Analysis of action plan

6
Monday 24 th November – Friday 28 th November *

Transcript of Analysis of action plan

Page 1: Analysis of action plan

Monday 24th November – Friday 28th November

*

Page 2: Analysis of action plan

*We followed most of our

action plan for the week

however some tasks that

we were meant to

complete were not in

our control. The tasks

that we had set for

Monday we completed

and uploaded them to

our blogs.

Page 3: Analysis of action plan

*On Tuesday we started our

presentation on how the

similar products we have

chosen link in with our

video, which is going

really well. However the

re-filming that we were

suppose to do, we did not

get it completed as one of

our actors could not stay

on due to a personal

issue, hence we had to

postpone it for a week.

Page 4: Analysis of action plan

*On Wednesday we

could not upload

the scenes that

we had re-filmed

as we did not film

anything,

although the

presentation was

going according to

our plan.

Page 5: Analysis of action plan

*On Thursday we had

finished our similar

products presentation

which was an interview

that we had recorded, so

we put it on to the Macs

and edited it. But we could

not start making the

storyboard as we did not

stay on to take pictures of

the different shots that we

have in our video. The

storyboard has also been

postponed to the following

weeks action plan.

Page 6: Analysis of action plan

*On Friday we had no lesson as we were in reader leader training but we did upload our presentation onto our blogs. Overall we did follow our action plan the only disruption that had occurred was not being able to re-film some of our scenes and not being able to take pictures of each of the shots in our opening scene. These two tasks have been moved to the following weeks action plan, the re-filming and storyboard is now our main priority.