Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

26
Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009

Transcript of Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

Page 1: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

Analysis of the ERCOT IDR Threshold Requirement

Presented by Bill BoswellPWG MeetingMay 27, 2009

Page 2: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

2

Round 1 load research kWh data was used in the analysis. The dollars were calculated by multiplying the kWh times the

corresponding load weighted average MCPE for the corresponding LRS and profiled interval.

Domains Analysis was used to calculate the mean LRS kWh and dollars and mean profiled kWh and dollars for each domain.

A sample point was assigned to a domain when its 15 minute kWh peak fell in the domain range two times during the study period. The following three (3) domains were defined. 0 – 300 kW => Domain 1 301 – 500 kW => Domain 2 501 – 700 kW => Domain 3

Analysis Methodology

Page 3: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

3

The profiled interval data for each sample point is calculated using the following procedure.

Sum the LRS intervals to get the daily kWh usage.

Select the profile such as BUSHILF COAST.

Calculate a scaling factor as :

Scaling Factor = daily kWh usage / (total kWh profiled for day)

Scale the BUSHILF COAST profile to the usage for the ESIID by multiplying each interval of the standard BUSHILF COAST profile by the scaling factor.

Analysis Methodology

Page 4: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

4

Analysis Methodology

DOMAIN Coast East FWest NCent North SCent South West Total

D1 236 299 170 176 154 219 232 228 1714D2 27 16 55 11 35 20 12 14 190D3 8 6 4 5 10 3 2 1 39

TOTAL 271 321 229 192 199 242 246 243 1943

DOMAIN Coast East FWest NCent North SCent South West TotalD1 100,526 13,658 14,536 111,076 12,105 5,262 52,923 13,643 323,729D2 1,509 130 151 2,112 97 68 289 56 4,412D3 8 29 4 644 11 8 17 1 722TOTAL 102,043 13,817 14,691 113,832 12,213 5,338 53,229 13,700 328,863

Weather Zone

Number of Sample Points in LRS Round 1

DOMAIN POPULATIONWeather Zone

Page 5: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

5

1.9

2.9

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

2

3

4

5

6

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

2

3

4

5

6

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

2

3

4

5

6

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 1 - August 8-14, 2005

15 Min LRS kWh Means 15 Min Profiled kWh Means

COAST SOUTH

SCENT NCENT

Page 6: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

6

1.9

2.9

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

2

3

4

5

6

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

2

3

4

5

6

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

2

3

4

5

6

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 1 - November 7-13, 2005

15 Min LRS kWh Means 15 Min Profiled kWh Means

COAST SOUTH

SCENT NCENT

Page 7: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

7

2.0

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

2

3

4

5

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

2

3

4

5

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

2

3

4

5

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 1 - January 23-29, 2005

15 Min LRS kWh Means 15 Min Profiled kWh Means

COAST SOUTH

SCENT NCENT

Page 8: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

8

2

3

4

5

6

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

2

3

4

5

6

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

2

3

4

5

6

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

1.9

2.9

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 1 - May 22-28, 2005

15 Min LRS kWh Means 15 Min Profiled kWh Means

COAST SOUTH

SCENT NCENT

Page 9: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

9

20

30

40

50

60

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

20

30

40

50

60

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

30

40

50

60

70

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

20

30

40

50

60

70

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 2 - August 8-14, 2005SOUTH

SCENT NCENT

COAST

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 10: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

10

20

30

40

50

60

70

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

20

30

40

50

60

70

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

20

30

40

50

60

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

20

30

40

50

60

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 2 - November 7-13, 2005COAST SOUTH

SCENT NCENT

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 11: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

11

20

30

40

50

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

20

30

40

50

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

20

30

40

50

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

20

30

40

50

60

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 2 - January 23-29, 2005COAST SOUTH

SCENT NCENT

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 12: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

12

30

40

50

60

70

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

20

30

40

50

60

70

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

30

40

50

60

70

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

20

30

40

50

60

70

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 2 - May 22-28, 2005COAST SOUTH

SCENT NCENT

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 13: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

13

60

70

80

90

100

110

120

130

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 3 - August 8-14, 2005

50

60

70

80

90

100

110

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

COAST SOUTH

50

60

70

80

90

100

110

120

130

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

SCENT

15 Min LRS kWh Means 15 Min Profiled kWh Means

40

50

60

70

80

90

100

110

120

130

Mon 08 Tue 09 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15

kWh

Time

NCENT

Page 14: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

14

40

50

60

70

80

90

100

110

120

130

140

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

60

70

80

90

100

110

120

130

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 3 - November 7-13, 2005

40

50

60

70

80

90

100

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

COAST SOUTH

40

50

60

70

80

90

100

110

Mon 07 Tue 08 Wed 09 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14

kWh

Time

15 Min LRS kWh Means 15 Min Profiled kWh Means

NCENTSCENT

Page 15: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

15

40

50

60

70

80

90

100

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

40

50

60

70

80

90

100

110

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

60

70

80

90

100

110

120

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 3 - January 23-29, 2006

40

50

60

70

80

Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30

kWh

Time

COAST SOUTH

SCENT

15 Min LRS kWh Means 15 Min Profiled kWh Means

NCENT

Page 16: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

16

50

70

90

110

130

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

LRS kWh Intervals vs Profiled kWh Intervals

Domain 3 - May 22-28, 2006

50

60

70

80

90

100

110

Sun 21 Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28

kWh

Time

COAST SOUTH

50

60

70

80

90

100

110

120

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

NCENT

60

70

80

90

100

110

120

130

Mon 22 Tue 23 Wed 24 Thu 25 Fri 26 Sat 27 Sun 28 Mon 29

kWh

Time

SCENT

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 17: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

