    IEEE TRANSACTIONS ON POWER SYSTEMS 1

    An Optimal Power Flow Function to Aid RestorationStudies of Long Transmission Segments

    Eduardo Martins Viana, Edimar Jos de Oliveira, Nelson Martins, Fellow, IEEE,Jos Luiz R. Pereira, Senior Member, IEEE, and Leonardo Willer de Oliveira

    AbstractThis paper presents an optimal power flow functionfor aiding restoration studies of subsystems having long transmis-sion segments. The method simultaneously computes an optimalset of variables which are critical for the subsystem restoration:the generation power plant high-side voltage, the minimum shuntreactor configuration and the maximum load to be safely ener-gized. A set of overvoltage restoration scenarios following load re-jection is constructed in such a way that the computed shunt re-actor compensation becomes distributed along the transmissioncorridor. The whole problem is formulated as a single optimiza-tion problem whose solution is obtained by an optimal power flow,

    based on the Primal-Dual Interior Point Method. The describedresults for a restoration study on a system from practice confirmthe effectiveness of the proposed method.

    Index TermsAutomatic voltage regulator, generator capabilitycurve, load rejection, long transmission segments, optimal powerflow, power system restoration, shunt reactors, sustained overvolt-ages.

    I. INTRODUCTION

    S YSTEM faults whose severity are above planning criteriacan cause electricity supply interruptions and, occasion-ally, lead to regional or widespread blackouts[1]. Following a

    blackout, restorative actions are promptly started and efficiently

    carried out in order to safely bring the system back to normal

    operation in minimum time. Power system restoration is a com-

    plex multi-stage process involving many issues[2] and whose

    studies require the use of computer tools for power flow [3],

    short-circuit, harmonic distortion, electromechanical stability

    and electromagnetic transient analyses. Restoration drills have

    become an important training resource, mainly when aided by

    powerful operator training simulators[4].

    Until the mid-1970s, all the Brazilian restorative actions

    were centrally supervised[5] and the average time required to

    completely restore the supply was excessively long. In order

    to speed-up the process, the Brazilian Interconnected PowerSystem (BIPS) operating bodies (previously the Eletrobras

    coordinating pool and now the system operator, ONS), divided

    Manuscript received May 05, 2011; revised October 06, 2011, January 07,2012, April 02, 2012, and May 08, 2012; accepted May 11, 2012. This workwas supported by CAPES, CNPq/INERGE, FAPEMIG, and CEPEL. Paper no.TPWRS-00414-2011.

    E. M. Viana is with Petrobrs (e-mail: [email protected]).E. J. de Oliveira, J. L. R. Pereira, and L. W. Oliveira are with the Elec-

    trical Engineering Department, Federal University of Juiz de ForaUFJF, Juizde Fora, Brazil (e-mail: [email protected]; [email protected]; [email protected]).

    N. Martins is with CEPEL, CP 68007, 21944-970 Rio de Janeiro, RJ, Brazil(e-mail: [email protected]).

    Digital Object Identifier 10.1109/TPWRS.2012.2202924

    the restoration process in two sequential stages, in which the

    first stage, calledparallel phase [5], is followed by the second

    stage, calledcoordinated phase[6],[7]. The former only deals

    with the restoration of the individual subsystems, which can

    be carried out independently, while the latter involves actions

    requiring rigorous coordination among subsystems.

    Parallel phase studies usually assume the generation-trans-

    mission (GT) subsystem totally de-energized. The restoration

    procedures for the subsystem are detailed in the operator in-

    structions and the operating staff in the several stations/sub-stations belonging to this GT subsystem should conduct the

    restoration with aminimum need of verbal communication be-

    tween stations[8]. The transmission segments in these GT sub-

    systems are energized in a radial configuration sequence and a

    compatible amount of load is picked up at the end of the process

    [9], evolving then to a generation-transmission-load (GTL) sub-

    system, also known as a system restoration island.

    In order to face a multitude of possible regional blackouts, as

    well as the very low probability event of a complete blackout

    in the continental-sized Brazilian Interconnected Power System

    (BIPS) the operator, ONS, has planned for more than 30 GT and

    GTL subsystem restoration processes to take place in parallel

    and simultaneously. The restoration of the GT/GTL subsystemsis based on hydroelectric black-start units and carried out under

    the responsibility of numerous owners and by their teams of

    operators, with ONS supervision[5]. The overvoltages during

    the subsystem restoration process must be kept at safe levels at

    all times by using the available shunt reactors and the reactive

    power capability of the synchronous machines[10].

