C-25 S-300Km Ks
19.00 3.9520.00 3.9621.00 3.9622.00 3.9723.00 3.9824.00 3.9825.00 3.9926.00 4.0027.00 4.0228.00 4.0329.00 4.0430.00 4.0531.00 4.0632.00 4.0733.00 4.0834.00 4.0935.00 4.1036.00 4.1137.00 4.1238.00 4.1539.00 4.1740.00 4.1841.00 4.2042.00 4.2143.00 4.2444.00 4.2645.00 4.2946.00 4.3147.00 4.3448.00 4.3649.00 4.3950.00 4.4151.00 4.4652.00 4.4953.00 4.5154.00 4.5655.00 4.6256.00 4.6557.00 4.6758.00 4.73
Design of slab mat fondatiooon
P1= 1308.60P2= 1368.00Mx= -My= - 3.5P3= 729.00P4= 849.60Mx= -My= -S-1= 1432.49 4S-2= 982.13S-3= 1575.45
N.B .For dimensions please refer the drawings
a)
8245.269 KN
17597.73
x= 2.13
17265.8655
y= 2.09
Eccentricity about the center of the slab
0.13 m
-0.09 m
b) Calculation of contact pressure
126.00
171.50
775.331107.19
277+-4.82*y+-4.82*x 6.15
247.71 6.46
273.54
226.18
252.00
Calculation of SP, e xand e y
SP
M1,2
MA,B
ex=
ey=
s=SP(1/A+-ex*y/Ix+-ey*x/Iy)
Ix= m4
Iy= m4
Mx=My=
s = Mx/Ix=
sA1= My/Iy=
sA2=
sB1=
sB2=
P1 P2
P3 P4
B
A
1 2
c) Calculation of Bending Moment and Determination of the Required Depth to Satisfy the shear stress
Divide them in to two equivalent beams
A1-B1 s= 236.94
A2-B2 s= 262.77
290.26 In the short direction
420.43 In the long direction
M= 295.61 Cantilever
Maximum shear would be the punching shear under the 1306KN
4x(0.4+d)dx641.67=1306
4x(0.4+d)d= 2.04
solving the quadratic equationd= 0.540 mD= 0.570 m
Reinforcement determination
I- short direction
Km= 31.55Ks= 4.06
f 20
2182.31 140 mm
II- Long direction
Km= 37.97Ks= 4.12
f 20
3207.72 98 mm
III- Cantilever
Km= 31.84Ks= 4.06
f 20
2222.58 140 mm
MAB=
M12=
4d2+1.6d-2.04=0
AS=
AS=
AS=
Shop and office Wzr Sewunet
Structural analysis and design
Design of Ribbed slabs / With Hollow concrete slabs/
Design Date
Concrete class- C-25
20 MPa
11.33 MPa
Steel grade S-300
300 Mpa
260.87 Mpa
Use Class I Workmanship
HCB size 40x24x20 cm
g= 14Concrete
g= 24Floor finish
g= 23 (Cement screed
g= 23 (Terrazzo tiles)
g= 16 ( PVC tiles)
g= 27 (Marle )
Design procedure
The ribs are placed at a clear spacing of 400mm.
The Depth of the topping is 60mm and the concrete strength
shall be of the same class as that of the ribs.
Loading
The function of the building is for office and shop(Mixed use).Therefore the live loading depends on the specific use of the floors.
Shop 5.00
Department sores 5.00
Offices 3.00
Restaurants and dining rooms 3.00
fck=
fcd=
fy=
fyd=
KN/m3
KN/m3
KN/m3
KN/m3
KN/m3
KN/m3
KN/m2
KN/m2
KN/m2
KN/m2
Shop and office Wzr Sewunet
Structural analysis and design
References:EBCS 1, 2, 3 ,& 8
Slab Analysis Solid slabs are preferable in areas where soil waste pipes pass.
