Analytical Program Management Infographic

1
2 05.088.14A

description

Our methodology for integrating cost, schedule, and risk of a program or project includes six general steps, which are based on NASA's Joint Confidence Level (JCL) guidelines.

Transcript of Analytical Program Management Infographic

Page 1: Analytical Program Management Infographic

2

05.088.14A