    Reference[11]presents a method for the control of sustained

    overvoltage during the early stages of restoration in which an

    expert system and a nonlinear programming module were de-

    signed taking into account the differences between the normal

    condition and the early stages of restoration. The over-voltage

    control scheme is solved by this module, using power fl

    owcalculations and sensitivity analyses in order to determine the

    target buses. System restoration voltage control strategies and

    overall planning are discussed in [2], [11], and [12], which

    provided important guidelines to the work reported in the

    present paper.

    The present paper proposes a new methodology to determine

    the minimum number of generating units, in-service transmis-

    sion circuits and shunt reactors configuration capable of safely

    restoring the individual GT and GTL subsystems and picking up

    a substantial amount of load. The proposed method utilizes an

    optimal powerflow (OPF) function based on the primal-dual in-

    terior point method[13]. Important phenomena like frequency

    dips that limit the amount of load that could be picked up to a

    0885-8950/$31.00 2012 IEEE

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    2 IEEE TRANSACTIONS ON POWER SYSTEMS

    Fig. 1. Restoration of transmission segments.

    small fraction of the available generation capacity, as well as

    electromagnetic transients resulting from line and transformer

    energization, are not captured by the steady-state OPF tool of

    this paper.

    II. PROBLEMDESCRIPTION

    A subsystem having a long transmission corridor is restored

    by following a safe equipment switching sequence, in which

    the number of shunt reactors connected to the system should be

    minimized.Fig. 1shows a restoration subsystem in which theenergization initiates at bus 1, the generator bus, and the load is

    picked up at bus 4, the remote end. There are 4 bus reactors in

    this subsystem, which are pictured all energized inFig. 1.

    During the restoration process of the GTL subsystem in

    Fig. 1, the fundamental frequency overvoltages are controlled

    by the reactors at buses 2, 3, and 4 and by the generator at bus

    1 in such a way that the load picked up at bus 4 is maximized.

    Picking up a remote load without resorting to shunt reactors

    is not feasible when relatively long transmission segments are

    involved. Also, a minimum set of bus reactors should not be

    switched off as loading is increased since there is always the risk

    of intempestive load rejection with associated overvoltages and

    generator self-excitation. The restoration process can be studied

    by establishing a sequence of subsystem scenarios. The sce-

    narios differ by the number of transmission line sections con-

    nected as well as the number of generating units. The voltage

    profile, reactive shunt compensation level and remote load sup-

    plied are solutions to the proposed OPF function. The number

    of generation units should ideally be also varied in these sce-

    narios, with less units connected when energizing the first line

    sections but, in this first implementation, the number of units is

    not a variable in the optimization process. If a heuristic search

    optimization method were used for the system in Fig. 2, the

    number of scenarios would be to cater for all the reactor con-

    nection possibilities for the base case alone, and on top of theseoptimize to maintain generation within its reactive power capa-

    bility and avoid overvoltages[14]. In our method this discrete

    optimization is approximated as a continuous problem, which is

    adjusted to the nearest discrete values, after convergence. Our

    initial scenarios, should therefore include, as data set, those can-

    didate scenarios and compensation alternatives that appear to be

    of practical value (seeFig. 2), since this provides a better initial

    condition for the optimization process.

    In the proposed method, the bus voltages are variables

    (unknowns) of the OPF problem and the various scenarios

    are included as data for the global optimization problem. The

    OPF method, considering the load rejection conceptual model

    sketched inFig. 3, is designed to simulate the system state at the

    three time instants, , and , which are related to the

    Fig. 2. Restoration scenarios.

    Fig. 3. Sketch of transient behavior of a system bus voltage magnitude fol-lowing load rejection in the GTL island.

    conditions immediately prior to the load rejection, immediately

    after it and at an anticipated steady-state condition.

    At , the load picked up at the remote bus should be max-

    imized for a given corridor, the reactive compensation by the

    shunt reactors should be minimized and the generators must re-

    main within their capability curves. At , the generators are

    represented as constant voltage behind their subtransient reac-

    tances, with thesubtransient voltage being a function of the gen-

    erator dispatch at . At , the post-disturbance steady-state

    is reached and the voltage regulators (AVR) are assumed to

    have adjusted the power plant terminal voltage to the optimized

    scheduled value, as long as its generating units do not violate

    their reactive power limits. The equations used to model the gen-

    erator capability limits are detailed inAppendix A.