17

Domain 1 Domain 2 Domain 3

COAST 0.000211 0.00714 0.00232

EAST 0.000664 0.00199 -0.01174

FWEST 0.000148 0.00190 0.02884

NCENT 0.000444 0.00035 0.00315

NORTH 0.000288 0.01117 -16.32502

SCENT 0.000317 0.00689 0.01426

SOUTH 0.000266 -0.00469 -0.01751

WEST 0.000314 0.00909 -3.59420

Study Period: J uly 2005 Thru J une 2006Difference = CHANGE - BASEWhere:

BASELINE is the LRS Mean kWh intervals.CHANGE is the Profiled kWh intervals.

WEATHER ZONE

MEAN KWH DIFFERENCES

Page 18: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

18

Domain 1 Domain 2 Domain 3

COAST 0.677 2.238 0.581

EAST 0.256 2.118 12.543

FWEST -0.023 3.577 3.696

NCENT -1.127 1.966 2.935

NORTH 0.349 1.290 7.299

SCENT 0.115 1.256 4.923

SOUTH -0.111 3.514 2.615

WEST 0.263 0.632 69.250

Study Period: J uly 2005 Thru J une 2006Percent Difference = (CHANGE - BASE)/BASE * 100Where:

BASELINE is the LRS Mean kWh intervals.CHANGE is the Profiled kWh intervals.

WEATHER ZONE

MEAN KWH PERCENT DIFFERENCES

Page 19: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

19

Domain 1 Domain 2 Domain 3

COAST 0.161 3.708 3.645

EAST 0.106 4.703 14.743

FWEST 0.121 5.181 8.955

NCENT 0.274 2.656 7.948

NORTH 0.099 2.755 26.533

SCENT 0.132 4.402 14.347

SOUTH 0.081 5.262 9.717

WEST 0.086 2.514 8.848

Study Period: J uly 2005 Thru J une 2006Difference = ABS(CHANGE - BASE)Where:

BASELINE is the LRS Mean kWh intervals.CHANGE is the Profiled kWh intervals.

WEATHER ZONE

MEAN ABSOLUTE KWH DIFFERENCES

Page 20: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

20

Domain 1 Domain 2 Domain 3

COAST 5.396 10.314 5.331

EAST 3.915 14.108 30.535

FWEST 5.047 13.543 17.521

NCENT 8.599 7.117 11.593

NORTH 4.464 7.677 55.037

SCENT 4.670 13.044 19.073

SOUTH 4.279 13.931 12.124

WEST 4.247 5.724 103.218

Study Period: J uly 2005 Thru J une 2006Percent Difference = ABS((CHANGE - BASE)/BASE * 100)Where:

BASELINE is the LRS Mean kWh intervals.CHANGE is the Profiled kWh intervals.

WEATHER ZONE

MEAN ABSOLUTE KWH PERCENT DIFFERENCES

Page 21: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

21

Average Day Across the Study Period Domain 1 - COAST

9

10

11

12

13

14

15

16

17

18

12AM 03AM 06AM 09AM 12PM 03PM 06PM 09PM 12AM

kW

Interv al Ending

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 22: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

22

Average Day Across the Study Period Domain 1 - NCENT

9

10

11

12

13

14

15

16

17

18

19

12AM 03AM 06AM 09AM 12PM 03PM 06PM 09PM 12AM

kW

Interv al Ending

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 23: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

23

Average Day Across the Study Period Domain 2 - COAST

100

110

120

130

140

150

160

170

180

190

200

210

220

12AM 03AM 06AM 09AM 12PM 03PM 06PM 09PM 12AM

kW

Interv al Ending

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 24: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

24

Average Day Across the Study Period Domain 2 - NCENT

100

110

120

130

140

150

160

170

180

190

200

210

220

230

240

12AM 03AM 06AM 09AM 12PM 03PM 06PM 09PM 12AM

kW

Interv al Ending

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 25: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

25

Average Day Across the Study Period Domain 3 - COAST

220

230

240

250

260

270

280

290

300

310

320

330

340

350

12AM 03AM 06AM 09AM 12PM 03PM 06PM 09PM 12AM

kW

Interv al Ending

15 Min LRS kWh Means 15 Min Profiled kWh Means

Page 26: Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.

26

Average Day Across the Study Period Domain 3 - NCENT

200

220

240

260

280

300

320

340

360

380

12AM 03AM 06AM 09AM 12PM 03PM 06PM 09PM 12AM

kW

Interv al Ending

15 Min LRS kWh Means 15 Min Profiled kWh Means