Slabs for first floor and second floor
.=Panel Type Case No220.00 11.33 1
300.00 260.87
0 S-1 1
Ratio calc. 1
30.00 40.00 1.14 38.57 1 -Continuous 30.00
Lx/4 0.88 0 -Discontinous
Panel Name S-1 D [mm] Panel Name
Depth Lx [m] Ly [m] d [mm] 60.00 Depth
3.50 4.00 38.57 36.30 200.00
D-Load Floor finish 5cm Screed Weight Ceiling PlasterOther.D.Load D-Load
0.06 1.15 5.00 0.46 0.00
Wall Load L(in) L(out) Wall HeightWall unit weight q Wall Load
1.70 1.70 2.70 3.30 2.50
Total dead load 9.17 Cover [mm] Total dead load
Live Load 5.00 15.00 Live Load
Design load 0.88 19.93 Design load
r values r values
0.00 1.33 1.33 1.33 1.00
Alpha values b Alpha values
0.045 0.037 0.034 0.028 0.32
Moment Mxs Mys Mxf Myf Moment
10.98 9.03 8.30 6.83
k-value 340 280 260 220 k-value
r 0.13 0.11 0.10 0.08 r
Amin[sq.mm] 300 300 300 300 Amin
Ascal [sq.mm] 238 195 179 147 Ascal
Asfinal [sq.mm] 300 300 300 300 Asfinal
f # of bars # of bars # of bars # of bars f10.00 5 5 5 5 10.00
S.max [mm] 400 400 400 400 S.max [mm]
S.calc[mm] 260.00 260.00 260.00 260.00 S.calc [mm]
S.final [mm] 260.00 260.00 260.00 260.00 S.final [mm]
Load Transfer on Beams Ly/Lx= 1.14
Shear coeffcien Shear coeffcie
#DIV/0! 0.00 0.36 0.24
Load on Beams #VALUE! Load on Beam
Total design lo #DIV/0! N.A. 25.11 16.74 Total design l
Live Load #DIV/0! N.A. 6.30 4.20 Live Load
Dead Load #DIV/0! N.A. 11.56 7.71 Dead Load
Note:- N.A.-Means Not Applicable
Fck Fcd Fck
Fyk Fyd Fyk
ba for 2:1 ba for 1:1 ba calc ba for 2:1
ba calc
r1 r2 r3 r4 nd
axs a ys a xf a yf
bvcx bvdx bvcy bvdy
Rdx Rcy Rdy
Fck for C25 is 20Mpa
Shop and office Wzr Sewunet
Structural analysis and design
Analysis and design of staircase
Depth determinationd= 133.52 mmD= 164.52 mm
Use D= 200.00 mmd= 169.00 mm
q= 29.740.52 rad
Dead load Inclined part Concrete 4.8
Screeed 0.69Marble 0.54
tread + riser 0.54
Total 6.57
Live load 5
7.57
5.00
17.84
Landing partConcrete 4.8Screeed 0.69
Marble 0.54Total 6.03 Kn/m
Live load 3Pd= 12.64
17.84
12.64 12.64
a b
1.25 2.52 1.6
Reaction determinationTaking moment about b)
Ra= 23.91Rb= 57.06
Mmax= 22.01 Kn-m SpanMmax= -15.92 Kn-m Support
Km= 27.76Ks= 4.02
Ascal= 522.81Reinf 12 c/c 150 mm
o
Kn/m2
Kn/m2
Pdead=
Plive=
Pd=
Kn/m2
Shop and office Wzr Sewunet
Structural analysis and design
x M(x) Mmax
0 - 0.20 (4.53) 0.40 (8.55) 0.60 (12.07) 0.80 (15.08) 1.00 (17.59) 1.20 (19.59) 1.40 (20.06) 1.60 (19.49) 1.80 (18.21) 2.00 (16.21) 2.20 (13.50) (13.50) 2.40 (10.08) 2.60 (5.94) 2.80 (1.09) 3.00 4.47 3.20 10.75 3.40 17.74 3.60 25.44 3.77 32.55 3.80 30.84 4.00 19.76 4.20 9.18 4.40 (0.89) 4.60 (10.46) 4.80 (19.52) 5.00 (28.07) 5.20 (36.12) 5.37 (42.57)