    III. PROPOSEDMETHOD

    The proposed methodology is based on an OPF formulation

    in which the AC network model for the GTL subsystem is

    fully considered. As keeping voltage and Var limits during

    the GT/GTL subsystem restoration process is vital, adequate

    representation in steady-state and subtransient-state of the

    synchronous machines, their capability curves [15][17] and

    associated voltage regulator [18] steady-state regulation char-

    acteristics, as well as the set of switchable shunt reactors placed

    at the various subsystem buses, should be considered into the

    optimization problem. These shunt reactors are considered to

    be continuous in the OPF solution, being later adjusted to their

    discrete values in practice which are closest to the obtained

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    VIANAet al.: AN OPTIMAL POWER FLOW FUNCTION TO AID RESTORATION STUDIES OF LONG TRANSMISSION SEGMENTS 3

    optimal solution. The proposed OPF problem is described as

    follows:

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    (9)

    (10)

    (11)

    (12)

    (13)

    (14)

    (15)

    (16)

    (17)

    (18)

    Equations(19)(23)ofAppendix Adefine the generator ca-

    pability curve and are also considered as constraints of this OPF

    problem, where

    active power generation at bus

    prior to load rejection ,

    at the instant and final

    steady state for scenario ;

    reactive power generation at bus

    prior to load rejection ,

    at the instant and final

    steady state for scenario ;

    active power load at bus prior

    to load rejection , at the

    instant and final steady

    state for scenario ;

    reactive power load at bus

    prior to load rejection ,

    at the instant and final

    steady state for scenario ;

    generator internal voltages at

    and ;

    generator internal angles at

    and ;

    voltage at bus at the instants

    and for the

    scenario ;

    generator terminal voltage at

    the instants and for

    scenario ;

    steady state voltage limits at the

    instant ;

    voltage limits at the instant

    ;

    steady state voltage limits at the

    instant ;

    angle at bus at the instants

    and for the

    scenario ;

    load factor at bus having

    existing load;

    active powerflow at circuit -

    at the instants and

    for the scenario ;

    Lagrange multipliers related to(2),(8), and(13);

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    4 IEEE TRANSACTIONS ON POWER SYSTEMS

    Lagrange multipliers related to

    (3),(9), and(14);

    Lagrange multipliers related to

    (4),(10), and(15);

    Lagrange multipliers related to

    (5),(11), and(16);

    reactive power consumed by

    reactor at bus ;

    maximum amount of MVAr

    reactors at bus ;

    reactive powerflow at circuit

    - at the instants

    and for the scenario ;

    set of buses directly connected

    to bus ;

    complete set of buses;

    set of shunt bus reactors;

    subtransient and synchronous

    reactances of generator;

    total number of scenarios;

    total number of system buses

    for scenario ;

    total number of load buses;

    total number of shunt reactors;

    total number of black-start units.

    Equation(1)is the objective function that maximizes the sup-plied load and minimizes the reactive power drawn by the shunt

    reactors. Note the maximization of supplied load implies in the

    minimization of shunt reactors, indicating that there is no need

    to consider weighting factors in the two terms of the objective

    function. The load factor is an optimization variable which

    enables determining the maximum load picked-up at the end of

    the optimization process.

    Equations (2)(7) and (18)(23) describe the operation

    decision problem related to the amount of supplied load

    and the number of switched-on reactors. Equations (4)(5)

    and (19)(23) are defined only for the connected black-start

    generating units, which are individually represented. If theoptimization problem considered only (2)(7) and (18)(23),

    the optimal solution achieved would comprise a large amount

    of supplied load and a very small amount of in-service shunt

    reactors. However, a GTL island restoration process involves

    many sequential stages of island component energizations as

    well as load rejection possibilities, all of which must be checked

    for sustained as well as temporary overvoltage problems.

    Equations (8)(12) describe the constraints at the instant

    associated with one generic restoration scenario. A set of

    (8)(12)must be used to model each one of the scenarios

    that are included in the OPF dataset. These scenarios data set

    is intended to provide a better initial condition that will lead to

    OPF solutions of more practical value rather than local minimaof lesser interest. The subproblem related to conditions at the

    Fig. 4. Sparse Hessian structure.

    instant of is connected to the subproblem , related

    to conditions prior to load rejection, by the global variables:

    and , as formulated in(8)(11). At the instant ,

    the voltage regulators (AVRs) have not yet responded and then

    , the generator subtransient voltage, remains unchanged. The

    constraint (12) becomes active due to overvoltages detected

    during the convergence process and then the decision in sub-

    problem forces a reduction in the amount of picked-up

    load and increases the reactive power consumption by the

    shunt reactors .

