Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

4
Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01

description

Analyse Assure Accelerate TM High-level U-ATS Roadmap* 2005 Q1 Q2 Q3 Q4 December 2005  HSDPA: Initial test cases from Section 9 - (2)  TX Diversity: Open Loop Transmit Diversity (including validated test case)  TX Diversity: Closed-Loop Transmit Diversity (including validated test case)  OB V test validation (subject to UE availability) April 2005 (U-ATS 3.1)  Support for asymmetric data rate testing as per real-world deployments  Operating Band V and VI support for Development Partners  RRM: GSM Cell Selection Test Cases (including validated , test cases)  RRM: Measurement Accuracy Test Cases (including validated , , , test cases)  OB I and II validation of new tests (per April 2005 roadmap) August 2005  RRM: GSM Hard Handover Test Cases (including validated test case)  RRM: GSM Cell Re-Selection (including validated test case)  RRM: GSM Measurement Accuracy (including validated test case)  Power Control: Combining of Power Control (TPC) streams (including validation of test)  Enhanced Energy Management tests  OB I and II validation of new tests (per Aug 2005 roadmap) * Target availability – dates and contents subject to change

Transcript of Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

Page 1: Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

Analyse Assure AccelerateTM

U-ATS UMTS Automatic Test System

Roadmap (April, 2005)Rev Draft 01

Page 2: Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

Analyse Assure AccelerateTM

The information contained in this presentation is considered to be

confidential and proprietary information of Spirent Communications Inc. and is subject

to the terms and conditions of the Non-disclosure agreement (NDA) between the recipient(s) or recipient's organization and

Spirent Communications Inc.

Notice of Confidential Information

Page 3: Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

Analyse Assure AccelerateTM

High-level U-ATS Roadmap*

2005 Q1 Q2 Q3 Q4

December 2005 HSDPA: Initial test cases

from Section 9 - (2) TX Diversity: Open Loop

Transmit Diversity (including validated 7.6.1 test case)

TX Diversity: Closed-Loop Transmit Diversity (including validated 7.6.2 test case)

OB V test validation (subject to UE availability)

April 2005 (U-ATS 3.1) Support for asymmetric data

rate testing as per real-world deployments

Operating Band V and VI support for Development Partners

RRM: GSM Cell Selection Test Cases (including validated 8.2.3.1, 8.2.3.2 test cases)

RRM: Measurement Accuracy Test Cases (including validated 8.7.1.1, 8.7.1.2, 8.7.2.1, 8.7.2.2 test cases)

OB I and II validation of new tests (per April 2005 roadmap)

August 2005RRM: GSM Hard Handover Test

Cases (including validated 8.3.4 test case)

RRM: GSM Cell Re-Selection (including validated 8.3.5 test case)

RRM: GSM Measurement Accuracy (including validated 8.6.4.1 test case)

Power Control: Combining of Power Control (TPC) streams (including validation of 7.7.3 test)

Enhanced Energy Management tests

OB I and II validation of new tests (per Aug 2005 roadmap)

* Target availability – dates and contents subject to change

Page 4: Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

Analyse Assure AccelerateTM

All trademarks mentioned herein are the property of their respective owners

Copyright © 2004 Spirent Communications Inc.

Analyse | Assure | Accelerate™