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6
-10
-5
0
5
10
15
20
25
30
35
Column D
Shop and office Wzr Sewunet
Structural analysis and design
Slabs for third floor and fourth floor
.=Panel Type Case No220.00 11.33 1
300.00 260.87
2.55 1.51 0 S-1 1
Ratio calc. 1
40.00 1.14 38.57 1
Lx/4 0.88 0 -Discontinous
S-1 D [mm]
Lx [m] Ly [m] d[mm] 60.00
3.50 4.00 38.57 36.30 270.00
Floor finish5cm Screed Weight Ceiling PlasterOther.D.Load
0.06 1.15 6.75 0.35 0.00
L(in) L(out) h Wall unit weight q
1.70 1.70 2.70 3.30 2.50
Total dead load 10.81 Cover [mm]
3.00 15.00
18.85
0.00 1.33 1.33 1.33 1.00
b0.045 0.037 0.034 0.028 0.32
Mxs Mys Mxf Myf
10.39 8.54 7.85 6.47
170 140 130 110
0.06 0.05 0.05 0.04
417 417 417 417
161 132 121 100
417 417 417 417
# of bars # of bars # of bars # of bars
7 7 7 7
540 540 540 540
180.00 180.00 180.00 180.00
180.00 180.00 180.00 180.00
Load Transfer on Beams Ly/Lx= 1.14
0.42 0.00 0.36 0.24
Rcx Rdx Rcy Rdy
27.97 N.A. 23.75 15.84
4.45 N.A. 3.78 2.52
16.04 N.A. 13.62 9.08
Fcd
Fyd
ba for 1:1 ba calc
ba calc
r1 r2 r3 r4 nd
axs a ys a xf a yf
bvcx bvdx bvcy bvdy
Shop and office Wzr Sewunet
Structural analysis and design
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6
-10
-5
0
5
10
15
20
25
30
35
Column D
Shop and office Wzr Sewunet
Structural analysis and design
1) Design of Ribbed slabs / With Hollow concrete slabs/
Design Date
Concrete class- C-25
20 MPa
11.33 MPa
Steel grade S-300
300 Mpa
260.87 Mpa
Use Class I Workmanship
HCB size 40x24x20cm
14Concrete
24Floor finish
23 (Cement screed
23 (Terrazzo tiles)
16 ( PVC tiles)
27 (Marle )
2) Design procedure
The ribs are placed at a clear spacing of 400mm.
The Depth of the topping is 60mm and the concrete strength
shall be of the same class as that of the ribs.
fck=
fcd=
fy=
fyd=
g= KN/m3
g= KN/m3
g= KN/m3
g= KN/m3
g= KN/m3
g= KN/m3
Shop and office Wzr Sewunet
Structural analysis and design
2.1 Loading
The function of the building is for hospital.Therefore the live loading depends on the specific use of the floors.
Offices 3.00
Wards 3.00
Rib slab
Topping 60mm use f 8 c/c200mm
Each rib carry half of the load b/n the ribsLoading
Dead load HCB 1.34 KN/mConc. Topping 0.58 KN/m
Plastering 0.29 KN/mPVC tiles 0.02 KN/m
Light wt. conc 0.92 KN/mTotal 3.14 KN/mLive Load 1.50 KN/m
Load carried by end ribDead load 1.57 KN/m
Live Load 0.75 KN/m
Load carried by intermidiate ribDead load 3.14 KN/m
Live Load 1.50 KN/m
Analyze and design the rib beams as per the AR requirment
KN/m2
KN/m2