    Equations (13)(17)and (19)(23)describe the constraints

    at the instant in which each equation must be written for

    the restoration scenarios. Subproblem is connected

    to the subproblem by the global variables: and

    , as formulated in (13)(16). At the post-disturbance final

    steady-state , the voltage regulators (AVR) have already

    regulated the generation terminal voltages back to the optimized

    scheduled values by adjusting to the steady state value

    . The constraint(17)becomes active due to final steady-

    state overvoltages detected during the convergence process, and

    then the decision in subproblem is forced to decrease the

    amount of supplied load and to increase . However, if

    generator reactive power capability is insufficient to ensure that

    bus voltage remains within limits, then only the reactive powerconsumption by the reactors, , is increased.

    The distributed shunt compensation is a solution from the

    continuous OPF method, and providing an adequate data set

    of restoration scenarios as initial conditions, cause the OPF

    problem to be more rapidly and effectively solved. As previ-

    ously described, the continuous solution values obtained for

    the shunt reactors are adjusted to the nearest discrete values,

    adopting the following criteria:

    1) The set of continuous reactive power values

    is scaled by the MVAr rating of the reactor unit at that bus,

    , say .

    2) The bus with the maximum value of in this set is thenselected for the addition of a fixed reactor, which is then

    modeled in the data set as a fixed impedance load.

    3) A new OPF simulation, using the system data adjusted by

    the addition of one fixed reactor as described in 2), is then

    executed to obtain a new set of continuous reactive power

    values absorbed by the system candidate reactors .

    4) Repeat step 1) to 3) as many times as reactor additions are

    needed, until a suitable tolerance is achieved.

    This heuristics has worked well for the example system of

    this paper as well as other simpler systems, but further testing

    and research is needed.

    The proposed solution for the global optimization problem

    should take into consideration the data set of restoration sce-narios which are judged to be the most practical. As the GT/GTL

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    VIANAet al.: AN OPTIMAL POWER FLOW FUNCTION TO AID RESTORATION STUDIES OF LONG TRANSMISSION SEGMENTS 5

    Fig. 5. Diagram for the Rio de Janeiro restoration transmission segment.

    subsystem contains a reduced number of buses, the overall OPF

    problem to be solved is always of a relatively small size. In the

    present case, the sparse Hessian matrix W has the structure pre-

    sented inFig. 4, where its component blocks are described as

    follows:

    block matrix related to in which the elements

    are obtained from (2)(7)and (18)(23)

    describing the complete GTL subsystem being

    considered;

    block matrix related to in which the elements

    are obtained from(8)(12). In this case there

    exists one sub-matrix for each GT scenario;

    block matrix related to in which the elements

    are obtained from(13)(17)and(19)(23). In

    this case there exists one sub-matrix for each

    GT scenario;

    coupling block matrix associated to the global

    variables ( and ) of and ;

    coupling block matrix associated to the global

    variables ( and ) of and .

    Note: It is worth mentioning a generation redispatch method de-

    scribed in[6] and [7] that also uses OPF constraints related to

    machine subtransient phenomena at and requires the mod-

    eling of generators by voltages behind their subtransient reac-

    tances.

    IV. RESULTS

    The proposed methodology was tested in the restoration study

    of the main transmission corridor of the Rio de Janeiro area ofBIPS. This GTL subsystem is shown in Fig. 5 and the associated

    system data is presented inAppendix B.

    The main components of this GT/GTL subsystem are the

    Marimbondo power plant, the 500-kV transmission system con-

    necting this plant to the Rio de Janeiro area and the 138-kV

    LIGHT distribution system and load. The Marimbondo hydro-

    electric plant comprises eight 186-MW generating units, five of

    which are needed for safe restoration according to[5], a refer-

    ence describing current BIPS restoration practices. In order to

    better test the proposed method, the line reactors in Fig. 5were

    also assumed to be bus reactors and maneuverable in all OPF

    simulations reported in this paper.

    Careful OPF data preparation, including an adequate restora-

    tion scenarios data set, is fundamental to obtain useful solutions.

