to accommodate the sun, jungle gyms and space for activity.
The singing board-walk, made out of a sea organ by architect Nikola Basic’
Grand Designs was an inspiring experience as Kevin McCloud was the guest speaker. The main focus of London’s Grand Designs was the reintroduction of row housing based on sustainable and green living. Many studies from the beginning of the 20th century have reinvented row housing because of population increases, condensed living spaces due to lack of space. The number of people increasing per year in London and the expense of living have led to their investigation on green systems to be implemented in this style of living. Richard Rogers is one of the architects who has introduced a concept development promoting this lifestyle which contains a low carbon footprint.
Grand Designsbarbican House, London
varanasi
mysore
mumbai
50
ind
ia
5India is an inspiring
country which feasts the eyes and overwhelms the mind with colour, chaos, contradiction, beauty, nature, architecture,
people, poverty and the unusual. My highlight was Le Corbusier’s city design, Chandigarh. This brutalistic spacious city contrasted the other congested states. I am not sure it suited the Indian lifestyle but was
majestic + modern in it’s presence.
mumbai mosque
chandigarh
pushkar
India; a place where space is a luxury - overpopulation - poverty. It is a country where nothing is wasted from space to banana leaves to the squashed bottle on the street. Everything is appreciated and recycled or invented to be used in some needed way. There is no such thing as privacy due to this evidence. Washing is exhibited in public streets and one's bed can be the sidewalk of a market. This results in claustrophobic spaces being in architecture, driving, walking, the state of street pollution etc. , Due to this overwhelming realm of activity, a lot of attention is paid to detail allowing innovation in personal lifestyle, work, buildings which makes India another planet on earth. 51
varanasi
high court, chandigarh
udaipur
varanasi
varanasi
le c
orb
usi
er
rotterdam52
eu
rop
e
5cube house
hundertwasserhaus
I chose THE CUBE HOUSE + HUNDERTWASSERHAUS to compare as the 2 apartment blocks which admiringly caught my attention. The Cube House, Rotterdam(1977) designed by Piet Blom is based on the high density development on “living as an urban roof”. Its static geometric structure floating in the air contrasts the organic colourful design of Hundertwasserhaus, Vienna(1986) which grows out of the ground through its organic forms. They are both unconventional irregular buildings which allow for an estranged adaptability as a living space which are either pleasing or uncomfortable to its occupants. There fantastical facades catch peoples attention and certainly evoke unusual eccentric emotions.
“A House is a mirror of the person”
Hundertwasser Hundertwasserhaus
vienna
the cube house, rotterdam
53london, barcelona, antwerp, munich, rotterdam, parisfa
cad
es
sagrada familia, barcelona
rotterdam
the dancing house, Prague
54
CV d
ocu
me
nt
55
56
refe
ren
ces
57
thank you
59