An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management...
-
Upload
karla-hodgkinson -
Category
Documents
-
view
216 -
download
3
Transcript of An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management...
![Page 1: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/1.jpg)
An Overview of Malaysian Construction
IndustryDr. Mohd Hanizun Hanafi
Construction Management ProgrammeSchool of Housing, Building and
Planning, USM
![Page 2: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/2.jpg)
The Importance of CI
• Backward and Forward Linkages• Employment• Fix asset• It establishes the infrastructure required for
socioeconomic development while being a major contributor to overall economic growth.
![Page 3: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/3.jpg)
Chronology of Malaysian CI
• Dependence - Craft-based industry• Phase I: The early years of post-independence
(the years immediately after independence up to the end of the 1960s)
• Phase II: The New Economic Policy (1970 –1990)
• Phase III: The New Development Policy and Vision 2020 (from 1991 onwards)
![Page 4: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/4.jpg)
• As Malaysia moves from developing country status towards a developed and industrialized nation as envisaged in Vision 2020, its construction industry will need to respond to the changes in construction demand
![Page 5: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/5.jpg)
Dependence - Craft-based industry
![Page 6: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/6.jpg)
Phase I: The early years of post-independence
• Construction output grew at an annual average rate of 4.1 percent between 1965 and 1970; construction output increased from RM801 million in 1965 to RM 980 million in 1970. Construction activity during the period was mainly brought about by economic development programmes in agriculture, infrastructure, rural development and the growth in capital expenditure on urban and rural housing.
![Page 7: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/7.jpg)
• Most of the construction work took place in the public sector, there was increased private sector investment towards the end of the sixties
• The public sector housing programmes focused on low-cost housing and housing for public employees, whereas the private sector concentrated on urban residential construction
Phase I: The early years of post-independence
![Page 8: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/8.jpg)
Phase II: The New Economic Policy (1970 –1990)
• The New Economic Policy (NEP) was launched in 1970 and construction activities expanded with the acceleration of public sector development expenditure, mainly in infrastructure projects.
• There was increased demand for residential construction and a high growth in private investment.
![Page 9: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/9.jpg)
• The expansion of private sector industrial growth and construction activities associated with manufacturing facilities continued from the late sixties.
• However, the rapid expansion in construction activities led to an increase in imports of machinery and equipment, and shortages of building materials and labour towards the end of the seventies.
Phase II: The New Economic Policy (1970 –1990)
![Page 10: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/10.jpg)
• When oil became dominant in the late seventies, supporting construction facilities and buildings expanded the industry’s activities. The expansion was compounded by the enhancement of foreign direct investment towards the end of the seventies.
Phase II: The New Economic Policy (1970 –1990)
![Page 11: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/11.jpg)
Phase III: The New Development Policy and Vision 2020 (from 1991 onwards) • The rapid expansion of construction demand
after recovering from the recession, continued into the 1990s.
• The growth of the industry was further enhanced by the implementation of Vision 2020 in 1991. This has resulted in rapid implementation of several large scale infrastructure projects, housing, schools, hospitals, commercial and industrial buildings enroute to realizing the goals envisaged in the Vision
![Page 12: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/12.jpg)
• The expansion of tourism and the manufacturing industry have also contributed to the industry's growth momentum. The rapid industrialization programmes have intensified the urbanization process which further increased the demand for housing and related infrastructure facilities. The country’s rapid industrialization has also created a new demand for large scale, complex, alternative energy production facilities.
Phase III: The New Development Policy and Vision 2020 (from 1991 onwards)
![Page 13: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/13.jpg)
• The slowdown of the country’s economic growth following the East Asian economic crisis has impacted the growth of the construction industry. The growth of the construction industry fell from 14.2 percent in 1996 to 9.5 percent in 1997. Construction growth further fell to –24 percent in 1998.
Phase III: The New Development Policy and Vision 2020 (from 1991 onwards)
![Page 14: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/14.jpg)
• Growth of the Malaysian economy is expected to resume, although growth will be slower than in the “ Miracle” days of the early 1990s. The economy will be on course to achieve the target set out in vision 2020 since the vision is the country’s long-term goal.
Phase III: The New Development Policy and Vision 2020 (from 1991 onwards)
![Page 15: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/15.jpg)
Construction Industry’s Products
Building-typed Products
Civil Engineering-typed Products
![Page 16: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/16.jpg)
![Page 17: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/17.jpg)
• Construction Industry Master Plan 2006 – 2015
• IBS RoadMap 2003 – 2010• IBS RoadMap 2011 - 2015
Strategic of Malaysian CI
3D Syndrome – Difficult, Dirty and Dangerous
Productivity, Quality of products are Low; Accident Rate
- Foreign labours- Low inflow rate
![Page 18: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/18.jpg)
Modernisation of Construction Industry
Productive, Responsive,Innovative
Safer, Easier,Cleaner
![Page 19: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/19.jpg)
BiggerSophisticated
More Competitive
High Quality; More Cheaper
CONSTRUCTION PRODUCTS
CONSTRUCTION PROCESSComplicatedTightnessDangerous
![Page 20: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/20.jpg)
Softwares?
![Page 21: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/21.jpg)
Forecasting
LaboursMachineriesMaterials
TOOL – Life Cycle Costing SimulationExpert SystemNeural NetworkFuzzy LogicGenetic Algorithm
Supply and Demand of Constr. Products; Clients’ needs; Information-based Solution
![Page 22: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/22.jpg)
PlanningTOOL – MS Project,Primavera,Computer based sophisticated tools
Supply Chain Management
![Page 23: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/23.jpg)
Scheduling
TOOL – WBSIshikawa
Labours, Materials, Machineries, Money, Methods
![Page 24: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/24.jpg)
Monitoring and Controlling
TOOL –
IshikawaProductivity Cycle _ MEPIEarned Value Analysis`S’ Curve`J’ CurveISOValue EngineeringLean ConstructionSimulation Modeling; etc
![Page 25: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/25.jpg)
Communication
Short, Effective and TRANSPARENT
![Page 26: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/26.jpg)
Motivation
![Page 27: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/27.jpg)
MOTHERBOARD
![Page 28: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/28.jpg)
PROCESS
![Page 29: An Overview of Malaysian Construction Industry Dr. Mohd Hanizun Hanafi Construction Management Programme School of Housing, Building and Planning, USM.](https://reader036.fdocuments.us/reader036/viewer/2022062511/55165a26550346a2698b4f3a/html5/thumbnails/29.jpg)