    This data set should reflect the transmission corridor sequential

    build up as well as subsystem configurations following load re-

    jection and split-up. Considering all these scenarios help to en-

    force an even distribution of the shunt reactors along the trans-

    mission corridor.Table Idescribes the chosen set of scenarios

    for the test system, which are identified by their disconnected

    lines, reactors and buses, as well as through the number of en-

    ergized buses they contain. Scenario 1 corresponds to the GTL

    case . Scenarios numbered 2, 3, 4, 5, and 6 are included

    to ensure a more or less even distribution of shunt reactors, as

    previously explained. Scenario 7 is included for being the mostimportant considering overvoltages and generator reactive ab-

    sorption (capability curve). Scenarios 2 to 7 correspond to GT

    subsystem cases ( and ).

    The data set scenarios involve system topologies that may

    occur after load rejection and consider both and con-

    ditions (which have different equations and constraints), as

    previously described. One should note that many scenarios

    related to stages of line section energization are omitted, since

    the only critical phenomena at this stage of transmission cor-

    ridor build-up would be electromagnetic transients, which are

    outside the scope of this work and can only be captured in

    electromagnetic transient simulations.Theadopted scenarios for the test case are listed inTable I,

    which have a reduced number of network buses (last column

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    6 IEEE TRANSACTIONS ON POWER SYSTEMS

    TABLE IRESTORATIONSCENARIOS

    TABLE IICASE A: BUSREACTORS

    TABLE IIICASE A: SHUNT LINE REACTORS

    of table). The global OPF problem, for the test system of this

    paper with its and scenarios included, has 959 variables.

    A detailed description of the global OPF dimensions is given in

    Appendix C.

    Table II lists the shunt reactors that should be switched-on

    according to the results from the proposed methodology and [5],

    for a case referred to as CASE A. It is seen from Table IIthat

    the bus reactor results from the two methodologies are identical.

    Table IIIshows that in the proposed technique, a larger amount

    of line reactors were connected. Note the reactive powers of

    the shunt reactors are modeled as continuous variables in the

    OPF problem, a frequently used approximation, and the discretenature of these equipment is taken into account by setting the

    continuous solution to the nearest discrete reactor value once

    the OPF process has converged[19].

    Table IV presents the recommended maximum load to be

    supplied and the generator voltage settings computed by the

    proposed OPF method and[5]. The optimal generation voltage

    , obtained from the proposed methodology, was 0.98 pu, a

    value considerably higher than that reported in[5]. As a conse-

    quence, the maximum load in the GTL subsystem has increased

    to 234 MW, representing a gain of 44 MW.

    In practice, synchronous condensers (SCs) are not used in the

    early stages of restoration [20], due to transient stability con-straints and risk of self-excitation [21]. Therefore, the SC of

    Fig.5 was assumed disconnected in all simulations of this paper.

    TABLE IVGENERATIONVOLTAGE ANDMAXIMUMSUPPLIED LOAD

    TABLE VCASE B: BUS REACTORS

    TABLE VICASEB: SHUNT LINE REACTORS

    TABLE VIICASE C: BUS REACTORS

    TABLE VIIICASEC: SHUNT LINE REACTORS

    Results are also included for a case, referred to as CASE B,

    where the generation high-side voltage was fixed at 0.90 pu, so

    as to allow a better comparison with the recommendations from

    [5]. The CASE B results, in Tables V andVI, show that the

    proposed optimization method required 10.8 MVAr less reactors

    than the results reported in[5], while the supplied remote load

    was increased by 5%.Results are also included for Case C, a test case in which the

    temporary overvoltage limit was set at a reduced value, 1.15 pu

    at , leading to the adjustment of the generation voltage at

    0.95 pu and an amount of 231 MW as the recommended max-

    imum for the load to be picked up. It is seen from Tables VII and

    VIIIthat an extra end line reactor of 73.4 MVAr was switched

    on to keep the overvoltage below the specified limit.

    As expected, the constraints associated with the machine

    under-excitation capability curve were active in most cases.

    The CPU timings provided are for Matlab 6.5 on an Intel

    Pentium IV processor with a 2.66-Ghz clock and 2 Gb of RAM.

    The OPF solutions for cases A, B, and C took 82.14 s, 44.13s, and 118.8 s of CPU time, respectively. CASE B solved in

    less cpu time because the high-side voltage was kept fixed,

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    VIANAet al.: AN OPTIMAL POWER FLOW FUNCTION TO AID RESTORATION STUDIES OF LONG TRANSMISSION SEGMENTS 7

    TABLE IXCASE D: SENSITIVITY ANALYSIS

    eliminating therefore the need for the AVR regulating function.

    On the other hand, CASE C requires more cpu time to solve

    because the temporary overvoltage limit was reduced to 1.15

    turning the optimization problem more restrictive.

    V. SENSITIVITY ANALYSIS

    A sensitivity analysis was carried out to determine the op-

    timal number of black-start generating units needed to safely

    restore the subsystem. Ideally, the number of units should also

    be a decision variable of the OPF, but this would involve adding

    another term to the objective function in(1)and facing yet more

    problems related to the approximate modeling, by continuous

    variables, of some system variables which are actually of dis-

    crete nature.Table IXshows a summary of the results obtained

    when considering cases with 3, 4, 5, or 6 generating units (in a

    total of 8 unitssee data in theAppendix B) participating in the

    restoration process.

    The obtained results indicated that, for three generating units,

    the OPF did not converge even when all the shunt reactors were

    switched on. With 4 units dispatched and all shunt reactors

    switched on, the amount of picked up load turned out to be verylow. With 5 units dispatched, the number of shunt reactors was

    reduced and a considerable amount of load could be supplied.

    The last simulation considered 6 units dispatched and yielded

    a larger safety margin regarding the system voltages, with the

    results indicating a slightly smaller value for the maximum

    supplied load, since the generator voltage and the number of re-

    actors were reduced. However, since the paralleling of a larger

    number of units is always more time consuming in practice, the

    6-unit alternative appears to be excessive. Then, this sensitivity

    analysis showed that 5 is the most adequate number of gener-

    ation units to be paralleled in the present restoration example.

    This result is in agreement with operator instructions from

    practice[5], which of course were also based on results from

    dynamic simulations and electromagnetic transient studies.

    VI. CONCLUDINGREMARKS

    This paper presented an OPF-based methodology to deter-

    mine the optimal generation voltages and minimum shunt re-

    actor configuration for the safe restoration of a GT/GTL sub-

    system containing a long transmission segment. The recom-

    mended maximum value of remote-end load to be supplied is

    also determined. The shunt reactors are required so as to keep

    generators operating within their capability curves and limit the

    temporary as well as steady-state overvoltages at fundamental

    frequency for the chosen set of restoration scenarios.

    The OPF restoration function has specific modeling aspects

    and data requirements, such as the following.

    The generation high-side voltage is adjusted in the opti-

    mization process in such a way as to increase the recom-

    mended maximum value of the remote load to be supplied

    while minimizing the amount of shunt reactor compensa-

    tion.

    The set of chosen scenarios should reflect the sequential

    build-up of the GT subsystem in order to ensure a bal-

    anced distribution of shunt reactor compensation. Those

    subsystem configurations prone to the highest overvolt-

    ages following load rejection should be modeled as well.

    The maximum temporary overvoltages at fundamental fre-

    quency, occurring immediately following load rejection,

    are better estimated with the adoption of a voltage behind

    subtransient reactance model for the generator.

    The optimal results can be obtained from just a few sim-

    ulations. As a consequence, the operation planning staff

    saves valuable time that can be used to perform other vital

    analyses such as electromagnetic transient studies. A nextstep in this research will be assessing the impact of OPF

    tools in the reduction of the overall restoration time.

    The described results indicate the proposed methodology

    may become a valuable tool for aiding system restoration

    studies. Note that the OPF program optimizes the GTL

    problem subjected to GT and GTL constraints.

    APPENDIXA

    This Appendix presents the generator capability curves con-

    straints which were included in the proposed OPF formulation

    for subproblems and .Fig. 6shows the parts A, B, C, D,

    and E of capability curve, which are detailed as follows:

    Part A: Mechanical Source Limit:

    (19)

    Part B: Stator Current Limit:

    (20)

    Part C: Over Excitation Limit:

    (21)

    Part D: Under Excitation Limit:

    (22)

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    8 IEEE TRANSACTIONS ON POWER SYSTEMS

    Fig. 6. Generator capability curves.

    TABLE XGENERATORDATA

    TABLE XITRANSMISSION SYSTEM DATA

    Part E: Stability Limit:

    (23)

    APPENDIXB

    This Appendix presents the Restoration Test System data.

    Table Xshows the generator data. Generator MVA base is as-

    sumed to be equal to the nominal capacity. Finally, Table XI

    shows the transmission line data on a 100-MVA base.

    APPENDIXC

    This Appendix describes the dimension of the global OPF

    problem for the proposed restoration study. The dimension of

    the matrix W is obtained from the determination of all optimiza-

    tion variables for the test case presented inSection IV, as fol-

    lows:

    1) Instant

    Variables and : ,

    where :

    Variables and , where

    :

    Variables and :

    Variable , where :

    Variable , where :

    Generator capability variables [slack variable and

    for(19),(21)(23); and for (20)]:

    2) Instant

    Variables and

    , where

    and :

    Variables and

    :

    The global variables computed in and , de-

    scribed for the subproblem , are also included in the sub-

    problem .

    3) Instant

    Variables and

    :

    http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-http://-/?-
  • 5/21/2018 An Optimal Power Flow Function to Aid Restoration

    This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.

    VIANAet al.: AN OPTIMAL POWER FLOW FUNCTION TO AID RESTORATION STUDIES OF LONG TRANSMISSION SEGMENTS 9

    Variables and

    :

    Variables and

    :

    Generator capability variables [slack variable

    and , for (19),(21)(23); and

    , for(20)]:

    The global variables computed in and , describedfor the subproblem , are also included in the subproblem

    . Then, the total number of variables (nv) of the global OPF

    problem can be calculated as .

    REFERENCES

    [1] F. F. Wu and A. J. Monticelli, Analytical tools for power systemrestorationConceptual design,IEEE Trans. Power Syst., vol. 3, no.1, pp. 1026, Feb. 1988.

    [2] M. M. Adibi, Power System Restoration: Methodologies and Imple-mentation Strategies, 1st ed. New York: Wiley/IEEE Press, 2000.

    [3] F. R. M. Alves, A. P. Guarini, R. M. Henriques, J. A. P. Filho, N. Mar-tins, D. M. Falco, and P. Gomes, Changing paradigms for increasedproductivity in power system restoration studies: The Brazilian ISO

    experience, inCigre Session 42, Paris, France, 2008, C2-109 paper.[4] R. Podmore, J. C. Giri, M. P. Gorenberg, J. P. Britton, and N. M.

    Peterson, An advanced dispatcher training simulator, IEEE Trans.Power App. Syst., vol. PAS-101, no. 1, pp. 1725, Jan. 1982.

    [5] P. Gomes, A. C. S. Lima, and A. P. Guarini, Guidelines for powersystem restoration in the Brazilian system, IEEE Trans. Power Syst.,vol. 19, no. 2, pp. 11591164, May 2004.

    [6] S. Wunderlich, M. M. Adibi, R. Fischl, and C. O. D. Nwankpa, Anapproach to standing phase angle reduction,IEEE Trans. Power Syst.,vol. 9, no. 1, pp. 470476, Feb. 1994.

    [7] N. Martins, E. J. Oliveira, W. C. Moreira, J. L. R. Pereira, and R. M.Fontoura, Redispatch to reduce rotor shaft impacts upon transmissionloop closure, IEEE Trans. Power Syst., vol. 23, no. 2, pp. 592600,May 2008.

    [8] ONSBrazilian System Operator, Guidelines and Criteria for Elec-trical Studies, item 10, sub-module 10.11 (in Portuguese). [Online].

    Available: http://www.ons.org.br/ons/procedimentos/index.htm.[9] ONSBrazilian System Operator, Guidelines and Criteria for Elec-trical Studies, item 8.5, sub-module 23.3 (in Portuguese). [Online].Available: http://www.ons.org.br/ons/procedimentos/index.htm.

    [10] Y. Ruan, R. Yuan, X. Tang, Z. Zhang, and B. Song, A new methodfor control of sustained over-voltage during the early stages of powersystem restoration, in Proc. Power and Energy Engineering Conf.,2009, pp. 15, Asia-Pacific.

    [11] M. M. Adibi, R. W. Alexander, and B. Avramovic, Overvoltage con-trol during restoration, IEEE Trans. Power Syst., vol. 7, no. 4, pp.14641470, Nov. 1992.

    [12] Y. Hou, C.-C. Liu, P. Zhang, and K. Sun, Constructing power systemrestoration strategies,in Proc. Int. Conf. Electrical and Electronics

    Engineering, Bursa, Turkey, 2009, pp. 813.[13] S. Granville, Optimal reactive dispatch through interior point

    methods,IEEE Trans. Power Syst., vol. 9, no. 1, pp. 136146, Feb.1994.

    [14] F. R. M. Alves, A. P. Guarini,and P. Gomes, Restoration studies, inCigre Session 44, Paris, France, 2012, SC-C2 paper.

    [15] N. G. Bretas, A. C. P. Martins, L. F. C. Alberto, and R. B. L. Guedes,Static simulationof voltage collapse considering the operational limitsof the generators, in Proc. IEEE Power Engineering Society General

    Meeting, Toronto, ON, Canada, 2003, vol. 4, pp. 26522658.[16] P.-A. Lof, G. Anderson, and D. J. Hill, Voltage dependent reactive

    power limits for voltage stability studies,IEEE Trans. Power Syst.,vol. 10, no. 1, pp. 220228, Feb. 1995.

    [17] N. E. Nilsson and J. Mercurio, Synchronous generator capabilitycurve testing and evaluation, IEEE Trans. Power Del., vol. 9, no. 1,pp. 414424, Jan. 1994.

    [18] Z. S. Machado, Jr., G. N. Taranto, andD. M. Falco,An optimal powerflow formulation including detailed modeling of generators, in Proc.

    IEEE P ES Po wer S ystems Conf. Expo.PSCE, New York, 2004.[19] P. J. Macfie, G. A. Taylor, M. R. Irving, P. Hurlock, and H. B. Wan,

    Proposed shunt rounding technique for large security-constrained lossminimization,IEEE Trans. Power Syst., vol. 25,no. 3, pp.14781485,Aug. 2010.

    [20] P. Czech and G. Scott, Application of static var compensators onHydro-Qubec EHV system, inIEEE PES Application of Static VarSystems forDynamic System Performance, publication87TH 0187-5-

    PWR, 1987, pp. 5459.[21] M. Adibi, N. Martins, and E. Watanabe, The impact of FACTS

    and other new technologies on power system restoration dynamics,in Proc. IEEE Power Engineering Society General Meeting, Min-neapolis, MN, 2010.

    Eduardo Martins Viana received the B.Sc. degree from the Federal Univer-sity of Viosa, Viosa, Brazil, in 2005 and the M.Sc. d egree from the FederalUniversity of Juiz de Fora, (UFJF), Juiz de Fora, Brazil, in 2008.

    His research interests include power system optimization and control of elec-trical power systems.

    Edimar Jos de Oliveira (M11) received the B.Sc. degree from the FederalUniversity of Juiz de Fora (UFJF), Juiz de Fora, Brazil, in 1984, the M.Sc. de-gree from the Federal University of Uberlndia, Uberlndia, Brazil, in 1993,and the D.Sc. degree from the Federal Univers ity of Itajub, Itajub, Brazil, in1998.

    Since 1989, he has been with the Electrical Engineering Department of UFJF.His main interests include stability analysis, power economics, optimization,

    and control of electrical power systems.

    Nelson Martins (SM91F98) received the B.Sc. degree in electrical engi-neering from the University of Brasilia, Brazil, in 1972 and the M.Sc. and Ph.D.degrees from the University of Manchester Institute of Science a nd Technology,Manchester, U.K., in 1974 and 1978, respectively.

    He works at CEPEL, Rio de Janeiro, Brazil, in the development of methodsand computer tools for power system analysis, with emphasis on dynamics andcontrol.

    Jos Luiz R. Pereira(M85) received the B.Sc. degree from the Federal Uni-versity of Juiz de Fora, Juiz de Fora, Brazil, in 1975, the M.Sc. degree fromCOPPEFederal University of Rio de Janeiro, Rio de Janeiro, Brazil, in 1978,and the Ph.D. degree from the University of Manchester Institute of Science andTechnology, Manchester, U.K., in 1988.

    From 1977 to 1992, he was with the Federal University of Rio de Janeiro.Since 1993, he has been with the Electrical Engineering Department of the Fed-eral University of Juiz de Fora. His research interests include online security,optimization, and control of electrical power systems.

    Leonardo Willer de Oliveirareceived the B.Sc. and M.Sc. degrees from theFederal University of Juiz de Fora, Juiz de Fora, Brazil, in 2003 and 2005, re-spectively, and the the D.Sc. degree from COPPEFederal University of Riode Janeiro, Rio de Janeiro, Brazil, in 2009.